2026-72 Codification Clarifying Qs 1.pdf

PDF 288 KB Posted

Attached to
Online Codification services and online code management for the Zoning Development Ordinance
Solicitation number
S-C01010-00018129
Issued by
Clackamas County, Oregon

About this file

This document is a response to clarifying questions submitted by interested vendors to Clackamas County's Request for Proposals #2026-72 for online codification services and online code management for the Zoning Development Ordinance (ZDO), Comprehensive Plan (Comp Plan), and Roadway Standards (RS). The county seeks to convert and host three regulatory documents in an online, cloud-based platform with enhanced functionality including search capabilities, hyperlinking, mobile optimization, and WCAG 2.1 AA compliance. The vendor must provide Microsoft Word versions of converted documents, standard drawings with roadway standards hosting, and one printed version initially with semi-annual printed supplements at estimated cost. Clarifications confirm that the ZDO underwent minor and time-sensitive amendments in August 2026 with additional amendments expected by year-end 2026, and that while a true form-based code does not exist, the zoning code and comprehensive plan include figures, graphics, and maps that will be included in the scope. Proposals are due November 9, 2026 at 2:00 p.m. Pacific Time, with questions due by November 3, 2026 at 5:00 p.m. Pacific Time. The initial contract term is five years from an anticipated signing date of early 2027.

The county retains all data ownership, with converted documents becoming county property. Evaluation will occur on a 100-point scale assessing proposer qualifications (0-30 points), scope of work (0-45 points), and fees (0-25 points). Fixed-fee pricing with clearly identified milestones and deliverables is required, along with three references demonstrating similar work for Oregon or U.S. jurisdictions. Proposals must not exceed 20 pages in 11-point font and must be submitted through the Bid Locker online portal. The vendor must provide a comprehensive Service Level Agreement addressing support processes, planned downtime, problem determination and resolution, severity level definitions, backup and disaster recovery procedures, and uptime commitments. Required insurance includes Commercial General Liability ($1,000,000/$2,000,000), Professional Liability ($1,000,000/$2,000,000), Automobile Liability ($1,000,000), and Cyber Liability ($1,000,000). Under Oregon Cooperative Contracting provisions, other public agencies may use the resulting contract on identical terms unless the contractor expressly limits availability to Clackamas County only, with all contractual arrangements made directly between the agency and contractor. Shipping expenses will be reimbursed at actual cost.

View the file

Other files

File Type Posted
RFP 2026-72 Online Codification.pdf PDF
2026-72 Codification Clarifying Qs 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department

PH: 503-742-5400 WWW.CLACKAMAS.US

REQUEST FOR PROPOSALS #2026-72

ONLINE CODIFICATION SERVICES AND ONLINE CODE MANAGEMENT FOR THE ZONING

DEVELOPMENT ORDINANCE (ZDO), THE COMPREHENSIVE PLAN (COMP PLAN) AND THE

ROADWAY STANDARDS (RS)

RESPONSE TO CLARIFYING QUESTIONS

#1

Note that these are questions submitted by interested firms to the above referenced solicitation. The below answers are for clarification purposes only and in no way alter or amend the RFP as published.

1. Are the Standard Drawings to be included with the Roadway Standards Hosting?

A. Roadway Standards | Clackamas County Yes

2. How recently has the Zoning Code been updated?

A. There was a set of Minor and Time Sensitive Amendments to the Zoning Development Ordinance that were adopted in August of 2026 and we expect to adopt another set of amendments by the end of 2026.

3. What is a Vanity URL? (page 9)

A. A vanity URL includes Clackamas County in the name, such as https://clackamas-or-us.avolvecloud.com/ that we use for our Development Direct program.

4. Could you please share Article II Paragraph 31- Cooperative Contracting? (page 9)

A. Cooperative Contracting. Pursuant to ORS 279A.200 to 279A.225, other public agencies may use this Contract resulting from a competitive procurement process unless the Contractor expressly noted in their proposal/quote that the prices and services are available to the County only. The condition of such use by other agencies is that any such agency must make and pursue contact, purchase order, delivery arrangements, and all contractual remedies directly with Contractor; the County accepts no responsibility for performance by either the Contractor or such other agency using this Contract. With such condition, the County consents to such use by any other public agency.

https://url.us.m.mimecastprotect.com/s/L3uACOYDwVI4R5j9iEfBNsGzUU5?domain=clackamas.us https://clackamas-or-us.avolvecloud.com/ https://clackamas-or-us.avolvecloud.com/

Department

PH: 503-742-5400 WWW.CLACKAMAS.US

5. Print is referenced in the RFP, how many printed copies would you like with the initial project?

A. We need just one printed version as a part of the initial project.

6. For the printed supplement pages, may a proposer name a commercial print vendor in its proposal and request the written pre-authorization described in Section 2.20, with print billed at cost?

A. An estimated cost should be included in the proposal, with the details related to where the printing is done can be addressed during contracting.

7. Is the expected print quantity known (number of printed sets per semiannual supplement)?

A. One (1) set

8. 3. Scope level. The RFP describes conversion of the existing ZDO, Comp Plan, and Roadway

Standards, along with online hosting and supplement services. Does the County want a standard republication of the existing text only, or would it also like an optional legal review of the ZDO for conflicts and inconsistencies?

A. No, we are not requesting the optional legal review of the ZDO for conflicts.

9. 4. Form based code. Does the County have a form based code adopted or in development for any of the three documents? If so, will it be part of this contract, and can the County share the current draft, along with any related graphics and maps, so we can scope it accurately?

A. While we don’t have a true form based code, there are some figures/graphics incorporated into the zoning code and there are a number of figures and maps in the Comprehensive Plan. They can see the current zoning code at: Zoning and Development Ordinance | Clackamas County and the current Comprehensive Plan at: Comprehensive Plan | Clackamas County.

End of Clarifying Questions #1 https://www.clackamas.us/planning/zdo https://www.clackamas.us/planning/comprehensive.html

File details come from the government source that posted it. Updated .