2026-04 2026 Southeast Pavement Overlay Project Plans.pdf

PDF 9 MB Posted

Attached to
2026 SE Pavement Overlay Project
Solicitation number
S-KS0070-00016869
Issued by
Oregon

About this file

This is a project plans document for the 2026 Southeast Pavement Overlay Project (Project No. 2026-04) prepared by the City of Scappoose, Oregon, in collaboration with the engineering firm Kittelson & Associates, Inc. The project encompasses pavement overlay and maintenance work on 3rd Street, Myrtle Street, Oak Street, and Elm Street within Scappoose. The scope of work includes asphalt concrete pavement overlay installation, full-depth asphalt removal and replacement in selected areas, pre-level base lifts, grind and inlay operations, driveway connections, manhole and valve box adjustments, and sand sealing of pavement edges. The project plans were prepared as of May 6, 2026, and consist of seven sheets including a cover sheet with project contacts, typical sections, and detailed pavement plans showing repair areas and dimensions. A pre-pavement meeting is required prior to any construction activities, during which a site walk with City staff will confirm the limits of repair, full-depth asphalt removal areas, driveway repair limits, and overall project boundaries. All base erosion and sediment control measures must be in place and approved before commencement of construction.

The project specifications require that contractors provide all necessary material and compaction testing at no additional cost to the City. Manhole and valve box adjustments are the contractor's responsibility, with quantities listed in the contract being approximate and subject to verification by both the contractor and City prior to payment. Existing valve boxes should be reused, with damaged boxes requiring City arrangement for replacement. Striping, raised pavement markers, geotextile installation, and additional shoulder aggregate are not included in the contract. The contractor must ensure that existing drainage patterns and curb exposures are not altered and must identify any ponding or drainage concerns with the City prior to commencing paving work. Project contacts include Chris Negelspach, P.E., City Engineer at 503.543.7184, and Tony Roos, P.E., with Kittelson & Associates at 503.535.7444.

View the file

Other files

File Type Posted
Book 1 - ITB.pdf PDF
Book 2 - Technical Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Locations

W es t L an e Rd

Scappoose

Vernonia Hwy

Columbia Ave

High School Way

PREPARED FOR

POTENTIAL UNDERGROUND

FACILITY OWNERS

"ONE CALL"

UTILITY NOTIFICATION CENTER

1-800-332-2344 or 811 ATTENTION: Oregon Law Requires You To Follow Rules Adopted By The Oregon Utility Notification Center. Those Rules Are Set Forth In OAR 952-001-0010 Through 952-001-0090. You May Obtain Copies Of The Rules By Calling The Center. (Note: The

Telephone Number For The Oregon Utility Notification Center Is (503) 232-1987.)

THE CITY OF SCAPPOOSE, OREGON

PROJECT NO. 2026-04

May 6, 2026

3RD ST, MYRTLE ST, OAK ST, AND ELM ST

CO

VE

R

SH

EE

T

VERTICAL & HORIZONTAL DATUM:

NO HORIZONTAL OR VERTICAL DATUM PROVIDED FOR THIS PROJECT.

Knowwhat's below.

Callbefore you dig.

R

PROJECT CONTACTS

CITY OF SCAPPOOSE

CONTACT: Chris Negelspach, P.E.

ADDRESS: 52610 NE 1st Street, Suite 120

Scappoose, OR 97056

PHONE: 503.543.7184

CITY ENGINEER PUBLIC WORKS DIRECTOR

These plans are approved for construction subject to the revisions as noted. All work must be in conformance with the City of Scappoose Public Works Design Standards and Specifications and with the City of Scappoose Municipal Code and does not relieve the Engineer of Record of responsibility for the design.

DA

TE

RE

VI

SI

ON

AP

P' D

Drawn:

JCH

Checked:

AMR

PROJECT BID NO.

SHEET NO.

E.

C ol um bi a Av e.

Ph on e:

(5

) 5

-7

| F ax

3)

-5

S E

PA

VE

M

EN

T

OV

ER

LA

Y

PR

OJ

EC

T

2026-04

Co m m un ity D ev el op m en t

Sc ap po os e, O

R

Designed:

JBK

Fi le

: H

\3

M yr tle

E lm P av em en t M ai nt en an ce \d es ig n\ _C

D\

9-

CD

-C

OV

ER

.d w g Pl ot S ta m p:

/2 9/

1:

:3

AM

Ja m es ta un

K ra up p

O nl y th e el ec tro ni c ve rs io n of th is d oc um en t w ith a d ig ita l s ig na tu re p er

O A

R

-0 is a n or ig in al

C on ta ct th e E ng in ee r o f R ec or d fo r t he e le ct ro ni c fil e if an a ut he nt ic d oc um en t i s re qu ire d or a ut he nt ic ity is in q ue st io n.

2026 SE PAVEMENT

OVERLAY PROJECT

ENGINEER

KITTELSON & ASSOCIATES, INC.

CONTACT: Tony Roos, P.E.

ADDRESS: 610 SW Alder St., Suite 700

Portland, OR 97205

PHONE: 503.535.7444

CITY OF SCAPPOOSE

CONTACT: Dave Sukau ADDRESS: 33568 E. Columbia Ave.

Scappoose, OR 97056

PHONE: 503.543.7146

VICINITY MAP

SCALE: NTS

BENCHMARK:

NO BENCHMARKS ARE PROVIDED FOR THIS PROJECT.

Approved By:

_______________________________ Date: _________________ Planning Services Manager

Approved By:

_______________________________ Date: _________________ City Engineer or Delegate

SH

EE

T

LA

YO

U

T, IN

D

EX

, A

BB

RE

VI

A

TI

O N

S, A

N D

G

EN

ER

A

L N

O

TE

S

DA

TE

RE

VI

SI

ON

AP

P'

D

Drawn:

JCH

Checked:

AMR

PROJECT BID NO.

SHEET NO.

E.

C ol um bi a Av e.

Ph on e:

(5

) 5

-7

| F ax

3)

-5

S E

PA

VE

M

EN

T

OV

ER

LA

Y

PR

OJ

EC

T

1A

2026-04

Co m m un ity D ev el op m en t

Sc ap po os e, O

R

Designed:

JBK

Fi le

: H

\3

M yr tle

E lm P av em en t M ai nt en an ce \d es ig n\ _C

D\

9-

CD

-C

OV

ER

.d w g Pl ot S ta m p:

/2 9/

1:

:4

AM

Ja m es ta un

K ra up p

O nl y th e el ec tro ni c ve rs io n of th is d oc um en t w ith a d ig ita l s ig na tu re p er

O A

R

-0 is a n or ig in al

C on ta ct th e E ng in ee r o f R ec or d fo r t he e le ct ro ni c fil e if an a ut he nt ic d oc um en t i s re qu ire d or a ut he nt ic ity is in q ue st io n.

INDEX OF SHEETS

SHEET NUMBER SHEET TITLE

1 COVER SHEET

INDEX, ABBREVIATIONS, AND SHEET LAYOUT 1A

TYPICAL SECTIONS2

PAVEMENT PLANS3 THRU 7

ABBREVIATIONS

DRAWING

STA. STATION

CATCH BASIN

CURB INLET

AREA DRAIN

SHOT SHEET

R.O.W. RIGHT-OF-WAY

CRT. RIGHT

R RADIUS

DELTA ANGLE

PT POINT OF TANGENCY

PI POINT OF VERTICAL INFLECTION

EDGE OF ASPHALT CONCRETE

ASPHALT CONCRETE

PVC POLY VINYL CHLORIDE

DUCTILE IRON

BEGIN VERTICAL CURVE

ELEVATION

FT FEET

AMERICAN DISABILITIES ACT

S SLOPE

EACH

RC REINFORCED CONCRETE PIPE

W WATER

ELECTRICAL

T TELECOM

SD STORM DRAIN

WA WATER QUALITY

COMPOSITE

THIN. THICKNESS

WM WATER QUALITY MANHOLE

PC POINT OF REVERSE CURVATURE

BACK OF CURB (TOP)

BACK OF SIDEWALK

BOOT OREGON DEPARTMENT OF TRANSPORTATION

LTV. LEFT

L LENGTH

PC POINT OF CURVATURE

PCC POINT OF COMPOUND CURVATURE

PI POINT OF INFLECTION

NO. NUMBER

LF LINEAR FEET

IE INVERT ELEVATION

PGE PORTLAND GENERAL ELECTRIC

G GAS

GV GAS VALVE

LVC LENGTH OF VERTICAL CURVE

ACP ASPHALT CONCRETE PAVEMENT

NOM. NOMINAL

N.T.S./NTS NOT TO SCALE

MJ MECHANICAL JOINT

Max. MAXIMUM

PE PLAIN END

TOC TOP OF CURB

F.T. FLAT TOP

VC VERTICAL CURVE

Min. MINIMUM

PUE PUBLIC UTILITY EASEMENT

PSUE PUBLIC SLOPE & UTILITY EASEMENT

PSE PUBLIC SLOPE EASEMENT

PSDUE PUBLIC SLOPE, DRAINAGE, & UTILITY EASEMENT

PWE PUBLIC WALL EASEMENT

PWUE PUBLIC WALL & UTILITY EASEMENT

END VERTICAL CURVE

EXISTING

FLANGE

FLOW LINE

DWG.

CB

CI

AD

Δ

EAC

AC

DI

BVC

ELEV

ADA

EA

E

COMP.

BC

BW

EVC

Extg.

FLG

F.L./FL

CITY OF SCAPPOOSECoS

MH MANHOLE

TC TOP OF CURB

TRK TRUCK

OSSC OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION

GENERAL NOTES

1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN

PLACE, FUNCTIONAL, AND APPROVED IN INITIAL INSPECTION, PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES.

2. A PRE-PAVEMENT MEETING IS REQUIRED PRIOR TO ANY PAVEMENT REMOVAL OR INSTALLATION. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE THIS MEETING. A SITE WALK WITH CITY OF SCAPPOOSE STAFF SHALL BE CONDUCTED DURING THE MEETING TO CONFIRM LIMITS OF REPAIR, INCLUDING FULL-DEPTH ASPHALT REMOVAL AND REPLACEMENT, ASPHALT PRE-LEVEL, DRIVEWAY REPAIR LIMITS, AND

OVERALL PROJECT LIMITS.

3. ALL REPAIR AREAS SHOWN ON THE PLANS ARE APPROXIMATE AND SHALL BE FINALIZED DURING THE REQUIRED SITE WALK AT THE

PRE-PAVEMENT MEETING.

4. AREA MAY BE IDENTIFIED FOR PRE-LEVEL DURING PRE-PAVEMENT MEETING. PRE-LEVEL CAN BE USED FOR ROAD REPAIR, DEVELOPING POSITIVE DRAINAGE. NO PRE-LEVEL COST WILL BE PAID FOR UNLESS AUTHORIZED BY THE CITY. QUANTITY PROVIDED CONTINGENCY

AMOUNT TO BE AUTHORIZED BY CITY.

5. ALL PAVEMENT EDGES SHALL BE SAND SEALED.

6. NO STRIPING OR RAISED PAVEMENT MARKERS ARE INCLUDED IN THIS CONTRACT.GEOTEXTILE SHALL NOT BE INSTALLED AS PART OF THIS

PROJECT.

7. QUANTITIES FOR MANHOLE ADJUSTMENTS AND VALVE LID ADJUSTMENTS ARE APPROXIMATE.

8. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIAL AND COMPACTION TESTING AT NO ADDITIONAL COST TO THE CITY.

9. NO ADDITIONAL SHOULDER AGGREGATE TO BE INSTALLED AS PART OF THIS PROJECT.

10. CONTRACTOR IS RESPONSIBLE FOR MAKING ALL NECESSARY ADJUSTMENTS TO MANHOLES AND VALVE BOXES. THE QUANTITY LISTED IN THE PAY ITEM IS APPROXIMATE AND MUST BE VERIFIED BY THE CONTRACTOR AND CITY PRIOR TO PAYMENT. VALVE BOXES SHOULD BE RE-USED; IF ANY ARE DAMAGED DURING ADJUSTMENTS, THE CONTRACTOR MUST CONTACT THE CITY TO ARRANGE FOR REPLACEMENTS.

11. THE CONTRACTOR SHALL ENSURE THAT EXISTING DRAINAGE PATTERNS AND CURB EXPOSURES ARE NOT ALTERED. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ANY PONDING OR DRAINAGE CONCERNS WITH THE CITY PRIOR TO COMMENCING ANY PAVING WORK.

SHEET LAYOUT

SE

RD

S

T

SE MYRTLE ST

SE OAK ST

SE

RD

S

T

SE MAPLE ST

SE SANTOSH ST

SE

RD

S

T

SE

TH

S

T

SE ELM ST

SH

T.

SH

T.

SHT. 5

SHT. 6

SHT. 7

SE

TH

S

T

SE

TH

S

T

SE

TH

S

T

SE

TH

S

T

SE

TH

S

T

FINISH GRADE

(SLOPE VAR.)

12"

3"

BATTER 2:1

(TYP.)

NO

RM

AL

E

DG

E

OF

S

HL

DR

ASPHALT DRAINAGE CURB

jkraupp Text Box 2026.04.29.

jkraupp Image

TY

PI

CA

L

SE

CT

IO

N

DA

TE

RE

VI

SI

ON

AP

P' D

Drawn:

JCH

Checked:

AMR

PROJECT BID NO.

SHEET NO.

E.

C ol um bi a Av e.

Ph on e:

(5

) 5

-7

| F ax

3)

-5

S E

PA

VE

M

EN

T

OV

ER

LA

Y

PR

OJ

EC

T

2026-04

Co m m un ity D ev el op m en t

Sc ap po os e, O

R

Designed:

JBK

Fi le

: H

\3

M yr tle

E lm P av em en t M ai nt en an ce \d es ig n\ _C

D\

9-

CD

-C

OV

ER

.d w g Pl ot S ta m p:

/2 9/

1:

:4

AM

Ja m es ta un

K ra up p

O nl y th e el ec tro ni c ve rs io n of th is d oc um en t w ith a d ig ita l s ig na tu re p er

O A

R

-0 is a n or ig in al

C on ta ct th e E ng in ee r o f R ec or d fo r t he e le ct ro ni c fil e if an a ut he nt ic d oc um en t i s re qu ire d or a ut he nt ic ity is in q ue st io n.

TYPICAL SECTION

0" - 2" VARIABLE GRIND AND INLAY 2" OVERLAY

FULL EXISINTG AC REMOVAL

AND REPLACEMENT WITH PRE-LEVEL

EXISTING GROUND

EXISTING GROUND

EXISTING GROUND2" INLAY AREA

Variable Grind

2" OVERLAY 2" OVERLAY

3" BASE LIFT

(PRE-LEVEL)

3RD ST, OAK ST, MYRTLE ST, ELM ST

SEE BELOW

SIDE STREET CONNECTIONS OR EXISTING

EXISTING ACP DRIVEWAY CONNECTIONS

REPLACEMENT AREAS

OR EXTENSION AREAS

jkraupp Text Box 2026.04.29.

DA

TE

RE

VI

SI

ON

AP

P' D

Drawn:

JCH

Checked:

AMR

PROJECT BID NO.

SHEET NO.

E.

C ol um bi a Av e.

Ph on e:

(5

) 5

-7

| F ax

3)

-5

S E

PA

VE

M

EN

T

OV

ER

LA

Y

PR

OJ

EC

T

2026-04

Co m m un ity D ev el op m en t

Sc ap po os e, O

R

Designed:

JBK

Fi le

: H

\3

M yr tle

E lm P av em en t M ai nt en an ce \d es ig n\ _C

D\

9-

CD

-P

AV

EM

EN

T

PL

AN

.d w g Pl ot S ta m p:

/2 9/

1:

:0

AM

Ja m es ta un

K ra up p

O nl y th e el ec tro ni c ve rs io n of th is d oc um en t w ith a d ig ita l s ig na tu re p er

O A

R

-0 is a n or ig in al

C on ta ct th e E ng in ee r o f R ec or d fo r t he e le ct ro ni c fil e if an a ut he nt ic d oc um en t i s re qu ire d or a ut he nt ic ity is in q ue st io n.

0 502550

Scale: 1" = 50'

SEE BELOW

LEFTSE 3RD ST

SE ELM

ST

SE SANTOSH ST

SE M

APLE ST

SEE SHEET 4

SEE ABOVE RIGHT

SE 3RD ST

SE OAK ST

SE M

YRTLE ST

SE 3RD ST

PA

VE

M

EN

T

PL

A N

PAVEMENT LEGEND

0"-2" VARIABLE GRIND AND INLAY

2" OVERLAY NEW ASPHALT DRIVEWAY CONNECTION

2" THICK

2" OVERLAY

3" BASE LIFT

ADD DRIVEWAY

WINGOUT

3' 10'

3' 10'

ADA CURB RAMP

COUNTER SLOPE AT CURB RAMP

SHALL NOT EXCEED 5%

3'6'

ADA CURB RAMP ADA CURB RAMP

COUNTER SLOPE AT CURB RAMP

SHALL NOT EXCEED 5%

COUNTER SLOPE AT CURB RAMP

SHALL NOT EXCEED 5%

3'

2' WING OUT AT GRAVEL

DRIVEWAY, TYPICAL

11.5'

PROTECT FIRE

HYDRANT

CITY TO WIDEN ROADWAY

FOR ADDITIONAL PAVING

3'

10'

3'

FULL EXISTING ASPHALT REMOVAL AND

REPLACEMENT PRE-LEVEL

10'

12'

12' 6'3'

6'

6' 9.5' 45.5'

28'

6'

4' jkraupp Text Box 2026.04.29.

TE

RE

VI

SI

ON

AP

P' D

Drawn:

JCH

Checked:

AMR

PROJECT BID NO.

SHEET NO.

E.

C ol um bi a Av e.

Ph on e:

(5

) 5

-7

| F ax

3)

-5

S E

PA

VE

M

EN

T

OV

ER

LA

Y

PR

OJ

EC

T

2026-04

Co m m un ity D ev el op m en t

Sc ap po os e, O

R

Designed:

JBK

Fi le

: H

\3

M yr tle

E lm P av em en t M ai nt en an ce \d es ig n\ _C

D\

9-

CD

-P

AV

EM

EN

T

PL

AN

.d w g Pl ot S ta m p:

/2 9/

1:

:0

AM

Ja m es ta un

K ra up p

O nl y th e el ec tro ni c ve rs io n of th is d oc um en t w ith a d ig ita l s ig na tu re p er

O A

R

-0 is a n or ig in al

C on ta ct th e E ng in ee r o f R ec or d fo r t he e le ct ro ni c fil e if an a ut he nt ic d oc um en t i s re qu ire d or a ut he nt ic ity is in q ue st io n.

SEE SHEET 3

SE 3RD ST

SE OLIVE ST

E COLUM

BIA AVE

0 502550

Scale: 1" = 50'

PA

VE

M

EN

T

PL

A N

PAVEMENT LEGEND

0"-2" VARIABLE GRIND AND INLAY

2" OVERLAY

FULL EXISTING ASPHALT REMOVAL AND

REPLACEMENT PRE-LEVEL

NEW ASPHALT DRIVEWAY CONNECTION

2" THICK

7' TIE IN MATCH AT GUTTER LIP

10' 3'

3'

10'2' WING OUT AT GRAVEL

DRIVEWAY, TYPICAL

4'

6'

5'

30'

12'

12' jkraupp Text Box 2026.04.29.

TE

RE

VI

SI

ON

AP

P' D

Drawn:

JCH

Checked:

AMR

PROJECT BID NO.

SHEET NO.

E.

C ol um bi a Av e.

Ph on e:

(5

) 5

-7

| F ax

3)

-5

S E

PA

VE

M

EN

T

OV

ER

LA

Y

PR

OJ

EC

T

2026-04

Co m m un ity D ev el op m en t

Sc ap po os e, O

R

Designed:

JBK

Fi le

: H

\3

M yr tle

E lm P av em en t M ai nt en an ce \d es ig n\ _C

D\

9-

CD

-P

AV

EM

EN

T

PL

AN

.d w g Pl ot S ta m p:

/2 9/

1:

:1

AM

Ja m es ta un

K ra up p

O nl y th e el ec tro ni c ve rs io n of th is d oc um en t w ith a d ig ita l s ig na tu re p er

O A

R

-0 is a n or ig in al

C on ta ct th e E ng in ee r o f R ec or d fo r t he e le ct ro ni c fil e if an a ut he nt ic d oc um en t i s re qu ire d or a ut he nt ic ity is in q ue st io n.

SEE ABOVE RIGHT

SE 3RD ST

SE MYRTLE ST

SE 4TH ST

SE MYRTLE ST

SEE BELOW

LEFT

0 502550

Scale: 1" = 50'

PA

VE

M

EN

T

PL

A N

3'

14'

3' 3' 3' 3'

8' 3'

14'

3' 3' 10'

10'

10'

EXISTING CB

PROTECT NEW CURB AND

SIDEWALK INSTALLED BY

OTHERS (NOT SHOWN)

PAVEMENT LEGEND

0"-2" VARIABLE GRIND AND INLAY

2" OVERLAY

FULL EXISTING ASPHALT REMOVAL AND

REPLACEMENT PRE-LEVEL

NEW ASPHALT DRIVEWAY CONNECTION

2" THICK

2' WING OUT AT GRAVEL

DRIVEWAY, TYPICAL

17'

10'

EXISTING CATCH BASIN

14' jkraupp Text Box 2026.04.29.

TE

RE

VI

SI

ON

AP

P' D

Drawn:

JCH

Checked:

AMR

PROJECT BID NO.

SHEET NO.

E.

C ol um bi a Av e.

Ph on e:

(5

) 5

-7

| F ax

3)

-5

S E

PA

VE

M

EN

T

OV

ER

LA

Y

PR

OJ

EC

T

2026-04

Co m m un ity D ev el op m en t

Sc ap po os e, O

R

Designed:

JBK

Fi le

: H

\3

M yr tle

E lm P av em en t M ai nt en an ce \d es ig n\ _C

D\

9-

CD

-P

AV

EM

EN

T

PL

AN

.d w g Pl ot S ta m p:

/2 9/

1:

:1

AM

Ja m es ta un

K ra up p

O nl y th e el ec tro ni c ve rs io n of th is d oc um en t w ith a d ig ita l s ig na tu re p er

O A

R

-0 is a n or ig in al

C on ta ct th e E ng in ee r o f R ec or d fo r t he e le ct ro ni c fil e if an a ut he nt ic d oc um en t i s re qu ire d or a ut he nt ic ity is in q ue st io n.

SEE ABOVE RIGHT

SE 3RD ST

SE OAK ST

SE 4TH ST

SE OAK ST

SEE BELOW

LEFT

0 502550

Scale: 1" = 50'

PA

VE

M

EN

T

PL

A N

3' 10'

3' 3' 3'

3' 3' 3'

6' 3' 3' 3'

PROTECT NEW CURB

AND SIDEWALK INSTALLED

BY OTHERS (NOT SHOWN)

10'

PROTECT NEW CURB

AND SIDEWALK INSTALLED

BY OTHERS (NOT SHOWN)

10' 3'

3'

3'

10'

PAVEMENT LEGEND

0"-2" VARIABLE GRIND AND INLAY

2" OVERLAY

FULL EXISTING ASPHALT REMOVAL AND

REPLACEMENT PRE-LEVEL

NEW ASPHALT DRIVEWAY CONNECTION

2" THICK

2' WING OUT AT GRAVEL

DRIVEWAY, TYPICAL

3'

5' jkraupp Text Box 2026.04.29.

TE

RE

VI

SI

ON

AP

P' D

Drawn:

JCH

Checked:

AMR

PROJECT BID NO.

SHEET NO.

E.

C ol um bi a Av e.

Ph on e:

(5

) 5

-7

| F ax

3)

-5

S E

PA

VE

M

EN

T

OV

ER

LA

Y

PR

OJ

EC

T

2026-04

Co m m un ity D ev el op m en t

Sc ap po os e, O

R

Designed:

JBK

Fi le

: H

\3

M yr tle

E lm P av em en t M ai nt en an ce \d es ig n\ _C

D\

9-

CD

-P

AV

EM

EN

T

PL

AN

.d w g Pl ot S ta m p:

/2 9/

1:

:2

AM

Ja m es ta un

K ra up p

O nl y th e el ec tro ni c ve rs io n of th is d oc um en t w ith a d ig ita l s ig na tu re p er

O A

R

-0 is a n or ig in al

C on ta ct th e E ng in ee r o f R ec or d fo r t he e le ct ro ni c fil e if an a ut he nt ic d oc um en t i s re qu ire d or a ut he nt ic ity is in q ue st io n.

SEE BELOW

LEFT

SE 4TH ST

SE ELM ST

SE 5TH ST

SE ENDICOTT LN

SEE ABOVE RIGHT

SE ELM ST

SE 6TH ST

SE 6TH CT

SE ELM ST

0 502550

Scale: 1" = 50'

PA

VE

M

EN

T

PL

A N

3' 3' 3' 3'

3" ASPHALT

DRAINAGE CURB 10'

3'

7.5' PROTECT EXISTING CURB

PROTECT EXISTING CURB

4' WIDEN

PROTECT TREE

UP TO 4" GRIND

PERPENDICULAR

TO LEFT EDGE

PAVEMENT LEGEND

0"-2" VARIABLE GRIND AND INLAY

2" OVERLAY

FULL EXISTING ASPHALT REMOVAL AND

REPLACEMENT PRE-LEVEL

NEW ASPHALT DRIVEWAY CONNECTION

2" THICK

2" OVERLAY

3" BASE LIFT

2' WING OUT AT GRAVEL

DRIVEWAY, TYPICAL

3'

10' 45' 12'

3' 18' jkraupp Text Box 2026.04.29.

Sheets and Views
1 COVER SHEET
1A SHEET LAYOUT, INDEX, ABBREVIATIONS, AND GENERAL NOTES
1A SHEET LAYOUT, INDEX, ABBREVIATIONS, AND GENERAL NOTES
2 TYPICAL SECTION
2 TYPICAL SECTION
3 PAVEMENT PLAN
3 PAVEMENT PLAN
4 PAVEMENT PLAN
4 PAVEMENT PLAN
5 PAVEMENT PLAN
5 PAVEMENT PLAN
6 PAVEMENT PLAN
6 PAVEMENT PLAN
7 PAVEMENT PLAN
7 PAVEMENT PLAN
2026-04-29T11:48:40-0700
Jamestaun B Kraupp

File details come from the government source that posted it. Updated .