2026-101_2026-102_MCC BID MANUAL.pdf

PDF 1 MB Posted

Attached to
MCC 2026-101 & 2026-102 Bid
Solicitation number
IFB1 GJGA 2026000151 1
Issued by
Otero County, Colorado

About this file

This is an Advertisement for Bids issued by Morgan Community College, a State of Colorado institution, for two concurrent construction projects: Project 2026-101 (STEM Project Renovations) and Project 2026-102 (Mi Casa Career Center). The STEM Project Renovations involve comprehensive renovation of three science laboratories and classroom space to house the STEM Studio, including installation of high-performance laboratory fume hoods, wood laboratory casework, safety equipment, specialized exhaust ductwork, HVAC system balancing, and all associated plumbing and electrical connections. The Mi Casa Career Center project encompasses renovation of the current Welcome Center into a Career Center with a newly constructed Welcome Center, plus updates to the adjacent Learning Commons, including interior refinishing, new glass storefront systems, architectural wood paneling, updated HVAC systems, electrical and lighting controls, and modernized fire suppression and security systems. A mandatory Pre-Bid Conference and Site Tour is scheduled for March 18, 2026, at 9:00 AM MST at Morgan Community College, 920 Barlow Road, Fort Morgan, Colorado 80701. The deadline for requests for clarifications is March 23, 2026, at 2:00 PM, with a final addendum anticipated by March 27, 2026. Bid submittals are due April 8, 2026, at 10:00 AM MST, with public bid opening at 10:15 AM the same day. Award notification is anticipated for April 9, 2026, with contracting expected between April 9–16, 2026, and contract approval by April 16, 2026. Construction is anticipated to commence April 16, 2026, with STEM Labs completion by July 31, 2026, and all construction completion and close-out by September 30, 2026.

Both projects are federally funded and must comply with the Build America Buy America (BABAA) Act, requiring that all iron, steel, manufactured products, and construction materials be produced in the United States. Prevailing wage rates apply per Colorado law, with wage determinations issued by the U.S. Department of Labor. State Prevailing Wage requirements and apprenticeship utilization certification are applicable for projects of this size. Qualified bidders must demonstrate experience with at least two projects exceeding $1,000,000 in hard costs within the past two years, current bonding capability up to $1,700,000 per project, and must not have been previously terminated by the State for non-performance. A 5% bid bond is required, and payment and performance bonds of not less than 50% of the contract value are mandated upon award. Although the projects are independently funded, Morgan Community College intends to award both to the same contractor with contracts awarded on cumulative bid totals. Bidding documents are available on https://www.bidnetdirect.com/colorado/mcc/, and all submittals become property of the State of Colorado and will not be returned. The contract documents incorporate the State of Colorado's standard Design/Bid/Build Agreement (SC-6.21) and General Conditions (SC-6.23), and both projects are subject to the Buy Clean Colorado Act with required Environmental Product Declaration (EPD) submissions for eligible materials.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OSA-AFB-1 pg. 1

REV 7/2025

ADVERTISEMENT FOR BIDS

Design / Bid / Build State of Colorado

Morgan Community College

Notice Number: CORE ID: 2026000151

Project Number: 2026-101 & 2026-102 Project Title: STEM Project Renovations and Mi Casa Career Center

NOTICES

1. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.

2. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.

3. All respondents accept the conditions of this AFB, including but not limited to, the following:

a. All submittals shall become the property of the State of Colorado and will not be returned.

b. Late submittals shall not be evaluated.

c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.

d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.

4. The respondent has reviewed Appendix F and by responding has agreed that the terms and conditions of the sample Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.21) and General Terms and Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.

5. Per C.R.S. §24-92-115 unless prohibited by applicable federal law, contract for any public project in the amount of one million dollars or more, that does not receive federal money, in the amount of one million dollars or more shall require the general contractor to which the contract is awarded to submit, at the time the mechanical, electrical, or plumbing subcontractor is put under

OSA-AFB-1 pg. 2 contract, documentation that Identifies the contractors or subcontractors that will be used for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work required on the project and certifies that all firms identified participate in apprenticeship programs registered with the United States department of labor’s employment and training administration or state apprenticeship councils recognized by the United States department of labor and have a proven record of graduating a minimum of 15% of its apprentices for at least three of the past five years.

6. Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include, in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.

7. Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors. Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.

8. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.

9. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

10. Due to the federal funding source of these projects, both projects are subject to Build America Buy America Sourcing Requirements Grant Condition Domestic Sourcing Under the Build America Buy America Act (BABAA). Requirement: As a condition of this award, a grantee using grant funds for infrastructure projects or activities (e.g., construction, remodeling, and broadband infrastructure) must comply with the following requirements:

OSA-AFB-1 pg. 3

(1) All iron and steel used in the infrastructure project or activity are produced in the United States. Accordingly, all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States. (2) All manufactured products used in the infrastructure project or activity are produced in the United States.

Accordingly, the manufactured product was manufactured in the United States and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation.

(3) All construction materials are manufactured in the United States. Accordingly, all manufacturing processes for the construction material occurred in the United States. Scope: The Buy America domestic sourcing requirement only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. The requirement does not apply to (1) tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project.

(2) equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.

PROJECT OVERVIEW

Introduction The State of Colorado, Morgan Community College (MCC) is soliciting bids from qualified contractors for 2026-101 STEM Project Renovations and 2026-102 Mi Casa Career Center.

Background: MCC is soliciting bids for two separate projects, each funded in whole or in part with federal grant dollars. Although these projects are independently funded, they are being advertised, contracted, and managed concurrently due to their shared project schedule and coordinated completion requirements of being fully complete, expended, and closed-out by September 30th, 2026, with STEM Project Renovations completed by July 31st, 2026, for the start of the ‘26 Fall semester. Due to this consideration, MCC intends to award these two projects to the same contractor.

However, bidders must provide bids for each project separately and contracts will be awarded on cumulative bid totals.

2026-101/STEM Project Renovations: Three science labs renovation and classroom renovation to house MCC’s STEM Studio. The comprehensive scope includes the installation of high-performance laboratory fume hoods with integrated service fixtures, new wood laboratory casework (including acid storage), essential safety equipment like emergency eyewashes, and new finishes throughout. To support these upgrades, the project requires extensive infrastructure work, including specialized laboratory exhaust ductwork, precise HVAC system balancing (TAB), and the coordination of all new plumbing and electrical connections.

2026-102/Mi Casa Career Center: Renovation of current MCC ‘Welcome Center,’ transforming the current space into Career Center and newly constructed Welcome Center, as well as updates to the adjacent Learning Commons. The comprehensive scope involves renovation of the existing administration wing and library to create a contemporary, new student services wing, including renovated Welcome Center with upgraded service desks, lobby, and work areas, new Career Center offices and lobby, and reorganized library space featuring new offices, an archives room, and an updated service desk. The scope encompasses complete interior refinishing—including new glass storefront systems, architectural wood paneling, ceilings, and flooring—

OSA-AFB-1 pg. 4 alongside a total overhaul of the facility's critical infrastructure, including high-efficiency HVAC systems, upgraded electrical and lighting controls, and modernized fire suppression and security systems.

Scope of Services

The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.

Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s bid.

MINIMUM REQUIREMENTS

Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:

1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.

2. The bidding contractor must have been in the same business, under the same name for the last two (2) years.

3. Demonstrated specific contracting experience in projects of similar scope and complexity for at least two (2) projects each in excess of $1,000,000 (hard costs), utilizing the expertise present in their Colorado Office; and

4. Demonstrated bonding capability up to $1,700,000 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.

5. Attended and signed in at the Mandatory Pre-Bid Conference

Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.

https://www.bidnetdirect.com/colorado/mcc/ https://www.bidnetdirect.com/colorado/mcc/

OSA-AFB-1 pg. 5

MANDATORY PRE-BID CONFERENCE AND SITE TOUR

A mandatory Pre-Bid Meeting will be held at:

Building Address: Morgan Community College 920 Barlow Road Fort Morgan, CO 80701 Room: Founders Room Date/Time March 18th, 2026 9a MST

SCHEDULE

The following is a tentative schedule of events for the Bid Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.

Advertisement for Bids Issued March 11th, 2026 Mandatory Pre-Bid Conference and Site Tour March 18th, 2026 @ 9AM MST

Request for Clarifications Due March 23rd, 2026 @ 2PM Final Addendum Issued (anticipated) March 27th,2026 Bid Submittals Due (date and Time) April 8th, 2026 @ 10a Public Bid Opening April 8th, 2026 @ 10:15a Award Intent Notification (anticipated) April 9th, 2026 Contracting April 9th-April 16th, 2026 Contract Approval (anticipated) April 16th, 2026 Anticipated Construction Start April 16th, 2026 STEM Labs Construction Finish July 31st, 2026 All Construction Finish & Close-out September 30th, 2026

The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on ColoradoVSS website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.

QUESTIONS, CLARIFICATIONS AND ADDENDA

Owner initiated changes to this AFB will be issued under numerically sequenced addenda.

Owner initiated changes to this AFB will be posted in the form of addenda on ColoradoVSS.

Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule.

Communication regarding the project during the procurement, outside of the this submission process or scheduled procurement milestones is not permitted.

OSA-AFB-1 pg. 6

POINT OF CONTACT/CLARIFICATION

Name: Chloe Hirschfeld Agency: Morgan Community College Email Address: chloe.hirschfeld@morgancc.edu Phone: 970-542-3126

BIDDING

Bids shall be submitted on the required bid form as indicated on the Information For Bidders document (SBP-6.12) in Appendix A.

One (1) hard copies of the sealed bid submittal are due April 8th, 2026 and shall be received no later than 10:00 AM MST, and shall be submitted/accepted via mail or hand delivered at the following address:

Morgan Community College ATTN: Chloe Hirschfeld 920 Barlow Road, Office AS103 Fort Morgan, CO 80701

Bid Forms and Appendices to be included with bid submittal:

Bid Form (SBP-6.13) Bid Bond (SBP-6.14) Bid Alternates (SBP-6.131)

Late bid submittals will be rejected without consideration. The State of Colorado assume no responsibility for costs related to the preparation of bid submittals.

BID OPENING

Public bid opening will take place at the date and time identified in the Schedule.

APPENDICES:

Appendix A: Information for Bidders (SBP-6.12) Appendix B: Bid Form (SBP-6.13) Appendix B1: Bid Alternates (SBP-6.131) Appendix B2: Bid Bond (SBP-6.14) Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18) Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe

Rates Appendix E: Sample: Apprenticeship Utilization Certifications (SBP-2.1)

NOT APPLICABLE

(Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s

Agreement and General Conditions of the Contract)

SBP-6.12

Rev 7/2025

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

INFORMATION FOR BIDDERS

Institution or Agency:

Project No./Project Name:

1. BID FORM: Bidders are required to use the Bid form attached to the solicitation.

Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days. In addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, in calendar days.

Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:

2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of addendum.

3. APPLICABLE LAWS AND REGULATIONS: All work under this Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.

4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form

Morgan Community College / GJGA 2026-101STEM Project Reno/2026-102 MiCasa Career Center

Morgan Community College ATTN: Chloe Hirschfeld, Office AS103 920 Barlow Road Fort Morgan, CO 80701 The outside of the sealed inner envelope should bear the following information:

Project # - Project Name-Name and Address of Bidder-Date and Time of Opening

SBP-6.12

satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.

5. TAXES: The Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the GENERAL CONDITIONS.

6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing. Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.

7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two

(2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.

8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal Representative.

Bidders should note the Method of Award is applicable to this Bid as stated below.

A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by, and the contract will be awarded on the base bid combined with deductible alternates, accepted in numerical order as listed in the Bid Alternates Form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.

B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with additive alternates in numerical order in as listed in the Bid Alternates Form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.

C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.

9. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation where settlement will be advertised in electronic media.

SBP-6.13

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

BID FORM

Institution or Agency:

Project No./Project Name:

Bidder Acknowledges Receipt of Addenda Numbers: _______________________________

(See 3a below for the next 3 items)

Bidder Anticipates Services outside the United States or Colorado:* No Yes

Bidder will comply with 80% Colorado Labor on project above $500,000 No Yes

Bidder is a Service-Disabled Veteran Owned Small Business:* No es

Base Bid $________________________

Bidder’s Time of Completion

Time Period from Notice to Proceed to Substantial Completion: ____________________________

Time Period from Substantial Completion to Final Acceptance: ____________________________

Total Time of Completion of Entire Project (a + b): _________________________

1. BID: Pursuant to the advertisement by the State of Colorado dated ______________ the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.

2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.

3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.

a. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys) *

Morgan Community College

2026-101/STEM Project Renovations

b. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project.

Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys) *

c. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs.

Attach proof of certification along with the bid submission. *

d. Projects estimated to be $1 million or more that do not receive federal funds are required to comply with the State Apprenticeship Utilization requirements C.R.S.

24-92-115

e. Projects estimated to be $500,000 or more that do not receive federal funds are required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201 through 210.

4. BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. Per C.R.S. §24- 105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Office of the State Architect, may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, and Insurance Policy.

5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of calendar days noted above. If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of the General Conditions of the Contract, and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor’s Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract.

6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications.

7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents.

8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.

9. The right is reserved to waive informalities and to reject any and all Bids.

*Does not apply to projects for Institutions of Higher Education that have opted out of the State Procurement Code.

SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid, the Bid shall so indicate and be properly signed.

Dated this ________ Day of _______________________ , 20______

THE BIDDER:

By ________________________________________ _________________________________________________ Company Name Address

Phone Number ______________________________ _________________________________________________ City, State Zip Code

By ________________________________________ _________________________________________________ Name (Print) and Title Signature

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

BID FORM

Institution or Agency:

Project No./Project Name:

Bidder Acknowledges Receipt of Addenda Numbers: _______________________________

(See 3a below for the next 3 items)

Bidder Anticipates Services outside the United States or Colorado:* No Yes

Bidder will comply with 80% Colorado Labor on project above $500,000 No Yes

Bidder is a Service-Disabled Veteran Owned Small Business:* No es

Base Bid $________________________

Bidder’s Time of Completion

Time Period from Notice to Proceed to Substantial Completion: ____________________________

Time Period from Substantial Completion to Final Acceptance: ____________________________

Total Time of Completion of Entire Project (a + b): _________________________

1. BID: Pursuant to the advertisement by the State of Colorado dated ______________ the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.

2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.

3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.

a. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys) *

Morgan Community College

2026-102/Mi Casa Career Center

b. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project.

Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys) *

c. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs.

Attach proof of certification along with the bid submission. *

d. Projects estimated to be $1 million or more that do not receive federal funds are required to comply with the State Apprenticeship Utilization requirements C.R.S.

24-92-115

e. Projects estimated to be $500,000 or more that do not receive federal funds are required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201 through 210.

4. BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. Per C.R.S. §24- 105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Office of the State Architect, may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, and Insurance Policy.

5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of calendar days noted above. If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of the General Conditions of the Contract, and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor’s Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract.

6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications.

7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents.

8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.

9. The right is reserved to waive informalities and to reject any and all Bids.

*Does not apply to projects for Institutions of Higher Education that have opted out of the State Procurement Code.

SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid, the Bid shall so indicate and be properly signed.

Dated this ________ Day of _______________________ , 20______

THE BIDDER:

By ________________________________________ _________________________________________________ Company Name Address

Phone Number ______________________________ _________________________________________________ City, State Zip Code

Name (Print) and Title Signature

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

BID BOND

Institution or Agency: Morgan Community College

Project No./Project Name: 2026-101 STEM Project Renovations and 2026-102 Mi Casa Career Center

KNOW ALL MEN BY THESE PRESENTS:

WHEREAS, hereinafter called the “PRINCIPAL”, is submitting a PROPOSAL for the above described project, to the STATE OF COLORADO, hereinafter called the “OBLIGEE”.

WHEREAS, the Advertisement for Bids has required as a condition of receiving the Proposals that the Principal submit with the PROPOSAL GUARANTY in an amount not less than five per cent (5%) of the Proposal, which sum it is specifically agreed is to be forfeited as Liquidated Damages in the event that the Principal defaults in his obligation as hereinafter specified, and, in pursuance of which Requirement, this Bid is made, executed and delivered.

NOW THEREFORE, the Principal and a corporation of the State of , duly authorized to transact business in Colorado, as Surety, are held and firmly bound unto the Obligee, in the sum of five per cent (5%) of the Principal’s total bid price, lawful money of the United States for the payment of which sum, well and truly to be made to the Obligee, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

FURTHER THAT, a condition of the obligation that the Principal shall maintain his Proposal in full force and effect for thirty (30) days after the opening of the proposals for the project, or, if the Principal’s Proposal is accepted, the Principal shall, within the prescribed time, execute the required Agreement, furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, Certificates of Insurance and Certification and Affidavit Regarding Illegal Aliens, then this obligation shall be null and void, otherwise it shall remain in full force and effect, and subject to forfeiture upon demand as Liquidated Damages.

IN WITNESS WHEREOF said Principal and Surety have executed this Bond, this ____ day of ________________________, A.D., 20 .

(Corporate Seal) THE PRINCIPAL

Company Name

ATTEST _________________________________________________

Address

City, State Zip Code

Name (Print) Signature

Name (Print) and Title

If the “Principal” is doing business as a Corporation, the Bid Bond shall be signed by an officer, i.e., President or Vice President. The signature of the officer shall be attested to by the Secretary and properly sealed.

If the “Principal” is an individual or a partnership, the Bid Bond shall so indicate and be properly signed.

(Corporate Seal) THE SURETY

____________________________________________ By_________________________________________________

Secretary Attorney-in-Fact

THIS BOND MUST BE ACCOMPANIED BY POWER OF ATTORNEY, EFFECTIVELY DATED.

FAILURE TO PROVIDE A PROPERLY EXECUTED BID BOND WITH A PROPERLY EXECUTED POWER

OF ATTORNEY WILL RESULT IN THE BIDDER’S PROPOSAL BEING DEEMED NON-RESPONSIVE.

State Form SBP–6.18 Issued 8/2023

STATE OF COLORADO

STATE BUILDINGS PROGRAM

DIRECT LABOR BURDEN CALCULATION

Institution/Agency: Morgan Community College Project No./Name: 2026-101 STEM Project Renovations/2026-102 Mi Casa Career Center

This form is required to be submitted for review prior to execution of a construction agreement.

List items below by the percentage of what makes up the total labor overhead; Items include benefits that a contractor pays to employees on their payroll. Examples include taxes, pension cost, health and dental insurance etc. The Labor Burden percentage must be agreed to by both the contractor and Principal Representative and will be included in the contract as part of Exhibit A and will be used in the calculation of any future Change Order Proposals (SC-6.312) Line 2.

Major sub-contractors defined as electricians, plumbers, mechanical contractors, excavators, millwork, concrete, block layers etc. Please provide one (1) Labor Burden Calculation Sheet per contractor and for each sub-contractor. These labor burdens shall be used in the calculation of any future Change Order Proposals (SC-6.312) Line 10.

State reserves the right to require back-up confirmation of all information included in this calculation.

Contractor/Subcontractor Name:

Percent of Salary Paid

Payroll Taxes Pension Costs Health Insurance Dental Insurance Life Insurance Other (Specify) Description: _________________________ Other (Specify) Description: _________________________

Total Labor Burden Percentage: 0%

"General Decision Number: CO20250001 12/12/2025

Superseded General Decision Number: CO20240001

State: Colorado

Construction Type: Building

Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Fremont, Garfield, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Washington and Yuma Counties in Colorado.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 01/03/2025 1 02/07/2025 2 03/14/2025 3 03/28/2025 4 05/16/2025 5 07/11/2025 6 07/18/2025 7 07/25/2025 8 08/08/2025 9 08/15/2025 10 09/05/2025 11 09/12/2025 12 12/05/2025 13 12/12/2025

ASBE0028-004 07/01/2025

ALL COUNTIES EXCEPT ARCHULETA, CONEJOS, COSTILLA, LA PLATA AND

MONTEZUMA

Rates Fringes

Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems.....................$ 36.98 16.82

ASBE0076-002 01/01/2025

ARCHULETA, CONEJOS, COSTILLA, LA PLATA AND MONTEZUMA

Rates Fringes

Asbestos Workers/Insulator (Includes application of all insulating materials, 12/29/25, 8:07 AM SAM.gov https://sam.gov/wage-determination/CO20250001/13 1/9 protective coverings, coatings and finishes to all types of mechanical systems)....................$ 36.60 11.83

BRCO0007-003 05/01/2024

ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS,

COSTILLA, CROWLEY, CUSTER, DOLORES, FREMONT, HINSDALE,

HUERFANO, KIOWA, KIT CARSON, LA PLATA, LAS ANIMAS, LINCOLN,

MINERAL, MONTEZUMA, PROWERS, SAGUACHE & SAN JUAN COUNTIES

Rates Fringes

BRICKLAYER.......................$ 32.93 14.29

BRCO0007-009 05/01/2024

DELTA, GARFIELD, GRAND, GUNNISON, JACKSON, LAKE, LOGAN, MOFFAT,

MONTROSE, MORGAN, OTERO, OURAY, PHILLIPS, RIO BLANCO, RIO

GRANDE, SAN MIGUEL, SEDGWICK, WASHINGTON & YUMA COUNTIES

Rates Fringes

BRICKLAYER.......................$ 32.93 14.29

BRCO0007-010 01/01/2024

EAGLE, PITKIN, ROUTT & SUMMIT COUNTIES

Rates Fringes

BRICKLAYER.......................$ 42.37 15.21

CARP9901-006 05/01/2024

Baca, Bent, Chaffee, Cheyenne, Clear Creek, Crowley, Custer, Delta, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Huerfano, Jackson, Kiowa, Kit Carson, Lake, Las Animas, Lincoln, Logan, Moffat, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Routt, Saguache, Sedgwick, Summit, Teller, Washington and Yuma Counties, Colorado

Rates Fringes

Carpenters:

Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work.........$ 33.11 12.17

CARP9901-007 05/01/2024

Rates Fringes

CARPENTER

Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work.........$ 33.11 12.17

ELEC0012-010 09/01/2025

ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,

https://sam.gov/wage-determination/CO20250001/13 2/9

CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,

OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES

Rates Fringes

Electricians:....................$ 35.40 16.06

ELEC0068-007 06/01/2025

EAGLE, GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK,

SUMMIT, WASHINGTON AND YUMA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 46.80 19.53

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls

ELEC0111-006 01/01/2025

DELTA,GARFIELD,MONTROSE,and RIO BLANCO COUNTIES in COLORADO.

Rates Fringes

ELECTRICIAN......................$ 31.75 13.25

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

ELEC0111-009 01/01/2025

DOLORES, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA,

OURAY, PITKIN, ROUTT, SAN JUAN and SAN MIGUEL COUNTIES in

COLORADO.

Rates Fringes

ELECTRICIAN......................$ 36.95 14.41

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

ELEC0111-013 01/01/2025

DELTA, GARFIELD, MONTROSE, and RIO BLANCO COUNTIES in COLORADO.

Rates Fringes

ELECTRICIAN......................$ 31.75 13.25

(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)

ELEC0113-003 06/01/2025

CHEYENNE, KIT CARSON & LINCOLN COUNTIES

Rates Fringes

ELECTRICIAN (Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)............$ 40.70 18.47 https://sam.gov/wage-determination/CO20250001/13 3/9

ELEV0025-002 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 56.57 38.435+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

IRON0024-002 11/01/2024

Rates Fringes

Ironworker, reinforcing and structural.......................$ 39.21 12.50

LABO0720-003 05/01/2021

Rates Fringes

LABORER

Concrete/Mason Tenders......$ 21.10 7.89

PAIN0930-001 07/01/2025

Rates Fringes

GLAZIER..........................$ 37.26 13.15

PLAS0577-001 05/01/2025

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.73 15.15

PLUM0003-006 06/01/2025

GRAND, JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK,

SUMMIT, WASHINGTON, AND YUMA. PARTS OF ELBERT, EAGLE, KIT

CARSON & LINCOLN COUNTIES

Rates Fringes

PLUMBER

(Including HVAC Work).......$ 47.23 21.68

PLUM0058-009 07/01/2025

ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, KIT CARSON

(Including towns of Dfalgler, Seibert, Vona, Stratton and Bethune), LAS ANIMAS, LINCOLN (Including towns of Geona and Arriba in the southern portion of the county), MINERAL, OTERO, PROWERS, RIO GRANDE, AND SAGUACHE COUNTIES

Rates Fringes https://sam.gov/wage-determination/CO20250001/13 4/9

PLUMBER/PIPEFITTER

(Plumbers include HVAC work) (Pipefitters exclude HVAC work).......................$ 47.60 18.10

PLUM0145-001 07/01/2025

ARCHULETA, DELTA, DOLORES, EAGLE (Eagle County is divided from where Pitkin and Lake Counties join on the north, and in a straight line to and including the town of Edwards and northerly to the south east corner of Routt County), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL

COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER

PLUMBERS (Including HVAC work) & PIPEFITTERS (Excluding HVAC work).......$ 41.32 16.01

PLUM0208-005 06/01/2025

CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,

PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, YUMA. PARTS OF ELBERT,

EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES

Rates Fringes

PIPEFITTER

(Excluding HVAC pipe).......$ 45.40 22.11 (Excluding HVAC work).......$ 43.40 22.11

ROOF0058-001 05/01/2025

Rates Fringes

ROOFER...........................$ 32.90 6.18

SHEE0009-001 07/01/2025

Rates Fringes

Sheet metal worker (Includes HVAC duct and installation of HVAC systems)....................$ 43.05 22.65

SUCO2001-008 12/20/2001

Rates Fringes

Carpenters:

Acoustical..................$ 15.69 3.15 All other Work..............$ 15.94 3.41

Drywall Finisher/Taper...........$ 14.44 2.19

Laborer, common..................$ 9.75

PAINTER..........................$ 15.19

https://sam.gov/wage-determination/CO20250001/13 5/9

(Excluding drywall finishing/taping) Brush, Roller, Spray

Power equipment operators:.......$ 13.41 Backhoe

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers https://sam.gov/wage-determination/CO20250001/13 6/9

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the…