2026-147-RFQ-RFP.pdf

PDF 831 KB Posted

Attached to
RFQ-RFP Phase 1: GC/CM DES - Campus Energy System Replacement
Solicitation number
2026-147
Issued by
Thurston County, Washington

About this file

This is a Request for Qualifications and Proposal (RFQ/RFP) issued by the Washington State Department of Enterprise Services (DES) for General Contractor/Construction Manager (GC/CM) services for the Campus Energy System Replacement project (2026-147). The project seeks to replace the Capitol Campus's 100-year-old steam heating system with a modern, zero-carbon energy system to comply with Washington State's Clean Buildings Performance Standards legislation and address safety and efficiency concerns. The Statement of Qualifications Phase One submittal deadline is Thursday, October 22, 2026, at 2:00 PM PT, with an informational meeting scheduled for October 8, 2026. The selection process consists of three phases: Phase One evaluates written qualifications of interested firms; Phase Two includes proprietary meetings, interviews, and final proposal submissions from a minimum of three short-listed finalists; and Phase Three involves MACC (Maximum Allowable Construction Cost) negotiations and contract execution. The anticipated project schedule extends from March 2026 through December 2032, with design phases occurring between January 2027 and August 2027, preconstruction services from August 2027 to August 2028, and construction beginning in 2032 with substantial completion targeted for December 2032. Final firm selection is anticipated for December 18, 2026, with contract execution for preconstruction services expected by January 29, 2027.

The estimated Maximum Allowable Construction Cost (MACC) for the project is $120,333,312. Phase One evaluation criteria include bonding capacity (mandatory requirement), experience and technical competence of key personnel (20 points), approach to executing the project and preconstruction services (20 points), past performance on negotiated and similarly complex projects including Project Labor Agreement (PLA) experience (20 points), project scheduling and cost control (10 points), risk identification and analysis (10 points), value engineering and constructability analysis (10 points), proximity of firm to project location and self-performance capacity (5 points), and firm capacity to perform the work (5 points). Phase Two evaluation adds interview assessment criteria and final proposal bid scoring. The project requires compliance with Executive Order 25-07 regarding Project Labor Agreements and RCW 39.04.320 apprenticeship participation requirements of 15 percent of total labor hours. All GC/CM costs during the selection process are borne by proposing firms. The project is funded through state capital appropriations, and MACC negotiations must be completed within 30 days of receiving the GC/CM's cost estimate, with negotiations to occur when construction documents reach at least 90 percent completion.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Washington Department of Enterprise Services

Request for Qualifications & Proposal for General Contractor / Construction Manager

(GC/CM)

Submittal Deadline: Thursday, October 22, 2026, at 2:00 PM PT

Campus Energy System Replacement

2026-147

THIS PAGE IS INTENTIONALLY BLANK

Table of Contents

CONTACTS

1.0 INTRODUCTION

2.0 PROJECT DESCRIPTION

3.0 SCHEDULES

4.0 SCOPE OF GC/CM SERVICES

5.0 SELECTION AND AWARD PROCESS

6.0 INFORMATIONAL MEETING

7.0 PHASE ONE - STATEMENT OF QUALIFICATIONS SUBMITTAL REQUIREMENTS

8.0 PHASE ONE - STATEMENT OF QUALIFICATIONS FORMAT

9.0 PHASE ONE - PROPOSAL EVALUATION CRITERIA:

10.0 PHASE TWO - NOTIFICATIONS & REFERENCE CHECKS

11.0 PHASE TWO - INTERVIEW

12.0 FINAL PROPOSALS

13.0 FINAL SELECTION

14.0 DIVERSE BUSINESS INCLUSION PLAN

15.0 APPRENTICESHIP REQUIREMENT

16.0 CONTRACTOR RESPONSIBILITY CRITERIA

Contract Documents

Attachments

Reference Documents

THIS PAGE IS INTENTIONALLY BLANK

Request for Qualifications & Proposal for GC/CM Services

Department of Enterprise Services Project Number 2026-147

CONTACTS

Department of Enterprise Services (Contracting Authority) Facility Professional Services, Engineering & Architectural Services Physical Address: 1500 Jefferson Street SE, Olympia, WA 98501 Mailing Address: P.O. Box 41476, Olympia, WA 98504-1476

Bob Willyerd, Project Manager* 360-810-0500 bob.willyerd@des.wa.gov

Oliver Wu, Program Manager 951-961-0420 oliver.wu@des.wa.gov

Courtney Albrecht, Contracts Specialist 360-706-4996 courtney.albrecht@des.wa.gov

Ryan Grimes, Selection Administrator 360-819-6937 ryan.grimes@des.wa.gov

DES (Owner) Physical Address:

1500 Jefferson St SE, Olympia, WA 98501

Architect (Designer) OAC Services Inc.

Physical Address:

1301 5th Avenue, Suite 2300 Seattle, WA 98101

Joshua Cloud, Senior Director 206-291-3359 joshua.cloud@consertus.com

*primary point of contact

Department of Enterprise Services

1.0 INTRODUCTION

The Department of Enterprise Services (DES) will be accepting Statement of Qualifications and Proposal from experienced firms to provide General Contractor/Construction Manager (GC/CM) services for the Campus Energy System Replacement project number 2026-147. DES intends to award a construction contract using a competitive negotiation process authorized by RCW 39.10 described more fully below.

DES has determined that the GC/CM project delivery method benefits the project in the following ways.

The involvement of the GC/CM during the design stage is critical to the success of the project

The project encompasses a complex or technical work environment

During the design phase of the project, the GC/CM will provide:

Assist in coordination of Contract Documents Input into procedures and specifications Detailed cost estimates Value analysis and life cycle cost design considerations Constructability analysis of design documents prior to solicitation of subcontract bid packages Detailed construction scheduling Development of bid packages Sequencing of work and construction logistics planning Investigation of existing conditions

If necessary to help meet the overall project schedule, the GC/CM may be authorized to bid out and start construction early on subcontract bid packages before all project construction documents are 100% complete.

The selection process will consist of three phases:

1. PHASE ONE, Request for Qualifications: Perspective GC/CM firms will submit written statements of qualifications which will be evaluated in accordance with the criteria set forth in Section 9 of this solicitation. These written submittals will be used to select a minimum of three of the most highly qualified firms to proceed to Phase Two.

2. PHASE TWO, Proprietary Meeting, Interview, and Final Proposal: Consists of a proprietary meeting, an interview, and the submittal of a Final Proposal which contains in a sealed bid, the Percent Fee stated as a percentage of the Estimated Maximum Allowable Construction Cost (MACC). Please reference Sections 11 and 12 of this solicitation which define the selection criteria for Phase Two.

The most qualified firm based on the interview and bid submitted and the other factors set forth herein will be selected to provide preconstruction services and for MACC

Department of Enterprise Services negotiations. If the parties cannot agree on a MACC, as described in Section 5, negotiations will be terminated and DES reserves the right to begin negotiations with the next highest scoring firm. All costs incurred by firms choosing to participate in this GC/CM Solicitation process shall be borne by the proposing firms.

All provisions of this solicitation will become a part of the GC/CM contract including the GC/CM’s written response to the RFQ.

PUBLIC DISCLOSURE:

Purpose: All documents submitted to DES as part of a GC/CM procurement become public records. DES will make the selected GC/CM procurement submissions publicly available upon completion of the selection process. This section explains that publication process.

Notice: Following completion of the selection of each GC/CM procurement DES will notify the finalist firms of the final selection, Publication: DES will then publish the following documents:

i. All submitted Statements of Qualifications (SOQs)

ii. Final Proposals submitted by each of the finalist firms

Location: DES will publish these documents on the Euna Procurement portal: https://deswa.bonfirehub.com/portal/?tab=pastOpportunities

Exceptions: DES will not publish the following separately submitted documents:

i. Diverse business inclusion plans

Note: This document will be disclosed if DES receives a public records request.

2.0 PROJECT DESCRIPTION

2.1 Background

Project Specific information

This request seeks a GCCM to assist in the development of the Campus Energy System Replacement, identified as the preferred alternative to replace the Capitol Campus's heating system. The existing steam heat system for the Capitol Campus, over 100 years old and serving most campus buildings, is neither reliable, safe, nor efficient. Transitioning to a new system aligns with Washington State's move towards a zero-carbon platform and directly contributes to meeting the Clean Buildings Performance Standards legislation.

This project will be funded through State capital appropriations and has an estimated Maximum Allowable Construction Cost (MACC) of $120,333,312.

Department of Enterprise Services

Project Goals

Improve System Resilience and Reliability

Replace outdated equipment with modern heating and cooling systems to ensure the campus energy infrastructure is robust, reliable, and capable of meeting current and future demands

Support Transition to Zero-Carbon Platform

Align the project with Washington State’s commitment to sustainability by moving toward a zero-carbon energy system, directly contributing to compliance with Clean Buildings Performance Standards legislation

Enhance Safety and Efficiency

Address safety concerns and inefficiencies inherent in the century-old steam heat system, providing safer and more efficient operations for campus facilities

Enable Value Engineering and Life Cycle Cost Optimization

Incorporate value analysis and life cycle cost design considerations during the design phase, ensuring the new system delivers long-term operational savings and optimal performance

Facilitate Constructability and Early Construction Start

Engage the GC/CM early in the design process to provide input on constructability, sequencing, and logistics, and allow for early bidding and construction of critical packages to meet project schedule requirements

Any inquiries or requests for information should be directed exclusively to DES and the Design Team for this project.

2.2 Estimated MACC:

The estimated MACC (maximum allowable construction cost) for the project is $120.3M.

3.0 SCHEDULES

The following is the current planned project schedule.

Anticipated Design and Construction March 2026 to December 2026 Schematic Design

January 2027 to April 2028 Design Development/Construction Documents

February 2027 to August 2027 Preconstruction Services

August 2027 to August 2028 Building Permits

August 2027 to August 2028 Bid & Award Subcontracts**

December 2027 December 2032 Start Construction**

2032 Substantial Completion and Final Acceptance

** Note: GC/CM Contractor may be asked to provide early bid package. The GC/CM will work with the owner and design team to determine specific bid packages and dates.

Department of Enterprise Services

GC/CM Selection Process Schedule

Tuesday, September 22, 2026

First publication of Request for Qualifications & Proposal for GC/CM Services in EUNA, WEBS, Seattle Daily Journal of Commerce

Thursday, October 8, 2026 Project Informational Meeting at 10:00 AM PT

Tuesday October 13, 2026 Deadline for questions

Thursday October 15, 2026 Final addendum issued

Thursday, October 22, 2026 Phase One Statements of Qualification submittal deadline from interested GC/CM firms prior to 2:00

PM PT

Thursday, November 5, 2026 Panel review of SOQ (discuss scores, cohesion of selection)

Week of, November 9, 2026 Notification of most qualified Finalist (short-listed) firms selected to move forward to Phase two

Week of, November 30, 2026 Proprietary Meetings - 2 hrs. per finalist

Thursday, December 3, 2026 References due for short-listed firms (Contractor to provide completed Performance Evaluation Questionnaire (Attachment 4) prior to 2:00 PM PT)

Week of, December 14, 2026 Interviews – 1.5 hrs. per finalist

Thursday December 17, 2026 Phase Two Final Proposal submittal deadline prior to

1:00 PM PT

Friday, December 18, 2026 Final selection of firm with the highest score

Monday, December 21, 2026 Notification of successful and unsuccessful firms

Friday, January 15, 2027 Preconstruction Work Plan due

Friday, January 29, 2027 Contract for Preconstruction Services executed

Department of Enterprise Services

4.0 SCOPE OF GC/CM SERVICES

The GC/CM will work collaboratively and proactively with the Owner and Architect to proceed with planning, design and development of the work in a manner that supports the Owner’s efforts to keep costs within the Owner’s budget. The GC/CM shall provide Construction Management (CM) services throughout the project, from the preconstruction period through construction and shall closely coordinate such work with the Architect and Owner. The GC/CM shall provide CM services, including but not limited to:

Assistance in identifying safe work practices and requirements for construction.

Assessing and recommending site logistics requirements.

Recommending phasing, sequencing of work and construction scheduling.

Providing cost-estimating including MACC Negotiated Support Services budgeting.

Determining and reconciling constructability issues and performing constructability analysis of the design documents prior to subcontract bidding.

Assessing alternative construction options for cost savings.

Identifying products for Value Engineering (VE) and engineering systems for life cycle cost design considerations and recommending all work necessary to support their implementation.

Participating in for Owner’s design and construction document phase coordination reviews.

Prepare subcontract bid packages and manage the bidding process.

Provide integrated use of current design and construction technology including

Building Information Systems (BIM).

In addition, the GC/CM must be familiar with the local labor and subcontracting market and be capable of working with subcontractors to generate viable pricing alternatives. It is anticipated the project will be required to comply with Executive Order 25-07 Project Labor Agreements. The GC/CM shall provide full general contracting services for construction of the project in accordance with the requirements of the contract documents and RCW 39.10.340 through 39.10.410, except to the extent work is specifically indicated in the contract documents to be the responsibility of others.

During preconstruction, design and construction phases the GC/CM actively shall participate as a member of the project team with the Owner and the Architect. The GC/CM shall be responsible for providing necessary consulting expertise to the Owner to ensure that the program scope is maximized, and the construction budget and the project schedule are met.

5.0 SELECTION AND AWARD PROCESS

The Department of Enterprise Services (DES) is contracting for GC/CM services in accordance with the process authorized by RCW Chapter 39.10. All proposers must be licensed and registered by the Washington State Department of Labor and Industries in accordance with RCW 18.27.020. The process for selection of the GC/CM firm, negotiation of the MACC, payment for Preconstruction Services and award of the GC/CM Contract for Construction is anticipated to be as follows:

Department of Enterprise Services

A. Anyone interested in becoming the GC/CM may submit their Phase 1 Statements of

Qualifications (SOQ) in accordance with the requirements set forth in this Request for Qualifications & Proposal (RFQ/RFP).

B. On the basis of the evaluation criterion set forth in this GC/CM solicitation the firms submitting qualifications will be scored and ranked. The most qualified firms (Finalists) will be invited to Phase 2 interviews.

C. Evaluation and Scoring of Criterion defined in Section 9 and 10 of this RFP/RFQ.

In evaluating each of the criteria for both Phase 1 and Phase 2, a selection panel will identify significant and minor strengths and weaknesses from the submissions and/or interviews. The selection panel will then use the following guidelines to evaluate and assign points to each selection criterion, based on the weighting assigned in this solicitation and any addenda. After initial scoring, the selection panel will come to a consensus ranking of the firms.

Definition of “strength” and “weakness”:

o The term “strength” ultimately represents a benefit to the Project and is expected to increase the firm’s ability to meet or exceed the Project goals. A minor strength has a slight positive influence, and a significant strength has a considerable positive influence on the firm’s ability to exceed the project goals.

o The term “weakness” detracts from the firm’s ability to meet the project goals and may result in inefficient or ineffective performance. A minor weakness has a slight negative influence, and a significant weakness has a considerable negative influence on the firm’s ability to exceed the project goals.

Scoring:

a. Excellent (81-100 percent of points available in each criterion): The Evaluative Criteria demonstrates an approach that is considered to exceed the Project goals and the RFQ/RFP requirements and provide a consistently outstanding level of quality. To be considered Excellent, it must be determined to have significant strengths and/or a number of minor strengths and few or no appreciable weaknesses.

b. Good (61-80 percent of available points in each criterion): The Evaluative

Criteria demonstrates an approach that is considered to meet the RFQ/RFP in a beneficial way (providing advantages, benefits, or added value to the Project) and offers quality. To be considered Good, it must be determined to have strengths and few, if any, significant weaknesses. Minor weaknesses are offset by strengths.

c. Fair (41-60 percent of available points in each criterion): The Evaluative

Criteria demonstrates an approach that contains minor and/or significant weaknesses and limited appreciable strengths.

d. Deficient (0-40 percent of available points in each criterion): The Evaluative

Criteria demonstrates an approach that contains significant weaknesses and no appreciable strengths.

Department of Enterprise Services

e. Non-Responsive: Does not meet the Minimum Qualifications required for evaluation. In addition, the Owner, at its sole discretion, may reject any Evaluative Criteria deemed non-responsive to any of the requirements.

D. At the interviews, short-listed firms shall submit a Final Proposal providing a bid for

GC/CM fee.

E. The Request for Final Proposal (Phase Two: RFFP) will be evaluated and scored independently from Scores from Phase One SOQ. The finalist firm with the highest Phase Two score based on the selection committee’s evaluation of the Phase Two Proprietary Meeting, interview, and the score for the Final Proposal will be asked to submit a Preconstruction Work Plan. Subject to DES approval of the Preconstruction Work Plan, the Contractor shall immediately execute and Contract for Preconstruction Services, which shall be solely for the performance and payment of Preconstruction Services.

It is anticipated that MACC negotiations will occur when the scope of the project is adequately defined and the contract documents are at least 90% complete as mutually determined by the GC/CM and the Owner, but no later than the conclusion of construction documents. At the time a MACC is successfully negotiated, the parties will sign the GC/CM contract for construction.

F. MACC negotiations will take place prior to execution of the GC/CM contract. MACC negotiations shall be completed within 30 days of the receipt of the GC/CM’s MACC estimate. The GC/CM’s MACC estimate shall be completed no later than three (3) weeks from receipt of the construction documents to be used for MACC negotiations.

Should the GC/CM and DES not agree on a satisfactory MACC that the DES determines to be fair, reasonable, and within the available funds, the Owner may cancel the negotiations and begin to negotiate with the next highest ranked firm.

Should DES choose to cancel the negotiations upon failure to achieve a MACC, such cancellation will be effective upon delivery of written notification by the GC/CM. The GC/CM shall not be reimbursed for the MACC negotiations.

6.0 INFORMATIONAL MEETING

A non-mandatory informational meeting is scheduled for Thursday, October 8, 10:00 AM PT, held via TEAMS. Participants are encouraged to submit questions prior to or ask questions at the meeting. To submit questions ahead of time, please email the Project Manager Bob Willyerd, bob.willyerd@des.wa.gov by 12:00 PM PT on Monday, October 5, 2026.

To join the TEAMS meeting, follow the link:

Join the meeting now

Meeting ID: 265 298 422 537 Passcode: rKizy8 Dial-in by phone

+1 564-999-2000,,242174687# Phone conference ID: 242 174 687#

Department of Enterprise Services

Copies of the RFQ/RFP with links to additional info./supporting documents/addenda shall be available at: https://des.wa.gov/services/facilities-leasing/public-works-design-construction/design-build-gccm-alternative-public-works-projects/gccm-project-selections

7.0 PHASE ONE - STATEMENT OF QUALIFICATIONS SUBMITTAL

REQUIREMENTS

Statement of Qualifications (SOQ) response to this RFQ/RFP containing the items listed in Sections 8 and 9 below will only be received electronically, in PDF format. Document and must be uploaded and received by the Department of Enterprise Services (date/time stamped by Euna Procurement) no later than Thursday, October 22, 2026, by 2:00 PM

PT.

SOQs must be uploaded to the DES Euna Procurement Hub for this project:

https://deswa.bonfirehub.com/portal/?tab=openOpportunities

If you experience difficulty with uploading, please contact Ryan Grimes via email: ryan.grimes@des.wa.gov.

Any addenda issued for this RFQ/RFP will be published at the following website address: https://deswa.bonfirehub.com/portal/?tab=openOpportunities

Proposers are responsible for checking Euna Procurement project portal up to one week prior to submission of proposals for any addenda. If you are unable to download the addenda, you may contact the individual noted above.

8.0 PHASE ONE - STATEMENT OF QUALIFICATIONS FORMAT

Every proposer must reply to each of the evaluation criteria set forth in Section 9 of this RFQ/RFP in a clear and concise manner. Responses must be in the same order as listed, clearly separated with tabs and labeled by response. Brevity is preferred. Pay attention to specific requests for information. The submittals shall be organized in a manner that will enable the GC/CM Selection Committee to quickly access pertinent information. In consideration of the reviewer’s time, every effort should be made to avoid duplicating information presented in the proposal.

Only submittals conforming to the following specifications will be considered:

Electronic copies shall be provided in PDF format online to Euna Procurement Completed copy of Attachment 00 Demonstrated Bonding Capacity Must not exceed (15) size 8.5”x11” sheets, printed front and back (total of 30 pages) o The page count does not include:

Cover Page

If cover page has more information than the required project number, project title, GC/CM name and address block, it will be counted towards the page limit

Dividers/Tabs (unless they have more information than category name)

Demonstrated Bonding Capacity Attachment 00

Department of Enterprise Services o Dividers/Tabs with any printing, other than index names, shall be counted in the 15-sheet maximum o 11”x17” foldouts are permitted, and are limited to a maximum of 2, and shall be counted as 2 pages and included in the 15-sheet count

Submittals should include pertinent data that will assist the selection committee in making its evaluation as set out in this RFQ/RFP.

All submittals must be received no later than Thursday, October 22, 2026, prior to 2:00 PM PT (date/time stamped by Euna Procurement).

For selection process questions, please contact Ryan Grimes, Selections Administrator, at 360-819-6937 or ryan.grimes@des.wa.gov.

For project questions or information, contact Bob Willyerd, DES Project Manager at 360- 810-0500 or bob.willyerd@des.wa.gov.

Explanation to Prospective Proposers Any prospective proposer desiring an explanation or interpretation of this RFQ/RFP must make a request in writing to the DES Project Manager no later than seven (7) days before the Phase One submittal due date. Any information given to a prospective proposer concerning this RFQ/RFP will be furnished promptly to all other proposers as an addendum to this RFQ/RFP if the information is necessary to submitting qualifications or if the lack of it would be prejudicial to other prospective proposers. Oral explanations or instructions given before the Phase One proposal due date will not be binding.

Acknowledgment of Addenda to Phase One Solicitation Submittals shall include a cover letter briefly describing the proposer’s interest in the project and other pertinent information. In this letter prospective proposers shall acknowledge receipt of any addenda to this RFP by identifying the addenda numbers and dates. Failure to acknowledge addenda may result in the submittal being declared non-responsive.

Phase One Submission of SOQ Proposals must be submitted before the Phase One RFQ deadline.

Once the specified deadline passes, access to submit will be disabled. Any modification of a SOQ received after the times specified will not be accepted or considered.

A Phase One proposal will be considered responsive if it meets the following requirements:

It is received at the proper time and place.

It meets each of the stated requirements of the RFQ.

It is submitted by a licensed/registered contractor within the state of

Washington at the time required and is not banned from bidding by the Department of Labor and Industries.

Department of Enterprise Services

9.0 PHASE ONE - PROPOSAL EVALUATION CRITERIA:

Each proposer must reply to each of the criterion in a clear and concise manner. The responses must be in the same order as listed below. Each evaluation criterion has been assigned weighted points based on its relative value. The proposal criteria and their associated points are as follows:

Criteria Points

Bonding, Phase One Requirement (mandatory requirement) Not Scored

Experience and technical competence of key professional personnel 20

Approach to Executing the Project / Preconstruction Services 20

Past Performance in negotiated and similarly complex projects.

Experience with PLAs.

Project scheduling & cost control 10

Risk Identification and Analysis 10

Value Engineering and Constructability Analysis 10

Proximity of Firm to Project Location / Self Performance 5

The proposer’s capacity to perform the work 5

The proposers past performance in utilization of disadvantaged business enterprises, small business entities and their inclusion plan for these entities.

Not Scored

Total 100

Bonding - (Mandatory Phase One Requirement) Proposers shall include a statement from their bonding agent indicating the commitment to bond this project shall be included should the Proposer be selected as a Finalist to proceed to Phase 2. The statement shall include the bonding company name, agent’s name, address, telephone, fax, and email address.

Failure to meet this bonding requirement is a cause for disqualification.

Experience and technical competence of key professional personnel Proposers shall clearly identify the project staffing that the proposer intends to utilize throughout the project, including all key project staff, their roles and responsibilities and the level of effort to be committed (full time vs. part time), and at what phases of the project they will be utilized.

Proposers shall provide an organizational chart and list of key personnel including their roles and responsibilities including both field and office staff for preconstruction and also for construction. Proposers shall include:

resumes of all individuals listed on the project organization chart.

a description of the GC/CM experience of each person assigned to this project and if each person’s experience was with the proposing firm or another firm.

the level of effort, as a percentage of time, to be committed by each person and for which phases of the project (preconstruction, construction).

Department of Enterprise Services

At a minimum, the following individuals shall be included:

Project executive in charge Project manager Superintendent At least one project engineer Individuals assigned to handle:

o Estimating o Construction schedule o Quality control o Safety o Security

Names and qualifications of any consultants and the services they will contribute to the GC/CM’s services are also required.

If selected, the proposer agrees that it will provide, for the duration of the project, the full complement of staff, including the specific persons identified in this proposal.

During the design process, the GC/CM firm shall provide, at a minimum, one dedicated professional project manager and/or higher-level professional staff to attend all design meetings. The GC/CM's preconstruction services during the design process shall cover all services and expenses provided as identified in the bid proposal. During the construction phase, the GC/CM shall provide full supervision to coordinate the job in the field and provide for sufficient and appropriately skilled staff to implement a quality control program.

Approach to executing the project / Preconstruction Services Proposers shall describe how their firm will integrate project scheduling, quality assurance, interdisciplinary review, etc. into the project, and further describe their approach to working with the Owner, the A/E and project stakeholders, and explain how the GC/CM will promote a successful team atmosphere throughout the course of the project.

Proposers shall describe the major challenges to successful completion and how their firm proposes to approach them. Proposers also shall describe any expectations their firm may have for the Owner, including but not limited to, the extent of on-site architectural and/or engineering representatives during major construction or installation phases.

Proposers also shall describe their philosophy and approach to Preconstruction Services and specifically address the following Preconstruction responsibilities:

Cost tracking, cost-estimating and reconciliation with second parties.

Experience working within an occupied facility or campus.

Providing Design and MACC Negotiated Support Services budgeting.

Providing Design and Construction Document coordination comments and verifying their implementation.

Investigation of existing conditions to verify the construction documents will reflect the actual site conditions.

Department of Enterprise Services

Scheduling, making recommendations for change and advising long-lead procurement packages to ensure the project schedule.

Assessing and recommending site logistics requirements.

Subcontract plan preparation, procurement planning and bid management.

Provide two (2) or more examples of projects that demonstrate the range of Preconstruction Services your firm has provided on previous GC/CM projects, or private sector projects with a guaranteed maximum price.

Past Performance in negotiated and similarly complex projects Proposers shall provide a list of negotiated private and public works projects their firm has completed, with a description of the project and the construction cost similar to this project in complexity, including the use of multiple phases, multi-story construction, and working on an occupied campus. Private and public works projects should be identified.

Include the following information:

Description of the project, including gross square feet Public work or private Scope of firm's work on the project, including percent self-performed Location Owner, contact person, telephone number, and email address Initial negotiated price

Final negotiated price Total number and dollar amount of all claims against the Owner Total number and total dollar amount of all claims against the Owner adjudicated by a dispute resolution board, arbitration, or litigation Experience in dealing with craft labor relations, including Project Labor

Agreement (PLA) coordination

Project scheduling & cost control Proposers shall describe how their firm will monitor and ensure the Owner’s program scope is maximized, and the Owner’s construction budget and project schedule are met at every phase of the Design and Construction Documents development and during construction. The proposer shall describe the firm’s experience using life-cycle costs, while incorporating operating costs and energy efficiency measures into the work. In addition, Proposers shall describe the estimating and scheduling systems and management techniques their firm employs to achieve success in the aforementioned items.

Proposers also shall provide the following information for each of the projects listed in response to Section 9.4 above:

As-planned schedule vs. as-built schedule (Notice to Proceed to

Substantial Completion) Owner’s original estimate Original total contract cost Total dollar amount of change orders

The proposer’s capacity to perform the work Proposers shall provide a brief description of their firm’s history, size, location of home and regional offices, and their capabilities to perform the requirements of this contract, Department of Enterprise Services including annual volume, financial position, and bonding capacity.

Proposers shall summarize recent, current, and projected firm workloads. Such summary shall include the firm’s annual volume (in dollars) of construction for the past five years and the anticipated volume for the current year and the firm’s plan for the next two years including how the firm’s participation in this project would affect that plan.

Proposers shall identify the scope of work the firm proposes to self-perform and its past performance in that scope of work.

Risk identification and analysis Proposers shall provide a Project Risk Assessment plan, identifying potential project risks beyond the control of the GC/CM and strategies to mitigate these risks.

Value Engineering and Constructability Analysis Proposers shall describe their philosophy, experience, and methodology in value engineering and constructability analysis, describing the key project individuals’ experience in each of these areas. Proposers shall provide examples of both value engineering reports and constructability analyses developed and utilized on prior projects and the results obtained. A description of the GC/CM’s approach to working with the Owner and the A/E should be included. Include a statement on how proposer will determine and assess constructability issues and provide assistance identifying safe work practices and requirements for construction. For value analysis, identify experience in assessing alternative construction options, products, and engineering systems for cost savings and life cycle cost design considerations.

Proximity to the Project Location / Self Performance Proposers shall identify the point-to-point distance of the office responsible for this project and the Washington State Capitol Campus, describe their firm’s familiarity with the local labor and subcontracting market and capability of working with subcontractors to generate viable pricing alternatives.

Past utilization of disadvantaged business enterprises The proposers past performance in utilization of disadvantaged business enterprises, small business entities and their inclusion plan for these entities.

10.0 PHASE TWO - NOTIFICATIONS & REFERENCE CHECKS

After scoring proposals, the selection committee will select a short-list of the most highly qualified firms as Finalists to move forward in the selection process. Phase Two only applies to Finalist firms and consists of proprietary meetings (required), an interview and a Final Proposal as described in the following sections.

The short-listed Finalists shall provide no less than five 5 and no more than 15 references on the DES provided Performance Evaluation Questionnaire (Attachment 04). The selection committee reserves the right to make reference checks beyond those provided by the short-listed firms.

Each Finalist will have one individual proprietary meeting with the Selection Panel. The purpose of the meetings is for the finalists to ask questions of the Owner and the Design Team and better understand the requirements of the project. Each finalist will create their own proprietary meeting agenda and lead the meeting. Each of the finalist firms will have 90 minutes to conduct the meeting. The proprietary meetings will not exceed the

Department of Enterprise Services time allotted. Information shared in these meetings will not be discussed with other finalists.

11.0 PHASE TWO - INTERVIEWS

After scoring proposals or qualifications, the selection committee will select a short-list of the most highly qualified firms as Finalists to interview.

Should a firm be invited to interview, questions will be directed solely to the proposed project team. At a minimum, the project executive dedicated to the project, the project manager, the superintendent, at least one project engineer, estimator, and other key individuals responsible for Preconstruction Services shall attend the interview. In addition to presenting their qualifications, experience, and approach to the project the project team will be expected to respond to questions from the selection committee regarding the proposal as well as additional questions that might have been posed in the notification letter to the firm.

The selection committee will evaluate oral interviews with feedback from reference checks, with emphasis on the following items as they relate to this project.

Criteria Value

Ability and qualifications of professional personnel 20

Approach to Preconstruction Services, integration with design team, and cost estimating

Value engineering, constructability/interdisciplinary review and approach to executing the project

Project sequencing Time and budget requirements; schedule management 15

Past performance on similar complex or negotiated contracts 15

Risk analysis, mitigation and management 10

Final Proposal (Bid) 5

Diverse Business Inclusion Plan (Mandatory Requirement) Not Scored

Accident Prevention Program (Mandatory Requirement) Not Scored

Diverse Business Inclusion Plan Mandatory Requirement Each Finalist team shall present its project Diverse Business Inclusion Plan during its interview. See Section 14.0 and Attachment 06 for Plan requirements.

Accident Prevention Program Mandatory Requirement A copy of an accident prevention plan and safety program shall be provided that is similar to that to be developed for this project, identifying specific criteria applicable to this project.

Department of Enterprise Services

12.0 FINAL PROPOSALS

The Finalists that the selection committee believes to be the most highly qualified based upon their Phase 1 proposal scores will be requested to Interview and submit a Final Proposal for GC/CM Percent Fee. Final proposals will be computed as follows:

Lowest Conforming Proposal (bid) / Proposal being evaluated (bid) X 5

Firms asked to submit Final Proposals shall submit a bid number for the GC/CM Percent Fee on a Final Proposal form to be provided. The terms GC/CM Percent Fee work will be specifically defined in the Request for Final Proposal (RFFP).

State your Percent Fee as a percentage and multiply it by the estimated “MACC” indicated in the RFFP document to determine a single lump sum number for the dollar amount of the Percent Fee.

In completing the Final Proposal form, the proposer must enter a number for the

Percent Fee. No other entries, modifications, or qualifications shall be made to the bid. Failure to comply in full with these requirements shall be grounds for a bid being declared non-responsive. The Owner reserves the right to reject any or all bids, and to waive informalities or non-material irregularities in the bids received.

The name, address, and contractor's registration number shall be typed or printed on the Final Proposal form in the space provided.

Bids must be (1) submitted on the forms furnished by DES or on copies of those forms, and (2) manually signed in ink, or electronically signed with date and time.

Proposers shall submit bid amounts in the format provided in the Request For

Final Proposal form. Only the amounts and information asked for in the Final Proposal form furnished will be considered as the bid. All blank spaces must be filled in.

Clearly identify the project name on the outside of the bid envelope.

13.0 FINAL SELECTION

The Finalist with the highest Phase Two score resulting from the selection committee’s scoring of the Interview, and the results of the Final Proposal will be selected to provide Preconstruction Services and for MACC negotiations. Interview scores amongst the panelists will be averaged in each category to determine final points. In the event of a tie in total score, the firm with the lowest conforming Final Proposal (bid) will be selected.

14.0 DIVERSE BUSINESS INCLUSION PLAN (see also Attachment 06)

Each Finalist team shall present its project Diverse Business Plan during its interview. In accordance with legislative findings and policies set forth in Chapter 39.19 RCW, the state of Washington encourages participation in all contracts by firms certified by the Office of Minority and Women’s Business Enterprises (“OMWBE”), and set forth in RCW 43.60A.200 for firms certified by the Washington State Department of Veterans Affairs, and set forth in RCW 39.26.005 for firms that are Washington Small Businesses.

Department of Enterprise Services

Participation may be either on a direct basis or on a subcontractor basis. However, no preference on the basis of participation is included in the evaluation of Diverse Business Inclusion Plans submitted at the time of finalist interviews, and no minimum level of minority- and women-owned business enterprise (MWBE), Washington Public Works Small Business, or Washington State certified Veteran Business participation is required as a condition for receiving an award of the GC/CM Contract. Any affirmative action requirements set forth in any federal Governmental Rules included or referenced in the contract documents will apply. Further instructions will be included in the RFFP, as applicable.

15.0 APPRENTICESHIP REQUIREMENT

In accordance with RCW 39.04.320 the state of Washington requires Apprenticeship Participation for this project. Apprenticeship participation requirement shall be 15% of the total labor hours. On applicable bid packages, the bid advertisement and Bid Proposal form shall establish a minimum required percentage of apprentice labor hours compared to the total labor hours as described in Article 7. Bidders may contact the Department of Labor and Industries, Specialty Compliance Services Division, Apprenticeship Section, P.O. Box 44530, Olympia, WA 98504-4530, or by phone 360- 902-5320 to obtain information on available apprenticeship programs. The GC/CM and all trade partners shall, at least monthly, file weekly certified payroll on L&I’s website.

The selected GC/CM shall determine the best method of obtaining apprentice participation and shall provide an Apprentice Utilization Plan for Owner review using the Attachment 7 Apprenticeship Utilization Plan form. The plan will demonstrate how and when the GC/CM intends to achieve the Apprenticeship Utilization requirements. The Contractor shall upload the completed plan to the Labor and Industries (LNI) project page through the Contractor portal prior to proceeding with the buyout phase of the project. The Contractor shall provide and updated Plan during the course of construction when there are significant changes to the Plan which may affect their ability to meet the Apprenticeship Utilization requirement.

The GC/CM’s performance in meeting the apprentice requirement for this project will be evaluated and may be considered when selecting GC/CM’s for future projects.

16.0 CONTRACTOR RESPONSIBILITY CRITERIA

Mandatory Responsibility Criteria: Proposers must comply with RCW 39.04.05.350 (1), which provides that:

1. Before award of a public works contract, a bidder must meet the following responsibility criteria to be considered a responsible bidder and qualified to be awarded a public works project. The bidder must:

a) At the time of bid submittal, have a certificate of registration in compliance with Chapter 18.27 RCW;

b) Have a current state unified business identifier number;

c) If applicable, have industrial insurance coverage for the bidder's employees working in Washington as required in Title 51 RCW; an Employment Security Department number as required in Title 50 RCW; and a state excise tax registration number as required in Title 82 RCW;

d) Not be disqualified from bidding on any public works contract under RCW

39.06.010 or 39.12.065(3); and

Department of Enterprise Services

e) If bidding on a public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, not have been found out of compliance by the Washington State Apprenticeship and Training Council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under chapter 49.04 RCW for the one-year period immediately preceding the date of the bid solicitation.

f) Public Works and Prevailing Wage Training/Exemption. Bidders shall have received training on the requirements related to public works and prevailing wage under this chapter and chapter 39.12 RCW. The bidder must designate a person or persons to be trained on these requirements. The training must be provided by the department of labor and industries or by a training provider whose curriculum is approved by the department. The department, in consultation with the prevailing wage advisory committee, must determine the length of the training. Bidders that have completed three or more public works projects and have had a valid business license in Washington for three or more years are exempt from this subsection. The department of labor and industries must keep records of entities that have satisfied the training requirement or are exempt and make the records available on its website.

Responsible parties may rely on the records made available by the department regarding satisfaction of the training requirement or exemption.

http://lni.wa.gov/TradesLicensing/PrevWage/Contractors/Training.asp

g) Within the three year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgement entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of RCW 49.46, 49.48, or 49.52. A bidder shall submit a signed Contractor Certification form with the bid or within two (2) business days of request by Owner regarding this wage theft prevention responsible bidder criteria.

Contract Documents

Article 00 GCCM Instructions to Proposers

Article 01 General/Supplemental Conditions for Washington State Facilities Construction

Article 02 Not Applicable (Not Provided)

Article 03 Modifications to the Washington State General Conditions

Article 04 Form of Contract (Examples)

Article 05 Preconstruction Services

Article 06 Total Contract Price

Article 07 Apprenticeship Requirements

Article 08 Quality Control/Quality Assurance

Article 09 Coordination & Meetings

Article 10 Budget

Article 11 Contract Changes

Article 12 Schedule Management

Article 13 Substantial Completion / Project Closeout

Department of Enterprise Services

Article 14 Definitions

Attachments

Attachment 00 Proposer Contact Page

Attachment 01 Advertisement for GCCM

Attachment 02 Request for Final Proposal (RFFP) for GC/CM Services

Attachment 03 Final Proposal Form

Attachment 04 Performance Evaluation Questionnaire

Attachment 05 Cost Responsibility Matrix

Attachment 06 Phase 2 Diverse Business Inclusion Plan Criteria (will be issued via addendum)

Attachment 07 Apprentice Utilization Plan Form

Attachment 08 Protest Procedures – Phase One

Attachment 09 Protest Procedures – Phase Two

Attachment 10 RCWs Relevant to GCCM

Attachment 11 Retainage Bond

Attachment 12 Change Order Proposal

Attachment 13 Field Authorization

Attachment 14 Team Change Memo

Attachment 15 Wage Theft Prevention Form

Attachment 16 Certificate of Substantial Completion

Attachment 17 Final Acceptance