2026-06 Addendum (1).pdf
PDF 164 KB Posted
- Attached to
- Window Washing Service(s) - GBHA
- Solicitation number
- 2026-06
- Issued by
- Brown County, Wisconsin
About this file
Addendum to RFB 2026-06 Window Washing Services
This addendum document pertains to Request for Bid 2026-06, issued jointly by the City of Green Bay and the Green Bay Housing Authority (GBHA) for professional window washing services at Mason Manor, an 8-story high-rise residential apartment building containing 154 units located at 1424 Admiral Court, Green Bay, Wisconsin. The scope of work encompasses comprehensive interior and exterior window cleaning services for all window surfaces, frames, sills, and ledges throughout the entire building, with services primarily scheduled for spring or on an as-needed basis. A mandatory pre-bid site inspection is scheduled for April 30, 2026, at 11:00 AM CDT, with questions from prospective bidders due by May 5, 2026. Addenda will be posted by May 7, 2026, and bids are due by May 14, 2026, at 2:00 PM CDT. The contract term consists of an initial three-year period with two optional one-year renewal periods, contingent upon satisfactory performance and available funding, with termination possible at any time with 30 days' written notice. Work must be performed Monday through Friday between 8:00 AM and 4:00 PM with a minimum of 24 hours' notice.
Award will be made to the lowest responsive and responsible bidder based on total bid price for the initial three-year term, with pricing to remain firm throughout the base term. Contractors must furnish all labor, equipment, materials, and expertise required to perform the work safely and with minimal disruption to residents and building operations. Qualified bidders must demonstrate a minimum of five years of prior window washing experience supported by three professional references from comparable institutions, provide a dedicated on-site supervisor with at least five years of high-rise experience, and employ technicians with current certifications for the access methods used. Contractors must maintain comprehensive insurance coverage including Commercial General Liability of at least $1,000,000 per occurrence, Business Automobile Liability of $1,000,000 combined single limit, statutory Workers' Compensation insurance, and Professional Liability insurance of at least $1,000,000 with six-year coverage extension post-project completion. All insurance policies must be obtained from insurers with an A.M. Best rating of no less than A- and a Financial Category rating of at least VII. Compensation will be on a fixed-price basis with payment made upon submission of itemized invoices and acceptance of completed services, and price adjustments are limited to documented, industry-wide cost increases submitted 60 days prior to subsequent contract periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| City of Green Bay Contract for Services - Sample.pdf | ||
| 2026-06 RFB.pdf | ||
| 2026-06 Bid Summary.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
RFB #2026-06 Window Washing Services
RFB Due Date: May 14, 2026 by 2:00 PM (CT)
This Addendum must be acknowledged on Form B – Receipt of Forms & Submittal Checklist.
The purpose of this Addendum is to clarify, modify, change, delete from, add to, explain or correct the original Request for Bids and is hereby made part of it. In case of conflict between the Request for Bids and this Addendum, this Addendum shall govern.
1.1 Supplementary Information
To ensure compliance with OSHA 1910.27 and 1910.28 safety regulations and to maintain building integrity, access to the rooftop is strictly prohibited for the purpose of window washing or related exterior maintenance. Contractors must utilize alternative methods such as – water-fed pole systems, aerial/scissor lifts, interior-based solutions, etc.
Contractors are responsible for their own safety regarding radio frequency (RF) exposure that may exceed the FCC Occupational Exposure Limits when working near rooftops containing telecommunication devices; Contractors shall review hazard assessments, obey warning signs, and maintain safe distances from active antennas and must establish protocols using personal protective equipment and limiting time in restricted zones for minimizing risk on worksites.
1.2 Questions & Answers
1. Are there roof anchors on the roof?
A. No. (see section 1.1 Supplementary Information)
2. Have the roof anchors been tested (both the 10-year engineer stamped certification and an annual roof anchor inspection; are both up to date and on file?
A. No. (see section 1.1 Supplementary Information)
3. If there are no roof anchors, is the parapet wall certified to hang from?
A. No.
4. Do you have portable anchors?
A. Awarded Contractor would be required to provide their own portable anchors.
5. The current phone online of the building shows screens; do they need to be taken out from within? If so, those will need to be removed before we arrive…
A. The Contractor is required for screen removal from within along with cleaning any contaminates on the screen itself and/or notifying City staff of any apparent damages.
6. Is there a current photo of the building with the windows?
A. Sliding windows (or “gliding windows”) that open horizontally on a track were recently installed (2025). Windows include a “safety block” that must be removed by the Contractor for full window access.
***End of Addendum***
File details come from the government source that posted it. Updated .