2026 Concrete RFP.pdf
PDF 1 MB Posted
- Attached to
- RFP for Concrete/Sidewalks
- Solicitation number
- RFP CADI 260000001859 1
- Issued by
- Wexford County, Michigan
About this file
2026 Concrete RFP - Cadillac Area Public Schools
This is a Request for Proposal (RFP) issued by Cadillac Area Public Schools for concrete and sidewalk removal and repair services at two school locations: Mackinaw Trail Middle School (8401 S Mackinaw Trail, Cadillac, MI 49601) and Cadillac High School (500 Chestnut Street, Cadillac, MI 49601). The project involves concrete demolition and disposal, site restoration, supply and placement of clean fill for subbase, forming and pouring of 4-inch sidewalks with wire mesh, and forming and pouring of curbs and ramps including ADA-compliant pads. The scope encompasses approximately 10,440 square feet of sidewalk and 685 linear feet of curb across both locations. Non-mandatory walk-throughs are available between April 27 and May 1, 2026, and can be scheduled with Lindsey Akom via email. Proposals are due May 6, 2026, at 2:00 p.m. and must be submitted by mail to Doug Sprik at the District office with "Concrete/Sidewalks" as the subject line. Post-bid interviews will be conducted between May 7 and May 11, 2026, with the Cadillac Area Public Schools Board of Education tentatively taking action on the lowest qualified bidder at the June board meeting. Work must be completed by August 21, 2026, though the District will consider a phased approach over two summers.
Proposals must include detailed cost breakdowns for all work phases, equipment, mobilization, site preparation, and unit pricing for additional unforeseen work, along with a project timeline. Bidders must comply with Michigan prevailing wage requirements under M.C.L. 480.1101 et seq., including providing certified payroll records. All proposals must include a Familial Disclosure Form, Iran Economic Sanctions Act Certification affidavit, and completed proposal form with base bid pricing for summer 2026 installation and an alternate bid option for summer 2027 installation. Contractors are responsible for verifying site conditions prior to submission, coordinating work to minimize school operational disruption, complying with all safety regulations in active school zones, and ensuring all materials and workmanship meet or exceed industry standards and local specifications including full ADA compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Legal Notice Ad-Concrete_Sidewalks.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
CONCRETE/SIDEWALKS
April 22, 2026
Prepared by:
Cadillac Area Public Schools
400 Linden St
Cadillac, MI 49601
REQUEST FOR PROPOSAL - CONCRETE/SIDEWALKS
Overview
Cadillac Area Public Schools (the “District”) is seeking proposals from a contractor (each a “Bidder’) for concrete and sidewalk removal and repair at Mackinaw Trail Middle School, 8401 S Mackinaw Trail Cadillac, MI 49601 and Cadillac High School, 500 Chestnut Street Cadillac, MI 49601.
Specifications
Refer to Appendix A - Project Specifications.
Additional Information
Non-Mandatory Walk-Throughs Walk-throughs can be scheduled with Lindsey Akom via email, lindsey.akom@cadillacschools.org and are recommended.
Desired Installation Time-Line The work shall be completed by August 21, 2026
Proposal Timeline
1. RFP released on April 22, 2026.
2. Non-mandatory walk-throughs can happen between April 27, 2026 and May 1, 2026. Please schedule with Lindsey Akom via email lindsey.akom@cadillacschools.org.
3. Proposals are due on May 6, 2026 at 2:00 pm. Bids are to be submitted via mail to: Cadillac Area
Public Schools, Attn: Doug Sprik, 400 Linden St, Cadillac, MI 49601 with a subject line of “Concrete/Sidewalks”.
4. Post bid interviews to be conducted between May 7 and May 11 2026.
5. The CAPS Board of Education will tentatively take action on the lowest qualified bidder at the June board meeting. The District will issue a notice to proceed to the awarded bidder after board approval.
6. This project needs to be completed by August 21, 2026 but CAPS will consider a phased approach over two summers.
Proposal Requirements
1. Proposals shall be prepared in compliance with the provisions of this RFP. All provisions and specifications are in Appendix A. Failure to comply may result in the disqualification of the proposal.
2. Interested Bidders are strongly encouraged to submit an intent to respond to Lindsey Akom via lindsey.akom@cadillacschools.org to ensure that the Bidder receives all addenda or communications regarding this RFP.
3. Late Proposals will not be accepted.
4. Each Bidder, before submitting a proposal, shall, if it is uncertain of the conditions, requirements, and/or obstacles that might impact the provision of the project, request further information. Failure to make such inquiry or receive an answer shall not relieve the selected Bidder from the obligation to comply, in every detail, with all provisions and requirements of the RFP nor shall it be a basis for any claim whatsoever for alteration in any term or payment required by the eventual contract between the selected Bidder and the District (the “Contract”).
5. If a Bidder discovers any ambiguity, conflict, discrepancy, omission or other error in the RFP, they shall immediately notify the District of such error in writing and request modification or clarification of the document. Modifications will be made by issuing a revision and will be given by written notice to all parties who have submitted an intent to respond. The Bidder is responsible for clarifying any ambiguity, conflict, discrepancy, omission or other error in the RFP prior to submitting the proposal or it shall be deemed waived.
6. All proposals and any accompanying documents become the property of the District and will not be returned.
7. The District reserves the right to waive irregularities in this RFP, the bid process, or the proposals. Any such waiver shall not modify any remaining RFP requirements or excuse a Bidder from full compliance with the RFP specifications and other Contract requirements if the Bidder is awarded the Contract.
8. Each Bidder who submits a bid, by submitting a bid, agrees to indemnify and hold harmless the District and its employees, board members, and consultants for any claim against the District involving the Bidder and arising out of the bid process. By submitting a bid, each Bidder agrees that it will make no claim against the District regarding this RFP or the bid process.
9. All Bidders, by submitting proposals, agree that they have read and are familiar with all the terms and conditions of the RFP and applicable federal and state laws, rules and regulations and will abide by the terms and conditions thereof.
10.Each Bidder completes Appendix D as the three forms are the proposal bidding documents. The documents include Affidavit of Bidder, Iran Economic Sanctions Act Certification, and the bid proposal sheet.
Attachments to RFP:
● Attachment A – Project Overview
● Attachment B– Familial Disclosure Form
● Attachment C– Iran Business Relationship Affidavit
● Attachment D– Proposal Form
● Appendix A – Specifications
Attachment A – Project Overview
Project The goal of this project is to provide concrete replacement services at Cadillac High School and Mackinaw Trail Middle School. The intent of this project is to remove and replace deteriorated or non-compliant concrete sidewalks, curbs, and ramps to improve safety, accessibility, drainage, and overall site functionality.
The selected contractor will be responsible for furnishing all labor, removal, materials, equipment, and supervision necessary to complete the work in accordance with applicable local, state, and federal standards, including ADA compliance where applicable.
Refer to Appendix A - Specifications
Prevailing Wage The District's obligations under M.C.L. 480.1101, et seq. include ensuring the following:
● The contractor shall determine the prevailing rates of wages and fringe benefits for all classes of construction mechanics called for in the contract.
● A schedule of these rates shall be made part of the contract for work to be performed and shall be printed on the bidding forms.
● Every contractor and subcontractor must fulfill its obligations under the statute relating to prevailing wage.
● The contract must contain the statutory language providing that construction mechanics are intended beneficiaries of the contractual prevailing wage, fringe benefit, and non-discrimination, non-retaliation requirements, and provide that any construction mechanic aggrieved by the failure of a contractor or subcontractor to pay prevailing wages or benefits as specified in the contract or retaliation associated therewith, may bring an action in a court of competent jurisdiction against the contractor or subcontractor for damages or injunctive relief along with other remedies prescribed by statute.
● The Contractor shall provide the District certified payroll records and other records required by law.
Contracts on State Projects which contain provisions regarding payment of prevailing wages as determined by the United States Secretary of Labor or which contain minimum wage schedules which are the same as prevailing wages in the Locality as determined by collective bargaining agreements or understandings between bona fide organizations of Construction Mechanics and their employers are exempt from the above requirements.
Attachment B – Familial Disclosure Form
AFFIDAVIT OF ______________________________
(insert name of affiant)
STATE OF MICHIGAN )
)ss
COUNTY OF _________________ )
___________________________________ makes this Affidavit under oath and states as follows:
(insert name of affiant)
1. I am a/the:
President Vice-President Chief Executive Officer Member Partner Owner Other (please specify) ________________________ of , ____________________________ a bidder for custodial services for Cadillac Area Public Schools.
(insert name of contractor)
2. I have personal knowledge and/or I have personally verified that the following are all of the familial relationships existing between the owner(s) and the employee(s) of the aforementioned contractor and the school district's superintendent and/or board members:
3. I have authority to bind the aforementioned contractor with the representations contained herein, and I am fully aware that the school district will rely on my representations in evaluating bids for the custodial services.
4. I declare the above information to be true to the best of my knowledge, information and belief. I could completely and accurately testify regarding the information contained in this affidavit if requested to do so.
(signature of affiant)
Dated: ________________
Subscribed and sworn before me in _________________ County, Michigan, on the ___ day of _________________, 202_
____________________________________________(signature)
_____________________________________________ (printed)
Notary public, State of Michigan, County of ________________
My Commission expires on _____________________________
Acting in the County of ________________________________
Attachment C - AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized officer of the below-named contractor (the “Contractor”), pursuant to the compliance certification requirement provided in the Cadillac Area Public Schools (the “School District”) Request For Proposals (the “RFP”), hereby certified, represents and warrants that the Contractor *(including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Contractor is awarded a contract as a result of the aforementioned RFP, the Contractor will not become an “Iran linked business” at any time during the course of performing any services under the contract.
CONTRACTOR:
Name of Contractor
By: ____________________________
Signature:_______________________
Its: ____________________________
Date:___________________________
STATE OF ________________________________)
)ss.
COUNTY OF ______________________________)
This instrument was acknowledged before me on the _____day of ________________, 202_.
by________________________________.
,Notary Public
____________County, Michigan
My Commission Expires:______________
Acting in the County of ______________
Attachment D – Proposal Form
Proposal
Please make sure that all specifications outlined in Appendix A are accounted for.
Prevailing Wage Familial Disclosure Form Affidavit of Compliance – Iran Economic Sanctions Act Proposal Form
BASE BID Summer 2026 Install $
ALTERNATE Summer 2027 Install $
Contractor
Primary Contact
Primary Contact Email
APPENDIX A - Specifications
Proposal Requirements
Proposals must include a detailed cost breakdown covering:
● Concrete demolition and disposal
● Hauling and removal of debris and unwanted materials
● Restore the site to its previous condition
● Supply and placement of clean fill for subbase
● Labor and materials for forming and pouring sidewalks (4” with wire mesh)
● Labor and materials for forming and pouring curbs and ramps (including rebar if required)
● Equipment, mobilization, and site preparation costs
● Any necessary fencing or barricades
● Unit pricing for additional or unforeseen work, if applicable
● Project timeline and estimated duration
● Approximately 10,440 square feet of sidewalk with 685 linear feet of curb
Project Considerations
● Work must be coordinated to minimize disruption to school operations.
● Contractors must comply with all safety regulations, including working in active school zones.
● All materials and workmanship shall meet or exceed industry standards and local specifications.
● Contractors are responsible for verifying site conditions prior to submission.
This project aims to enhance pedestrian safety, ensure ADA compliance, including all the ADA pads or stamped pads for all cut-outs, and extend the service life of site infrastructure at both school locations.
Qualified contractors are encouraged to submit comprehensive proposals demonstrating experience with similar municipal or educational facility projects.
Cadillac High School Mackinaw Trail Middle School