This is an Addendum No. 2 to bidding documents for Valdosta State University's Martin Hall 1st Floor HVAC Replacement project, issued under Purchase Order PO-26-0307 and NBP #26024. The addendum modifies the original bidding documents dated April 1, 2026, and was issued on April 24, 2026. The project involves the replacement of HVAC systems on the first floor of Martin Hall, which includes multiple classrooms, offices, tutoring spaces, and support areas. The scope of work includes removal of existing ceiling grids and tiles to facilitate installation of new ductwork, temporary support of light fixtures, installation of new acoustic ceiling tiles and grid systems, removal of existing ceiling soffits where required, and adjustment of lighting to match new ceiling layouts. The addendum specifically modifies Sheet A301 with a revised reflected ceiling plan that details demolition and new work for the first floor. Bidders are required to acknowledge receipt of this addendum on the Bid Form, with failure to do so potentially resulting in disqualification.

The document provides detailed architectural drawings showing room-by-room ceiling specifications, material requirements including Armstrong Metal Works tiles and nickel chrome finish mesh trellis with grid, and installation notes requiring contractors to confirm existing conditions in the field and coordinate with design professionals. The contract documents indicate a COA expiration date of June 30, 2026, with the engineer of record being NBP Engineers, Inc. located in Macon, Georgia. No specific pricing information, set-asides, or contract term details are provided in this addendum document, which serves primarily as a technical modification to the original construction specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VALDOSTA STATE UNIVERSITY

PO-26-0307 MARTIN HALL 1ST FLOOR HVAC REPLACEMENT

NBP #26024

ADDENDUM NO.2

A1 - 1

This Addendum forms part of the Contract Documents and modifies the original bidding documents dated April 1, 2026. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do may subject the bidder to disqualification.

The contract documents are herein amended under the date of April 24, 2026 as follows:

AMENDMENT TO THE DRAWINGS

1. SHEET A301:

A. Revised RCP.

END OF ADDENDUM

SCALE:

= 1'-0

8 0 4 8 16

A301

SCALE:

= 1'-0

8 0 4 8 16

NOTES:(THIS SHEET ONLY)

GENERAL NOTES:(THIS SHEET ONLY)

A

PROFESSIONAL ANY DISCREPANCIES.

IN THE FIELD. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH THE DESIGN

AND SITE OBSERVATION. EXISTING WORK SHOWN MAY NOT MATCH WHAT IS INSTALLED

EXISTING DRAWINGS ARE BASED ON PREVIOUS DRAWINGS OF WORK DONE IN BUILDING

FIRST FLOOR PLAN - NEW WORK - REFLECTED CEILING PLANFIRST FLOOR PLAN - DEMOLITION - REFLECTED CEILING PLAN

OTS

OTS

OTS

OTS

116A

9' - 0"GYP.

9' - 0"GYP.

11' - 2"GYP.

9' - 0"GYP.

116A

9' - 0"GYP.

8' - 0"GYP.

9' - 0"ACT-1

105A

9' - 0"GYP.

9' - 0"ACT-1

9' - 0"GYP.

10' - 0"ACT-1

9' - 0"ACT-1

10' - 6"ACT-2

9' - 0"GYP.

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"GYP.

8' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"GYP.

116A

9' - 0"GYP.

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"GYP.

9' - 0"GYP.

9' - 0"GYP.

9' - 2"ACT-2

CEILING PLAN

REFLECTED

NEW WORK -

DEMOLITION &

FIRST FLOOR PLAN -

CEILING GRID AND TILE AT SAME ORIGINAL CEILING HEIGHT.

OF NEW DUCTWORK. TEMPORARILY SUPPORT LIGHT FIXTURES. PROVIDE NEW ACT

REMOVE ALL CEILING GRID AND TILE IN THIS SPACE TO ALLOW FOR INSTALLATION

NEW DUCTWORK HAS BEEN INSTALLED.

INSTALLATION OF NEW DUCTWORK. SAVE TILE AND GRID FOR REINSTALLATION ONCE

REMOVE PORTION OF EXISTING CEILING TILE AND GRID IN THIS SPACE TO FACILITATE

REMOVE EXISTING CEILING

SOFFIT TO REMAIN

EXISTING GYPSUM

CEILING

OF EXISTING GYPSUM

REMOVE PORTION

TO MATCH EXISTING

GYPSUM CEILING

PROVIDE NEW

OPEN TO STRUCTURE

EXISTING CEILING TO REMAIN

EXISTING CEILING TO REMAIN

MESH TRELLIS WITH •GRID IN NICKEL CHROME FINISH.

NEW GRID AND TILE WHERE VRF CASSETTE IS REMOVED. ARMSTRONG METAL WORKS

TILES FOR REINSTALLATION ONCE NEW DUCTWORK HAS BEEN INSTALLED. INSTALL

REMOVE EXISTING CEILING GRID AND METAL TILES IN THIS SPACE. SAVE GRID AND

10' - 0"ACT 2

10' - 0"ACT 2

10' - 0"ACT 2

1 ADDENDUM 2 04/24/26

ADJUST LIGHTS TO MATCH NEW CEILING LAYOUT.

TEMPORARILY SUPPORT LIGHT FIXTURES.

NEW ACT @ 9'-1" B.E. (TYPICAL)

TEMPORARILY SUPPORT LIGHT FIXTURES.

REMOVE CEILING AND LINEAR LIGHTS FROM THESE SPACES

SEAL

SCALE:

FILE PATH:

P:\26024\26024Arcp301.dgn

DATE PLOTTED

DGN FILE

24-APR-2026

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\26024\26024Arcp301.dgn

AS SHOWN

V a ld o s ta S ta te U n iv e rs it y

M a rt in H a ll s t F lo o r

H v a c R e p la c e m e n t

D e s ig n

WSH

LTF

WSH

04.01.2026

26024

B

ID

S E

T

COA Expiration: 6.30.2026

COA#PEF000774

NBP Engineers, Inc.

V S

U P

R O J E

C T N

O

P

O -2

-0

ABCDEFG

STEM CLASSROOM 1

STEM CLASSROOM 2

STEM CLASSROOM 3

STAIR NO. 1

CHAIR STORAGE

105A

VEST.

LOBBY

STAIR NO. 2

UP

UP

UP

CUST.

LOBBY

ELEV.

ELEV. MACH.

INST. SUPPLIES

PLANNING

116A

HVAC

LEARNING CORRIDOR

116B

LOUNGE

SEMINAR

DIRECTOR'S SUITE

TUTORING

TUTORING

RECEPTION

TUTORING

SEMINAR

DIRECTOR'S SUITE

TUTORING

TUTORING

TUTORING

TUTORING

TUTORING

TEL.

MEN'S

WOMEN'S

DATA

ELEC.

CORRR.

FEC.

FEC.

FEC. FEC. FEC.

ABCDEFG

STEM CLASSROOM 1

STEM CLASSROOM 2

STEM CLASSROOM 3

STAIR NO. 1

CHAIR STORAGE

105A

VEST.

LOBBY

STAIR NO. 2

UP

UP

UP

FEC.

FEC.

CUST.

LOBBY

ELEV.

ELEV. MACH.

INST. SUPPLIES

PLANNING

116A

HVAC

LEARNING CORRIDOR

116B

LOUNGE

SEMINAR

DIRECTOR'S SUITE

TUTORING

TUTORING

RECEPTION

TUTORING

SEMINAR

DIRECTOR'S SUITE

TUTORING

TUTORING

TUTORING

TUTORING

TUTORING

TEL.

MEN'S

WOMEN'S

DATA

ELEC.

CORRR.

FEC. FEC. FEC.

1XX

MECH. RM.

116A

9' - 0"GYP.

9' - 0"GYP.

11' - 2"GYP.

9' - 0"GYP.

116A

9' - 0"GYP.

8' - 0"GYP.

9' - 0"ACT-1

105A

9' - 0"GYP.

9' - 0"ACT-1

9' - 0"GYP.

10' - 0"ACT-1

9' - 0"ACT-1

10' - 6"ACT-2

9' - 0"GYP.

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"GYP.

8' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"GYP.

116A

9' - 0"GYP.

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"ACT-1

9' - 0"GYP.

9' - 0"GYP.

9' - 0"GYP.

9' - 2"ACT-2