2026_04_23 GLCS Ryan Carpet.pdf

PDF 1 MB Posted

Attached to
Carpet Replacement - Ryan Int. School
Solicitation number
RFP GLCS 260000001877 1
Issued by
Michigan

About this file

This is a construction document set for a sinking fund project at Ryan Intermediate School, a facility operated by Gull Lake Community Schools located at 9562 M-89 in Richland, Michigan 49083. The project encompasses renovations to Units 100 and 500 of the school building, with work including flooring removal and replacement, carpet installation, vinyl composition tile (VCT) flooring, rubber base installation, and touch-up painting. The construction documents dated April 23, 2026, include a title sheet, data sheet, composite floor plan, demolition plans for Units 100 and 500, and color layout plans. The project is being managed by Miller Davis (Construction Manager) located in Kalamazoo, Michigan, with architectural and civil engineering services provided by Kingscott Associates Inc. in Portage, Michigan. The documents establish baseline conditions and scope requirements for bidders to develop proposals for the renovation work.

The construction documents detail specific demolition requirements, finish specifications, and coordination responsibilities for contractors. Flooring work includes removal and disposal of all existing flooring with preparation of remaining surfaces, removal of VCT and rubber base at casework areas, and installation of new carpet (CPT-1) and luxury vinyl tile (LVT-1) flooring with rubber base transitions. The project requires contractors to coordinate with all other drawings and specifications, perform necessary demolition beyond what is specifically indicated, and repair or patch existing walls, floors, and ceilings to match existing conditions. Additionally, an existing library circulation desk is to be salvaged and reinstalled after carpet installation. The documents establish that the contractor is responsible for site preparation, quality standards, and proper disposal of demolished materials, with color finishes and transitions specified throughout Units 100 and 500.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100 400500

LOCATION MAP

KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC

JOB NO.

SHEET TITLE

SHEET NO.

ISSUANCES DATE

N

P L

E A

S E

R E

C Y

C L

E

T H

E S

E D

R A

W

IN

G S

A N

D T

H E

W O

R K

R E

P R

E S

E N

T E

D T

H E

R E

IN

A

R E

T H

E P

R O

P E

R T

Y O

F A

N D

C

O P

Y R

IG

H

T

K

IN

G

S C

O T

T A

S S

O C

IA

T

E S

A

D

M A

Y N

O T

B E

U S

E D

O R

R E

P R

O D

U C

W

IT

H

O U

T P

E R

M

IS

S

IO

N

L A

S T

P R

IN

T

E D ljh

PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT

Gull Lake Community Schools

/2

/2

:4 :0

P

M

A u to d e s k D o c s

/G L C

S

S in k in g F u n d /G

L C

S R

Y A

N I

N T

E R

M E

D

IA

T E

A rc h r2

.r v t

2288 . 77

TITLE SHEET

G1

M -8

Ri ch la nd , M

I 4

R ya n In te rm e d ia te

S

IN

K

IN

G F

U N

D

Ryan Intermediate

2026 SINKING FUND

CONSTRUCTION DOCUMENTS

RYAN INTERMEDIATE

9562 M-89

April 23, 2026

SHEET INDEX

G1 TITLE SHEET

G2 DATA SHEET

A0.1 COMPOSITE FLOOR PLAN

D1.1 DEMOLITION PLANS - UNIT 100 & UNIT 500

A8.1 COLOR LAYOUT PLANS - UNIT 100 & UNIT 500

CLIENT:

ARCHITECT & CIVIL ENGINEER:

KINGSCOTT ASSOCIATES INC.

950 TRADE CENTRE WAY, SUITE 130

PORTAGE, MI 49002

P. (800) 632-7815

CONSTRUCTION MANAGER:

DIRECTORY

GULL LAKE COMMUNITY SCHOOLS

10100 EAST 'D' AVE.

RICHLAND, MI 49083

P. (269) 548-3400

MILLER DAVIS

1029 PORTAGE ST.

KALAMAZOO, MI 49001

P. (269) 345-3561

CONSTRUCTION DOCUMENTS 04/23/2026

(M

IN

(M A X

TO

S

P O

UT

'-0

9"

7" M

A X

S

IN

K D

EP

TH

11"

(MIN.)

17"

3" (MAX.) S

'-8

3"

DOOR

FRAME

DOOR

FRAME

EXIT

WALL SPACE

AVAILABLE

U.N.O.

WALL

SPACE

AVAILABLE

U.N.O.

NOTE:

WATER SUPPLY & DRAIN PIPES BELOW

LAVATORIES AND SINKS MUST BE INSULATED

OR OTHERWISE CONFIGURED TO PROTECT

AGAINST CONTACT.

EW

C

R

IN

K

G

F

UN

TA

IN

S H O

W

ER

E

Y E

W A S H

W A

LL

H

UN

LA

V

B A R

R

IE

R F

EE

LA

UN

TE

R

TY

P

IC

A L

LI

G

H T

S W

IT

H

LO

A

TI

O N

EX

IT

L

IG

TS

B

O V

E D

O O

R S

'-0

(M

IN

1'- " S

EE

E

LE

C T.

'-0

'-8

R SS

S

DOOR

MOUNTING HEIGHT COORDINATION

ARCHITECTURAL, MECHANICAL & ELECTRICAL

TRADES SHALL COORDINATE LOCATIONS OF WALL

MOUNTED ITEMS TO ALIGN EITHER VERTICALLY OR

HORIZONTALLY.

FINISH FLOOR LINE

C L

C L

C L

C L

C L

'-8

" 5 '-0

'-8

" 6

(M

IN

7' -7

C

N

TR

'D O

V

ER

D R

. F R

W A

LL

B

UT

TO

N S

B R

A

IL

LE

A R

A C

TE

R

B

M E D

IC

A L G

UT

LE

T

P O

W

ER

TA

T

H

EA

D W

A

LL

S

H A

LL

L A N

TE

R N

'-4

'-4

TO

C

A B

IN

ET

H A N D

LE

'-0

" 6 '-0

F

IR

E H

O

E, EX

TI

N G

UI

S

C O

M B

IN

A

TI

B

IN

ET

FI

R

E H O

S E

R A C K

LV

E

FI

R

E

EX

TI

N G

UI

S H

ER

FI

R

E

EX

TI

N G

UI

S

B

IN

ET

FI

R

E V

A

LV

E

C A B

IN

ET

EL

EC

TR

IC

P

N

EL

C A B

IN

ET

(M

A X

(M

IN

(M

A X

(M

IN

2' -1

SEE PLAN

12" 12"

TO

W

E L

D

IS

P

EN

S

EC

EP

TA

C L E

W A

TE

EC

EP

TA

C L E

H A N D

R A

IL

R A M

P

(M

IN

. O

UT

LE

T)

1'- 7"

TO

IL

ET

T

IS

UE

IS

P E N S E R

LD

ER

X T

F

A B

B A R

S

'-0

M

A X O

UT

LE

T

M

IN

1'-

M

IN

1/

2"

ABOVE BAR TOILET

PAPER DISPENSER

LOCATION

BELOW BAR TOILET

PAPER DISPENSER

LOCATION

(M A X

1'- 5"

(M A X

3' -8

2' -0

" (M A X

'-0

3' -4

2' -6

(M A X

3' -4

2'-0"

(M

IN

2' -5

2' -1

3' -8

BOTTOM OF

OUTLET

BOTTOM OF

LIGHT FIXTURE

B .F

UR

IN

A L

S

TD

UR

IN

A L

S A N

IT

A

Y

P K

EN

D O

R

S O

P

EN

S

ER

S A N

IT

A

Y

P K

P O

S A L

M

IR

R O

R

M

IR

R O

EL

F

P O

W

ER

P A N E L

EL

EC

TR

IC

TE

LE

P H O

N E

TV

UT

LE

T

V

IE

W B

O X

S W

IT

C

H

P

US

H B

UT

TO

N

F

IR

E A

LA

B

X

TH

E R

M O

S

TA

T

C A R

D R

EA

D

ER

M

EC

H A N

IC

A L

P A N

EL

FI

IS

H

ED

S P A C

ES

S

EL

EC

TO

IT

C

H

S W

IT

C H O

R W

LL

UT

LE

T

A B

O V

E

C A B

IN

ET

TO

EL

P

EN

S

ER

UL

TI

P

UR

P O

S E

UN

IT

MOUNTING HEIGHTS (U.N.O.)

3'-6" MAX. 2'

-1

1'-0" 3'-6" 3'

-4

1'-

42"

18" GRAB BAR

42" GRAB BAR

S

ID

E W

A B

B

A

TI

O N S

EV

IO

US

F

P

EN

S

ER

S

3'-0" MAX.

TYP.

2'-0" MIN.

'-0

M O

P S

TR

IP

EL

F

O R

U.

N .O

V A R

IE

S

S

EE

IN

TE

R

IO

R E

LE

V A

TI

O N

C

LO

C K

7' -0

FI

R

E A

LA

R N

TR

O B

E

U.

N .O

7' -0

W

B

IN

ET

2' -9

3' -8

(M

A X

1'-

6" 3'-0"

16"-18"

36" GRAB BAR

W A

TE

S

ET

MIN.

1'-0"

ABBREVIATIONS

MATERIAL SYMBOLS

ARCHITECTURAL SYMBOLS

CONCRETE

BATT

BRICK

CMU

RIGID

INSULATION

INSULATIONROUGH

WOOD

PLAN & SECTION INDICATIONS

EARTH

WOOD

FINISHED

PLYWOOD

GYPSUM

BOARD

ACOUSTICAL

TILE

SECTION REFERENCE

BORROWED LITE TAG WALL SECTION

ELEVATION

CSI

092500A

KEYNOTE DESIGNATION

PLAN/SECTION DETAIL

XXX

XXX

EXTERIOR ELEVATION

INTERIOR ELEVATION

ROOM NUMBER EXISTING CONSTRUCTION

SPRAY FOAM

INSULATION

WINDOW/STOREFRONT/

INSULATED PANEL LABEL

CL

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

AL / ALUM ALUMINUM

ALT ALTERNATE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

ARCH ARCHITECT / ARCHITECTURAL

AVG AVERAGE

AWP ACOUSTICAL WALL PANEL

BD BOARD

BF BARRIER FREE

BFF BELOW FINISHED FLOOR

BFST BARRIER FREE STONE THRESHOLD

BL BORROWED LIGHT

BLDG BUILDING

BLK BLOCK

BM BEAM

BN BULLNOSE

B.O. BY OWNER

BOD BOTTOM OF DECK

BOX BOTTOM OF STEEL

BOT BOTTOM

BP BEARING PLATE

BRG BEARNG

BSMT BASEMENT

CAB CABINET

CAP CAPACITY

CB CHALKBOARD

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

COL COLUMN

CONC CONCRETE

CONST CONSTRUCT OR CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

COR CORRUGATED

CORR CORRIDOR

CP CENTER POINT

CPT CARPET

CR / CLRM CLASSROOM

CS COUNTER SINK

CTF CERAMIC TILE FLOOR

CTR CENTER

CTW CERAMIC TILE WALL

CUST CUSTODIAN

CU YD CUBIC YARDS

CYL CYLINDER

DBL DOUBLE

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIR DIRECTORY

DN DOWN

DR DOOR

DS DOWNSPOUT

DWG DRAWING

E EAST

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

EMER EMERGENCY

ENCL ELCLOSURE

ENT ENTRANCE

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATE

EW EACH WAY

EX / EXIST EXISTING

EXP EXPOSED

EXPN EXPANSION

EXT EXTERIOR

F FAHRENHEIT

FB FACEBRICK

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FH FULL HEIGHT

FHC FIRE HOSE CABINET

FIG FIGURE

FIN FINISH

FIX FIXTURE

FL / FLR FLOOR

FLEX FLEXIBLE

FR FRAME

FRPF FIREPROOF

F.S. FULL SIZE

FT FEET

FTG FOOTING

FURN FURNITURE

FRP FIBERGLASS REINFORCED PANEL

GA GAUGE

GAL GALLON

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN GENERAL

GL GLASS

GOVT GOVERNMENT

GYP GYPSUM

HD HAND

HDWR HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HORZ HORIZONTAL

HP HIGH POINT

HPC HIGH PERFORMANCE COATING SYSTEM

HR HOUR

HT HEIGHT

ID INSIDE DIAMETER

IN INCH

INCL INCLUDE

INFO INFORMATION

INSUL INSULATION

INT INTERIORS

JAN JANITOR

JC JANITOR CLOSET

JCT JUNCTION

JT JOINT

KIT KITCHEN

KP KICK PLATE

KS KNEEE SPACE

L LENGTH

LAB LABORATORY

LB POUND

LIN LINEAR

LKR LOCKER

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

LP LOW POINT

LVT LUXURY VINYL TILE

MAT / MATL MATERIAL

MAX MAXIMUM

MB MARKERBOARD

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MS METAL SHELVING

MTD MOUNTED

MTL METAL

MT METAL TRANSITION

MWL METAL WARDROBE LOCKER

N NORTH

NIC NOT IN CONTRACT

NO NUMBER

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OH OVERHAED

OP OPERABLE PARTITION

OPNG OPENING

OPP OPPOSITE

P / PT PAINT

PART PARTITION

PC POLISHED CONCRETE

PERF PERFORATED

PL PLATE

PLAM PLASTIC LAMINATE

PLAT PLATFORM

PLWD PLYWOOD

POL POLISH

P.P.M. PARTS PER MILLION

PR PAIR

PREFAB PREFABRICATED

PREFIN PREFINISHED

PROJ PROJECT

PSE PROJECTION SCREEN - ELECTRIC

PSM PROJECTION SCREEN - MANUAL

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT

PVC POLYVINYL-CHLORIDE

1/4 RD QUARTER ROUND

R / RAD RADIUS

RAF RESILIENT ATHLETIC FLOOR

RB RESILIENT BASE / RUBBER BASE

RD ROOF DRAIN

REC RECESSED

RECT RECTANGLE / RECTANGULAR

REF REFERENCE

REINF REINFORCED / REINFORCEMENT

REM REMOVEABLE

RESIL RESILIENT

REQD REQUIRED

REV REVISION

RFG ROOFING

RFS RUBBER FLOOR SHEET

RFT RUBBER FLOOR TILE

RGH ROUGH

RM ROOM

RO ROUGH OPENING

RSTA RESILIENT STAIR TREAD ACCESSORY

RT RESILIENT TRANSITION

S SOUTH

SAF SAFETY

SC SEALED CONCRETE

SCH SCHEDULE

SECT SECTION

SECY SECRETARY

SEQ SEQUENCE

SHT SHEET

SIM SIMILAR

SPEC SPECIFICATIONS

SPF SOUNDPROOF

SPM SINGLE PLY MEMBRANE

SQ SQUARE

SS STAINLESS STEEL

STA STATION

STD STANDARD

STL STEEL

STOR STORAGE

STR STRUCTURAL

SUB SUB FLOOR

SUSP SUSPENDED

STM SYMMETRICAL

ST / STOR STORAGE

SV SHEET VINYL FLOORING

T TOILET

T&G TONGUE & GROOVE

TA TOILET ACCESSORY

TB TACK BOARD

TC TOP CHORD

TCX TOP CHORD EXTENSION

TEL TELEPHONE

TEMP TEMPERATURE

THK THICK

TOB TOP OF BEAM

TOF TOP OF FOOTING

TOJ TOP OF JOIST

TOL TOP OF LEDGE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TS TUBE STEEL

TV TELEVISION

TYP TYPICAL

TZ TERRAZZO

TZT TERRAZZO TILE

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VBS VOLLEYBALL STANDARD

VCT VINYL COMPOSITION TILE

VDB VISUAL DISPLAY BOARD

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VIN VINYL

VOL VOLUME

VRB VENTER RUBBER BASE

W WEST

w/ WITH

WAF WIID ATHLETIC FLOOR

WB WOOD BASE

WC WALL COVERING

WD WOOD

W/O WITHOUT

W.P. WORKING POINT

WPF WATERPROOF

WT WEIGHT

YD YARD

NAME

XXX

A

A

DOOR TAG

# ARCHITECTURAL KEYNOTE TAG

DEMOLITION KEYNOTE TAG

A101

A101

NEW CONSTRUCTION

ANGLE

CENTERLINE

BUILDING SECTION

DTL. #

SHEET #

KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC

JOB NO.

SHEET TITLE

SHEET NO.

ISSUANCES DATE

N

P L

E A

S E

R E

C Y

C L

E

T H

E S

E D

R A

W

IN

G S

A N

D T

H E

W O

R K

R E

P R

E S

E N

T E

D T

H E

R E

IN

A

R E

T H

E P

R O

P E

R T

Y O

F A

P

Y R

IG

H

T

K

IN

G

S C

O T

T A

S S

O C

IA

T

D

M A

Y N

O T

B E

U S

E D

O R

R E

P R

O D

U C

H

O U

T P

E R

M

IS

S

IO

N

L A

S T

P R

IN

T

E D ljh

PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT

Gull Lake Community Schools

/2

/2

:2 :4

A

M

A u to d e s k D o c s

/G L C

S

S in k in g F u n d /G

L C

S R

Y A

N I

N T

E R

M E

D

IA

T E

A rc h r2

.r v t

2288 . 77

DATA SHEET

G2

M -8

Ri ch la nd , M

I 4

R ya n In te rm e d ia te

S

IN

K

IN

G F

U N

F

R E

F

W/D

FA

C

P

R E

F

TITLE 1

TITLE 1

STEAM

STORAGE

COMMONS

STORAGE

COMMONS

STAFF ROOM

RESOURCE

CLASSROOM

CLASSROOM

COMMONS

RESOURCE

STAFF ROOM

CLASSROOM

CLASSROOM

CORRIDOR

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

WOMEN

MEN

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

OFFICE

OFFICE

ADMINISTRATION

CONFERENCE

WORK / MAIL

MUSIC

PRACTICE

CLASSROOM

CLASSROOM

STORAGE

KILN

ART

CORRIDOR

CORRIDOR

STORAGE

GYMNASIUM

CORRIDOR

CORRIDOR

CORRIDOR

CAFETERIA

KITCHEN

S.E.

S.E.

LOUNGE

CLASSROOM

MEN

WOMEN

CORRIDOR

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDOR

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

WOMEN

MEN

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDOR

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDOR

TITLE 1

TITLE 1

MEDIA CENTER

OFFICE

A/V MDF

OFFICE

OFFICE

S.E.

CLASSROOM

COMMONS

STAFF ROOM

RESOURCE

CLASSROOM

CLASSROOM

D1.1

D1.1

A8.1

A8.1

100 400500

KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC

JOB NO.

SHEET TITLE

SHEET NO.

ISSUANCES DATE

N

P L

E A

S E

R E

C Y

C L

E

T H

E S

E D

R A

W

IN

G S

A N

D T

H E

W O

R K

R E

P R

E S

E N

T E

D T

H E

R E

IN

A

R E

T H

E P

R O

P E

R T

Y O

F A

P

Y R

IG

H

T

K

IN

G

S C

O T

T A

S S

O C

IA

T

D

M A

Y N

O T

B E

U S

E D

O R

R E

P R

O D

U C

H

O U

T P

E R

M

IS

S

IO

N

L A

S T

P R

IN

T

E D ljh

PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT

Gull Lake Community Schools

/2

/2

:2 :4

A

M

A u to d e s k D o c s

/G L C

S

S in k in g F u n d /G

L C

S R

Y A

N I

N T

E R

M E

D

IA

T E

A rc h r2

.r v t

2288 . 77

COMPOSITE FLOOR PLAN

A0.1

M -8

Ri ch la nd , M

I 4

R ya n In te rm e d ia te

S

IN

K

IN

G F

U N

D

1/16" = 1'-0"

COMPOSITE FLOOR PLAN

1. CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH ALL OTHER DRAWINGS AND SPECIFICATIONS FOR

OTHER AREAS THAT WILL REQUIRE DEMOLITION NOT INDICATED ON THESE SHEETS.

2. THE DEMOLITION PLANS GENERALLY INDICATE AREAS OF EXTENSIVE REMOVALS AND DO NOT INDICATE

ALL OF THE WORK. CONTRACTOR SHALL PERFORM ALL DEMOLITION WHICH IS NECESSARY FOR THE

PROPER EXECUTION OF THE PROJECT WHETHER OR NOT SAID DEMOLITION IS SPECIFICALLY INDICATED

WITHIN THE DOCUMENTS.

3. CONTRACTOR IS RESPONSIBLE TO INFILL, PATCH AND/ OR REPAIR, EXISTING WALL, FLOORS AND

CEILINGS TO MATCH EXISTING WHERE DEMOLITION OCCURS OTHER THAN AS DESCRIBED IN THESE

DOCUMENTS.

4. PATCH AND REPAIR REMAINING ADJACENT SURFACES AT AREAS OF REMOVAL AND/ OR ALTERATION

TO MATCH EXISTING. PROVIDE A SOUND AND PROPER SUBSTRATE FOR NEW FINISH. COORDINATE WITH

COLOR PLANS. WHERE A NEW FINISH IS NOT INDICATED, MATCH EXISTING ADJACENT FINISHES.

5. ALL DEMOLITION IS TO BE DONE WITH REASONABLE CARE AS TO MINIMIZE DAMAGE TO EXISTING

REMAINING SURFACES. CONTRACTOR IS RESPONSIBLE TO PROPERLY DISPOSE OF ALL DEMOLISHED

ITEMS NOT INDICATED TO BE RELOCATED OR TURNED OVER TO OWNER.

6. CLEAN AND PREPARE ALL EXISTING SURFACES WHICH ARE TO BE PAINTED/ PATCHED. PREPARATION

TO INCLUDE MINOR PATCHING.

DEMOLITION GENERAL NOTES:

DEMOLITION PLAN KEYNOTES:

FLOORS

A. REMOVE AND DISPOSE OF ALL FLOORING. PREP REMAINING SURFACES TO RECEIVE NEW

FINISHES.

B. REMOVE AND DISPOSE OF EXISTING VCT FLOOR AND RUBBER BASE AT CASEWORK. PREP

REMAINING SURFACE TO RECEIVE NEW FINISHES.

WALLS

NOT USED

CEILINGS

NOT USED

EQUIPMENT

A. REMOVE, SALVAGE, AND RE-INSTALL EXISTING LIBRARY CIRCULATION DESK.

100 400500

OFFICE

OFFICE

ADMINISTRATION

CONFERENCE

IDF-B

WORK / MAIL

HEALTH

T

MUSIC

J.C.

PRACTICE

VESTIBULE

CLASSROOM

CLASSROOM

CORRIDOR

VESTIBULE

HALL

1A

1A

1A 1A

1B 1A

CORRIDOR

MEDIA CENTER

OFFICE

1A

1A

4A

EXISTING PERIMETER SHELVING TO

REMAIN - REMOVE CARPET TO EDGE OF

SHELVING, TYP.

KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC

JOB NO.

SHEET TITLE

SHEET NO.

ISSUANCES DATE

N

P L

E A

S E

R E

C Y

C L

E

T H

E S

E D

R A

W

IN

G S

A N

D T

H E

W O

R K

R E

P R

E S

E N

T E

D T

H E

R E

IN

A

R E

T H

E P

R O

P E

R T

Y O

F A

P

Y R

IG

H

T

K

IN

G

S C

O T

T A

S S

O C

IA

T

D

M A

Y N

O T

B E

U S

E D

O R

R E

P R

O D

U C

H

O U

T P

E R

M

IS

S

IO

N

L A

S T

P R

IN

T

E D ljh

PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT

Gull Lake Community Schools

/2

/2

:2 :4

A

M

A u to d e s k D o c s

/G L C

S

S in k in g F u n d /G

L C

S R

Y A

N I

N T

E R

M E

D

IA

T E

A rc h r2

.r v t

2288 . 77

DEMOLITION PLANS - UNIT 100 &

UNIT 500

D1.1

M -8

Ri ch la nd , M

I 4

R ya n In te rm e d ia te

S

IN

K

IN

G F

U N

D

1/8" = 1'-0"1

DEMOLITION PLAN - UNIT 100

1/8" = 1'-0"2

DEMOLITION PLAN - UNIT 500

F

C P

100 400500

1. PROVIDE TOUCH UP PAINT TO MATCH ADJACENT WALL AT AREAS DAMAGED DUE TO

FLOORING REPLACEMENT.

COLOR LAYOUT GENERAL NOTES:

COLOR SYMBOL KEY:

FLOORING TRANSITION

WORKPOINT

EXISTING FINISHES TO REMAIN.

EXISTING GLAZED BLOCK WALL BASE.

EXISTING WOOD BASE TO REMAIN.

COLOR KEYNOTES:

OFFICE

OFFICE

118 ADMINISTRATION

CONFERENCE

115 IDF-B

WORK / MAIL

HEALTH

T

MUSIC

J.C.

PRACTICE

VESTIBULE

CLASSROOM

CLASSROOM

CORRIDOR

VESTIBULE

HALL

CPT-1

CPT-1

CPT-1

LVT-1

CPT-1

RB-1

@ CASEWORK

LVT & CPT

SAME THICKNESS

NOT TRANSITION

REQUIRED

CPT-1

RB-1

@ CASEWORK

CORRIDOR

TITLE 1

MEDIA CENTER

OFFICE

TITLE 1

CPT-1

CPT-1

INSTALL CARPET TO EDGE OF EXISTING

PERIMETER SHELVING, TYP

CIRCULATION DESK TO BE RE-INSTALLED

AFTER CARPET INSTALL

KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC

JOB NO.

SHEET TITLE

SHEET NO.

ISSUANCES DATE

N

P L

E A

S E

R E

C Y

C L

E

T H

E S

E D

R A

W

IN

G S

A N

D T

H E

W O

R K

R E

P R

E S

E N

T E

D T

H E

R E

IN

A

R E

T H

E P

R O

P E

R T

Y O

F A

P

Y R

IG

H

T

K

IN

G

S C

O T

T A

S S

O C

IA

T

D

M A

Y N

O T

B E

U S

E D

O R

R E

P R

O D

U C

H

O U

T P

E R

M

IS

S

IO

N

L A

S T

P R

IN

T

E D ljh

PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT

Gull Lake Community Schools

/2

/2

:4 :0

A

M

A u to d e s k D o c s

/G L C

S

S in k in g F u n d /G

L C

S R

Y A

N I

N T

E R

M E

D

IA

T E

A rc h r2

.r v t

2288 . 77

COLOR LAYOUT PLANS - UNIT 100

& UNIT 500

A8.1

M -8

Ri ch la nd , M

I 4

R ya n In te rm e d ia te

S

IN

K

IN

G F

U N

D

1/8" = 1'-0"1

COLOR LAYOUT PLAN - UNIT 100

1/8" = 1'-0"2

COLOR LAYOUT PLAN - UNIT 500

Sheets
G1 - TITLE SHEET

File details come from the government source that posted it. Updated .