2026 05 21-GHS Roof_Drawings_Sealed_Cert.pdf
PDF 2 MB Posted
- Attached to
- Granville Health System Roofing Project
- Solicitation number
- 373GHS00011
- Issued by
- Graham County, North Carolina
About this file
This file comprises architectural drawings and building code documentation for a roof replacement project at Granville Health System's Main Hospital located at 1010 College Street, Oxford, North Carolina 27565. The project involves the removal and replacement of approximately 18,000 square feet of roofing system, including demolition of existing roofing, flashings, edge metal, coping, roof drains, gutters, downspouts, scuppers, vents, and associated equipment down to the existing slab. The new roofing system will consist of TPO membrane fully adhered to walls with 2.5-inch rigid insulation, 1/4-inch cover board, and tapered roof insulation to accommodate proper drainage with a maximum slope of 1/4 inch per 12 inches. The project drawings are sealed and certified by Progressive Architecture Engineering, P.C., with project number 22180003, drawn by Julia Brewer, AIA, and issued for construction on May 21, 2026. Interested firms must submit responses by Tuesday, June 16, 2026, at 2:00 p.m. eastern standard time, with a public bid opening to follow immediately at the Administration Conference Room at the Main Hospital. An optional pre-bid conference and site tour will be held on Tuesday, June 2, 2026, at 2:00 p.m. at the project location, which the owner highly encourages prospective bidders to attend.
The solicitation requires qualified firms to demonstrate experience with similar roofing projects and meet applicable HUB (Historically Underutilized Business) participation goals as established by North Carolina General Statutes and local government guidelines. Submissions will be evaluated according to NC General Statutes and local government guidelines. Detailed instructions, advertisement for bid, and complete scope of work are available on the NC eProcurement Website. Inquiries regarding the project should be directed to Zeb Barnette at zbarnette@granvillemedical.com or 919-690-3412 for assistance with technical or procedural questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 01 (6-11-26) - binder.pdf | ||
| newspaper advertisment _ roofing project_ 5-22-2026 (1).docx | DOCX document | |
| GHS - Main Hospital Roofing Project - Project Manual (5.18.26).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWN BY
PROFESSIONAL
PROJECT MANAGER
PROJECT NUMBER
CHECKED BY
7 6 5 4 3 2 1
A B
C D
E
7 6 5 4 3 2 1
ISSUANCE
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P
.C
T H
IS
D
O C
U M
E N
T H
A S
B E
E N
P R
E P
A R
E D
B Y
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P .C
A
S A
N
IN
S T
R U
M E
N T
O F
S E
R V
IC
E
, A N
D P
R O
G R
E S
S
IV
E A
R C
H
IT
E C
T U
R E
E N
G
IN
E E
R
IN
G
P .C
. S H
A
LL
R E
T A
IN
A
LL
C
O M
M O
N L
A W
, S T
A T
U T
O R
Y A
N D
O T
H E
R R
E S
E R
V E
D R
IG
H
T S
IN
C
LU
D
IN
G
T H
E C
O P
Y R
IG
H
T T
H E
R E
T O
5/
/2
:4 4:
A
M A ut od es k
D oc s:
//2
G ra nv ill e
M ed ic al
C en te r
R oo f R ep la ce m en t/2
- G ra nv ill e
M ed
R oo f - A rc h.
rv t
MAIN HOSPITAL ROOFING PROJECT
GRANVILLE HEALTH SYSTEM
1010 COLLEGE STREET, OXFORD, NC 27565
TITLE DRAWING
TD001
M A
IN
H
O S
P
IT
A L
R O
O F
IN
G
P R
O J
E C
T
G R
A N
V
IL
L E
H E
A L
T H
S Y
S T
E M
C O
LL
E
G E
S T
R E
E T
O
X F
O R
D
N C
J.BREWER
J.BREWER
B.MCCAFFERY
22180003
J.TRUSSLER
T D
T
IT
LE
D
R A
W
IN
G
.2
.0
DRAWING INDEX
GENERAL
TD001 TITLE DRAWING
G101 BUILDING CODE SUMMARY
ARCHITECTURAL
AD101 DEMOLITION PLAN
A102 ROOF PLAN
A311 ROOF DETAILS
2 05/21/2026 ISSUED FOR
CONSTRUCTION
jbrewer Stamp jbrewer Stamp
DRAWN BY
PROFESSIONAL
PROJECT MANAGER
PROJECT NUMBER
CHECKED BY
7 6 5 4 3 2 1
A B
C D
E
7 6 5 4 3 2 1
ISSUANCE
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P
.C
T H
IS
D
O C
U M
E N
T H
A S
B E
E N
P R
E P
A R
E D
B Y
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P .C
A
S A
N
IN
S T
R U
M E
N T
O F
S E
R V
IC
E
, A N
D P
R O
G R
E S
S
IV
E A
R C
H
IT
E C
T U
R E
E N
G
IN
E E
R
IN
G
P .C
. S H
A
LL
R E
T A
IN
A
LL
C
O M
M O
N L
A W
, S T
A T
U T
O R
Y A
N D
O T
H E
R R
E S
E R
V E
D R
IG
H
T S
IN
C
LU
D
IN
G
T H
E C
O P
Y R
IG
H
T T
H E
R E
T O
5/
/2
:4 6:
A
M A ut od es k
D oc s:
//2
G ra nv ill e
M ed ic al
C en te r
R oo f R ep la ce m en t/2
- G ra nv ill e
M ed
R oo f - A rc h.
rv t
BUILDING CODE
SUMMARY
G101
M A
IN
H
O S
P
IT
A L
R O
O F
IN
G
P R
O J
E C
T
G R
A N
V
IL
L E
H E
A L
T H
S Y
S T
E M
C O
LL
E
G E
S T
R E
E T
O
X F
O R
D
N C
J.BREWER
J.BREWER
B.MCCAFFERY
22180003
J.TRUSSLER
G
B
U
IL
D
IN
G C
O D
E S
U M
M A
R Y
.2
.0
2018 APPENDIX B
BUILDING CODE SUMMARY
FOR ALL COMMERCIAL PROJECTS
LEAD DESIGN PROFESSIONAL
2018 NC BUILDING CODE:
BASIC BUILDING DATA:
DESIGN LOADS:
NAME OF PROJECT:
ADDRESS:
PROPOSED USE:
OWNER OR AUTHORIZED AGENT:
OWNED BY:
CODE ENFORCEMENT JURISDICTION: CITY: COUNTY:
PHONE #:
DESIGNER FIRM NAME LICENSE# TELEPHONE
ARCHITECTURAL:
CIVIL:
ELECTRICAL:
FIRE ALARM:
PLUMBING:
MECHANICAL:
SPRINKLER/STANDPIPE:
STRUCTURAL:
RETAINING WALLS >5' HIGH:
OTHER:
CONSTRUCTION TYPE:
I-A I-B II-A II-B III-A III-B IV V-A V-B
SPRINKLERS:
STANDPIPES:
FIRE DISTRICT:
SPECIAL INSPECTIONS REQUIRED:
YESNO
YESNO
YESNO
NFPA 13 NFPA 13R NFPA 13D
I II III WET DRY
GROSS BUILDING AREA TABLE:
PRIMARY OCCUPANCY:
FLOOR EXISTING (SQ. FT.) NEW WORK AREA (SQ. FT.) SUB TOTAL
6TH FLOOR:
5TH FLOOR:
4TH FLOOR:
3RD FLOOR:
2ND FLOOR:
MEZZANINE:
1ST FLOOR:
BASEMENT:
TOTAL:
MIXED OCCUPANCY: YES NO SEPARATION:
NON-SEPARATED USE (508.3) - THE REQUIRED TYPE OF CONSTRUCTION FOR THE BUILDING SHALL BE DETERMINED BY APPLYING THE HEIGHT
AND AREA LIMITATIONS FOR EACH OF THE APPLICABLE OCCUPANCIES TO THE ENTIRE BUILDING. THE MOST RESTRICTIVE TYPE OF CONSTRUCTION, SO DETERMINED, SHALL APPLY TO THE ENTIRE BUILDING.
SEPARATED USE (508.4) - SEE BELOW FOR AREA CALCULATIONS FOR EACH STORY, THE AREA OF THE OCCUPANCY SHALL BE SUCH THAT THE SUM OF THE RATIOS OF THE ACTUAL FLOOR AREA OF
EACH USE DIVIDED BY THE ALLOWABLE FLOOR AREA FOR EACH USE SHALL NOT EXCEED 1.
ACTUAL AREA OF OCCUPANCY A
ALLOWABLE AREA OF OCCUPANCY A
ACTUAL AREA OF OCCUPANCY B
ALLOWABLE AREA OF OCCUPANCY B+ = < 1.00
ASSEMBLY A-1 A-2 A-3 A-4 A-5
BUSINESS
HAZARDOUS H-1 Detonate H-2 Deflagrate
INSTITUTIONAL I-1 CONDITION 1 2
I-2 CONDITION
R-1
STORY
NUMBER DESCRIPTION AND USE
(A)
BUILDING AREA PER STORY
(ACTUAL)
(B)
TABLE 506.2
AREA
(C)
AREA FOR
FRONTAGE INCREASE
(D)
ALLOWABLE AREA PER
STORY OR UNLIMITED
FRONTAGE AREA INCREASE FROM SECTION 506.3 ARE COMPUTED THUS:
A. PERIMETER WHICH FRONTS A PUBLIC WAY OR OPEN SPACE HAVING 20 FEET MINIMUM WIDTH =_______________(F)
B. TOTAL BUILDING PERIMETER =________________(P)
C. RATIO (F/P)=_______________(F/P)
D. W= MINIMUM WIDTH OF PUBLIC WAY=______________(W)
E. PERCENT OF FRONTAGE INCREASE I = 100 [F/P-0.25] x W/30 =_______________(%)
UNLIMITED AREA APPLICABLE UNDER CONDITIONS OF SECTION 507.
MAXIMUM BUILDING AREA = TOTAL NUMBER OF STORIES IN THE BUILDING x D (506.2).
MAXIMUM AREA OF OPEN PARKING GARAGES MUST COMPLY WITH 406.5.4.
FRONTAGE INCREASE IS BASED ON THE UNSPRINKLERED AREA VALUE IN TABLE 506.2.
LIFE SAFETY SYSTEM
REQUIREMENTS:
EMERGENCY LIGHTING:
EXIT SIGNS:
FIRE ALARM:
SMOKE DETECTION SYSTEMS:
PANIC HARDWARE:
YESNO
YESNO
YESNO
YESNO
YESNO
IMPORTANCE FACTORS:
GROUND SNOW LOAD:
WIND LOAD:
SNOW
SEISMIC
(ls)
(le)
LIVE LOADS: ROOF
MEZZANINE
FLOOR
psf psf psf
ULTIMATE WIND SPEED
EXPOSURE CATEGORY
mph (ASCE-7)
= < 1.00
(EXCEPT 1 AND 2 - FAMILY DWELLINGS AND TOWNHOUSES)
(REPRODUCE THE FOLLOWING DATA ON THE BUILDING PLAN SHEET 1 OR 2)
ZIP CODE:
E-MAIL:
STATE:
STATEPRIVATECITY/COUNTY
NEW BUILDING ADDITION RENOVATION
CONSTRUCTED (date)
PARTIAL
CLASS:
FLOOD HAZARD AREA: YESNO
ALLOWABLE AREA
H-4 Health H-5 HPM
EXCEPTION:HR.
1,5 2,3
F
STRUCTURAL DESIGN
ALLOWABLE HEIGHT:
PLUMBING FIXTURE REQUIREMENTS (SECTION 2902.1):
ACCESSIBLE PARKING (Section 1106):
SPECIAL
APPROVALS:
BUILDING HEIGHT IN FEET (Table 504.3)
BUILDING HEIGHT IN STORIES (Table 504.4)
ALLOWABLE SHOWN ON PLANS CODE REFERENCE
TOTAL:
LOT OR PARKING
AREA
TOTAL NUMBER OF PARKING SPACES
REQUIRED PROVIDED REGULAR WITH 5'
ACCESS AISLE
132" ACCESS AISLE
TOTAL # OF
ACCESSIBLE
PROVIDED
# OF ACCESSIBLE SPACES PROVIDED
SPECIAL APPROVAL: (LOCAL JURISDICTION, DEPARTMENT OF INSURANCE, OSC, DPI, DHHS, ICC, ETC., DESCRIBE BELOW)
SEISMIC DESIGN CATEGORY:
LATERAL DESIGN CONTROL:
SOIL BEARING CAPACITIES:
FIELD TEST (PROVIDE COPY OF TEST REPORT)
PRESUMPTIVE BEARING CAPACITY
PILE SIZE, TYPE, AND CAPACITY
psf psf
PROVIDE THE FOLLOWING SEISMIC DESIGN PARAMETERS:
RISK CATEGORY (TABLE 1604.5)
SPECTRAL RESPONSE ACCELERATION:
SITE CLASSIFICATION: (ASCE 7)
BASIC STRUCTURAL SYSTEM
Sds= Sd1=%g %g
BEARING WALL
BUILDING FRAME
MOMENT FRAME
DUAL WITH SPECIAL MOMENT FRAME
DUAL WITH INTERMEDIATE R/C OR SPECIAL STEEL
INVERTED PENDULUM
ANALYSIS PROCEDURE:
ARCHITECTURAL, MECHANICAL, COMPONENTS ANCHORED?
SIMPLIFIED EQUIVALENT LATERAL FORCE DYNAMIC
psf
B C D
1ST TIME INTERIOR COMPLETION
CURRENT OCCUPANCY(S) (Ch. 3)
RENOVATED (date)
USE:
WATER CLOSETS
FEMALE UNISEX
URINALS LAVATORIES
MALE FEMALE
SHOWERS/
TUBS
DRINKING FOUNTAINS
REGULAR ACCESSIBLE
SPACE
Partial
A
A C E
ENERGY REQUIREMENTS:
THE FOLLOWING DATA SHALL BE CONSIDERED MINIMUM AND ANY SPECIAL ATTRIBUTE REQUIRED TO MEET THE ENERGY CODE SHALL ALSO BE PROVIDED. EACH
DESIGNER SHALL FURNISH THE REQUIRED PORTIONS OF THE PROJECT INFORMATION FOR THE PLAN DATA SHEET. IF PERFORMANCE METHOD, STATE THE ANNUAL ENERGY COST FOR THE STANDARD REFERENCE DESIGN VS ANNUAL ENERGY COST FOR THE PROPOSED DESIGN.
THERMAL ENVELOPE
ROOF/CEILING ASSEMBLY (EACH ASSEMBLY)
DESCRIPTION OF ASSEMBLY:
U-VALUE OF TOTAL ASSEMBLY:
R-VALUE OF INSULATION:
SKYLIGHT IN EACH ASSEMBLY
u-value of skylight:
total square footage of skylights in each assembly:
EXTERIOR WALLS (EACH ASSEMBLY)
DESCRIPTION OF ASSEMBLY:
U-VALUE OF TOTAL ASSEMBLY:
R-VALUE OF INSULATION:
OPENING (windows or doors with glazing) u-value of assembly:
Solar heat gain coefficient:
projection factor:
Door R-Values:
FIRE PROTECTION REQUIREMENTS:
STRUCTURAL FRAME, INCLUDING
COLUMNS, GIRDERS, TRUSSES
BEARING WALLS
EXTERIOR
NORTH
EAST
WEST
SOUTH
INTERIOR
NON-BEARING WALLS &
PARTITIONS
EXTERIOR WALLS
NORTH
EAST
WEST
SOUTH
INTERIOR WALLS AND PARTITIONS
FLOOR CONSTRUCTION INCLUDING
SUPPORTING BEAMS & JOISTS
SHAFT ENCLOSURES - EXIT
SHAFT ENCLOSURES - OTHER
CORRIDOR SEPARATION
OCCUPANCY/FIRE BARRIER SEPARATION
PARTY/FIRE WALL SEPARATION
SMOKE BARRIER SEPARATION
BUILDING ELEMENT FIRE
SEPARATION
DISTANCE
(FEET)
RATING
REQ'D PROVIDED
(W/________*)
REDUCTION)
DETAIL #
SHEET #
DESIGN # FOR
RATED ASSEMBLY
DESIGN # FOR
RATED
PENETRATION
DESIGN # FOR
RATED JOINTS
* INDICATE SECTION NUMBER PERMITTING REDUCTION
Notes:
ELECTRICAL SYSTEM AND EQUIPMENT
ELECTRICAL SUMMARY
METHOD OF COMPLIANCE:
LIGHTING SCHEDULE (EACH FIXTURE TYPE)
LAMP TYPE REQUIRED IN FIXTURE
NUMBER OF LAMPS IN FIXTURE
BALLAST TYPE USED IN THE FIXTURE
NUMBER OF BALLASTS IN FIXTURE
TOTAL WATTAGE PER FIXTURE
TOTAL INTERIOR WATTAGE SPECIFIED VS ALLOWED (WHOLE BUILDING OR SPACE BY SPACE)
TOTAL EXTERIOR WATTAGE SPECIFIED VS ALLOWED
ADDITIONAL PRESCRIPTIVE COMPLIANCE
(When using the 2018 NCECC; not required for ASHRAE 90.1)
WALLS BELOW GRADE (EACH ASSEMBLY)
DESCRIPTION OF ASSEMBLY:
U-VALUE OF TOTAL ASSEMBLY:
R-VALUE OF TOTAL INSULATION:
FLOORS OVER UNCONDITIONED SPACE (EACH ASSEMBLY)
DESCRIPTION OF ASSEMBLY:
U-VALUE OF TOTAL ASSEMBLY:
R-VALUE OF TOTAL INSULATION:
MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT
MECHANICAL SUMMARY
THERMAL ZONE
WINTER DRY BULB:
SUMMER DRY BULB:
INTERIOR DESIGN CONDITIONS
WINTER DRY BULB:
SUMMER DRY BULB:
RELATIVE HUMIDITY:
BUILDING HEAT LOAD:
BUILDING COOLING LOAD:
MECHANICAL SPACING CONDITIONING SYSTEM
UNITARY
DESCRIPTION OF UNIT:
BOILER
CHILLER
HEATING EFFICIENCY:
COOLING EFFICIENCY:
SIZE CATEGORY OF UNIT:
SIZE CATEGORY. IF OVERSIZED, STATE REASON:
SIZE CATEGORY. IF OVERSIZED, STATE REASON:
LIST EQUIPMENT EFFICIENCIES
II III IVI
EXISTING
REQUIRED
NEW
PROPOSED OCCUPANCY(S) (Ch. 3)
(Check all that apply)
7TH FLOOR:
EDUCATIONAL
FACTORY F-1 Moderate F-2 Low
H-3 Combust
MERCANTILE
RESIDENTIAL R-2 R-3 R-4
STORAGE S-1 Moderate S-2 Low High-piled
Parking Garage Open Enclosed Repair Garage
UTILITY & MISC.
LIFE SAFETY PLAN REQUIREMENTS: LIFE SAFETY PLAN SHEET#:
Fire and/or smoke rated wall locations (Chapter 7)
Assumed and real property line locations (if not on the site plan)
Exterior wall opening area with respect to distance to assumed property lines
(705.8)
Occupancy Use for each area as it relates to occupant load calculation
(Table 1004.1.2)
Occupant loads for each area
Exit access travel distances (1017)
Common path of travel distances (Tables 1006.2.1 & 1006.3.2(1))
Dead end lengths (1020.4)
Clear exit widths for each exit door
Maximum calculated occupant load capacity each exit door can accommodate based on egress width (1005.3) Actual occupant load for each exit door
ACCESSIBLE DWELLING UNITS (SECTION 1107):
TOTAL UNITS ACCESSIBLE
UNITS
REQUIRED
ACCESSIBLE
UNITS
PROVIDED
8' ACCESS AISLE
CLIMATE ZONE 3A 4A 5A
METHOD OF COMPLIANCE: PRESCRIPTIVEPERFORMANCE
PRESCRIPTIVEPERFORMANCE
FLOORS SLAB ON GRADE
DESCRIPTION OF ASSEMBLY:
U-VALUE OF TOTAL ASSEMBLY:
R-VALUE OF TOTAL INSULATION:
Horizontal / vertical requirement:
Slab heated? (Y/N)
ENERGY SUMMARY:
PERFORMANCE
PERFORMANCE
ENERGY CODE
ASHRAE 90.1
PRESCRIPTIVE
PRESCRIPTIVE
C406.2 More Efficient Mechanical Equipment
C406.3 Reduced Lighting Power Density
C406.4 Enhanced Digital Lighting Controls
C406.5 On-Site Supply of Renewable Energy
C406.6 Dedicated Outdoor Air System
C406.7 Reduced Energy Use in Service Water Heating
FIELD TEST PRESUMPTIVE HISTORICAL DATA
FDB
Data Source:
YES NO
EARTHQUAKE WIND
SHELL/CORE - CONTACT THE LOCAL INSPECTION JURISDICTION FOR POSSIBLE ADDITIONAL
PROCEDURES AND REQUIREMENTS
PHASED CONSTRUCTION - SHELL/CORE - CONTACT THE LOCAL INSPECTION JURISDICTION FOR POSSIBLE ADDITIONAL
PROCEDURES AND REQUIREMENTS
2018 NC EXISTING BUILDING CODE: EXISTING: PRESCRIPTIVE REPAIR CHAPTER 14
LEVEL I LEVEL II LEVEL III
HISTORIC PROPERTY CHANGE OF USE
RISK FACTOR (Table 1604.5): ICurrent:
Proposed: I
II
II
III
III
IV
IV
"OTHER" should include firms and individuals such as truss, precast, pre-engineering, interior designers, etc.)
YESNO CONTACT THE LOCAL INSPECTION JURISDICTION FOR ADDITIONAL PROCEDURES AND REQUIREMENTS
(SELECT ONE)
I-3 CONDITION
21 3 4 5
I-4
ACCESSORY OCCUPANCY CLASSIFICATION(S):
INCIDENTAL USES
SPECIAL USES (Chapter 4 - List Code Sections):
SPECIAL PROVISIONS: (Chapter 5 - List Code Sections):
(Table 509):
= < 1.00
PROVIDE CODE REFERENCE IF THE "SHOWN ON PLANS" QUANTITY IS NOT BASED ON TABLE 504.3 OR 504.4
THE MAXIMUM HEIGHT OF AIR TRAFFIC CONTROL TOWERS MUST COMPLY WITH TABLE 412.3.1.
THE MAXIMUM HEIGHT OF OPEN PARKING GARAGES MUST COMPLY WITH TABLE 406.5.5.
FLOOR CEILING ASSEMBLY
COLUMNS SUPPORTING BEAMS
ROOF CONSTRUCTION, INCLUDING SUPPORTING
BEAMS AND JOISTS
ROOF CEILING ASSEMBLY
COLUMNS SUPPORTING BEAMS
SMOKE PARTITION
TENANT/DWELLING
UNIT/SLEEPING UNIT SEPARATION
INCIDENTAL USE SEPARATION
A separate schematic plan indicating where fire rated floor/ceiling and/or roof structure is provided for purposes of occupancy separation
Location of doors with panic hardware (1010.1.10)
Location of doors with delayed egress locks and the amount of delay
(1010.1.9.7)
Location of doors with electromagnetic egress locks (1010.1.9.9)
Location of doors equipped with hold-open devices
Location of emergency escape windows (1030)
The square footage of each fire area (202)
The square footage of each smoke compartment for Occupancy
Classification I-2 (407.5)
Note any code exceptions or table notes that may have been utilized regarding the items above
TYPE A
UNITS
REQUIRED
TYPE A
UNITS
PROVIDED
TYPE B
UNITS
REQUIRED
TYPE B
UNITS
PROVIDED
TOTAL #
ACCESSIBLE
UNITS PROVIDED
VAN SPACES WITH
MALE UNISEX
EXISTING BUILDING ENVELOPE COMPLIES WITH CODE: NO YES (THE REMAINDER OF THIS SECTION IS NOT APPLICABLE)
ENERGY CODE
ASHRAE 90.1
IF "OTHER" SPECIFY SOURCE HERE
(PROVIDE ON THE STRUCTURAL SHEETS IF APPLICABLE)
psf
0 0 0 000
GRANVILLE HEALTH SYSTEM MAIN HOSPITAL ROOFING PROJECT
1010 COLLEGE ST, OXFORD, NC
HOSPITAL
KELLY LUCAS 919.693.1217
GRANVILLE
JULIA BREWER, AIA
PROGRESSIVE COMPANIES JULIA BREWER 15070 919.682.2870
27565 klucas@granvillemedical.com jbrewer@weareprogressive.com
0 0 0
0 0 0
00 0
0 0 0 0
0 0 0 0 0 0 0 0
HOSPITAL
HOSPITAL
X
X
X
X
X X
X
X
X
X X
X
X
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
EXIS
TIN
G N O C
HANGE
2 05/21/2026 ISSUED FOR
CONSTRUCTION
jbrewer
EXISTING CONSTRUCTION TO REMAIN
DEMOLITION NOTES AND LEGEND
1. EXISTING BUILDING CONDITION BASED ON OWNER PROVIDED DRAWINGS AND
LIMITED FIELD VERIFICATION. VERIFY EXACT CONDITIONS IN FIELD. SHOULD
DISCREPANCIES OCCUR, NOTIFY ARCHITECT FOR CLARIFICATIONS.
2. BEGINNING WORK INDICATES THAT THE CONTRACTOR HAS ACCEPTED AND
VERIFIED EXISTING CONDITIONS.
3. COORDINATE DEMOLITION WITH ALL CONTRACTORS WORKING IN AREAS BEING
RENOVATED.
4. DURING DEMOLITION, PROTECT ALL ADJACENT CONSTRUCTION TO REMAIN.
5. ANY ASBESTOS CONTAINING MATERIALS THAT ARE ENCOUNTERED ARE TO BE
REMOVED BY THE OWNER.
6. COORDINATE CONSTRUCTION BARRIER LOCATIONS, NOISY DEMOLITION /
CONSTRUCTION, AND WORK NOTED "INTERMITTENT" WITH OWNER.
EXISTING CONSTRUCTION TO BE REMOVED
D01
D02
D02
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
A06
D01
D01
D01
D01
D01
D01
D07
D03
D06
D10
D10
D10
D10
D10
D10
D04
D04
D04
D05
D05
D05
D05
D04
RAISED AREA OF ROOF TO REMAIN.
ROOFING TO BE REPLACED AS PER
NOTES AND DETAILS
D09
D09
D10
DRAWN BY
PROFESSIONAL
PROJECT MANAGER
PROJECT NUMBER
CHECKED BY
7 6 5 4 3 2 1
A B
C D
E
7 6 5 4 3 2 1
ISSUANCE
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P
.C
T H
IS
D
O C
U M
E N
T H
A S
B E
E N
P R
E P
A R
E D
B Y
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P .C
A
S A
N
IN
S T
R U
M E
N T
O F
S E
R V
IC
E
, A N
D P
R O
G R
E S
S
IV
E A
R C
H
IT
E C
T U
R E
E N
G
IN
E E
R
IN
G
P .C
. S H
A
LL
R E
T A
IN
A
LL
C
O M
M O
N L
A W
, S T
A T
U T
O R
Y A
N D
O T
H E
R R
E S
E R
V E
D R
IG
H
T S
IN
C
LU
D
IN
G
T H
E C
O P
Y R
IG
H
T T
H E
R E
T O
5/
/2
:4 6:
A
M A ut od es k
D oc s:
//2
G ra nv ill e
M ed ic al
C en te r
R oo f R ep la ce m en t/2
- G ra nv ill e
M ed
R oo f - A rc h.
rv t
DEMOLITION
PLAN
AD101
M A
IN
H
O S
P
IT
A L
R O
O F
IN
G
P R
O J
E C
T
G R
A N
V
IL
L E
H E
A L
T H
S Y
S T
E M
C O
LL
E
G E
S T
R E
E T
O
X F
O R
D
N C
B.MCCAFFERY
22180003
A D
D E
M O
LI
T
IO
N
P
LA
N
.2
.0
DEMOLITION PLAN KEYNOTES
NUMBER NOTE
D01 REMOVE EXISTING ROOFING SYSTEM, FLASHINGS, EDGE METAL, COPING, ETC.
DOWN TO THE EXISTING SLAB
D02 REMOVE EXISTING PIPE AS SHOWN
D03 REMOVE EXISTING SATELITE, CONDUIT, AND ASSOCIATED EQUIPMENT AS
SHOWN
D04 REMOVE ROOF DRAIN, TYP. REPLACE IN KIND
D05 REMOVE GUTTER AND DOWNSPOUTS. REPLACE IN KIND
D06 EXISTING CONDUIT TO REMAIN
D07 REMOVE VENT
D09 REMOVE ANTENNA AND ALL ASSOCIATED CONDUIT AND EQUIPMENT
D10 REMOVE EXISTING SCUPPER LINER. REPLACE IN KIND
1/8" = 1'-0"
ROOF DEMOLITION PLAN
2 05/21/2026 ISSUED FOR
CONSTRUCTION
jbrewer
ROOF LEGEND
MEMBRANE ROOFING OVER COVER BOARD OVER TAPERED
ROOF INSULATION OVER BASE LAYER ROOF INSULATION ON
FLAT ROOF DECK
ROOF SLOPE
INDICATES DIRECTION OF SLOPE -
1/4" PER FOOT UNLESS NOTED OTHERWISE
ROOF WALKWAY PAD
ROOF DRAIN (RD) OR OVERFLOW ROOF DRAIN (ORD)
INDICATES TAPERED INSULATION OVERLAY (SADDLE)
/4
M A
X S
LO
P
E
OVERFLOW SCUPPERS TO
MATCH EXISTING. SEE
DETAILS
1/4" / 12"
MAX SLOPE
1/4" / 12"
MAX SLOPE
1/4" / 12"
MAX SLOPE
1/4" / 12"
MAX SLOPE
1/4" / 12"
MAX SLOPE
1/4" / 12"
MAX SLOPE
1/4" / 12"
MAX SLOPE
1/4" / 12"
MAX SLOPE
1/ 4"
M
A X
S
LO
P E
GUTTER AND DOWNSPOUTS
TO MATCH EXISTING
GUTTER AND DOWNSPOUTS
TO MATCH EXISTING
GUTTER AND DOWNSPOUTS
TO MATCH EXISTING
EXISTING VENTS TO REMAIN,
TYP. SEE DETAIL SHEET FOR
PENETRATION INFORMATION
EXISTING VENTS TO REMAIN,
TYP. SEE DETAIL SHEET FOR
PENETRATION INFORMATION
DRAWN BY
PROFESSIONAL
PROJECT MANAGER
PROJECT NUMBER
CHECKED BY
7 6 5 4 3 2 1
A B
C D
E
7 6 5 4 3 2 1
ISSUANCE
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P
.C
T H
IS
D
O C
U M
E N
T H
A S
B E
E N
P R
E P
A R
E D
B Y
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P .C
A
S A
N
IN
S T
R U
M E
N T
O F
S E
R V
IC
E
, A N
D P
R O
G R
E S
S
IV
E A
R C
H
IT
E C
T U
R E
E N
G
IN
E E
R
IN
G
P .C
. S H
A
LL
R E
T A
IN
A
LL
C
O M
M O
N L
A W
, S T
A T
U T
O R
Y A
N D
O T
H E
R R
E S
E R
V E
D R
IG
H
T S
IN
C
LU
D
IN
G
T H
E C
O P
Y R
IG
H
T T
H E
R E
T O
5/
/2
:4 9:
A
M A ut od es k
D oc s:
//2
G ra nv ill e
M ed ic al
C en te r
R oo f R ep la ce m en t/2
- G ra nv ill e
M ed
R oo f - A rc h.
rv t
ROOF PLAN
A102
M A
IN
H
O S
P
IT
A L
R O
O F
IN
G
P R
O J
E C
T
G R
A N
V
IL
L E
H E
A L
T H
S Y
S T
E M
C O
LL
E
G E
S T
R E
E T
, O X
F O
R D
, N C
J.BREWER
J.BREWER
B.MCCAFFERY
22180003
J.TRUSSLER
A
R
O O
F P
LA
N
.2
.0
1/8" = 1'-0"
ROOF PLAN
2 05/21/2026 ISSUED FOR
CONSTRUCTION
jbrewer
EXISTING DECK
TPO MEMBRANE FULLY ADHERED TO WALL
TPO 6" REINFORCED TERMINATION STRIPS
TPO MEMBRANE
FASTENERS AND PLATES 12" O.C. MAX
MEMBRANE ADHESIVE
MEMBRANE PRIMER
PEEL & STICK
SECTION OF RTS
EXISTING PARAPET
TPO MEMBRANE FULLY ADHERED TO
WALL
TERMINATION BAR
TPO MEMBRANE
EXISTING PARARET
TPO MEMBRANE FULLY ADHERED TO
WALL
1/
2"
2.5" RIGID INSULATION
1/4" COVER BOARD
RIGID INSULATION
M
IN
W
E L
D
/2
MIN. WELD CONT.
1 1/2" (38 MM)
MIN. WELD CONT.
1 1/2" (38 MM)
TPO MEMBRANE FULLY ADHERED TO WALL
SEALANT
TPO MEMBRANE ADHESIVE
TPO MEMBRANE FULLY
ADHERED
SCUPPER FLANGES SET INTO BED OF SEALANT
SEALANT
WOOD NAILER SECURELY
ANCHORED TO DECK
EXISTING DECK
CAULK
APPROVED WALL /
SUBSTRATE
TPO-COATED METAL
SCUPPER LINER
1/
2"
1/2"
STRAINER
CLAMP RING
TPO MEMBRANE
TPO MEMBRANE
APPROVED DECK
SEALANT
TAPERED DRAIN
SINGLE PLY SEALING MASTIC
CUT HOLE THROUGH MEMBRANE AT
LEAST THE SAME DIAMETER AS THE
ROOF DRAIN PIPE - TYP.
CLEAN OUT EXISTING DRAIN PIPE AND
LEADER AS REQUIRED
INSULATION TAPERED TO
DRAIN
FASTENERS AND PLATES 12" O.C. MAX.
TPO MEMBRANE FULLY ADHERED TO WALL
GROMMETED FASTENERS
FASTENER AND PLATE
EDGE SEALANT
MIN. WELD CONT.
1 1/2" (38 mm)
EXISTING DECK
3" TO 8"
COUNTERFLASHING SKIRT
TPO MEMBRANE
TPO MEMBRANE ADHESIVE
EXISTING CURB
1/
2"
TPO MEMBRANE FULLY ADHERED
TPO MEMBRANE ADHESIVE 3" MIN. TAPE
LAP ONTO METAL
1 1/2"
MINIMUM
1"
MIN
CAULK ALONG BOTH EDGES
MEMBRANE PRIMER
SINGLE PLY SEALING MASTIC
TPO COVER TAPE
INSULATION / COVER BOARD
WOOD NAILER SECURELY
ANCHORED TO DECK
EXISTING DECK
1/
2"
TPO MEMBRANE FULLY ADHERED
TPO MEMBRANE ADHESIVE
3" MIN. TAPE
LAP ONTO METAL
1 1/2"
MINIMUM
1"
MIN
CAULK ALONG BOTH EDGES
MEMBRANE PRIMER
SINGLE PLY SEALING MASTIC
TPO COVER TAPE
RIGID INSULATION
WOOD NAILER SECURELY
ANCHORED TO DECK
EXISTING DECK
SINGLE PLY SEALING MASTIC
FASTENER
METAL ROOF EDGE BY OTHERS
CONTINUOUS METAL CLEAT
GUTTER
1/
2"
JM APPROVED FASTENER AND PLATE MIN. OF (4)
AROUND PIPE. PENETRATION DEPENDANT ON DECK
MATERIAL(S). SEE SPECIFICATIONS FOR FURTHER
INFORMATION
JM TPO EDGE SEALANT IF
REQUIRED
JM TPO MEMBRANE FULLY
ADHERED OR MECHANICALLY
FASTENED
MIN. WELD CONT.
1 1/2" (38 mm)
APPROVED DECK
RIGID INSULATION
JM TPO ROUND SPLIT PIPE BOOT
FLASHING
JM SINGLE PLY LVOC CAULK
JM SINGLE PLY SEALING MASTIC
ADJUSTABLE METAL STRAP (PROVIDE BY
JM)
JM TPO MEMBRANE ADHESIVE (FOR
ADHERED SPECIFICATIONS ONLY)
(2 m m
EXISTING DECK
RIGID INSULATION
WELD FLASHING BASE TO
FIELD MEMBRANE MIN. 1 1/2" (38
mm) CONTINUOUS
1/
2"
FASTENER AND PLATE MIN. OF FOUR AROUND PIPE
TPO EDGE
SEALANT
TPO MEMBRANE FULLY ADHEREDMIN. WELD CONT.
1 1/2"
EXISTING DECK
RIGID INSULATINO
MIN. WELD CONT.
1 1/2"
PIPE
CAULK
SINGLE PLY SEALING MASTIC
DRAW BAND REQUIRED
TPO DETAIL MEMBRANE ADHERED WITH
MEMBRANE ADHESIVE
STRETCH TPO MEMBRANE FORM 1"
TPO MEMBRANE ADHESIVE
1/
2"
TPO MEMBRANE FULLY ADHERED TO
WALL
SLOPE TO DRAIN
EXISTING PARAPET
INSTALL MEMBRANE DOWN
OUTSIDE FACE OF WALL 1/2"
BELOW NAILER
METAL COPING SLOPED TO
DRAIN
FASTENER
VARIES
1/ 2"
DRAWN BY
PROFESSIONAL
PROJECT MANAGER
PROJECT NUMBER
CHECKED BY
7 6 5 4 3 2 1
A B
C D
E
7 6 5 4 3 2 1
ISSUANCE
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P
.C
T H
IS
D
O C
U M
E N
T H
A S
B E
E N
P R
E P
A R
E D
B Y
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P .C
A
S A
N
IN
S T
R U
M E
N T
O F
S E
R V
IC
E
, A N
D P
R O
G R
E S
S
IV
E A
R C
H
IT
E C
T U
R E
E N
G
IN
E E
R
IN
G
P .C
. S H
A
LL
R E
T A
IN
A
LL
C
O M
M O
N L
A W
, S T
A T
U T
O R
Y A
N D
O T
H E
R R
E S
E R
V E
D R
IG
H
T S
IN
C
LU
D
IN
G
T H
E C
O P
Y R
IG
H
T T
H E
R E
T O
5/
/2
:4 9:
A
M A ut od es k
D oc s:
//2
G ra nv ill e
M ed ic al
C en te r
R oo f R ep la ce m en t/2
- G ra nv ill e
M ed
R oo f - A rc h.
rv t
ROOF DETAILS
A311
M A
IN
H
O S
P
IT
A L
R O
O F
IN
G
P R
O J
E C
T
G R
A N
V
IL
L E
H E
A L
T H
S Y
S T
E M
C O
LL
E
G E
S T
R E
E T
, O X
F O
R D
, N C
J.BREWER
J.BREWER
B.MCCAFFERY
22180003
J.TRUSSLER
A
R
O O
F D
E T
A
IL
S
.2
.0
12" = 1'-0"
BASE FLASHING
6" = 1'-0"
THROUGH WALL SCUPPER
6" = 1'-0"
ROOF DRAIN
12" = 1'-0"
CURB DETAIL
12" = 1'-0"
DRIP EDGE
12" = 1'-0"
GUTTER & METAL EDGE
6" = 1'-0"
PIPE BOOT
6" = 1'-0"
FIELD FABRICATED PENETRATION DETAIL
6" = 1'-0"
COPING CAP
2 05/21/2026 ISSUED FOR
CONSTRUCTION
jbrewer
| 01 - TD01 - TITLE DRAWING |
| 05 - G101 - BUILDING CODE SUMMARY |
| 32 - AD101 - DEMOLITION PLAN |
| 33 - A102 - ROOF PLAN |
| 33 - A311 - ROOF DETAILS |
| 2026-05-21T11:07:12-0400 | |
| Yi Luo | |
| I have reviewed this document |
File details come from the government source that posted it. Updated .