This construction document set represents detailed architectural, mechanical, and electrical plans for the Richland Elementary School Gymnasium Cooling and Lighting project in Richland, Michigan, prepared for Gull Lake Community Schools. The project encompasses installation of a new 12.5-ton packaged rooftop air-conditioning unit (RTU-101B) with a capacity of 5,000 CFM, including direct expansion cooling with hot gas reheat capability, supply and return ductwork, grilles, and diffusers. The mechanical scope includes new refrigerant piping, condensate drainage, economizer controls, and integration with the district's existing building automation system. The electrical work involves providing power distribution, lighting controls, occupancy sensors, and fire alarm integration for the gymnasium space (Room 508). The construction documents indicate an "Estimation on Hold" status with revision dates of December 19, 2025, January 20, 2026, and April 9, 2026.
The project specifications require adherence to current editions of the Michigan Electrical Code, National Electrical Code, International Building Code, and International Mechanical Code. The mechanical systems include variable air volume control with direct digital controls, minimum outdoor air requirements of 1,500 CFM with economizer capability up to 5,000 CFM, and CO2-based demand control ventilation maintaining setpoints between 800-1,000 PPM. The electrical infrastructure specifies Square D NQOD panelboards for 208/120V distribution, LED lighting fixtures, occupancy and vacancy sensors, and addressable fire alarm system integration. All equipment requires shop drawing submittals, field testing and balancing per ASHRAE 111 standards, and one-year warranties on workmanship and materials following final acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026_04_09 GLCS Kellogg Gym Lighting.pdf | ||
| Bid Advertisement Apr 2026 Sink Fund.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
200 300
LOCATION MAP
KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
N D
C
O P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
E S
A
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
W
IT
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
CLIENT:
GULL LAKE COMMUNITY SCHOOLS
10100 EAST 'D' AVE.
RICHLAND, MI 49083
P. (269) 548-3400
ARCHITECT & CIVIL ENGINEER:
KINGSCOTT ASSOCIATES INC.
950 TRADE CENTRE WAY, SUITE 130
PORTAGE, MI 49002
P. (800) 632-7815
CONSTRUCTION MANAGER:
MEP ENGINEER:
IGNYTE
38 COMMERCE AVE. SW
SUITE 450
GRAND RAPIDS, MI 49503
DIRECTORY
MILLER DAVIS
1029 PORTAGE ST.
KALAMAZOO, MI 49001
P. (269) 345-3561
PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT
Gull Lake Community Schools
/9
/2
:0 :2
A
M
A u to d e s k D o c s /G
L C
S
S in k in g F u n d /G
L C
S R
IC
H
L A
N D
E le m A rc h r2
.r v t 2288.77
TITLE SHEET
G1
M
-8
Ri ch la nd
, M I
R ic hl a nd E le m e nt a ry
R
IC
H L A
N D
S
IN
K
IN
G
F U
N D
Richland Elementary
RICHLAND 2026 SINKING FUND
SHEET INDEX
GENERAL
G1 TITLE SHEET
ARCHITECTURAL
A0.1 COMPOSITE FLOOR PLAN
A1.5 FLOOR PLAN - UNIT 500
MECHANICAL
M000 MECHANICALSYMBOLS AND GENERAL NOTES
M001 MECHANICAL SPECIFICATIONS
M002 MECHANICAL SPECIFICATIONS
M003 MECHANICAL SPECIFICATIONS
M004 MECHANICAL SPECIFICATIONS
M110 MECHANICAL PLANS
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND GENERAL NOTES
E001 ELECTRICAL SPECIFICATIONS
E110 FIRST FLOOR POWER PLAN
E120 SECOND FLOOR POWER PLAN
E401 ELECTRICAL ONE-LINE DIAGRAM
CONSTRUCTION DOCUMENTS
RICHLAND ELEMENTARY
9476 M-89
APRIL 09, 2026
CONSTRUCTION DOCUMENTS 04/09/2026
CG
1.25
1.5
1.4
1F
1F
1H
1.1
1.2
2.2
2.3
2.6
2.7
2.8
1A
1A
2.1
3A
3.2
3.3
3.6
3.8
3.45
3.35
3.05
3.25
3C
3.7
1C
1C 2A 3B
3D
3E
1.3
1B
1B
1D
1D
1E 1G
YOUNG 5's
YOUNG 5's
CORRIDOR
ART
MUSIC
SPEECH
J.C.
ITIN
CORRIDOR
ITIN
STAFF
PRINCIPAL
CONFERENCE
WKRM
HEALTH
RECEPTIONIST
VESTIBULE
CORRIDOR
STORAGE
STOR.
SPEECH
STEAM STOR.
STEAM
KINDERGARTEN
CORRIDOR
KINDERGARTEN
KINDERGARTEN
KINDERGARTEN
KINDERGARTEN
KINDERGARTEN
VEST.
KINDERGARTEN
SPEECH
ITIN.
MECHANCIAL
CORRIDOR
1st GRADE
1st GRADE
1st GRADE
1st GRADE
1st GRADE
1st GRADE
1st GRADE
VEST.
CORRIDOR
CORRIDOR
VEST.
CAFETERIA
TITLE 1
TITLE 1
SPEECH
KITCHEN
CUSTODIAN
COOLER
WOMEN
MEN
J.C.
WOMEN
MEN
STOR.
MEDIA CENTER
WKRM
SPANISH
RESOURCE
2nd GRADE
2nd GRADE
2nd GRADE
CORRIDOR
2nd GRADE
2nd GRADE
CORRIDOR
2nd GRADE
2nd GRADE
STORAGE
OFFICE
MULTI-PURPOSE
2.5
2.4
3.4
3.5
3.09
3.1
200 300
1. INDICATES CONSTRUCTION DOCUMENT ROOM NUMBERS.XX
COMPOSITE PLAN GENERAL NOTES:
AREA OF WORK
KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT
Gull Lake Community Schools
/9
/2
:0 :2
A
M
A u to d e s k D o c s /G
L C
S
S in k in g F u n d /G
L C
S R
IC
H
L A
N D
E le m A rc h r2
.r v t 2288.77
COMPOSITE FLOOR PLAN
A0.1
M
-8
Ri ch la nd
, M I
R ic hl a nd E le m e nt a ry
R
IC
H L A
N D
S
IN
K
IN
G
F U
N D
1/16" = 1'-0"
COMPOSITE PLAN
CONSTRUCTION DOCUMENTS 04/09/2026
Q
NEW 15' X 14' CONCRETE PAD
SEE DETAIL 2/A1.5
NEW EXPANSION JOINT
NEW MECH UNIT (SEE MECH)
OPENING FOR DUCTS. INFILL UNUSED AREAS
WITH INSULATED SHEET METAL PANEL. PAINT
TO MATCH EXTERIOR BRICK AND INTERIOR
CMU WALLS. COORDINATE OPENING SIZE
WITH MECH.
SEE DETAIL 3/A5.1
HSS 8x4x1/4 W/
5/16x19" BOT PL.
SEE DETAIL 3/A5.1
PAINT GRILLE TO MATCH EXISTING WALL
PAINT TO MATCH
CEILING
PAINT DUCT WORK
TO MATCH
EXISTING BRICK
200 300
1. INDICATES CONSTRUCTION DOCUMENT ROOM NUMBERS.
2. MASONRY CONTRACTOR TO INSTALL LOOSE LINTELS FOR MISCELLANEOUS OPENINGS NOT
INDICATED ON DRAWINGS BUT REQUIRED FOR MECHANICAL, ELECTRICAL OR OTHER ITEMS TO PASS
THROUGH A WALL.
3. CONTRACTOR TO CUT OPENINGS IN MASONRY WALL IN A NEAT AND STRAIGHT MANNER. REPAIR OR
REPLACE DAMAGED BLOCK AND BRICK DUE TO MASONRY WORK.
4. PROVIDE BREAK METAL IF NEEDED AT NEW DUCT WORK TO SEAL THE OPENING.
5. SEAL OPENINGS AT PENETRATIONS WEATHERTIGHT.
XX
ARCHITECTURAL GENERAL NOTES:
PLAN GRADE
8" CONCRETE WALK
6" MDOT CLASS II SAND
T
UR
N D
O W
N E
D G
E
1' -2
8"
1. ALL UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CALL "MISS DIG" AND VERIFY ALL
UNDERGROUND UTILITIES BEFORE EXCAVATION AT THE SITE. ANY UTILITIES DISTURBED BY
CONSTRUCTION SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE. USE PRIVATE UTILITY LOCATOR
SERVICE FOR ANY UTILITIES MISS DIG WILL NOT TRACE.
2. ANY DISCREPANCIES BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS SHOULD BE
REPORTED TO THE OWNER'S REPRESENTATIVE IMMEDIATELY FOR RESOLUTION.
3. EROSION SHALL BE CONTROLLED AS SPECIFIED AND AS REQUIRED BY LOCAL, STATE OR FEDERAL
AUTHORITIES HAVING JURISDICTION.
4. ALL DIMENSIONS ARE GIVEN TO BACK OF CURB OR EDGE OF PAVEMENT UNLESS OTHERWISE
NOTED. ALL RADII ARE 5' UNLESS OTHERWISE NOTED.
5. ALL UNPAVED AREAS DISTURBED BY CONSTRUCTION SHALL RECEIVE 4" TOPSOIL AND LAWN PER
SPECIFICATIONS. SUPPLEMENT WITH IMPORTED TOPSOIL AS REQUIRED TO PROVIDE 4" DEPTH.
SITE GENERAL NOTES:
1. EARTHWORK AND PAVEMENT CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE
CURRENT MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION UNLESS OTHERWISE NOTED IN THE
FOLLOWING ITEMS.
2. REMOVE ANY EXISTING TOPSOIL, VEGETATION, TREES AND OTHER DELETERIOUS MATERIALS TO
EXPOSE THE SUBGRADE SOIL. TREE ROOTS SHALL BE COMPLETELY REMOVED.
3. EXCAVATE TO THE DEPTH OF THE FINAL SUBGRADE ELEVATION TO ALLOW FOR GRADE CHANGES
AND THE PLACEMENT OF THE RECOMMENDED PAVEMENT SYSTEM.
4. THE TOP 12 INCHES OF THE EXPOSED SUBGRADE SHALL BE COMPACTED TO A DENSITY NO LESS
THAN 95 PERCENT OF THE MAXIMUM DENSITY AS DETERMINED BY THE MODIFIED PROCTOR (ASTM D
1557-91).
5. LOOSE OR YIELDING AREAS WHICH CANNOT BE MECHANICALLY STABILIZED SHALL BE REMOVED
AND REPLACED WITH ENGINEERED FILL OR AS DICTATED BY FIELD CONDITIONS.
6. THE ENGINEERED FILL SHALL BE COMPACTED TO A DENSITY NO LESS THAN 95 PERCENT OF THE
MAXIMUM DENSITY AS DETERMINED BY THE MODIFIED PROCTOR (ASTM D 1557-91). THE BASE SHALL
EXTEND A MINIMUM OF 1 FOOT BEYOND THE PAVED EDGE.
7. CONTRACTOR SHALL PROTECT EXISTING CURB, GUTTER, SIDEWALK, WALLS, FENCES AND ALL
OTHER EXISTING SITE FEATURES NOT INDICATED FOR REMOVAL OR REHABILITATION.
8. PLACE EXPANSION JOINTS WHERE NEW CONCRETE PAVEMENT OR WALKS ABUT BUILDING WALLS
(PROPOSED OR EXISTING), COLUMN WALLS OR BASES, CONCRETE FOUNDATIONS OR BASES, CURBS, OR EXISTING CONCRETE PAVEMENT. PLACE JOINT SEALANT ON ALL EXPANSION JOINTS.
9. CONCRETE PAVEMENT SHALL MEET THE REQUIREMENTS FOR MDOT GRADE 4000 CONCRETE PER
THE CURRENT MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION.
10. APPLY SILENCURE SRT (OR APPROVED EQUIVALENT) ACRYLIC CURING COMPOUND AND SILOXANE
SEALER ON ALL CONCRETE PAVING, CURBS, AND WALKS (APPLY PER MANUFACTURER
RECOMMENDATIONS).
PAVING CONSTRUCTION NOTES:
EXISTING CONSTRUCTION
12" NOMINAL
1/2"
11 1/4" AT 12" NOM 7 3/4"
1/2"
BOTTOM PLATE
LINTEL
OPEN HEAD WEEPS W/ VENTS @ 24" OC
GALVANIZED SHEET METAL RAIN DIVERTER
DRAINAGE SYSTEM
SEALANT W/BACKER ROD ON ALL SIDES -
INTERIOR AND EXTERIOR
INSTALL SALVAGED BRICK
DUCT - REFER TO MECHANICAL DRAWINGS
SLOPE DUCT 1/4" PER FOOT
DOWNWARD AWAY FROM BUILDING
FOR DRAINAGE
RIGID INSULATION TO MATCH EXISTING
SS FLASHING WITH BARRIER AT STEEL ANGLE
THRU WALL FLASHING
KINGSCOTT ASSOCIATES INC. PORTAGE, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
PORTAGE | CHELSEA | GRAND RAPIDS | DETROIT
Gull Lake Community Schools
/9
/2
:5 :1
A
M
A u to d e s k D o c s /G
L C
S
S in k in g F u n d /G
L C
S R
IC
H
L A
N D
E le m A rc h r2
.r v t 2288.77
FLOOR PLAN - UNIT 500
A1.5
M
-8
Ri ch la nd
, M I
G ul l L a ke C o m m un ity S ch o o ls
R
IC
H L A
N D
S
IN
K
IN
G
F U
N D
1/8" = 1'-0"1
FLOOR PLAN - UNIT 500
CONSTRUCTION DOCUMENTS 04/09/2026
1" = 1'-0"2
8" CONCRETE PAVEMENT
1 1/2" = 1'-0"3
DUCT OPENING
B
M
D
Ƨ
Ƨ
M
S
S
M
CO2
CO
H2
HZG
NO2
O2
HS
H
T
TC
TH
TS
CHWS
CD
CDR
CWR
CWS
HHWR
HHWS
G
STM
(E)
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE DRAIN
CONDENSATE RETURN
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
HEATING HOT WATER RETURN
HEATING WATER SUPPLY
NATURAL GAS
STEAM
RL
RS
REFRIGERANT-LIQUID
REFRIGERANT-SUCTION
2"
RD REFRIGERANT-HOT GAS
MECHANICAL PIPING SYMBOLS
KEYNOTE SYMBOL
CONTINUATION SYMBOL
SHEET NUMBER WHERE DETAIL IS PLACED
DETAIL NUMBER ON SHEET
PLAN REVISION NUMBER
GENERAL PLAN SYMBOLS
SPACE TAG / SPACE NUMBER
POINT WHERE NEW CONNECTS TO EXISTING
EXISTING PIPE TO REMAIN
AREA BEING DEMOLISHED
AREA NOT IN CONTRACT
PIPE TO BE DEMOLISHED
ABOVE GROUND PIPING
NOMINAL PIPE SIZE
BELOW GROUND PIPING
PIPE SLOPE (WHEN APPLICABLE)
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN
THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE
USED IN THIS SET OF DRAWINGS.
LP PROPANE GAS
1/8" / 12" SLOPE
24"x12"
24"/12"
18"Ø
EXHAUST AIR
OUTDOOR AIR
BUILDING RELIEF AIR
RETURN AIR
SUPPLY AIR - LOW PRESSURE
TRANSFER AIR
GRILLES, REGISTERS, DIFFUSERS
AIRFLOW
CATALOG THROW PERFORMANCE
NECK SIZE / MODULE SIZE
EXISTING DUCT TO REMAIN
OVAL DUCT SIZE (WIDTH X HEIGHT
DIAMETER)
DUCT SIZE (WIDTH X HEIGHT)
HVAC SYMBOLS
RECT. SUPPLY DUCT RISE / DROP
MECHANICAL EQUIPMENT
ROUND DUCT SIZE (DIAMETER)
DUCT TO BE DEMOLISHED
KITCHEN EXHAUST AIR
ENV. TOBACCO SMOKE
EBO - EQUIPMENT BY OTHERS
(REFER TO OTHER DISCIPLINES)
EXISTING TO REMAIN EQUIPMENT
FLUE GAS VENT
COMBUSTION AIR
VENTILATION AIR
(E)AHU-XX
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GF GAS-FIRED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MUA MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
RA RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RLA RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
SA SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
ABBREVIATIONS
TYPE (SEE SCHEDULE)
MAX NC RATING
DESIGN AIRFLOW RATE
RTU-XX
10.0 ton
RTU-XX
180000 Btu/h
180 CFH
3.7 GPM
TU-XX
DESIGN WATER FLOW
OPERATING WEIGHT
HEATING CAPACITY
NOMINAL COOLING
CAPACITY
MECHANICAL CONTROL DEVICES AND SENSORS
GWR
GWS
GEOTHERMAL WATER RETURN
GEOTHERMAL WATER SUPPLY
EXISTING RELOCATED EQUIPMENT(R)AHU-XX
AC AIR CONDITIONING UNIT
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CHWP CHILLED WATER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
ECH ELECTRIC CABINET HEATER
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HRU HEAT RECOVERY UNIT
PRV POWER ROOF VENTILATOR
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
EQUIPMENT ABBREVIATIONS
DAMPER TYPES
LAB EXHAUST AIR
UNIT IDENTITY
VALVE TYPES
2" CHECK
2" BAL
3" CIRC
2" GATE
2" PRV
2" STRAIN
2" M-CNTRL
2" SHUTOFF
1" GAS-CNTRL
ALTERNATE CHECK VALVE
1" REG
1" GAS COCK
1" PLUG
2" BFV
2" GLOBE
2" LOCK
4" 3-WAY CNTRL
2" QUICK
FLUE
CA
SA-LP
VA
OA
RA
BRA
TA
EA
KEA
LEA
ETS
ROUND SUPPLY DUCT RISE / DROP
RECT. RETURN DUCT RISE / DROP
ROUND RETURN DUCT RISE / DROP
RECT. EXHAUST DUCT RISE / DROP
ROUND EXHAUST DUCT RISE / DROP
(E)
EF-XX
500 CFM
AC-XX
AFF:7'-0" BOTTOM OF EQUIPMENT HEIGHT
CARBON DIOXIDE DETECTOR
CARBON MONOXIDE DETECTOR
HYDROGEN GAS DETECTOR
HAZARDOUS GAS DETECTOR
NITROGEN DIOXIDE DETECTOR
OXYGEN GAS DETECTOR
SMOKE DAMPER
FIRE DAMPER
COMB. FIRE/SMOKE DAMPER
MANUAL DAMPER
MOTORIZED DAMPER
BACKDRAFT DAMPER
PIPE RISE / DROP
6"Ø
CD-XX 100
TYP. X 4
10"Ø/24x24 H6/9/1729
CD-XX 500
8"Ø/2s/4'-0"L
LD-XX 200
18"x10"
SG-XX 500
AFF:9'-0"
NECK SIZE
AIRFLOW
AIRFLOW
MOUNTING ELEVATION (CENTERLINE)
NOMINAL DUCT SIZE
AIRFLOW
NECK SIZE/ SLOT(S)/ ACTIVE LENGTH
16"x16"
RG-XX 800
AFF:9'-0"
12"x12"/24x24
RG-XX 500
AIRFLOW
MOUNTING ELEVATION (CENTERLINE)
NOMINAL DUCT SIZE
AIRFLOW
NECK SIZE / MODULE SIZE
MAX NC RATING
TYPE COUNT FOR SPACE
UNIT IDENTITY
GAS SUPPLY INPUT
RATE
ET-XX
379 lb
HUMIDITY SENSOR
HUMIDISTAT
THERMOSTAT
TEMP / CO2 SENSOR
TEMP / HUMIDITY SENSOR
TEMPERATURE SENSOR
AHU-1
BALL VALVE
BALANCING VALVE
BUTTERFLY VALVE
CHECK VALVE
CIRCUIT SETTER
GATE VALVE
GLOBE VALVE
LOCKED SHIELD VALVE
PRESSURE REDUCING VALVE
QUICK OPENING VALVE
FLUID STRAINER
ELEC. CONTROL VALVE
3-WAY ELEC. VALVE
EMERGENCY GAS SHUTOFF
PLUG VALVE
GAS SHUTOFF COCK
GAS REGULATOR
2" CHECK
THROW PATTERN
SPACE
SIDEWALL
SUPPLY GRILLE
ROUND CEILING
DIFFUSER
SQUARE CEILING
DIFFUSER
SIDEWALL
RETURN GRILLE
CEILING
RETURN
SUPPLY AIR - MEDIUM PRESSURESA-MP
LINEAR
DIFFUSER
KINGSCOTT ASSOCIATES INC. PORTAGE, CC
JOB
SHEET
TITLE
SHEET
NO.
ISSUANCE DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
PORTAGE | CHELSEA | GRAND RAPIDS |
Gull Lake Community Schools
/9
/2
:1 :5
A
M
A u to d e s k D o c s
/G L C
S
S in k in g F u n d /2
.1
K
G A
G
U L L L
A K
E R
IC
H
L A
N D
E L E
M E
N T
A R
Y G
Y M
C O
O L
IN
G M
E P
.r v t
2288.77
MECHANICAL SYMBOLS AND
GENERAL NOTES
M000
M
-8
R ic h la n d M
I
G u ll
L a k e
C o m m u n it y S c h o o ls
R
IC
H L
A N
D
S
IN
K
IN
G
F U
N D
ESTIMATION
ON HOLD
CONSTRUCTION DOCUMENTS
12/19/2025
01/20/2026
04/09/2026
PROJECT REQUIREMENTS
A REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
B THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, ALL
EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS.
C THE CONTRACTOR SHALL PERFORM SERVICE AND REPAIR ON THE
EXISTING EQUIPMENT AND ITS ACCESSORIES AS FOLLOWS: CLEAN ALL
COILS, REPLACE THE FILTERS AND BELTS, INSPECT, REPAIR, OR
REPLACE THE ECONOMIZERS, DRIVES AND FAN BEARINGS, MOTORS,
CONTROL COMPONENTS, VALVES AND ANY OTHER ITEM NECESSARY
FOR A COMPLETE AND PROPER OPERATING SYSTEM. THIS CONTRACTOR
SHALL ALSO VISIT THE SITE, PRIOR TO FINAL BIDDING, AND VERIFY ALL
EXISTING SITE CONDITIONS. PROVIDE ALL MATERIAL AND COMPONENTS
AS NEEDED TO BRING THE UNITS TO FULL COMPLIANCE OF THE
LANDLORD'S CRITERIA AND LOCAL AUTHORITY HAVING JURISDICTION.
D WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION,
PREVENT CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY
SEALING DRAIN OPENING PRIOR TO START OF WORK. UNSEAL DRAINS AT
COMPLETION OF CONSTRUCTION.
E COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS,
CABLE TRAY, STRUCTURE, AND EQUIPMENT TO PREVENT CONFLICTS.
F THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH
EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS AS WELL AS
THOSE WHICH CAN BE REASONABLY ANTICIPATED INCLUDING, BUT NOT
LIMITED TO ARCHITECTURAL, ELECTRICAL, VENTILATION, PLUMBING,
AND OTHER SYSTEMS INVOLVED ON THIS PROJECT.
G FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM,
AND SHALL CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL,
STATE, AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO THE
INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL
CODE.
H LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.
I ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT
EDITION OF ALL APPLICABLE CODES AS APPLIED BY THE AUTHORITY
HAVING JURISDICTION.
J ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM
EDGE OF ROOF.
K LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM
THE SPACE ABOVE ELECTRICAL PANELS. TRANSFORMERS AND OTHER
ELECTRICAL EQUIPMENT.
L PENETRATIONS OF RATED ASSEMBLIES SHALL BE FIRE STOPPED. FIRE
STOPPING SHALL BE AN APPROVED MATERIALAND SHALL BE U.L.
LISTED.
M PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS
THROUGH FOUNDATIONS, FLOORS, WALLS, AND ROOF.
N MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER
ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND
OPERATION. WHERE INDICATED OR REQUIRED, PROVIDE ACCESS
PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH
INSTALLED.
O ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO
MECHANICAL EQUIPMENT.
P REFER TO HVAC SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE
DRAIN PIPING.
Q PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW
UNTIL ANOTHER SIZE IS SHOWN.
R FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN
ON THE SEGMENTS, REFER TO DETAILS, SCHEDULES, AND
SPECIFICATIONS.
S INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE
MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS, AT A LEVEL
OF QUALITY AND WORKMANSHIP CONSISTENT WITH THE
SPECIFICATIONS.
T LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON
THE DRAWING, ARE APPROXIMATE AND SUBJECT TO MINOR
ADJUSTMENTS IN THE FIELD. WORK SHALL BE COORDINATED WITH ALL
OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.
U INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN
ROOMS WITHOUT CEILINGS.
V THE CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO AND
APPROVED BY THE OWNER.
W PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL
MECHANICAL EQUIPMENT, PLUMBING FIXTURES, AND DIFFUSERS.
X CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS
AND SHALL ARRANGE FOR ALL INSPECTIONS AS REQUIRED.
Y PROVIDE ONE YEAR WARRANTY FOR ALL WORKMANSHIP AND
MATERIALS AFTER THE DATE OF FINAL ACCEPTANCE.
GENERAL MECHANICAL NOTES
A SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.
B CONTRACTOR SHALL LOCATE THERMOSTATS AND TEMPERATURE
SENSORS AT 5'-0" AFF, A MINIMUM OF 8" FROM LIGHT SWITCH.
C REFER TO HVAC DRAWINGS FOR THERMOSTAT AND TEMPERATURE
SENSOR LOCATIONS.
D CONDENSATE DRAINS SHALL BE SUPPLIED FOR ALL COOLING
EQUIPMENT. CONTRACTOR SHALL ENSURE PROPER INSTALLATION AND
DRAINAGE AS REQUIRED BY FEDERAL, STATE, AND LOCAL CODES.
CONDENSATE PIPING SHALL BE TYPE "L" COPPER.
D ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK SHALL BE RATED FOR
PRESSURE CLASS OF 2" W.G. UNLESS NOTED OTHERWISE.
E COORDINATE THE EXACT LOCATION OF ALL CEILING DIFFUSERS,
REGISTERS, AND GRILLES WITH NEW AND EXISTING LIGHTING.
F PROVIDE DIFFUSERS AND REGISTERS WITH 4-WAY BLOW PATTERN
UNLESS OTHERWISE NOTED.
G PROVIDE A 4" HOUSEKEEPING PAD FOR EACH PIECE OF MECHANICAL
EQUIPMENT. COORDINATE SIZES WITH MECHANICAL EQUIPMENT
SELECTED.
H THIS CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON HVAC
EQUIPMENT AFTER ALL DUST PRODUCING CONSTRUCTION HAS BEEN
COMPLETED AND PRIOR TO THE FINAL PUNCH.
I INSTALL, SUPPORT, AND BRACE ALL HVAC DUCTWORK AND
ACCESSORIES PER "HVAC DUCT CONSTRUCTION STANDARDS" BY
SMACNA, ANSI/SMACNA 006-2006 AND "SEISMIC RESTRAINT MANUAL
GUIDELINES FOR MECHANICAL SYSTEMS" BY SMACNA, ANSI/SMACNA
001-2008.
J MAINTAIN MINIMUM SEPARATION BETWEEN OUTSIDE AIR INTAKES OR
OTHER OPENINGS INTO THE BUILDING AND OTHER ELEMENTS AS
REQUIRED AND AS FOLLOWS:
K PLUMBING VENTS AND EXHAUST OUTLETS: 10'-0" SEPARATION
L ENVIRONMENTAL AIR OUTLETS AND DOMESTIC DRYER VENTS: 3'-0"
SEPARATION
M IN HIGH-HUMIDITY AREAS, INCLUDING SHOWER ROOMS, ALL DUCTWORK
SHALL BE CONSTRUCTED OF ALUMINUM.
N INSULATE ALL SUPPLY AND RETURN AIR DUCTWORK AS REQUIRED BY
ENERGY CODE.
O ALL DUCTWORK DIMENSIONS SHOWN REPRESENT INTERAL FREE AREA
DIMENSION.
MECHANICAL SHEET INDEX
M000 MECHANICAL SYMBOLS AND GENERAL NOTES
M001 MECHANICAL SPECIFICATIONS
M002 MECHANICAL SPECIFICATIONS
M003 MECHANICAL SPECIFICATIONS
M004 MECHANICAL SPECIFICATIONS
M110 MECHANICAL PLANS
MIF CO H E IGT AAT NS
No.
6201060604
JONATHAN
RUMOHR
ENGINEER
PART 1 - GENERAL
1. PROVIDE GENERAL REQUIREMENTS FOR SINGLE-PHASE AND POLYPHASE, GENERAL-PURPOSE MOTORS FOR HVAC EQUIPMENT.
2. RELATED DOCUMENTS: CONTRACT DRAWINGS, GENERAL AND SUPPLEMENTARY CONDITIONS, AND DIVISION 01 SPECIFICATIONS
APPLY TO THIS SECTION.
3. QUALITY ASSURANCE:
• MOTORS TO COMPLY WITH NEMA MG 1.
• UL LISTED WHERE APPLICABLE.
• PREMIUM-EFFICIENT MOTORS PER NEMA MG 1.
PART 2 - PRODUCTS
1. GENERAL REQUIREMENTS:
• HORIZONTAL, SQUIRREL-CAGE INDUCTION MOTORS, RATED UP TO 600V.
• CONTINUOUS DUTY AT 40°C AMBIENT, 3300 FT ELEVATION.
2. POLYPHASE MOTORS:
• NEMA MG 1, DESIGN B, MEDIUM INDUCTION.
• PREMIUM EFFICIENCY.
• SERVICE FACTOR 1.15.
• ROTOR: RANDOM-WOUND, SQUIRREL CAGE.
• BEARINGS: REGREASABLE, SHIELDED, ANTIFRICTION.
• INSULATION: CLASS F.
• TEMPERATURE RISE: MATCH INSULATION RATING.
• ENCLOSURE MATERIAL: CAST IRON (324T FRAME AND LARGER), ROLLED STEEL (SMALLER).
3. ADDITIONAL POLYPHASE REQUIREMENTS:
• COMPATIBLE WITH REDUCED-VOLTAGE, MULTISPEED, AND VARIABLE-FREQUENCY CONTROLLERS.
• INVERTER-DUTY: CLASS F TEMP RISE, CLASS H INSULATION, WITH THERMAL PROTECTION.
4. SINGLE-PHASE MOTORS:
• TYPES: PERMANENT-SPLIT CAPACITOR, SPLIT PHASE, CAPACITOR START/INDUCTOR RUN, OR CAPACITOR
START/CAPACITOR RUN.
• MULTISPEED: VARIABLE-TORQUE, PSC TYPE.
• BEARINGS: PRELUBRICATED, ANTIFRICTION BALL OR SLEEVE.
• MOTORS 1/20 HP OR SMALLER: SHADED-POLE TYPE.
• THERMAL PROTECTION: INTERNAL AUTOMATIC RESET.
SECTION 23 0513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
PART 1 - GENERAL
1. SECTION INCLUDES:
• EXPANSION JOINTS.
• FLEXIBLE CONNECTORS.
• EXPANSION LOOPS.
2. QUALITY ASSURANCE:
• COMPLY WITH ASME B31.9 REQUIREMENTS.
• UL-LISTED OR FM-APPROVED WHERE APPLICABLE.
PART 2 - PRODUCTS
1. EXPANSION JOINTS:
• METALLIC BELLOWS TYPE WITH CONTROL RODS.
• RATED FOR MINIMUM 150 PSIG AT 200°F.
• STAINLESS STEEL BELLOWS, FLANGED OR GROOVED ENDS.
2. FLEXIBLE CONNECTORS:
• STAINLESS STEEL HOSE AND BRAID.
• MINIMUM WORKING PRESSURE 150 PSIG.
• BRONZE OR STEEL END FITTINGS.
3. EXPANSION LOOPS:
• FABRICATED FROM SAME PIPING MATERIAL AS CONNECTED SYSTEM.
• SIZED TO ACCOMMODATE THERMAL EXPANSION INDICATED.
PART 3 - EXECUTION
1. INSTALL EXPANSION FITTINGS, CONNECTORS, AND LOOPS PER MANUFACTURER INSTRUCTIONS.
2. PROVIDE ANCHORS AND GUIDES AS REQUIRED.
3. MAINTAIN CLEARANCES FOR MOVEMENT.
4. ALIGN PIPING TO AVOID PRE-STRESS ON EXPANSION JOINTS.
SECTION 23 0516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
PART 1 - GENERAL
1. SECTION INCLUDES:
• ESCUTCHEONS.
• FLOOR PLATES.
PART 2 - PRODUCTS
1. ESCUTCHEONS:
• ONE-PIECE STEEL, POLISHED CHROME-PLATED, WITH SETSCREW FASTENER.
• ONE-PIECE DEEP-PATTERN STEEL, POLISHED CHROME-PLATED, WITH SPRING-CLIP FASTENERS.
• ONE-PIECE STAMPED STEEL, POLISHED CHROME-PLATED, WITH SPRING-CLIP FASTENERS.
• SPLIT-PLATE STAMPED STEEL, POLISHED CHROME-PLATED, CONCEALED HINGE, WITH SPRING-CLIP FASTENERS.
2. FLOOR PLATES:
• SPLIT FLOOR PLATES, STEEL WITH CONCEALED HINGE.
PART 3 - EXECUTION
1. INSTALL ESCUTCHEONS FOR ALL PIPING PENETRATIONS OF WALLS, CEILINGS, AND FINISHED FLOORS.
2. INSTALL ESCUTCHEONS TIGHT TO PIPE, LARGE ENOUGH TO FULLY COVER OPENINGS.
3. NEW PIPING:
• DEEP-PATTERN ESCUTCHEONS WHERE FITTING OR SLEEVE PROTRUDES.
• ONE-PIECE STEEL FOR CHROME-PLATED OR INSULATED PIPING.
• ONE-PIECE OR SPLIT-PLATE STEEL FOR BARE PIPING IN FINISHED AREAS.
4. EXISTING PIPING TO REMAIN:
• SPLIT-PLATE ESCUTCHEONS FOR CHROME, INSULATED, OR BARE PIPING.
5. INSTALL FLOOR PLATES IN EQUIPMENT ROOMS, NEW OR EXISTING, USING SPLIT FLOOR PLATES.
6. FIELD QUALITY CONTROL: REPLACE BROKEN OR DAMAGED ESCUTCHEONS AND FLOOR PLATES.
SECTION 23 0518 - ESCUTCHEONS FOR HVAC PIPING
PART 1 - GENERAL
1. SECTION INCLUDES:
• PRESSURE GAUGES.
• THERMOMETERS.
• PRESSURE GAUGE WELLS AND THERMOMETER WELLS.
2. QUALITY ASSURANCE:
• MANUFACTURER’S NAME AND SCALE SHALL BE PERMANENTLY MARKED ON EACH GAUGE AND THERMOMETER.
PART 2 - PRODUCTS
1. PRESSURE GAUGES:
• BOURDON-TUBE TYPE, 4-1/2 INCH MINIMUM DIAMETER DIAL.
• ACCURACY: PLUS OR MINUS 1 PERCENT OF FULL SCALE.
• CASE: STEEL OR BRASS, WITH GLASS LENS.
• CONNECTIONS: BRASS OR COPPER ALLOY.
• RANGE: SUITABLE FOR SYSTEM OPERATING PRESSURE PLUS 25 PERCENT.
2. THERMOMETERS:
• INDUSTRIAL, LIQUID-IN-GLASS OR BIMETALLIC TYPE.
• 9 INCHES MINIMUM SCALE LENGTH.
• CASE: BRASS OR ALUMINUM.
• ACCURACY: PLUS OR MINUS 1 PERCENT OF SCALE RANGE.
• RANGE: SUITABLE FOR SYSTEM OPERATING TEMPERATURE PLUS 25 PERCENT.
3. PRESSURE GAUGE WELLS:
• BRASS OR BRONZE WITH THREADS MATCHING CONNECTIONS.
• COMPLETE WITH NEEDLE VALVE OR BALL VALVE TO PERMIT GAUGE REMOVAL.
4. THERMOMETER WELLS:
• BRASS OR BRONZE, THREADED OR SWEAT CONNECTION.
• SUITABLE FOR TEMPERATURES UP TO 400°F.
• COMPLETE WITH REMOVABLE THERMOMETER INSERT.
PART 3 - EXECUTION
1. INSTALL GAUGES AND THERMOMETERS WHERE INDICATED, ACCESSIBLE FOR OBSERVATION.
2. INSTALL WELLS IN PIPING SYSTEMS TO PERMIT REMOVAL AND REPLACEMENT WITHOUT DRAINING.
3. MOUNT PRESSURE GAUGES IN VERTICAL POSITION, DIAL FACING FRONT.
4. INSTALL THERMOMETERS IN UPRIGHT OR ANGLED POSITIONS FOR EASY READING.
5. FIELD QUALITY CONTROL: VERIFY ACCURACY OF INSTALLED GAUGES AND THERMOMETERS.
SECTION 23 0519 - METERS AND GAGES FOR HVAC PIPING
PART 1 - GENERAL
1. SECTION INCLUDES:
A. METAL PIPE HANGERS AND SUPPORTS.
B. TRAPEZE PIPE HANGERS.
C. THERMAL HANGER-SHIELD INSERTS.
D. FASTENER SYSTEMS.
E. EQUIPMENT SUPPORTS.
2. QUALITY ASSURANCE:
A. STRUCTURAL-STEEL WELDING QUALIFICATIONS: AWS D1.1/D1.1M.
B. PIPE WELDING QUALIFICATIONS: ASME BPVC SECTION IX.
3. REFERENCE DOCUMENTS:
A. REFER TO MECHANICAL PIPING & VALVE APPLICATION SCHEDULE, MECHANICAL PIPE & ACCESSORY INSULATION
APPLICATION SCHEDULE, DUCT SYSTEM APPLICATION SCHEDULE, MECHANICAL EQUIPMENT INSULATION APPLICATION
SCHEDULE, AND DUCT ACCESSORY INSULATION APPLICATION SCHEDULE ON SHEET M006 FOR REQUIRED PIPE, DUCT, EQUIPMENT, AND ACCESSORY MATERIALS, CONNECTION TYPES, VALVES, AND INSULATION APPLICATIONS.
B. THESE SCHEDULES GOVERN MATERIAL, INSTALLATION, AND INSULATION REQUIREMENTS FOR ALL HVAC SYSTEMS
UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS.
C. COORDINATE ALL SUBMITTALS, INSTALLATION DETAILS, AND FIELD APPLICATIONS WITH THE MATERIALS AND
REQUIREMENTS INDICATED ON SHEET M006.
PART 2 - PRODUCTS
1. PIPE HANGERS: STEEL, GALVANIZED, DESIGNED FOR PIPE OUTSIDE DIAMETER.
2. TRAPEZE HANGERS: STEEL CHANNELS AND RODS, ENGINEERED FOR LOAD REQUIREMENTS.
3. HANGER RODS: THREADED STEEL, ASTM A36 OR EQUIVALENT.
4. THERMAL HANGER-SHIELD INSERTS: HIGH-DENSITY INSULATION WITH GALVANIZED METAL JACKET.
5. PIPE SUPPORTS AND STANCHIONS: FLOOR- OR STRUCTURE-MOUNTED, GALVANIZED STEEL OR CONCRETE BASE.
6. EQUIPMENT SUPPORTS: FABRICATED STEEL OR STRUCTURAL MEMBERS SUITABLE FOR EQUIPMENT LOADS.
7. FASTENERS AND ANCHORS: EXPANSION ANCHORS, POWER-ACTUATED FASTENERS, OR WELDED CONNECTIONS, RATED FOR
APPLIED LOADS.
PART 3 - EXECUTION
1. INSTALL HANGERS AND SUPPORTS PER NFPA, SMACNA, AND MANUFACTURER REQUIREMENTS.
2. SPACE HANGERS TO MAINTAIN PIPE ALIGNMENT AND SUPPORT LOADS WITHOUT EXCESSIVE DEFLECTION.
3. INSTALL TRAPEZE HANGERS FOR MULTIPLE PIPES, WITH ENGINEERED CALCULATIONS WHERE REQUIRED.
4. PROVIDE THERMAL HANGER-SHIELD INSERTS FOR INSULATED PIPING TO PREVENT DAMAGE TO INSULATION.
5. PROVIDE ADDITIONAL SUPPORTS AT:
• PIPE CONNECTIONS TO EQUIPMENT.
• VALVES, FITTINGS, AND BRANCH TAKEOFFS.
• SEISMIC RESTRAINT LOCATIONS WHERE REQUIRED.
6. ATTACH HANGERS AND SUPPORTS TO STRUCTURE; DO NOT FASTEN TO OTHER PIPING OR EQUIPMENT.
7. FIELD QUALITY CONTROL: VERIFY ALIGNMENT, LOAD DISTRIBUTION, AND CONNECTION TIGHTNESS.
SECTION 23 0529 - HANGERS AND SUPPORTS FOR HVAC PIPING EQUIPMENT
PART 1 - GENERAL
1. SECTION INCLUDES:
• PIPE MARKERS.
• VALVE TAGS.
• EQUIPMENT LABELS.
• WARNING SIGNS.
• STENCILS/PAINT.
2. SUBMITTALS:
• PRODUCT DATA FOR PIPE MARKERS, VALVE TAGS, AND EQUIPMENT LABELS.
• VALVE TAG SCHEDULE.
3. QUALITY ASSURANCE:
• COMPLY WITH ANSI/ASME A13.1 FOR PIPE IDENTIFICATION.
• COMPLY WITH NFPA REQUIREMENTS FOR FIRE- AND LIFE-SAFETY SYSTEMS.
4. REFERENCE DOCUMENTS:
A. REFER TO MECHANICAL PIPING & VALVE APPLICATION SCHEDULE, MECHANICAL PIPE & ACCESSORY INSULATION
APPLICATION SCHEDULE, DUCT SYSTEM APPLICATION SCHEDULE, MECHANICAL EQUIPMENT INSULATION
APPLICATION SCHEDULE, AND DUCT ACCESSORY INSULATION APPLICATION SCHEDULE ON SHEET M006 FOR
REQUIRED PIPE, DUCT, EQUIPMENT, AND ACCESSORY MATERIALS, CONNECTION TYPES, VALVES, AND INSULATION
APPLICATIONS.
B. THESE SCHEDULES GOVERN MATERIAL, INSTALLATION, AND INSULATION REQUIREMENTS FOR ALL HVAC SYSTEMS
UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS.
C. COORDINATE ALL SUBMITTALS, INSTALLATION DETAILS, AND FIELD APPLICATIONS WITH THE MATERIALS AND
REQUIREMENTS INDICATED ON SHEET M006.
PART 2 - PRODUCTS
1. PIPE MARKERS:
A. ADHESIVE, LAMINATED PLASTIC, PRE-PRINTED WITH SERVICE DESIGNATION AND FLOW ARROW.
B. COLORS AND LETTERING PER ANSI/ASME A13.1.
2. VALVE TAGS:
A. BRASS OR STAINLESS-STEEL TAGS, MACHINE-ENGRAVED WITH IDENTIFICATION NUMBER.
B. ATTACH WITH CHAINS OR STAINLESS WIRE.
3. EQUIPMENT LABELS:
A. LAMINATED PLASTIC OR ENGRAVED NAMEPLATES, PERMANENTLY FASTENED.
4. WARNING SIGNS:
A. ENAMEL-COATED METAL OR WEATHER-RESISTANT PLASTIC, LETTERED WITH SAFETY MESSAGES.
5. STENCILS/PAINT:
A. USE ONLY WHERE MARKERS CANNOT BE APPLIED.
PART 3 - EXECUTION
1. INSTALL PIPE MARKERS AT INTERVALS NOT GREATER THAN 20 FEET, AND AT DIRECTION CHANGES, WALL PENETRATIONS, AND CONNECTIONS.
2. INSTALL VALVE TAGS ON EVERY VALVE; PREPARE VALVE SCHEDULE INDICATING TAG NUMBER, SERVICE, AND LOCATION.
3. INSTALL EQUIPMENT NAMEPLATES ON MAJOR MECHANICAL EQUIPMENT INCLUDING PUMPS, AIR-HANDLING UNITS, BOILERS, AND CHILLERS.
4. INSTALL WARNING SIGNS AT EQUIPMENT AND VALVES AS REQUIRED FOR SAFETY.
5. FIELD QUALITY CONTROL: VERIFY ALL IDENTIFICATION IS VISIBLE, LEGIBLE, AND MATCHES SYSTEM DRAWINGS AND
SCHEMATICS.
SECTION 23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
PART 1 - GENERAL
1. SECTION INCLUDES:
• SLEEVES WITHOUT WATERSTOP.
• SLEEVES WITH WATERSTOP.
• SLEEVE-SEAL SYSTEMS.
• GROUT.
• SILICONE SEALANTS.
PART 2 - PRODUCTS
1. SLEEVES WITHOUT WATERSTOP:
• CAST-IRON, DUCTILE-IRON, OR STEEL PIPE, ASTM A53, SCH 40.
• STEEL SHEET, ASTM A653, GALVANIZED.
• PVC PIPE, ASTM D1785, SCH 40.
2. SLEEVES WITH WATERSTOP:
• MANUFACTURED PVC OR HDPE WATERSTOP ASSEMBLY FOR CAST-IN-CONCRETE.
3. SLEEVE-SEAL SYSTEMS:
• MODULAR EPDM-RUBBER ELEMENTS, FIELD-ASSEMBLED TO FORM HYDROSTATIC SEAL TO 20 PSIG MINIMUM.
• STAINLESS STEEL TYPE 316 PRESSURE PLATES, BOLTS, AND NUTS.
4. GROUT:
• NONSHRINK HYDRAULIC-CEMENT, ASTM C1107, 5000 PSI MINIMUM AT 28 DAYS.
5. SILICONE SEALANTS:
• ASTM C920, TYPE S, CLASS 25, NEUTRAL-CURING, NONSAG OR POURABLE.
PART 3 - EXECUTION
1. INSTALLATION – SLEEVES:
• PROVIDE SLEEVES FOR ALL PIPING THROUGH FLOORS, WALLS, PARTITIONS, AND ROOFS.
• SIZE TO ALLOW CLEARANCE FOR SEALS OR INSULATION.
• EXTEND 2 INCHES ABOVE FINISHED FLOOR IN MECHANICAL OR WET AREAS.
• SEAL ANNULAR SPACE WITH GROUT OR SEALANT.
2. INSTALLATION – WATERSTOP SLEEVES:
• INSTALL DURING CONCRETE PLACEMENT, WATERSTOP CENTERED IN SLAB OR WALL.
• SEAL EXTERIOR WITH SILICONE SEALANT.
3. INSTALLATION – SLEEVE-SEAL SYSTEMS:
• USE FOR EXTERIOR WALLS AND SLABS-ON-GRADE.
• INSTALL RUBBER ELEMENTS AND TIGHTEN TO PROVIDE WATERTIGHT SEAL.
4. FIRE-RATED AND SMOKE BARRIERS:
• MAINTAIN RATINGS OF ASSEMBLIES.
• SEAL PENETRATIONS WITH APPROVED FIRESTOP MATERIALS.
5. FIELD QUALITY CONTROL:
• LEAK TEST AFTER SEALANT CURE.
• REPAIR DEFECTS AND RETEST UNTIL LEAK-FREE.
• SUBMIT TEST REPORTS.
6. SLEEVE SCHEDULE:
• EXTERIOR CONCRETE WALLS ABOVE/BELOW GRADE: WATERSTOP SLEEVES WITH SEAL SYSTEM.
• SLABS-ON-GRADE: WATERSTOP SLEEVES WITH SEAL SYSTEM.
• SLABS ABOVE GRADE: WATERSTOP SLEEVES.
• INTERIOR WALLS: SLEEVES WITHOUT WATERSTOPS.
SECTION 23 0517 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
PART 1 - GENERAL
1. SECTION INCLUDES:
• BALL VALVES.
• BUTTERFLY VALVES.
• CHECK VALVES.
2. QUALITY ASSURANCE:
• VALVES SHALL BE UL-LISTED OR FM-APPROVED WHERE REQUIRED.
• COMPLY WITH ASME B16 AND MSS SP STANDARDS.
• LEAD-FREE CERTIFICATION FOR DOMESTIC WATER SERVICE.
PART 2 - PRODUCTS
1. BALL VALVES
• BRONZE OR BRASS BODY, FULL-PORT OR REGULAR-PORT.
• PRESSURE RATING: 600 CWP MINIMUM.
• SEATS: PTFE.
• ENDS: THREADED, SOLDERED, OR FLANGED.
• HAND LEVER OPERATOR ≤ NPS 4; GEAR OPERATOR ≥ NPS 5.
• EXTENDED NECKS FOR INSULATED PIPING.
2. BUTTERFLY VALVES
• CAST-IRON OR DUCTILE-IRON BODY, MSS SP-67.
• DISC: ALUMINUM BRONZE OR DUCTILE IRON WITH EPDM SEAT.
• STEM: STAINLESS STEEL.
• CONNECTIONS: LUG, WAFER, OR GROOVED.
• HAND LEVER OPERATOR ≤ NPS 6; GEAR OPERATOR ≥ NPS 8.
• EXTENDED NECKS FOR INSULATED PIPING.
3. CHECK VALVES
• SWING TYPE OR LIFT TYPE.
• BODY: BRONZE OR CAST IRON.
• PRESSURE RATING: 200 PSI MINIMUM.
• SEATS: BRONZE OR STAINLESS STEEL.
• CONNECTIONS: THREADED, SOLDERED, FLANGED, OR GROOVED.
PART 3 - EXECUTION
1. INSTALL VALVES WHERE INDICATED, WITH STEMS OR HANDLES ACCESSIBLE.
2. INSTALL ISOLATION VALVES AT EQUIPMENT CONNECTIONS, BRANCHES, AND SYSTEM TERMINATIONS.
3. INSTALL CHECK VALVES IN DIRECTION OF FLOW; PROVIDE SWING CHECKS IN HORIZONTAL OR VERTICAL LINES.
4. PROVIDE UNION OR FLANGED CONNECTIONS AT VALVES FOR MAINTENANCE.
5. INSTALL EXTENDED HANDLES OR OPERATORS WHERE INSULATION INTERFERES.
6. FIELD QUALITY CONTROL: OPERATE EACH VALVE THROUGH FULL RANGE TO VERIFY FUNCTION.
7. REPLACE DEFECTIVE OR LEAKING VALVES WITH NEW MATERIAL.
SECTION 23 0523 - HVAC PIPING VALVES
PART 1 - GENERAL
1. SECTION INCLUDES:
• GENERAL REQUIREMENTS AND COMMON WORK RESULTS FOR HVAC SYSTEMS.
• PIPING MATERIALS, JOINING METHODS, SLEEVES, SEALS, AND ANCHORAGES.
• COORDINATION, SUBMITTALS, AND QUALITY REQUIREMENTS APPLICABLE TO ALL DIVISION 23 WORK.
2. RELATED SECTIONS:
• DIVISION 01 – GENERAL REQUIREMENTS.
• 23 05 29 – HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT.
• 23 05 53 – IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT.
• 23 07 00 – HVAC INSULATION.
• 23 09 23 – DIRECT DIGITAL CONTROL SYSTEM FOR HVAC.
3. QUALITY ASSURANCE:
• COMPLY WITH APPLICABLE CODES AND REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
• WELDING QUALIFICATIONS: STEEL SUPPORT WELDING PER AWS D1.1; PIPING WELDING PER ASME SECTION IX AND B31
SERIES.
• EQUIPMENT AND COMPONENTS SHALL BE UL LISTED AND LABELED FOR THE INTENDED SERVICE.
4. SUBMITTALS:
• SUBMIT PRODUCT DATA AND PERFORMANCE INFORMATION FOR ALL HVAC EQUIPMENT, VALVES, AND ACCESSORIES
SCHEDULED ON THE DRAWINGS.
• SUBMIT O&M DATA INCLUDING INSTALLATION, START-UP, AND MAINTENANCE INSTRUCTIONS.
• SUBMITTALS ARE REQUIRED FOR ALL PRODUCTS AND EQUIPMENT SCHEDULED OR LISTED ON THE DRAWINGS.
5. REFERENCE DOCUMENTS:
• REFER TO MECHANICAL PIPING & VALVE APPLICATION SCHEDULE, MECHANICAL PIPE & ACCESSORY INSULATION
APPLICATION SCHEDULE, DUCT SYSTEM APPLICATION SCHEDULE, AND MECHANICAL EQUIPMENT INSULATION
APPLICATION SCHEDULE ON SHEET M006 FOR REQUIRED PIPE, DUCT, AND EQUIPMENT MATERIALS, CONNECTION
TYPES, VALVES, AND INSULATION APPLICATIONS.
• THESE SCHEDULES GOVERN MATERIAL, INSTALLATION, AND INSULATION REQUIREMENTS FOR ALL HVAC SYSTEMS
UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS.
• COORDINATE ALL SUBMITTALS, INSTALLATION DETAILS, AND FIELD APPLICATIONS WITH THE MATERIALS AND
REQUIREMENTS INDICATED ON SHEET M006.
6. DELIVERY, STORAGE, AND HANDLING:
• DELIVER MATERIALS AND EQUIPMENT IN MANUFACTURER’S ORIGINAL PACKAGING WITH LABELS INTACT.
• STORE INDOORS IN CLEAN, DRY AREAS AND PROTECT FROM MOISTURE AND DAMAGE.
7. COORDINATION:
• COORDINATE INSTALLATION OF ALL HVAC SYSTEMS WITH ARCHITECTURAL, STRUCTURAL, ELECTRICAL, AND
PLUMBING WORK.
• ARRANGE PIPE SPACES AND EQUIPMENT LOCATIONS TO PERMIT SERVICE AND MAINTENANCE ACCESS.
8. PROJECT COMMISSIONING:
• PARTICIPATE IN OWNER COMMISSIONING ACTIVITIES AND PROVIDE ALL TEST REPORTS AND START-UP
DOCUMENTATION.
PART 2 - PRODUCTS
1. PIPING MATERIALS:
• REFER TO INDIVIDUAL DIVISION 23 SECTIONS FOR PIPE AND FITTING MATERIALS.
• PIPE THREADS: ASME B1.20.1.
• FLANGES AND GASKETS PER ASME B16 SERIES STANDARDS.
2. JOINING MATERIALS:
• GASKETS: ASME B16.21, NON-ASBESTOS, 1/8 INCH THICK.
• SOLDER AND BRAZING FILLER: LEAD-FREE ALLOYS PER ASTM B32 AND AWS A5.8.
• SOLVENT CEMENTS: ASTM D2564 FOR PVC; ASTM F493 FOR CPVC.
3. DIELECTRIC FITTINGS:
• DIELECTRIC UNIONS, FLANGES, OR COUPLINGS TO PREVENT ELECTROLYTIC ACTION BETWEEN DISSIMILAR METALS.
4. SLEEVES AND SEALS:
• PROVIDE SLEEVES FOR ALL PIPE PENETRATIONS THROUGH WALLS, FLOORS, AND ROOFS.
• USE MODULAR RUBBER SEALING SYSTEMS AT EXTERIOR WALLS AND SLABS.
5. GROUT AND ANCHORAGES:
• NON-SHRINK HYDRAULIC CEMENT GROUT, ASTM C1107, MINIMUM 5000 PSI AFTER 28 DAYS.
6. EQUIPMENT BASES AND VIBRATION ISOLATION:
• CONCRETE BASES AS SPECIFIED IN STRUCTURAL DRAWINGS.
• SPRING OR RUBBER ISOLATORS PER EQUIPMENT MANUFACTURER RECOMMENDATIONS.
PART 3 - EXECUTION
1. INSTALLATION – GENERAL:
• INSTALL HVAC EQUIPMENT AND PIPING IN ACCORDANCE WITH APPROVED SHOP DRAWINGS AND MANUFACTURER
INSTRUCTIONS.
• INSTALL TRUE TO LINE AND GRADE WITH ADEQUATE SPACE FOR SERVICE AND INSULATION.
2. SLEEVES AND SEALS:
• INSTALL SLEEVES IN ADVANCE OF CONCRETE PLACEMENT AND SEAL AROUND PIPING TO MAINTAIN WATER AND FIRE
RATINGS.
3. CONCRETE BASES:
• CONSTRUCT EQUIPMENT BASES LEVEL AND TO REQUIRED DIMENSIONS; SET ANCHOR BOLTS USING EQUIPMENT
TEMPLATES.
4. VIBRATION ISOLATION:
• INSTALL ISOLATION DEVICES LEVEL AND ADJUST FOR PROPER LOAD DISTRIBUTION.
5. FIELD QUALITY CONTROL:
• VERIFY ALIGNMENT, SUPPORT, AND ANCHORAGE OF PIPING AND EQUIPMENT.
• REPLACE DAMAGED COMPONENTS AND RESTORE PROTECTIVE FINISHES BEFORE SUBSTANTIAL COMPLETION.
6. CLEANING AND ADJUSTING:
• REMOVE DEBRIS, PROTECT OPEN PIPE ENDS, AND CLEAN ALL EQUIPMENT SURFACES.
• ADJUST AND ALIGN COMPONENTS FOR PROPER OPERATION.
SECTION 23 0500 - GENERAL MEHCANICAL REQUIREMENTS
PART 1 - GENERAL
1. SECTION INCLUDES:
• TESTING, ADJUSTING, AND BALANCING (TAB) OF AIR SYSTEMS.
• TESTING, ADJUSTING, AND BALANCING OF HYDRONIC PIPING SYSTEMS.
• TAB OF NEW HVAC EQUIPMENT.
• TAB OF EXISTING HVAC SYSTEMS AND EQUIPMENT.
2. DEFINITIONS:
• AABC: ASSOCIATED AIR BALANCE COUNCIL.
• NEBB: NATIONAL ENVIRONMENTAL BALANCING BUREAU.
• TAB: TESTING, ADJUSTING, AND BALANCING.
• TABB: TESTING, ADJUSTING, AND BALANCING BUREAU.
• TAB SPECIALIST: QUALIFIED INDEPENDENT ENTITY TO PERFORM TAB.
3. QUALITY ASSURANCE:
• TAB SPECIALIST CERTIFIED BY AABC, NEBB, OR TABB.
• COMPLY WITH ASHRAE 111.
PART 2 - PRODUCTS
1. INSTRUMENTS:
• CALIBRATED WITHIN THE LAST 12 MONTHS.
• CAPABLE OF ACCURACY REQUIRED BY ASHRAE 111.
2. TEST EQUIPMENT:
• HOOD-TYPE AIRFLOW METERS, ANEMOMETERS, MANOMETERS, THERMOMETERS, PRESSURE GAUGES, FLOWMETERS.
PART 3 - EXECUTION
1. PREPARATION:
• REVIEW CONTRACT DOCUMENTS.
• PREPARE TAB STRATEGIES AND STEP-BY-STEP PROCEDURES.
• VERIFY SYSTEM READINESS: PIPING AND DUCTS COMPLETE, VALVES AND CONTROLS FUNCTIONING, STRAINERS
CLEAN, SYSTEMS FILLED AND PURGED.
2. GENERAL PROCEDURES:
• PERFORM TAB PROCEDURES PER ASHRAE 111 AND SPECIFICATIONS.
• INSTALL TEMPORARY TEST PORTS WHERE NEEDED.
• RECORD DEFAULT AND FINAL SETTINGS FOR CONTROLS AND BALANCING DEVICES.
3. AIR SYSTEMS:
• BALANCE CONSTANT-VOLUME AND VARIABLE-AIR-VOLUME SYSTEMS.
• MEASURE AND RECORD AIRFLOW, VELOCITIES, AND PRESSURES.
• ADJUST DAMPERS, REGISTERS, AND TERMINAL UNITS TO DESIGN FLOW.
4. HYDRONIC SYSTEMS:
• BALANCE VARIABLE-FLOW SYSTEMS.
• MEASURE AND RECORD FLOW, PRESSURE DROP, AND TEMPERATURE DIFFERENCES.
• ADJUST BALANCING VALVES TO DESIGN FLOW.
5. REPORTS:
• PROVIDE CERTIFIED FINAL TAB REPORTS INCLUDING ALL MEASURED DATA, INSTRUMENT CALIBRATION
CERTIFICATES, AND SYSTEM DIAGRAMS.
SECTION 23 0593 - TESTING, ADJUSTING, AND BLANACING FOR HVAC
KINGSCOTT ASSOCIATES INC. PORTAGE, CC
JOB
SHEET
TITLE
SHEET
NO.
ISSUANCE DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
PORTAGE | CHELSEA | GRAND RAPIDS |
Gull Lake Community Schools
/9
/2
:1 :5
A
M
A u to d e s k D o c s
/G L C
S
S in k in g F u n d /2
.1
K
G A
G
U L L L
A K
E R
IC
H
L A
N D
E L E
M E
N T
A R
Y G
Y M
C O
O L
IN
G M
E P
.r v t
2288.77
MECHANICAL
SPECIFICATIONS
M001
M
-8
R ic h la n d M
I
G u ll
L a k e
C o m m u n it y S c h o o ls
R
IC
H L
A N
D
S
IN
K
IN
G
F U
N D
ESTIMATION
ON HOLD
CONSTRUCTION DOCUMENTS
12/19/2025
01/20/2026
04/09/2026
MIF CO H E IGT AAT NS
No.
6201060604
JONATHAN
1. SECTION INCLUDES:
• FURNISHING AND INSTALLING A COMPLETE DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC EQUIPMENT.
• HARDWARE, SOFTWARE, FIELD DEVICES, INSTRUMENTATION, AND CONTROL WIRING.
• INTEGRATION WITH OTHER BUILDING SYSTEMS AS REQUIRED.
2. REFERENCES:
• ASHRAE 135 (BACNET) PROTOCOL STANDARD.
• NFPA 70 (NATIONAL ELECTRICAL CODE).
• ASHRAE 90.1 ENERGY STANDARD.
• SMACNA HVAC SYSTEMS DUCT DESIGN AND TAB MANUALS.
3. QUALITY ASSURANCE:
• INSTALLER SHALL HAVE MINIMUM FIVE YEARS EXPERIENCE IN DDC SYSTEMS OF EQUIVALENT SIZE AND COMPLEXITY.
• CONTROLS CONTRACTOR SHALL BE AUTHORIZED BY THE SYSTEM MANUFACTURER.
• PROVIDE COMPLETE SOFTWARE LICENSES AND PROGRAMMING ACCESS TO OWNER.
4. REFERENCE DOCUMENTS:
A. REFER TO MECHANICAL PIPING & VALVE APPLICATION SCHEDULE, MECHANICAL PIPE & ACCESSORY INSULATION
APPLICATION SCHEDULE, DUCT SYSTEM APPLICATION SCHEDULE, MECHANICAL EQUIPMENT INSULATION APPLICATION
SCHEDULE, AND DUCT ACCESSORY INSULATION APPLICATION SCHEDULE ON SHEET M007 FOR REQUIRED PIPE, DUCT, EQUIPMENT, AND ACCESSORY MATERIALS, CONNECTION TYPES, VALVES, AND INSULATION APPLICATIONS.
B. THESE SCHEDULES GOVERN MATERIAL, INSTALLATION, AND INSULATION REQUIREMENTS FOR ALL HVAC SYSTEMS
UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS.
C. COORDINATE ALL SUBMITTALS, INSTALLATION DETAILS, AND FIELD APPLICATIONS WITH THE MATERIALS AND
REQUIREMENTS INDICATED ON SHEET M007.
SECTION 23 0923 - DIRECT DIGITAL CONTROL SYSTEM FOR HVAC
PART 1 - GENERAL
1. SECTION INCLUDES:
• NATURAL-GAS PIPING SYSTEMS WITH VALVES, FITTINGS, AND APPURTENANCES.
• PIPING MATERIALS, JOINTS, AND CONNECTIONS TO EQUIPMENT.
• VALVE BOXES AND IDENTIFICATION.
2. REFERENCES:
• NFPA 54 – NATIONAL FUEL GAS CODE.
• ASTM A53/A53M – STEEL PIPE, BLACK AND HOT-DIPPED ZINC-COATED.
• ASME B31.9 – BUILDING SERVICES PIPING.
• ANSI Z223.1 – FUEL GAS CODE.
• IFGC – INTERNATIONAL FUEL GAS CODE.
3. QUALITY ASSURANCE:
• INSTALLER SHALL BE LICENSED FOR GAS PIPING WORK IN THE JURISDICTION OF INSTALLATION.
• MATERIALS AND WORKMANSHIP SHALL COMPLY WITH APPLICABLE CODES AND STANDARDS.
• WELDERS AND BRAZERS SHALL BE QUALIFIED IN ACCORDANCE WITH ASME SECTION IX.
4. REFERENCE DOCUMENTS:
A. REFER TO MECHANICAL PIPING & VALVE APPLICATION SCHEDULE, MECHANICAL PIPE & ACCESSORY INSULATION
APPLICATION SCHEDULE, DUCT SYSTEM APPLICATION SCHEDULE, MECHANICAL EQUIPMENT INSULATION
APPLICATION SCHEDULE, AND DUCT ACCESSORY INSULATION APPLICATION SCHEDULE ON SHEET M007 FOR
REQUIRED PIPE, DUCT, EQUIPMENT, AND ACCESSORY MATERIALS, CONNECTION TYPES, VALVES, AND INSULATION
APPLICATIONS.
B. THESE SCHEDULES GOVERN MATERIAL, INSTALLATION, AND INSULATION REQUIREMENTS FOR ALL HVAC SYSTEMS
UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS.
C. COORDINATE ALL SUBMITTALS, INSTALLATION DETAILS, AND FIELD APPLICATIONS WITH THE MATERIALS AND
REQUIREMENTS INDICATED ON SHEET M007.
PART 2 - PRODUCTS
1. STEEL PIPE:
• ASTM A53/A53M, TYPE E OR S, GRADE B, SEAMLESS OR ELECTRIC-RESISTANCE WELDED, SCHEDULE 40.
• ENDS THREADED OR GROOVED AS REQUIRED.
2. PIPE FITTINGS:
• MALLEABLE-IRON THREADED FITTINGS CONFORMING TO ASME B16.3.
• WROUGHT-STEEL BUTT-WELDING FITTINGS ASME B16.9 WHERE INDICATED.
3. VALVES:
• BALL VALVES RATED FOR 125 PSIG MINIMUM, BRASS OR STEEL BODY, THREADED ENDS.
• PLUG VALVES NOT PERMITTED EXCEPT WHERE REQUIRED BY MANUFACTURER.
4. UNIONS AND JOINTS:
• THREADED UNIONS OF FORGED STEEL WITH GROUND JOINT SURFACES.
• DIELECTRIC UNIONS WHERE CONNECTING DISSIMILAR METALS.
5. VALVE BOXES AND COVERS:
• CAST-IRON BOXES WITH BOLTED COVERS LABELED “GAS.”
6. PIPE HANGERS AND SUPPORTS:
• GALVANIZED STEEL RING OR CLEVIS TYPE IN ACCORDANCE WITH SECTION 23 0529.
7. PIPE IDENTIFICATION:
• YELLOW LABEL TAPE WITH BLACK LETTERING “NATURAL GAS.”
PART 3 - EXECUTION
1. INSTALLATION:
• INSTALL PIPING AS INDICATED, TRUE TO LINE AND GRADE, WITH PROPER SUPPORT AND ALLOWANCE FOR MOVEMENT.
• MAINTAIN CLEARANCE FROM ELECTRICAL CONDUITS AND HEAT SOURCES PER CODE.
• PROVIDE UNIONS AT EQUIPMENT CONNECTIONS AND VALVES.
• PROVIDE SHUT-OFF VALVES AT EACH BRANCH AND EACH EQUIPMENT CONNECTION.
• INSTALL PIPING SLOPED NOT LESS THAN 1/4 INCH PER 15 FEET TO DRAIN POINTS.
2. JOINTING:
• THREAD PIPE WITH NPT THREADS; USE APPROVED PIPE DOPE SUITABLE FOR NATURAL GAS.
• TIGHTEN JOINTS TO ENSURE GAS-TIGHT SEAL WITHOUT OVERSTRESSING.
• WELD JOINTS WHERE INDICATED BY QUALIFIED WELDERS.
3. VALVE INSTALLATION:
• INSTALL VALVES IN ACCESSIBLE LOCATIONS WITH STEMS UPRIGHT OR HORIZONTAL.
• INSTALL SHUTOFF VALVE UPSTREAM OF EACH PIECE OF GAS-FIRED EQUIPMENT.
4. FIELD QUALITY CONTROL:
• TEST ENTIRE SYSTEM AT 1.5 TIMES OPERATING PRESSURE BUT NOT LESS THAN 10 PSIG FOR 10 MINUTES MINIMUM.
• USE DRY NITROGEN OR AIR FOR TESTING; DO NOT USE NATURAL GAS.
• INSPECT FOR LEAKS USING SOAP SOLUTION OR ELECTRONIC DETECTOR.
• REPAIR LEAKS AND RETEST UNTIL SYSTEM IS LEAK-FREE.
SECTION 23 1123 - FACILITY NATURAL-GAS PIPING
PART 1 - GENERAL
1. SECTION INCLUDES:
• HYDRONIC HEATING AND CHILLED WATER PIPING SYSTEMS.
• PIPING MATERIALS, FITTINGS, VALVES, AND JOINTS.
• EXPANSION COMPENSATION, PIPE HANGERS, AND ACCESSORIES.
2. REFERENCES:
• ASME B31.9 – BUILDING SERVICES PIPING.
• ASTM A53/A53M – STEEL PIPE, BLACK AND HOT-DIPPED ZINC-COATED.
• ASTM B88 – SEAMLESS COPPER WATER TUBE.
• MSS SP-58 – PIPE HANGERS AND SUPPORTS.
• ASHRAE 90.1 – ENERGY STANDARD FOR BUILDINGS.
3. QUALITY ASSURANCE:
• INSTALLER SHALL HAVE FIVE YEARS EXPERIENCE IN HYDRONIC SYSTEM INSTALLATION.
• ALL MATERIALS SHALL BE NEW AND OF CURRENT MANUFACTURE.
• WELDERS SHALL BE CERTIFIED IN ACCORDANCE WITH ASME SECTION IX.
4. REFERENCE DOCUMENTS:
A. REFER TO MECHANICAL PIPING & VALVE APPLICATION SCHEDULE, MECHANICAL PIPE & ACCESSORY INSULATION
APPLICATION SCHEDULE, DUCT SYSTEM APPLICATION SCHEDULE, MECHANICAL EQUIPMENT INSULATION APPLICATION
SCHEDULE, AND DUCT ACCESSORY INSULATION APPLICATION SCHEDULE ON SHEET M007 FOR REQUIRED PIPE, DUCT, EQUIPMENT, AND ACCESSORY MATERIALS, CONNECTION TYPES, VALVES, AND INSULATION APPLICATIONS.
B. THESE SCHEDULES GOVERN MATERIAL, INSTALLATION, AND INSULATION REQUIREMENTS FOR ALL HVAC SYSTEMS
UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS.
C. COORDINATE ALL SUBMITTALS, INSTALLATION DETAILS, AND FIELD APPLICATIONS WITH THE MATERIALS AND
REQUIREMENTS INDICATED ON SHEET M007.
PART 2 - PRODUCTS
1. STEEL PIPE:
• ASTM A53/A53M, TYPE E OR S, GRADE B, SCHEDULE 40.
• USE FOR MAINS AND RISERS 2 INCHES AND LARGER.
2. COPPER PIPE:
• ASTM B88, TYPE L HARD TEMPER FOR ABOVEGROUND.
• ASTM B88, TYPE K FOR BELOW-GRADE.
3. FITTINGS:
• MALLEABLE-IRON THREADED FITTINGS, ASME B16.3.
• WROUGHT-COPPER FITTINGS, ANSI B16.22.
• FLANGED OR GROOVED FITTINGS AS REQUIRED.
4. VALVES:
• BALL VALVES 600 PSI WOG MINIMUM RATING.
• BUTTERFLY VALVES 200 PSI MINIMUM RATING.
• CHECK VALVES, SWING OR SPRING-LOADED, SAME PRESSURE RATING AS PIPING.
• BALANCING VALVES WITH MEMORY STOPS AND FLOW-MEASURING PORTS.
5. EXPANSION FITTINGS AND LOOPS:
• BRONZE OR STAINLESS-STEEL EXPANSION COMPENSATORS SUITABLE FOR SYSTEM PRESSURE AND TEMPERATURE.
6. PIPE HANGERS AND SUPPORTS:
• GALVANIZED STEEL CLEVIS OR RING TYPE IN ACCORDANCE WITH SECTION 23 0529.
• PROVIDE THERMAL HANGER SHIELDS WHERE INSULATED.
7. JOINING MATERIALS:
• WELDING MATERIALS COMPATIBLE WITH BASE METAL.
• SOLDER: LEAD-FREE ALLOY, ASTM B32.
• THREAD COMPOUND OR TEFLON TAPE SUITABLE FOR SYSTEM PRESSURE AND TEMPERATURE.
8. PIPE IDENTIFICATION:
• COLOR-CODED MARKERS INDICATING SERVICE AND FLOW DIRECTION IN ACCORDANCE WITH SECTION 23 0553.
PART 3 - EXECUTION
1. INSTALLATION:
• INSTALL PIPING TRUE TO ALIGNMENT AND GRADE WITH PROPER SUPPORT AND EXPANSION COMPENSATION.
• PROVIDE SHUT-OFF VALVES AT BRANCHES AND EQUIPMENT CONNECTIONS.
• SLOPE PIPING TO FACILITATE DRAINAGE AND AIR REMOVAL.
• INSTALL STRAINERS AT PUMP SUCTION CONNECTIONS AND AS INDICATED.
• PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS.
2. CONNECTIONS:
• CONNECT HYDRONIC PIPING TO EQUIPMENT USING UNIONS OR FLANGES.
• USE FLEXIBLE CONNECTORS AT EQUIPMENT SUBJECT TO VIBRATION.
3. TESTING:
• HYDROSTATIC TEST AT 1.5 TIMES WORKING PRESSURE FOR TWO HOURS MINIMUM WITHOUT LEAKAGE.
• FLUSH SYSTEMS WITH CLEAN WATER UNTIL FREE OF DEBRIS.
• VERIFY AIR VENTS OPERATE PROPERLY.
4. CLEANING AND DISINFECTION:
• CLEAN PIPING USING A MILD ALKALINE CLEANER APPROVED BY THE EQUIPMENT MANUFACTURER.
• FLUSH UNTIL WATER IS CLEAR AND NEUTRAL pH.
5. DEMONSTRATION AND TRAINING:
• PROVIDE OWNER’S PERSONNEL WITH TRAINING ON VALVE OPERATION, SYSTEM FLUSHING, AND PRESSURE CHECKS.
• SUBMIT FINAL TEST REPORTS AND AS-BUILT DRAWINGS.
SECTION 23 2113 - HYDRONIC PIPING
PART 1 - GENERAL
1. SECTION INCLUDES:
• INSULATION FOR SUPPLY, RETURN, OUTSIDE AIR, EXHAUST, AND RELIEF DUCTS.
• INSULATION FOR DUCT ACCESSORIES AND CASINGS.
2. QUALITY ASSURANCE:
• COMPLY WITH ASHRAE 90.1 AND SMACNA “HVAC DUCT CONSTRUCTION STANDARDS.”
• INSTALLATION BY EXPERIENCED MECHANICAL INSULATION CONTRACTOR.
3. REFERENCE DOCUMENTS:
A. REFER TO MECHANICAL PIPING & VALVE APPLICATION SCHEDULE, MECHANICAL PIPE & ACCESSORY INSULATION
APPLICATION SCHEDULE, DUCT SYSTEM APPLICATION SCHEDULE, MECHANICAL EQUIPMENT INSULATION APPLICATION
SCHEDULE, AND DUCT ACCESSORY INSULATION APPLICATION SCHEDULE ON SHEET M007 FOR REQUIRED PIPE, DUCT, EQUIPMENT, AND ACCESSORY MATERIALS, CONNECTION TYPES, VALVES, AND INSULATION APPLICATIONS.
B. THESE SCHEDULES GOVERN MATERIAL, INSTALLATION, AND INSULATION REQUIREMENTS FOR ALL HVAC SYSTEMS
UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS.
C. COORDINATE ALL SUBMITTALS, INSTALLATION DETAILS, AND FIELD APPLICATIONS WITH THE MATERIALS AND
REQUIREMENTS INDICATED ON SHEET M007.
PART 2 - PRODUCTS
1. MANUFACTURERS:
• CERTAINTEED, OWENS CORNING, JOHNS MANVILLE, KNAUF, OR EQUAL.
2. INSULATION MATERIALS:
• FIBERGLASS BLANKET INSULATION WITH FACTORY-APPLIED VAPOR-BARRIER JACKETING.
• THICKNESS PER ENERGY CODE AND ASHRAE 90.1.
• SERVICE TEMPERATURE RANGE: -20°F TO 250°F MINIMUM.
3. JACKETS:
• FACTORY-APPLIED FOIL-SCRIM-KRAFT (FSK) VAPOR BARRIER.
• REINFORCED FOIL OR ALL-SERVICE JACKET (ASJ) TYPE.
4. ACCESSORY MATERIALS:
• ADHESIVES AND SEALANTS COMPATIBLE WITH INSULATION AND JACKETING.
• BANDS AND STAPLES FOR SECURING JACKETS.
• PROTECTIVE SHIELDS AT MECHANICAL EQUIPMENT CONNECTIONS.
PART 3 - EXECUTION
1. INSTALL INSULATION TIGHT AND CONTINUOUS WITHOUT GAPS OR VOIDS.
2. INSULATE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .