2026-DPW-007 Public Safety Complex Roof Replacement_PrevailingWage.pdf
PDF 720 KB Posted
- Attached to
- Roof Replacement at Public Safety Complex
- Solicitation number
- BD-25-1729-WNWBY-WNWBY-121135
- Issued by
- Essex County, Ocean Grove CDP, Massachusetts
About this file
This document is an Invitation for Bid (IFB) issued by the Town of West Newbury, Massachusetts for a Public Safety Complex Roof Replacement project (Contract #2026-DPW-007). The project involves removing existing roofing and replacing it with Drexell Metal Roofing Systems or an equivalent, covering approximately 7,000 square feet at 401 Main Street. The bid response deadline is Thursday, October 9th, 2025 at 10:00 A.M., with a mandatory site visit scheduled for Tuesday, September 30th, 2025 at 9:00 A.M. The contract term is set to expire on June 30, 2026, with work to be completed by that date. Questions from potential bidders must be submitted by Friday, October 3rd, 2025 at 4:00 P.M.
The project is a prevailing wage contract requiring weekly certified payroll reports and compliance with Massachusetts State Building Code for Public Buildings. Bidders must submit a 5% bid deposit, performance and payment bonds, and various certifications including OSHA training documentation. The contract will be awarded to the most responsible and responsive bidder offering the best price, following Massachusetts General Laws Chapter 149. Insurance requirements include general liability coverage of $1,000,000 per occurrence and workers' compensation insurance. The project involves full removal of existing roofing, inspection and repair of roof sheathing, and installation of a complete metal roofing system according to manufacturer specifications, with the town reserving the option to choose between snap-lock or double-lock panel systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LegalNoticeAd_2026-DPW-007.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF WEST NEWBURY
West Newbury – Public Safety Complex Roof Replacement – 2026-DPW-007 Invitiation for Bids – Building Construction M.G.L. c. 149
Invitation for Bid (IFB) Roof Replacement at the Public Safety Complex
IFB # 2026-DPW-007
IFB Response Deadline: Thursday, October 9th, 2025 at 10:00 A.M.
Mandatory Site Visit: Tuesday, September 30th, 2025 at 9:00 A.M.
Questions Submittal Deadline: Friday, October 3rd, 2025 at 4:00 P.M.
Bids Due:
Thursday, October 9th, 2025 at 10:00 A.M. EST. Time
At
Town Clerk’s Office
381 Main Street
West Newbury, Massachusetts 01985
Attachments Att. A: Bid Form Att. B: Performance and Payment Bond Att. C: Certifications Required by Law Att. D: Certificate of OSHA Training Att. E: Bidder Business Reference Form Att. F: Aerial Image of Location Att. G: Prevailing Wage Schedule
Invitiation for Bids – Building Construction M.G.L. c. 149
THIS AGREEMENT made by and between the TOWN OF WEST NEWBURY, a municipal corporation duly organized under the laws of Massachusetts and having a usual place of business at 381 Main Street, West Newbury, Massachusetts, 01985, hereinafter referred to as the “TOWN”, and the “CONTRACTOR”.
WITNESSETH:
WHEREAS, the TOWN is conducting an Invitation for Bid (IFB) from CONTRACTORS to submit proposals for the West Newbury Public Safety Complex Roof Replacement Project (located at 401 Main Street, West Newbury, MA 01985) called the “WORK” and WHEREAS, the “CONTRACTOR” submitted a proposal to perform the WORK required to complete the WORK on or before Thursday, October 9th, 2025 at 10:00 A.M EST.; and
Whereas, the TOWN as authorized by its Selectboard (Awarding Authority) and per M.G.L has authorized the appointed Chief Procurement Officer (CPO) to enter into this agreement with the CONTRACTOR on behalf of the TOWN; and
Now therefore the TOWN and the CONTRACTOR (sometimes collectively referred to herein as the “Parties”) covenant and agree as follows:
The CONTRACTOR shall provide the TOWN all of the WORK described in the Scope of Work, attached hereto.
In addition to said Scope of Work, the parties agree as follows:
1. INVITATION FOR BID (IFB) Submittal Instructions;
This IFB shall be submitted on or before 10:00 A.M EST on Thursday, October 9th, 2025 in a sealed envelope and hand delivered or mailed to;
West Newbury Town Clerk’s Office 381 Main Street
West Newbury, MA 01985
The front of the sealed enveloped must be clearly marked “IFB #2026-DPW-007 Roof Replacement.”
The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30-days. Saturdays, Sundays and legal holidays excluded, after the bid submission date.
The TOWN reserves the right to waive any informalities to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the TOWN.
2. QUESTIONS:
Questions concerning this IFB must be submitted via e-mail ONLY to: Procurement@wnewbury.org by Friday, October 3rd, 2025 at 4PM EST. Responses will be emailed to all bidders on record as having requested the IFB in the form of an addendum.
3. TIME OF THE ESSENCE:
The CONTRACTOR shall complete the WORK described in the Scope of Work in accordance with the Contract Documents. The WORK must be completed by June 30, 2026. The start date may be negotiated with the TOWN and adjusted only upon agreement from the TOWN.
This contract shall expire on June 30, 2026.
4. RULES OF CONTRACT AWARD:
This contract will be awarded per M.G.L. c. 149 and awarded to one Contractor who is the most responsible and responsive bidder offering the best price.
mailto:Procurement@wnewbury.org
Invitiation for Bids – Building Construction M.G.L. c. 149
To receive consideration, bids shall be submitted on the appropriate forms no later than the above date and time for the opening. Proposals must be accompanied by a bid deposit in the amount of FIVE PERCENT (5%) of the total bid price in the form of a bid bond or certified treasurer’s or cashier’s check issued by a responsible bank or trust company.
This solicitation is being conducted in accordance with the provisions of Massachusetts General Laws, c. 149, and all contracts must be strictly awarded in accordance with the requirements of this Act. The Town of West Newbury reserves the right to reject any or all bids which are not responsible and/or responsive, in whole or in part, as deemed in the best interest of the Town, in accordance with Massachusetts General Laws.
5. CHANGE ORDERS AND ADJUSTMENTS:
A. No deviation shall be made to the Scope of Work unless authorized by a written change order from the Awarding Authority, which change order shall include an equitable adjustment of the contract price agreed to between the Awarding Authority and the CONTRACTOR, if any. Under no circumstances may a change order be authorized orally.
B. Change orders may be authorized on behalf of the Awarding Authority by the Chief Procurement Officer of the Town of West Newbury.
6. PAYMENT PROCEDURES AND CONTRACT VALUE:
Payment to the CONTRACTOR shall be due and payable upon completion of the project as described in the Scope of Work to the complete satisfaction of the TOWN.
The contract value of this contract shall not exceed the dollar amount submitted in the Contractors Price Proposal hereto this agreement unless a change order has been approved by the TOWN prior to the additional work.
7. APPLICABLE PROVISIONS OF THE LAW:
This is a Massachusetts contract and shall be construed and interpreted according to the laws of the Commonwealth of Massachusetts. To the extent that any of the provisions contained herein are inconsistent with the requirements of the Massachusetts General Laws or other applicable law, the requirements of applicable provisions of law shall control and any such inconsistent provision or provisions hereof shall be deemed modified or stricken to the extent required to comply with the law.
8. INDEPENDENT CONTRACTOR:
The CONTRACTOR acknowledges and agrees that it is acting as an independent CONTRACTOR for all work and services rendered pursuant to this Agreement, and shall not be considered an employee or agent of the TOWN for any purpose.
9. INDEMNIFICATION:
The CONTRACTOR shall indemnify, defend, and hold the TOWN harmless from and against any and all claims, demands, liabilities, actions, causes of actions, costs and expenses, including attorney’s fees, arising out of the CONTRACTOR's breach of this Agreement or the negligence or misconduct of the CONTRACTOR, or the CONTRACTOR's agents or employees.
10. INSURANCE:
A. The CONTRACTOR shall obtain and maintain in full force and effect during the term of this Agreement the insurance coverage in companies licensed to do business in the Commonwealth of Massachusetts, and acceptable to the TOWN, as set forth below:
Invitiation for Bids – Building Construction M.G.L. c. 149
General Liability Bodily Injury Liability $1,000,000 per occurrence Property Damage Liability $1,000,000 per occurrence
Or combined single limit $1,000,000 per occurrence
Workers’ Compensation Insurance Coverage for all employees in accordance with Massachusetts General Laws, per state statutory requirements.
B. All policies shall identify the TOWN as an additional insured (except Workers' Compensation) and shall provide that the TOWN shall receive written notification at least 30 days prior to the effective date of any amendment or cancellation. Certificates evidencing all such coverages shall be provided to the TOWN upon the execution of this Agreement. Each such certificate shall specifically refer to this Agreement and shall state that such insurance is as required by this Agreement. Failure to provide or to continue in force such insurance shall be deemed a material breach of this Agreement and shall be grounds for immediate termination.
11. TERMINATION:
A. Termination for Cause. If at any time during the term of this Agreement the TOWN determines that the
CONTRACTOR has breached the terms of this Agreement by negligently or incompetently performing the work, or any part thereof, or by failing to perform the work in a timely fashion, or by failing to perform the work to the satisfaction of the TOWN, or by not complying with the direction of the TOWN or its agents, or by otherwise failing to perform this Agreement in accordance with all of its terms and provisions, the TOWN shall notify the CONTRACTOR in writing, by mail or e-mail, stating therein the nature of the alleged breach and directing the CONTRACTOR to cure such breach within ten (10) days. The CONTRACTOR specifically agrees that it shall indemnify and hold the TOWN harmless from any loss, damage, cost, charge, expense or claim arising out of or resulting from such breach regardless of its knowledge or authorization of the actions resulting in the breach. If the CONTRACTOR fails to cure said breach within ten (10) days, the TOWN may, at its election at any time after the expiration of said ten (10) days, terminate this Agreement by giving written notice, by mail or e-mail, thereof to the CONTRACTOR specifying the effective date of the termination. Upon receipt of said notice, the CONTRACTOR shall cease to incur additional expenses in connection with this Agreement. Upon the date specified in said notice, this Agreement shall terminate. Such termination shall not prejudice or waive any rights or action which the TOWN may have against the CONTRACTOR up to the date of such termination, and the CONTRACTOR shall be liable to the TOWN for any amount which it may be required to pay in excess of the compensation provided herein in order to complete the work specified herein in a timely manner. Upon such termination, the CONTRACTOR shall be entitled to compensation for all satisfactory work completed prior to the termination date, as determined by the TOWN.
B. Termination for Convenience. The TOWN may terminate this Agreement at any time for convenience by providing the CONTRACTOR written notice, by mail or e-mail, specifying therein the termination date which shall not be sooner than ten (10) days from the issuance of said notice. Upon receipt of said notice, the CONTRACTOR shall cease to incur additional expenses in connection with this Agreement. Upon such termination, the CONTRACTOR shall be entitled to compensation for all satisfactory work completed prior to the termination date, as determined by the TOWN, such payment not to exceed the fair value of the services provided hereunder.
Invitiation for Bids – Building Construction M.G.L. c. 149
12. CONTRACT DOCUMENTS:
The Contract Documents consist of this Agreement, Bid Form, Performance and Payment Bonds, Signature Page for Certifications Required by Law, Signature Page for Certification of OSHA Training, Reference List, Aerial Image of Location and the Prevailing Wage Sheet.
13. WORKMANSHIP WARRANTY:
The CONTRACTOR shall warranty the workmanship for 12-months. Any failure in the WORK shall be repaired or replaced by the CONTRACTOR at no cost to the TOWN within 30-days of notification. The warranty shall start immediately after the final TOWN acceptance and payment issuances.
14. WAGE RATES:
This is a prevailing wage contract. The Contractor must submit Weekly Certified Payroll Reports and a Weekly Statement of Compliance.
https://www.mass.gov/doc/a-guide-to-prevailing-wage-for-contractors-on-public-works-projects/download
Full compliance with Federal, State and Municipal Wage Laws is required of all work done for the Town of West Newbury. Minimum Wage Rates as determined by the Commissioner of the Department of Labor and Industries under the provision of M.G.L., Chapter 149, Section 26 to 27D, as amended, apply to this project. It is the responsibility of the Contractor, before bid opening to request, if necessary, any additional information on Prevailing Wage Rates for those tradespeople who may be employed for the proposed work under this contract.
Prevailing Wage Rates 20250916135631 are applicable to this project. A weekly certified payroll submittal shall be required of the successful bidder in accordance with MGL C149, S27B. No payments will be made by the Town until all payroll information necessary for the Town to determine compliance with prevailing wage law requirements for the time period of the payment request has been submitted.
https://www.mass.gov/doc/a-guide-to-prevailing-wage-for-contractors-on-public-works-projects/download
Invitiation for Bids – Building Construction M.G.L. c. 149
SCOPE OF WORK
PUBLIC SAFETY COMPLEX ROOF REPLACEMENT
TOWN OF WEST NEWBURY
1.0 INTRODUCTION:
The Town of West Newbury is seeking one qualified Contractor to perform work of replacing the roof at the Public Safety Complex located at 401 Main Street, West Newbury, MA 01985.
Estimated total quantity of the finished area(s) is 7000 square feet.
The Contractor shall provide all labor, materials, equipment, and supervision necessary to remove and replace two large asphalt roof areas and turret with Drexell Metal Roofing Systems (or an equivalent system) and Polyglass materials. Work includes full removal of existing roofing, inspection and repair of roof sheathing, and installation of a complete metal roofing system per manufacturer’s specifications. All materials and adhesives must comply with the Massachusetts State Building Code for Public Buildings. The Contractor shall possess all required licenses and shall be responsible for obtaining and paying for all permits necessary to perform and complete the work.
I. Demolition and Removal
a. Strip all roofing materials from the designated roof sections, including but not limited to: shingles, flashing, nails, trim, and metal.
b. Properly dispose of all roofing debris off-site in compliance with local regulations.
II. Roof Deck Preparation
a. Inspect entire roof deck after removal.
b. Re-nail any loose roof sheathing as required.
c. Replace any rotted or damaged sheathing with materials of equal quality and dimension.
III. Underlayment Installation
a. Install 100% Polystick XFR fire-resistant self-adhered underlayment (or an equivalent product) over all prepared roof deck surfaces, ensuring complete coverage and watertight installation.
IV. Flashing and Trim Installation
a. Install drip edge along all fascia trim.
b. Install gable trim up the rakes.
c. At ridge lines, install CFR trim pieces on both sides of the roof.
d. Vented or unvented CFR trim to be used depending on the current type of installation in the building.
Invitiation for Bids – Building Construction M.G.L. c. 149
e. Install ridge cap trim pieces along the entire ridge, covering CFR components.
V. Metal Roofing Installation
a. Install 20" wide by 1-1/2" high metal panels per manufacturer’s specifications.
b. Panels to be installed using clips and screws to ensure proper fastening and alignment.
c. Panel system shall be either snap-lock or double-lock type, at the discretion of the Town.
VI. Quality and Standards
a. All work must conform to manufacturer specifications for Drexell Metal Roofing Systems (or approved equivalent).
b. Installation shall comply with applicable state and local building codes.
c. Contractor shall provide all manufacturer warranties for installed products as well as a standard workmanship warranty.
VII. Options / Allowances
a. The Town reserves the option to select between snap-lock or double-lock panel systems prior to installation.
2.0 SITE WALK
There will be a mandatory site walk on Tuesday, September 30th at 9:00 A.M EST. GPS location – 401 Main Street, West Newbury, MA 01985.
3.0 HOURS OF PERFORMANCE:
A. Normal business hours of the Department of Public Works is 7:00 A.M to 3:00 P.M Monday- Friday.
Invitiation for Bids – Building Construction M.G.L. c. 149
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and year written below.
Executed this _________________________ day of ___________________________, 2025
The Town of West Newbury, by Submitted and agreed upon by the CONTRACTOR, Katelyn Barker Name (signature) Chief Procurement Officer
Printed Name: _____________________________
Title: ____________________________________
Company Name: ___________________________
Phone Number: ____________________________
E-Mail: ___________________________________
CERTIFICATION PURSUANT TO M.G.L. CHAPTER 44 SECTION 31C
The undersigned hereby certifies, pursuant to M.G.L. Chapter 44 section 31C, that an appropriation in the amount of this contract is available.
Jennifer Walsh Date Town Accountant
Invitiation for Bids – Building Construction M.G.L. c. 149
Attachment A – Bid Form The CONTRACTOR shall provide the TOWN all of the WORK (including labor, materials and equipment) described in the Scope of Work and specified in this contract at the fix lump sum of;
Bid amount in numbers: $_______________________________________________________
Bid amount in words: ___________________________________________________________
Name of Bidder: _______________________________________________________________
COMPLETE AND SIGN BELOW:
Authorized Person’s Signature Date
Print Name & Title of Signatory
Name of Contractor/Vendor
Corporate seal, if applicable
Invitiation for Bids – Building Construction M.G.L. c. 149
Attachment B: Performance and Payment Bond
CONSTRUCTION PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: That we ___________________________________
(Name of CONTRACTOR) a ___________________________________________ hereinafter called “Principal” and (Corporation, Partnership, Joint Venture or Individual) _______________________________of _________________________________, State of
(Surety) hereinafter called the "Surety" and licensed by the State Division of Insurance to do business under the laws of the Commonwealth of Massachusetts, are held and firmly bound to the TOWN of West Newbury, Massachusetts, 01985 hereinafter called "TOWN", in the sum of;
____________________________________________ Dollars ($______________________) (100% of the bid price of here within contract) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain contract with the TOWN, dated the __________ day of _________________, 20___ (the “Construction Contract”), for the construction described as follows:
Public Safety Complex Roof Replacement – Contract # 2026-DPW-007
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of the Construction Contract during the original term thereof, and any extensions thereof which may be granted by the TOWN, with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under the Construction Contract, and shall fully indemnify and save harmless the TOWN from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the TOWN all outlay and expense which the TOWN may incur in making good any default, then this obligation shall be void;
otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the Surety’s obligation under this Bond shall arise after (1) the
TOWN has declared the Principal in default of the Construction Contract or any provision thereof or
(2) has declared that the Principal has failed, or is otherwise unable or unwilling, to execute the WORK consistent with, and in conformance to, the Construction Contract (collectively referred to as a “CONTRACTOR Default”). The determination of a CONTRACTOR Default shall be made solely by the TOWN. The TOWN need not terminate the Construction Contract to declare a CONTRACTOR Default or to invoke its rights under this Bond.
Invitiation for Bids – Building Construction M.G.L. c. 149
When the Surety’s obligation under this Bond arises, the Surety, at its sole expense and at the consent and election of the TOWN, shall promptly take one of the following steps: (1) arrange for the Principal to perform and complete the WORK of the Construction Contract: (2) arrange for a CONTRACTOR other than the Principal to perform and complete the WORK of the Construction Contract; (3) reimburse the TOWN, in a manner and at such time as the TOWN shall decide, for all costs and expenses incurred by the TOWN in performing and completing the WORK of the Construction Contract. Surety will keep TOWN reasonably informed of the progress, status and results of any investigation of any claim of the TOWN.
If the Surety does not proceed as provided in this Bond with due diligence and all deliberate speed, the Surety shall be deemed to be in default of this Bond, and the TOWN shall be entitled to promptly enforce any remedy available to the TOWN notwithstanding any defenses or objections raised by the Principal.
After the Surety’s obligation under this Bond arises, the Surety is obligated, to the limit of the amounts of this Bond, for (1) the correction of defective WORK and completion of the Construction Contract; (2) additional design, professional services, and legal costs, including attorneys’ fees, resulting from the CONTRACTOR Default or from the default of the Surety under this Bond; (3) any additional WORK beyond the Construction Contract made necessary by the CONTRACTOR Default or default of the Surety under this Bond; (4) indemnification obligation of the Principal, if any, as provided in the Construction Contract; and (5) liquidated damages as provided in the Construction Contract, or if none are so specified, actual and foreseeable consequential damages resulting from the CONTRACTOR Default or default of the Surety under this Bond.
Any proceeding, legal or equitable, under this Bond shall be instituted in any court of competent jurisdiction in the Commonwealth of Massachusetts.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Construction Contract or to the WORK to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Construction Contract or to the WORK or to the specifications.
IN WITNESS WHEREOF, this instrument is executed in ( ) counterparts, each one of which shall be deemed an original, this the day of , 2025.
ATTEST:
Principal
By (Principal Secretary)
(Address – Zip Code)
Invitiation for Bids – Building Construction M.G.L. c. 149
______________________________ (SEAL)
Witness as to Principal
(Address-Zip Code)
Surety
______________________________ By
(Attorney-in-Fact)
Witness as to Surety
(Address-Zip Code)
NOTE: Date of Bond must not be prior to date of Contract.
If CONTRACTOR is a Partnership, all partners should execute Bond.
Invitiation for Bids – Building Construction M.G.L. c. 149
CONSTRUCTION PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: That we _________________________ a ____________________________________________ (Name of CONTRACTOR) (Corporation, Partnership, Joint Venture or Individual) hereinafter called "Principal" and ______________________________ of _________________, (Surety)
State of ________________________ hereinafter called the “Surety” and licensed by the State
(TOWN and State)
Division of Insurance to do business under the laws of the Commonwealth of Massachusetts, are held and firmly bound to the TOWN of _________________, Massachusetts, hereinafter called "TOWN", in the sum of;
______________________________________________ Dollars ($___________________) (100% of the bid price of here within contract) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain contract with the TOWN, dated the day of __________________, 2025, for the construction described as follows:
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such WORK, and all insurance premiums on said WORK, and for all labor, performed in such WORK whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the WORK to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of this contract or to the WORK or to the specifications.
PROVIDED, FURTHER, that no final settlement between the TOWN and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in ____ ( ) counterparts, each one of which shall be deemed an original, this the _________ day of _____________________, 2025.
Surety
______________________________ By
(Attorney-in-Fact)
Witness as to Surety
(Address-Zip Code)
NOTE: Date of Bond must not be prior to date of Contract.
If CONTRACTOR is a Partnership, all partners should execute Bond.
Attachment C – Certifications Required by Law You must COMPLETE and SIGN the following certifications. You must also print, at the bottom of this page, the name of the contractor for whom these certifications are submitted.
STATEMENT OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A(b), I, the undersigned, authorized signatory for the below named contractor, do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts relating to taxes, reporting of employees and contractors, and withholding and remitting child support
NON-COLLUSION CERTIFICATE
The undersigned certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this paragraph the word “person” shall mean and natural person, joint venture, partnership, corporation or other business or legal entity.
COMPLETE AND SIGN BELOW:
Authorized Person’s Signature Date
Print Name & Title of Signatory
Invitiation for Bids – Building Construction M.G.L. c. 149
Attachment D: Certificate of OSHA Training In Accordance with M.G.L. C.30, S.39S;
The undersigned hereby certifies that within _____________________________________ (Name of Company), all employees and any sub-contractors to be employed at the Worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10-hours in duration at the time the employee begins WORK and who shall furnish documentation of successful completion of said course with the first payroll report for each employee and that all employees to be employed in the WORK subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10-hours in duration.
COMPLETE AND SIGN BELOW:
Authorized Person’s Signature Date
Print Name & Title of Signatory
Invitiation for Bids – Building Construction M.G.L. c. 149
Attachment E – Bidder Business Reference Form (Three Required)
Bidder Company Name: ________________________________________________
REFERENCE #1
Customer Name Contact Name Contact Address Contact Telephone # Contact E-Mail Installation Date Brief Description of Work Completed
REFERENCE #2
Contact Name Contact Address Contact Telephone # Contact E-Mail Installation Date
REFERENCE #3
Contact Name Contact Address Contact Telephone # Contact E-Mail Installation Date
Invitiation for Bids – Building Construction M.G.L. c. 149
Attachment F: Aerial Image of Location
Highlighted area is the location of the Public Safety Complex at 401 Main Street, West Newbury, MA 01985.
Invitiation for Bids – Building Construction M.G.L. c. 149
Bidder Checklist
Required for bid submittals:
o Signature page from Town of West Newbury contract agreement (page 8) o Attachments A-F o Bid deposit totaling 5% of the total bid o W9 o Bonds o 50% payment bond if bid is $50,000-$150,000. 100% payment bond if bid is over $150,000 o No performance bond required if bid is under $150,000; 100% performance bond if bid is over $150,000
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: Town of West Newbury City/Town: WEST NEWBURY
Contract Number: 2026-DPW-007
Description of Work: Remove existing roof and replace with metal roofing
Job Location: 401 Main Street, West Newbury, MA 1985
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, the awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. The updated wage schedule must be provided to all contractors, including general and sub-contractors, working on the construction project.
This annual update requirement is generally not applicable to 27F “rental of equipment” contracts. For such contracts, the prevailing wage rates issued by DLS shall remain in effect for the duration of the contract term. However, if the prevailing wage rate sheet issued does not contain wage rates for each year covered by the contract term, the Awarding Authority must request updated rate sheets from DLS and provide them to the contractor to ensure the correct rates are being paid throughout the duration of the contract. Additionally, if an Awarding Authority exercises an option to renew or extend the contract term, they must request updated rate sheets form DLS and provide them to the contractor.
This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request Number” on all pages of this schedule.
An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.
The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or a sub-contractor.
Apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentices must keep their apprentice identification card on their persons during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DAS regardless of whether they are registered with another federal, state, local, or private agency must be paid the journeyworker's rate.
Every contractor or subcontractor working on the construction project must submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee’s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. For a sample payroll reporting form go to http://www.mass.gov/dols/pw.
Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617)
626-6953.
Contractors must obtain the wage schedules from awarding authorities. Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties.
Employees not receiving the prevailing wage rate set forth on the wage schedule may file a complaint with the Fair Labor Division of the office of the Attorney
General at (617) 727-3465.
Page 1 of 36Wage Request Number: 20250916135631Issue Date: 09/17/2025
Att. G
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2025 $40.95 $15.57 $20.17 $0.00 $0.00 $76.69
12/1/2025 $40.95 $15.57 $21.78 $0.00 $0.00 $78.30
1/1/2026 $40.95 $16.17 $21.78 $0.00 $0.00 $78.90
6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90
12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64
(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24
6/1/2025 $41.02 $15.57 $20.17 $0.00 $0.00 $76.76
12/1/2025 $41.02 $15.57 $21.78 $0.00 $0.00 $78.37
1/1/2026 $41.02 $16.17 $21.78 $0.00 $0.00 $78.97
6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97
12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71
(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31
6/1/2025 $41.14 $15.57 $20.17 $0.00 $0.00 $76.88
12/1/2025 $41.14 $15.57 $21.78 $0.00 $0.00 $78.49
1/1/2026 $41.14 $16.17 $21.78 $0.00 $0.00 $79.09
6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09
12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83
(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
1/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
6/1/2025 $41.09 $9.90 $9.25 $9.11 $0.00 $69.35
12/1/2025 $42.47 $9.90 $9.25 $9.11 $0.00 $70.73
6/1/2026 $43.91 $9.90 $9.25 $9.11 $0.00 $72.17
12/1/2026 $45.35 $9.90 $9.25 $9.11 $0.00 $73.61
6/1/2027 $46.80 $9.90 $9.25 $9.11 $0.00 $75.06
12/1/2027 $48.25 $9.90 $9.25 $9.11 $0.00 $76.51
6/1/2028 $49.75 $9.90 $9.25 $9.11 $0.00 $78.01
AIR TRACK OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $51.25 $9.90 $9.25 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $41.09 $9.90 $9.25 $9.21 $0.00 $69.45
12/1/2025 $42.47 $9.90 $9.25 $9.21 $0.00 $70.83
6/1/2026 $43.91 $9.90 $9.25 $9.21 $0.00 $72.27
AIR TRACK OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $45.35 $9.90 $9.25 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2025 $43.80 $14.50 $4.30 $6.75 $0.00 $69.35ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
12/1/2025 $44.80 $14.50 $4.30 $6.75 $0.00 $70.35
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
ASPHALT RAKER
LABORERS
LABORERS - ZONE 2
Page 2 of 36Wage Request Number: 20250916135631Issue Date: 09/17/2025
Supplemental
Unemployment Total Rate
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $9.90 $9.25 $9.21 $0.00 $68.95
12/1/2025 $41.97 $9.90 $9.25 $9.21 $0.00 $70.33
6/1/2026 $43.41 $9.90 $9.25 $9.21 $0.00 $71.77
ASPHALT RAKER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.85 $9.90 $9.25 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
BACKHOE/FRONT-END LOADER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
BARCO-TYPE JUMPING TAMPER
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $41.09 $9.90 $9.25 $9.11 $0.00 $69.35
12/1/2025 $42.47 $9.90 $9.25 $9.11 $0.00 $70.73
6/1/2026 $43.91 $9.90 $9.25 $9.11 $0.00 $72.17
12/1/2026 $45.35 $9.90 $9.25 $9.11 $0.00 $73.61
6/1/2027 $46.80 $9.90 $9.25 $9.11 $0.00 $75.06
12/1/2027 $48.25 $9.90 $9.25 $9.11 $0.00 $76.51
6/1/2028 $49.75 $9.90 $9.25 $9.11 $0.00 $78.01
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS
LABORERS - ZONE 2
12/1/2028 $51.25 $9.90 $9.25 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $41.09 $9.90 $9.25 $9.21 $0.00 $69.45
12/1/2025 $42.47 $9.90 $9.25 $9.21 $0.00 $70.83
6/1/2026 $43.91 $9.90 $9.25 $9.21 $0.00 $72.27
BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &
HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $45.35 $9.90 $9.25 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
Page 3 of 36Wage Request Number: 20250916135631Issue Date: 09/17/2025
Supplemental
Unemployment Total Rate
BOILER MAKER
BOILERMAKERS LOCAL 29
BOILERMAKERS LOCAL 29
1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79
8/1/2025 $67.95 $11.49 $15.57 $8.02 $0.00 $103.03
2/1/2026 $69.30 $11.49 $15.57 $8.02 $0.00 $104.38
8/1/2026 $71.50 $11.49 $15.57 $8.02 $0.00 $106.58
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (LYNN)
2/1/2027 $72.90 $11.49 $15.57 $8.02 $0.00 $107.98
6/1/2025 $57.68 $15.55 $13.25 $3.25 $0.00 $89.73
12/1/2025 $59.12 $15.55 $13.25 $3.25 $0.00 $91.17
BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98
4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40
5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82
6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25
7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66
8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10
Apprentice to Journeyworker Ratio: 1:4
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $33.98 $11.49 $15.57 $8.02 $0.00 $69.06
2 60.00 $40.77 $11.49 $15.57 $8.02 $0.00 $75.85
3 70.00 $47.57 $11.49 $15.57 $8.02 $0.00 $82.65
4 80.00 $54.36 $11.49 $15.57 $8.02 $0.00 $89.44
5 90.00 $61.16 $11.49 $15.57 $8.02 $0.00 $96.24
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 2/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $34.65 $11.49 $15.57 $8.02 $0.00 $69.73
2 60.00 $41.58 $11.49 $15.57 $8.02 $0.00 $76.66
3 70.00 $48.51 $11.49 $15.57 $8.02 $0.00 $83.59
4 80.00 $55.44 $11.49 $15.57 $8.02 $0.00 $90.52
5 90.00 $62.37 $11.49 $15.57 $8.02 $0.00 $97.45
Apprentice to Journeyworker Ratio: 1:5
Page 4 of 36Wage Request Number: 20250916135631Issue Date: 09/17/2025
Supplemental
Unemployment Total Rate
6/1/2026 $60.40 $15.55 $13.25 $3.25 $0.00 $92.45OPERATING ENGINEERS LOCAL 4
12/1/2026 $61.84 $15.55 $13.25 $3.25 $0.00 $93.89
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $48.85 $9.90 $9.25 $9.80 $0.00 $77.80
12/1/2025 $50.35 $9.90 $9.25 $9.80 $0.00 $79.30
6/1/2026 $51.90 $9.90 $9.25 $9.80 $0.00 $80.85
CAISSON & UNDERPINNING BOTTOM MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $53.40 $9.90 $9.25 $9.80 $0.00 $82.35
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $47.70 $9.90 $9.25 $9.80 $0.00 $76.65
12/1/2025 $49.20 $9.90 $9.25 $9.80 $0.00 $78.15
6/1/2026 $50.75 $9.90 $9.25 $9.80 $0.00 $79.70
CAISSON & UNDERPINNING LABORER
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $52.25 $9.90 $9.25 $9.80 $0.00 $81.20
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $48.03 $9.90 $9.25 $9.80 $0.00 $76.98
12/1/2025 $49.53 $9.90 $9.25 $9.80 $0.00 $78.48
6/1/2026 $51.08 $9.90 $9.25 $9.80 $0.00 $80.03
CAISSON & UNDERPINNING TOP MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $52.58 $9.90 $9.25 $9.80 $0.00 $81.53
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
CARBIDE CORE DRILL OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
9/1/2025 $50.87 $9.83 $11.47 $8.50 $0.00 $80.67
3/1/2026 $52.12 $9.83 $11.47 $8.50 $0.00 $81.92
9/1/2026 $53.37 $9.83 $11.47 $8.50 $0.00 $83.17
CARPENTER
CARPENTERS
CARPENTERS -ZONE 2 (Eastern Massachusetts)
3/1/2027 $54.62 $9.83 $11.47 $8.50 $0.00 $84.42
Apprentice: CARPENTER
Effective Date: 9/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $22.89 $9.83 $0.00 $1.73 $0.00 $34.45
2 45.00 $22.89 $9.83 $0.00 $1.73 $0.00 $34.45
3 55.00 $27.98 $9.83 $0.00 $3.40 $0.00 $41.21
4 55.00 $27.98 $9.83 $0.00 $3.40 $0.00 $41.21
5 70.00 $35.61 $9.83 $11.41 $5.10 $0.00 $61.95
6 70.00 $35.61 $9.83 $11.41 $5.10 $0.00 $61.95
7 80.00 $40.70 $9.83 $11.44 $6.80 $0.00 $68.77
8 80.00 $40.70 $9.83 $11.44 $6.80 $0.00 $68.77
Page 5 of 36Wage Request Number: 20250916135631Issue Date: 09/17/2025
Supplemental
Unemployment Total Rate
10/1/2024 $26.65 $7.02 $3.80 $1.00 $0.00 $38.47
10/1/2025 $27.75 $7.02 $3.80 $1.00 $0.00 $39.57
CARPENTER WOOD FRAME
CARPENTERS
CARPENTERS-ZONE 3 (Wood Frame) 10/1/2026 $28.85 $7.02 $3.80 $1.00 $0.00 $40.67
All Aspects of New Wood Frame Work
Apprentice: CARPENTER
Effective Date: 3/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $23.45 $9.83 $0.00 $1.73 $0.00 $35.01
2 45.00 $23.45 $9.83 $0.00 $1.73 $0.00 $35.01
3 55.00 $28.67 $9.83 $0.00 $3.40 $0.00 $41.90
4 55.00 $28.67 $9.83 $0.00 $3.40 $0.00 $41.90
5 70.00 $36.48 $9.83 $11.41 $5.10 $0.00 $62.82
6 70.00 $36.48 $9.83 $11.41 $5.10 $0.00 $62.82
7 80.00 $41.70 $9.83 $11.44 $6.80 $0.00 $69.77
8 80.00 $41.70 $9.83 $11.44 $6.80 $0.00 $69.77
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $15.99 $7.02 $0.00 $0.00 $0.00 $23.01
2 60.00 $15.99 $7.02 $0.00 $0.00 $0.00 $23.01
3 65.00 $17.32 $7.02 $0.00 $1.00 $0.00 $25.34
4 70.00 $18.66 $7.02 $0.00 $1.00 $0.00 $26.68
5 75.00 $19.99 $7.02 $3.80 $1.00 $0.00 $31.81
6 80.00 $21.32 $7.02 $3.80 $1.00 $0.00 $33.14
7 85.00 $22.65 $7.02 $3.80 $1.00 $0.00 $34.47
8 90.00 $23.99 $7.02 $3.80 $1.00 $0.00 $35.81
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $16.65 $7.02 $0.00 $0.00 $0.00 $23.67
2 60.00 $16.65 $7.02 $0.00 $0.00 $0.00 $23.67
3 65.00 $18.04 $7.02 $0.00 $1.00 $0.00 $26.06
4 70.00 $19.43 $7.02 $0.00 $1.00 $0.00 $27.45
5 75.00 $20.81 $7.02 $3.80 $1.00 $0.00 $32.63
6 80.00 $22.20 $7.02 $3.80 $1.00 $0.00 $34.02
7 85.00 $23.59 $7.02 $3.80 $1.00 $0.00 $35.41
8 90.00 $24.98 $7.02 $3.80 $1.00 $0.00 $36.80
Page 6 of 36Wage Request Number: 20250916135631Issue Date: 09/17/2025
Supplemental
Unemployment Total Rate
CEMENT MASONRY/PLASTERING
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (LYNN)
7/1/2024 $49.19 $13.35 $16.43 $7.78 $1.80 $88.55
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
CHAIN SAW OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $59.51 $15.55 $13.25 $3.25 $0.00 $91.56
12/1/2025 $60.98 $15.55 $13.25 $3.25 $0.00 $93.03
6/1/2026 $62.31 $15.55 $13.25 $3.25 $0.00 $94.36
CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $63.79 $15.55 $13.25 $3.25 $0.00 $95.84
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $37.52 $15.55 $13.25 $3.25 $0.00 $69.57
12/1/2025 $38.47 $15.55 $13.25 $3.25 $0.00 $70.52
6/1/2026 $39.33 $15.55 $13.25 $3.25 $0.00 $71.38
COMPRESSOR OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $40.28 $15.55 $13.25 $3.25 $0.00 $72.33
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
7/1/2025 $58.51 $10.30 $11.95 $12.50 $0.00 $93.26DELEADER (BRIDGE)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 2
1/1/2026 $59.56 $10.35 $12.00 $12.60 $0.00 $94.51
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.60 $13.35 $16.43 $0.00 $0.00 $54.38
2 60.00 $29.51 $13.35 $16.43 $2.78 $1.80 $63.87
3 65.00 $31.97 $13.35 $16.43 $3.78 $1.80 $67.33
4 70.00 $34.43 $13.35 $16.43 $4.78 $1.80 $70.79
5 75.00 $36.89 $13.35 $16.43 $5.78 $1.80 $74.25
6 80.00 $39.35 $13.35 $16.43 $6.78 $1.80 $77.71
7 90.00 $44.27 $13.35 $16.43 $7.78 $1.80 $83.63
Apprentice to Journeyworker Ratio: 1:3
Page 7 of 36Wage Request Number: 20250916135631Issue Date: 09/17/2025
Supplemental
Unemployment Total Rate
6/2/2025 $47.75 $9.90 $9.25 $9.65 $0.00 $76.55
12/1/2025 $49.25 $9.90 $9.25 $9.65 $0.00 $78.05
6/1/2026 $50.80 $9.90 $9.25 $9.65 $0.00 $79.60
12/7/2026 $52.30 $9.90 $9.25 $9.65 $0.00 $81.10
6/7/2027 $53.90 $9.90 $9.25 $9.65 $0.00 $82.70
12/6/2027 $55.50 $9.90 $9.25 $9.65 $0.00 $84.30
6/5/2028 $57.18 $9.90 $9.25 $9.65 $0.00 $85.98
DEMO: ADZEMAN
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.85 $9.90 $9.25 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.75 $9.90 $9.25 $9.65 $0.00 $77.55
12/1/2025 $50.25 $9.90 $9.25 $9.65 $0.00 $79.05
6/1/2026 $51.80 $9.90 $9.25 $9.65 $0.00 $80.60
12/7/2026 $53.30 $9.90 $9.25 $9.65 $0.00 $82.10
6/7/2027 $54.90 $9.90 $9.25 $9.65 $0.00 $83.70
12/6/2027 $56.50 $9.90 $9.25 $9.65 $0.00 $85.30
6/5/2028 $58.18 $9.90 $9.25 $9.65 $0.00 $86.98
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.85 $9.90 $9.25 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
Apprentice: DELEADER (BRIDGE)
Effective Date: 7/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.26 $10.30 $0.00 $0.00 $0.00 $39.56
2 55.00 $32.18 $10.30 $0.00 $6.88 $0.00 $49.36
3 60.00 $35.11 $10.30 $0.00 $7.50 $0.00 $52.91
4 65.00 $38.03 $10.30 $0.00 $8.13 $0.00 $56.46
5 70.00 $40.96 $10.30 $11.95 $8.75 $0.00 $71.96
6 75.00 $43.88 $10.30 $11.95 $9.38 $0.00 $75.51
7 80.00 $46.81 $10.30 $11.95 $10.00 $0.00 $79.06
8 90.00 $52.66 $10.30 $11.95 $11.25 $0.00 $86.16
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.78 $10.35 $0.00 $0.00 $0.00 $40.13
2 55.00 $32.76 $10.35 $0.00 $6.93 $0.00 $50.04
3 60.00 $35.74 $10.35 $0.00 $7.56 $0.00 $53.65
4 65.00 $38.71 $10.35 $0.00 $8.19 $0.00 $57.25
5 70.00 $41.69 $10.35 $12.00 $8.82 $0.00 $72.86
6 75.00 $44.67 $10.35 $12.00 $9.45 $0.00 $76.47
7 80.00 $47.65 $10.35 $12.00 $10.08 $0.00 $80.08
8 90.00 $53.60 $10.35 $12.00 $11.34 $0.00 $87.29
Apprentice to Journeyworker Ratio: 1:1
Page 8 of 36Wage Request Number: 20250916135631Issue Date:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .