2026 Library Salient Characteristics.pdf
PDF 73 KB Posted
- Attached to
- Library Inventory Storage
- Solicitation number
- FA560626QA041
About this file
This document is a Performance Work Statement outlining contractor requirements for a library relocation project. The contractor must pack, transport, and store approximately 27,000 library items totaling 230 cubic meters of materials, then unpack and place items in designated library locations. The contractor is responsible for providing all necessary labor, equipment, tools, dollies, carts, and packing supplies to complete the work. Materials must be packed using methods appropriate to item type to prevent damage during handling, transport, storage, and unpacking. The contractor must maintain detailed itemized inventory records identifying packed items, container numbers, and destination locations to support retrieval and re-shelving operations.
Storage must occur in a secure environment protecting materials from loss, damage, dust, moisture, pests, and unauthorized access. All transit must utilize fully enclosed commercial moving vehicles such as box trucks or vans; open-bed transport is prohibited. Materials must be returned in organized condition to facilitate efficient shelving and use. The contractor must complete packing and removal of all items no later than August 15, 2026, and finish return and unpacking operations by September 25, 2026. The contractor must possess the labor force, equipment, and facility footprint to handle the simultaneous packing, transport, and storage of the full 230 cubic meter volume.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026 Library SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• Pack, label, and protect all library contents. The contractor shall pack library materials, equipment, and related contents using methods and materials appropriate to the item type, to prevent damage during handling, transport, storage, and unpacking.
• Must possess the labor force, equipment, and facility footprint to pack, transport, and store 230 cubic meters (approximately 27,000 library items and assorted materials) simultaneously.
• Maintain inventory control. The contractor shall create and maintain an itemized inventory or packing list that identifies packed items, carton or container numbers, and destination locations sufficient to support retrieval and re-shelving.
• Provide secure storage. The contractor shall store contents in a secure environment that protects materials from loss, damage, dust, moisture, pests, and unauthorized access.
• Unpack and place items by location. The contractor shall unpack materials and place them in designated library spaces or staging areas as directed by the Government.
• Provide labor and equipment necessary for the move. The contractor shall furnish all labor, tools, dollies, carts, packing supplies, and other equipment needed to complete the work.
• Must utilize fully enclosed commercial moving vehicles (box trucks or vans) to guarantee protection from weather and environmental elements during transit. Open-bed transport is strictly prohibited.
• Return materials in organized condition. The contractor shall ensure items are placed so they can be efficiently shelved, shelved back, or otherwise made ready for use after unpacking.
• Adhere to required time frame. The contractor shall ensure that packing and removal of items is concluded NLT August 15, 2026. Return and unpacking of items shall be concluded by September 25, 2026.