2026_04_23 GLCS Ryan Carpet.pdf
PDF 1 MB Posted
- Attached to
- Carpet Replacement - Ryan Int. School
- Solicitation number
- RFP GLCS 260000001877 1
- Issued by
- Michigan
About this file
This is a construction document set for a sinking fund project at Ryan Intermediate School, a facility operated by Gull Lake Community Schools located at 9562 M-89 in Richland, Michigan 49083. The project encompasses renovations to Units 100 and 500 of the school building, with work including flooring removal and replacement, carpet installation, vinyl composition tile (VCT) flooring, rubber base installation, and touch-up painting. The construction documents dated April 23, 2026, include a title sheet, data sheet, composite floor plan, demolition plans for Units 100 and 500, and color layout plans. The project is being managed by Miller Davis (Construction Manager) located in Kalamazoo, Michigan, with architectural and civil engineering services provided by Kingscott Associates Inc. in Portage, Michigan. The documents establish baseline conditions and scope requirements for bidders to develop proposals for the renovation work.
The construction documents detail specific demolition requirements, finish specifications, and coordination responsibilities for contractors. Flooring work includes removal and disposal of all existing flooring with preparation of remaining surfaces, removal of VCT and rubber base at casework areas, and installation of new carpet (CPT-1) and luxury vinyl tile (LVT-1) flooring with rubber base transitions. The project requires contractors to coordinate with all other drawings and specifications, perform necessary demolition beyond what is specifically indicated, and repair or patch existing walls, floors, and ceilings to match existing conditions. Additionally, an existing library circulation desk is to be salvaged and reinstalled after carpet installation. The documents establish that the contractor is responsible for site preparation, quality standards, and proper disposal of demolished materials, with color finishes and transitions specified throughout Units 100 and 500.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| notice to bidders for news paper Ryan.pdf | ||
| _2026_04_23 GLSF26ryan SPECIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100 400500
LOCATION MAP
KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
N D
C
O P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
E S
A
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
W
IT
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT
Gull Lake Community Schools
/2
/2
:4 :0
P
M
A u to d e s k D o c s
/G L C
S
S in k in g F u n d /G
L C
S R
Y A
N I
N T
E R
M E
D
IA
T E
A rc h r2
.r v t
2288 . 77
TITLE SHEET
G1
M -8
Ri ch la nd , M
I 4
R ya n In te rm e d ia te
S
IN
K
IN
G F
U N
D
Ryan Intermediate
2026 SINKING FUND
CONSTRUCTION DOCUMENTS
RYAN INTERMEDIATE
9562 M-89
April 23, 2026
SHEET INDEX
G1 TITLE SHEET
G2 DATA SHEET
A0.1 COMPOSITE FLOOR PLAN
D1.1 DEMOLITION PLANS - UNIT 100 & UNIT 500
A8.1 COLOR LAYOUT PLANS - UNIT 100 & UNIT 500
CLIENT:
ARCHITECT & CIVIL ENGINEER:
KINGSCOTT ASSOCIATES INC.
950 TRADE CENTRE WAY, SUITE 130
PORTAGE, MI 49002
P. (800) 632-7815
CONSTRUCTION MANAGER:
DIRECTORY
GULL LAKE COMMUNITY SCHOOLS
10100 EAST 'D' AVE.
RICHLAND, MI 49083
P. (269) 548-3400
MILLER DAVIS
1029 PORTAGE ST.
KALAMAZOO, MI 49001
P. (269) 345-3561
CONSTRUCTION DOCUMENTS 04/23/2026
(M
IN
(M A X
TO
S
P O
UT
'-0
9"
7" M
A X
S
IN
K D
EP
TH
11"
(MIN.)
17"
3" (MAX.) S
'-8
3"
DOOR
FRAME
DOOR
FRAME
EXIT
WALL SPACE
AVAILABLE
U.N.O.
WALL
SPACE
AVAILABLE
U.N.O.
NOTE:
WATER SUPPLY & DRAIN PIPES BELOW
LAVATORIES AND SINKS MUST BE INSULATED
OR OTHERWISE CONFIGURED TO PROTECT
AGAINST CONTACT.
EW
C
R
IN
K
G
F
UN
TA
IN
S H O
W
ER
E
Y E
W A S H
W A
LL
H
UN
LA
V
B A R
R
IE
R F
EE
LA
UN
TE
R
TY
P
IC
A L
LI
G
H T
S W
IT
H
LO
A
TI
O N
EX
IT
L
IG
TS
B
O V
E D
O O
R S
'-0
(M
IN
1'- " S
EE
E
LE
C T.
'-0
'-8
R SS
S
DOOR
MOUNTING HEIGHT COORDINATION
ARCHITECTURAL, MECHANICAL & ELECTRICAL
TRADES SHALL COORDINATE LOCATIONS OF WALL
MOUNTED ITEMS TO ALIGN EITHER VERTICALLY OR
HORIZONTALLY.
FINISH FLOOR LINE
C L
C L
C L
C L
C L
'-8
" 5 '-0
'-8
" 6
(M
IN
7' -7
C
N
TR
'D O
V
ER
D R
. F R
W A
LL
B
UT
TO
N S
B R
A
IL
LE
A R
A C
TE
R
B
M E D
IC
A L G
UT
LE
T
P O
W
ER
TA
T
H
EA
D W
A
LL
S
H A
LL
L A N
TE
R N
'-4
'-4
TO
C
A B
IN
ET
H A N D
LE
'-0
" 6 '-0
F
IR
E H
O
E, EX
TI
N G
UI
S
C O
M B
IN
A
TI
B
IN
ET
FI
R
E H O
S E
R A C K
LV
E
FI
R
E
EX
TI
N G
UI
S H
ER
FI
R
E
EX
TI
N G
UI
S
B
IN
ET
FI
R
E V
A
LV
E
C A B
IN
ET
EL
EC
TR
IC
P
N
EL
C A B
IN
ET
(M
A X
(M
IN
(M
A X
(M
IN
2' -1
SEE PLAN
12" 12"
TO
W
E L
D
IS
P
EN
S
EC
EP
TA
C L E
W A
TE
EC
EP
TA
C L E
H A N D
R A
IL
R A M
P
(M
IN
. O
UT
LE
T)
1'- 7"
TO
IL
ET
T
IS
UE
IS
P E N S E R
LD
ER
X T
F
A B
B A R
S
'-0
M
A X O
UT
LE
T
M
IN
1'-
M
IN
1/
2"
ABOVE BAR TOILET
PAPER DISPENSER
LOCATION
BELOW BAR TOILET
PAPER DISPENSER
LOCATION
(M A X
1'- 5"
(M A X
3' -8
2' -0
" (M A X
'-0
3' -4
2' -6
(M A X
3' -4
2'-0"
(M
IN
2' -5
2' -1
3' -8
BOTTOM OF
OUTLET
BOTTOM OF
LIGHT FIXTURE
B .F
UR
IN
A L
S
TD
UR
IN
A L
S A N
IT
A
Y
P K
EN
D O
R
S O
P
EN
S
ER
S A N
IT
A
Y
P K
P O
S A L
M
IR
R O
R
M
IR
R O
EL
F
P O
W
ER
P A N E L
EL
EC
TR
IC
TE
LE
P H O
N E
TV
UT
LE
T
V
IE
W B
O X
S W
IT
C
H
P
US
H B
UT
TO
N
F
IR
E A
LA
B
X
TH
E R
M O
S
TA
T
C A R
D R
EA
D
ER
M
EC
H A N
IC
A L
P A N
EL
FI
IS
H
ED
S P A C
ES
S
EL
EC
TO
IT
C
H
S W
IT
C H O
R W
LL
UT
LE
T
A B
O V
E
C A B
IN
ET
TO
EL
P
EN
S
ER
UL
TI
P
UR
P O
S E
UN
IT
MOUNTING HEIGHTS (U.N.O.)
3'-6" MAX. 2'
-1
1'-0" 3'-6" 3'
-4
1'-
42"
18" GRAB BAR
42" GRAB BAR
S
ID
E W
A B
B
A
TI
O N S
EV
IO
US
F
P
EN
S
ER
S
3'-0" MAX.
TYP.
2'-0" MIN.
'-0
M O
P S
TR
IP
EL
F
O R
U.
N .O
V A R
IE
S
S
EE
IN
TE
R
IO
R E
LE
V A
TI
O N
C
LO
C K
7' -0
FI
R
E A
LA
R N
TR
O B
E
U.
N .O
7' -0
W
B
IN
ET
2' -9
3' -8
(M
A X
1'-
6" 3'-0"
16"-18"
36" GRAB BAR
W A
TE
S
ET
MIN.
1'-0"
ABBREVIATIONS
MATERIAL SYMBOLS
ARCHITECTURAL SYMBOLS
CONCRETE
BATT
BRICK
CMU
RIGID
INSULATION
INSULATIONROUGH
WOOD
PLAN & SECTION INDICATIONS
EARTH
WOOD
FINISHED
PLYWOOD
GYPSUM
BOARD
ACOUSTICAL
TILE
SECTION REFERENCE
BORROWED LITE TAG WALL SECTION
ELEVATION
CSI
092500A
KEYNOTE DESIGNATION
PLAN/SECTION DETAIL
XXX
XXX
EXTERIOR ELEVATION
INTERIOR ELEVATION
ROOM NUMBER EXISTING CONSTRUCTION
SPRAY FOAM
INSULATION
WINDOW/STOREFRONT/
INSULATED PANEL LABEL
CL
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
AL / ALUM ALUMINUM
ALT ALTERNATE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECT / ARCHITECTURAL
AVG AVERAGE
AWP ACOUSTICAL WALL PANEL
BD BOARD
BF BARRIER FREE
BFF BELOW FINISHED FLOOR
BFST BARRIER FREE STONE THRESHOLD
BL BORROWED LIGHT
BLDG BUILDING
BLK BLOCK
BM BEAM
BN BULLNOSE
B.O. BY OWNER
BOD BOTTOM OF DECK
BOX BOTTOM OF STEEL
BOT BOTTOM
BP BEARING PLATE
BRG BEARNG
BSMT BASEMENT
CAB CABINET
CAP CAPACITY
CB CHALKBOARD
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
COL COLUMN
CONC CONCRETE
CONST CONSTRUCT OR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COR CORRUGATED
CORR CORRIDOR
CP CENTER POINT
CPT CARPET
CR / CLRM CLASSROOM
CS COUNTER SINK
CTF CERAMIC TILE FLOOR
CTR CENTER
CTW CERAMIC TILE WALL
CUST CUSTODIAN
CU YD CUBIC YARDS
CYL CYLINDER
DBL DOUBLE
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIR DIRECTORY
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
ENCL ELCLOSURE
ENT ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE
EW EACH WAY
EX / EXIST EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
F FAHRENHEIT
FB FACEBRICK
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FULL HEIGHT
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FIX FIXTURE
FL / FLR FLOOR
FLEX FLEXIBLE
FR FRAME
FRPF FIREPROOF
F.S. FULL SIZE
FT FEET
FTG FOOTING
FURN FURNITURE
FRP FIBERGLASS REINFORCED PANEL
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERAL
GL GLASS
GOVT GOVERNMENT
GYP GYPSUM
HD HAND
HDWR HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORZ HORIZONTAL
HP HIGH POINT
HPC HIGH PERFORMANCE COATING SYSTEM
HR HOUR
HT HEIGHT
ID INSIDE DIAMETER
IN INCH
INCL INCLUDE
INFO INFORMATION
INSUL INSULATION
INT INTERIORS
JAN JANITOR
JC JANITOR CLOSET
JCT JUNCTION
JT JOINT
KIT KITCHEN
KP KICK PLATE
KS KNEEE SPACE
L LENGTH
LAB LABORATORY
LB POUND
LIN LINEAR
LKR LOCKER
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LP LOW POINT
LVT LUXURY VINYL TILE
MAT / MATL MATERIAL
MAX MAXIMUM
MB MARKERBOARD
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MS METAL SHELVING
MTD MOUNTED
MTL METAL
MT METAL TRANSITION
MWL METAL WARDROBE LOCKER
N NORTH
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OH OVERHAED
OP OPERABLE PARTITION
OPNG OPENING
OPP OPPOSITE
P / PT PAINT
PART PARTITION
PC POLISHED CONCRETE
PERF PERFORATED
PL PLATE
PLAM PLASTIC LAMINATE
PLAT PLATFORM
PLWD PLYWOOD
POL POLISH
P.P.M. PARTS PER MILLION
PR PAIR
PREFAB PREFABRICATED
PREFIN PREFINISHED
PROJ PROJECT
PSE PROJECTION SCREEN - ELECTRIC
PSM PROJECTION SCREEN - MANUAL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PVC POLYVINYL-CHLORIDE
1/4 RD QUARTER ROUND
R / RAD RADIUS
RAF RESILIENT ATHLETIC FLOOR
RB RESILIENT BASE / RUBBER BASE
RD ROOF DRAIN
REC RECESSED
RECT RECTANGLE / RECTANGULAR
REF REFERENCE
REINF REINFORCED / REINFORCEMENT
REM REMOVEABLE
RESIL RESILIENT
REQD REQUIRED
REV REVISION
RFG ROOFING
RFS RUBBER FLOOR SHEET
RFT RUBBER FLOOR TILE
RGH ROUGH
RM ROOM
RO ROUGH OPENING
RSTA RESILIENT STAIR TREAD ACCESSORY
RT RESILIENT TRANSITION
S SOUTH
SAF SAFETY
SC SEALED CONCRETE
SCH SCHEDULE
SECT SECTION
SECY SECRETARY
SEQ SEQUENCE
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATIONS
SPF SOUNDPROOF
SPM SINGLE PLY MEMBRANE
SQ SQUARE
SS STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STR STRUCTURAL
SUB SUB FLOOR
SUSP SUSPENDED
STM SYMMETRICAL
ST / STOR STORAGE
SV SHEET VINYL FLOORING
T TOILET
T&G TONGUE & GROOVE
TA TOILET ACCESSORY
TB TACK BOARD
TC TOP CHORD
TCX TOP CHORD EXTENSION
TEL TELEPHONE
TEMP TEMPERATURE
THK THICK
TOB TOP OF BEAM
TOF TOP OF FOOTING
TOJ TOP OF JOIST
TOL TOP OF LEDGE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TS TUBE STEEL
TV TELEVISION
TYP TYPICAL
TZ TERRAZZO
TZT TERRAZZO TILE
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VBS VOLLEYBALL STANDARD
VCT VINYL COMPOSITION TILE
VDB VISUAL DISPLAY BOARD
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VIN VINYL
VOL VOLUME
VRB VENTER RUBBER BASE
W WEST
w/ WITH
WAF WIID ATHLETIC FLOOR
WB WOOD BASE
WC WALL COVERING
WD WOOD
W/O WITHOUT
W.P. WORKING POINT
WPF WATERPROOF
WT WEIGHT
YD YARD
NAME
XXX
A
A
DOOR TAG
# ARCHITECTURAL KEYNOTE TAG
DEMOLITION KEYNOTE TAG
A101
A101
NEW CONSTRUCTION
ANGLE
CENTERLINE
BUILDING SECTION
DTL. #
SHEET #
KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT
Gull Lake Community Schools
/2
/2
:2 :4
A
M
A u to d e s k D o c s
/G L C
S
S in k in g F u n d /G
L C
S R
Y A
N I
N T
E R
M E
D
IA
T E
A rc h r2
.r v t
2288 . 77
DATA SHEET
G2
M -8
Ri ch la nd , M
I 4
R ya n In te rm e d ia te
S
IN
K
IN
G F
U N
F
R E
F
W/D
FA
C
P
R E
F
TITLE 1
TITLE 1
STEAM
STORAGE
COMMONS
STORAGE
COMMONS
STAFF ROOM
RESOURCE
CLASSROOM
CLASSROOM
COMMONS
RESOURCE
STAFF ROOM
CLASSROOM
CLASSROOM
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
WOMEN
MEN
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
OFFICE
OFFICE
ADMINISTRATION
CONFERENCE
WORK / MAIL
MUSIC
PRACTICE
CLASSROOM
CLASSROOM
STORAGE
KILN
ART
CORRIDOR
CORRIDOR
STORAGE
GYMNASIUM
CORRIDOR
CORRIDOR
CORRIDOR
CAFETERIA
KITCHEN
S.E.
S.E.
LOUNGE
CLASSROOM
MEN
WOMEN
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
WOMEN
MEN
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CORRIDOR
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CORRIDOR
TITLE 1
TITLE 1
MEDIA CENTER
OFFICE
A/V MDF
OFFICE
OFFICE
S.E.
CLASSROOM
COMMONS
STAFF ROOM
RESOURCE
CLASSROOM
CLASSROOM
D1.1
D1.1
A8.1
A8.1
100 400500
KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT
Gull Lake Community Schools
/2
/2
:2 :4
A
M
A u to d e s k D o c s
/G L C
S
S in k in g F u n d /G
L C
S R
Y A
N I
N T
E R
M E
D
IA
T E
A rc h r2
.r v t
2288 . 77
COMPOSITE FLOOR PLAN
A0.1
M -8
Ri ch la nd , M
I 4
R ya n In te rm e d ia te
S
IN
K
IN
G F
U N
D
1/16" = 1'-0"
COMPOSITE FLOOR PLAN
1. CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH ALL OTHER DRAWINGS AND SPECIFICATIONS FOR
OTHER AREAS THAT WILL REQUIRE DEMOLITION NOT INDICATED ON THESE SHEETS.
2. THE DEMOLITION PLANS GENERALLY INDICATE AREAS OF EXTENSIVE REMOVALS AND DO NOT INDICATE
ALL OF THE WORK. CONTRACTOR SHALL PERFORM ALL DEMOLITION WHICH IS NECESSARY FOR THE
PROPER EXECUTION OF THE PROJECT WHETHER OR NOT SAID DEMOLITION IS SPECIFICALLY INDICATED
WITHIN THE DOCUMENTS.
3. CONTRACTOR IS RESPONSIBLE TO INFILL, PATCH AND/ OR REPAIR, EXISTING WALL, FLOORS AND
CEILINGS TO MATCH EXISTING WHERE DEMOLITION OCCURS OTHER THAN AS DESCRIBED IN THESE
DOCUMENTS.
4. PATCH AND REPAIR REMAINING ADJACENT SURFACES AT AREAS OF REMOVAL AND/ OR ALTERATION
TO MATCH EXISTING. PROVIDE A SOUND AND PROPER SUBSTRATE FOR NEW FINISH. COORDINATE WITH
COLOR PLANS. WHERE A NEW FINISH IS NOT INDICATED, MATCH EXISTING ADJACENT FINISHES.
5. ALL DEMOLITION IS TO BE DONE WITH REASONABLE CARE AS TO MINIMIZE DAMAGE TO EXISTING
REMAINING SURFACES. CONTRACTOR IS RESPONSIBLE TO PROPERLY DISPOSE OF ALL DEMOLISHED
ITEMS NOT INDICATED TO BE RELOCATED OR TURNED OVER TO OWNER.
6. CLEAN AND PREPARE ALL EXISTING SURFACES WHICH ARE TO BE PAINTED/ PATCHED. PREPARATION
TO INCLUDE MINOR PATCHING.
DEMOLITION GENERAL NOTES:
DEMOLITION PLAN KEYNOTES:
FLOORS
A. REMOVE AND DISPOSE OF ALL FLOORING. PREP REMAINING SURFACES TO RECEIVE NEW
FINISHES.
B. REMOVE AND DISPOSE OF EXISTING VCT FLOOR AND RUBBER BASE AT CASEWORK. PREP
REMAINING SURFACE TO RECEIVE NEW FINISHES.
WALLS
NOT USED
CEILINGS
NOT USED
EQUIPMENT
A. REMOVE, SALVAGE, AND RE-INSTALL EXISTING LIBRARY CIRCULATION DESK.
100 400500
OFFICE
OFFICE
ADMINISTRATION
CONFERENCE
IDF-B
WORK / MAIL
HEALTH
T
MUSIC
J.C.
PRACTICE
VESTIBULE
CLASSROOM
CLASSROOM
CORRIDOR
VESTIBULE
HALL
1A
1A
1A 1A
1B 1A
CORRIDOR
MEDIA CENTER
OFFICE
1A
1A
4A
EXISTING PERIMETER SHELVING TO
REMAIN - REMOVE CARPET TO EDGE OF
SHELVING, TYP.
KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT
Gull Lake Community Schools
/2
/2
:2 :4
A
M
A u to d e s k D o c s
/G L C
S
S in k in g F u n d /G
L C
S R
Y A
N I
N T
E R
M E
D
IA
T E
A rc h r2
.r v t
2288 . 77
DEMOLITION PLANS - UNIT 100 &
UNIT 500
D1.1
M -8
Ri ch la nd , M
I 4
R ya n In te rm e d ia te
S
IN
K
IN
G F
U N
D
1/8" = 1'-0"1
DEMOLITION PLAN - UNIT 100
1/8" = 1'-0"2
DEMOLITION PLAN - UNIT 500
F
C P
100 400500
1. PROVIDE TOUCH UP PAINT TO MATCH ADJACENT WALL AT AREAS DAMAGED DUE TO
FLOORING REPLACEMENT.
COLOR LAYOUT GENERAL NOTES:
COLOR SYMBOL KEY:
FLOORING TRANSITION
WORKPOINT
EXISTING FINISHES TO REMAIN.
EXISTING GLAZED BLOCK WALL BASE.
EXISTING WOOD BASE TO REMAIN.
COLOR KEYNOTES:
OFFICE
OFFICE
118 ADMINISTRATION
CONFERENCE
115 IDF-B
WORK / MAIL
HEALTH
T
MUSIC
J.C.
PRACTICE
VESTIBULE
CLASSROOM
CLASSROOM
CORRIDOR
VESTIBULE
HALL
CPT-1
CPT-1
CPT-1
LVT-1
CPT-1
RB-1
@ CASEWORK
LVT & CPT
SAME THICKNESS
NOT TRANSITION
REQUIRED
CPT-1
RB-1
@ CASEWORK
CORRIDOR
TITLE 1
MEDIA CENTER
OFFICE
TITLE 1
CPT-1
CPT-1
INSTALL CARPET TO EDGE OF EXISTING
PERIMETER SHELVING, TYP
CIRCULATION DESK TO BE RE-INSTALLED
AFTER CARPET INSTALL
KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT
Gull Lake Community Schools
/2
/2
:4 :0
A
M
A u to d e s k D o c s
/G L C
S
S in k in g F u n d /G
L C
S R
Y A
N I
N T
E R
M E
D
IA
T E
A rc h r2
.r v t
2288 . 77
COLOR LAYOUT PLANS - UNIT 100
& UNIT 500
A8.1
M -8
Ri ch la nd , M
I 4
R ya n In te rm e d ia te
S
IN
K
IN
G F
U N
D
1/8" = 1'-0"1
COLOR LAYOUT PLAN - UNIT 100
1/8" = 1'-0"2
COLOR LAYOUT PLAN - UNIT 500
| Sheets |
| G1 - TITLE SHEET |
File details come from the government source that posted it. Updated .