Summary of 2026_02_12_VSU_OdumLibChilli_100_CD_NBP.pdf
This is a construction document set prepared by Virginia State University for the Odum Library Chiller Replacement project (MRR-26-0207) in Georgia. The project entails the installation of a new air-cooled chiller plant to replace the existing chiller system serving Odum Library. The documents include 100% construction drawings and specifications necessary for bidding and construction purposes. The package provides comprehensive technical details, site plans, mechanical systems drawings, and engineering specifications required for contractors to prepare accurate bids for the chiller plant replacement work.
The construction document set serves as the basis for competitive bidding on this mechanical systems upgrade project. Bidders will utilize these 100% complete drawings and specifications to assess project scope, labor requirements, material quantities, and costs associated with removing the existing chiller plant and installing the new air-cooled chiller system. These documents establish the technical requirements, performance standards, and construction methodologies that successful bidders must follow throughout the project execution phase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026_02_12_VSU OdumLibChiller_Project Manual.pdf | ||
| 2026_02_12_VSU OdumLibChiller_Invitation to B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF
DRAWINGS
SHEET NO. TITLE
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
E0.1
M5.1 DETAILS - HVAC
VALDOSTA STATE UNIVERSITY
Valdosta, Georgia
M0.1 ABBREVIATIONS, LEGEND, & SCHEDULES - HVAC
M4.1 FLOW DIAGRAM - HVAC
E1.1
SCHEDULES AND RISER - ELECTRICAL
PARTIAL SITE PLAN - ELECTRICAL
E3.1
E3.2
LARGE SCALE - BOILER PLANT - NEW WORK - ELECTRICAL
LARGE SCALE - ODUM LIBRARY - MECH. RM. 154 - DEMOLITION & NEW WORK - ELEC
M1.1
M3.1
M3.2 LARGE SCALE - ODUM LIBRARY - MECH. RM. 154 - DEMOLITION & NEW WORK - HVAC
PARTIAL SITE PLAN - HVAC
LARGE SCALE - BOILER PLANT - NEW WORK - HVAC
M2.1 ODUM LIBRARY - PARTIAL CRAWL SPACE - NEW WORK - HVAC
VSU Project No. MRR-26-0207 Odum Library Chiller Replacement
02.12.2026 CONSTRUCTION DOCUMENTS
P:\25106\25106m01.dgn
DATE PLOTTED
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106m01.dgn
AS SHOWN
LTF
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
WSH
WSH
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
IO
N
D O
C U
M E
N T S
M0.1
SCHEDULES - HVAC
LEGENDS, &
ABBREVIATIONS,
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
F DEGREES FAHRE C DEGREES CENTI
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
SINGLE LINE DUCT LEGEND
DUCT (SUPPLY, RETURN & EXHAUST)
SUPPLY DUCT UP
SUPPLY DUCT DOWN
RETURN OR EXHAUST DUCT UP
RETURN OR EXHAUST DUCT DOWN
DUCT RISE
DUCT DOWN
VOLUME DAMPER (MANUAL UNLESS INDICATED A.V.D.)
TRANSITION
DUCT TAKE-OFF (SEE SPEC. PERTAINING TO DEFLECTROLS)
TRANSITION (FLAT ON TOP)
TRANSITION (FLAT ON BOTTOM)
TRANSITION (TOP OR BOTTOM ONLY)
SUPPLY CEILING DIFFUSER
RETURN OR EXHAUST CEILING GRILLE
SIDEWALL SUPPLY
SIDEWALL RETURN
FLEXIBLE CONNECTION (DUCT)
RELIEF AIR SUPPLY TO TOILET
DUCT SPLIT WITH SPLITTER DAMPER
FLEX. DUCT WITH SCREW ON COLLAR, TAKE-OFF
DUCT WITH DUCT LINER
SQUARE ELBOW WITH TURNING VANES
RADIUS ELBOW (SEE SPECS. PERTAINING TO TURNING VANES)
AUTOMATIC VOLUME DAMPER
DN
R
12\10 SPLIT
OR
OR
SCD
FOB
T OR B
RAS
AVD
FD/SCD
FD
SMOKE CONTROL DAMPER
COMBINATION FIRE/SMOKE CONTROL DAMPER
FIRE DAMPER (FD)
FIRE DAMPER
SPS
SD
COMBINATION STARTER
STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
GATE VALVE WITH
3/4" HOSE END
BALANCE VALVE
THREADED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
GATE VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
RELIEF VALVE
FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWN
ELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
TEE OUT BOTTOM
MANUAL AIR VENT
PIPE TEST PLUG
CHILLED WATER FLOW
HEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS
CONDENSER WATER FLOW
DRAIN
CHILLED WATER RETURN
HEATING WATER RETURN
HOT WATER DOMESTIC
G
D
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12
DOOR GRILLE
C.F.M.
REFERS TO DETAIL OR
PLAN ON SHEET M-1.THERMOSTAT
INTERVAL TIMER
T
I.T.
1\M-4
DUCT/PLENUM w/LINER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
INSULATED FLEX. DUCT
c
ECCENTRIC REDUCER
HWS
HWR
CHS
CHR
CONDENSER WATER RETURN
CS
CR
STATIC PRESSURE SENSOR
SMOKE DETECTOR
POINT OF CONNECTION
DUCT SPLIT
THREADED & FLANGED
THREADED & FLANGED
UNION
GAUGE TAPPING
GAUGE WITH TAPPING
THREADED & FLANGED
THREADED & FLANGED
PIPE SOCKET WELL
FLOW INDICATOR BALANCER
M
T G THERMOSTAT w/GROUND
ANNULAR ELEMENT FLOW STATION
M
DAMPER - BLADE VIEW DAMPER - END VIEW
xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)
DOUBLE WALL INSULATED
ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}
MARK SERVICE TYPE GPM
MAX. MIN.
EFF.%2
PUMP SCHEDULE
MANUFACTURERS
B&G TACO
REMARKS
DYNAMIC MIN.
HEAD
SHUT OFF
CHILLER SCHEDULE
MINIMUM
CAPACITY-MBH
RATING
EWT LWT
WATER
FLOW-GPM
EVAPORATOR DATA
MAXIMUM PRESSURE
DROP-FT-H O2
FOULING
FACTOR
MAX. TOTAL
ELECTRICAL DATA
VOLTS/
PHASE REMARKSMARK
CHR-OL-1
CHR-OL-2
INPUT Kw
CP-OL-1
CP-OL-2
CHILLER WATER
CHILLER WATER
MIN.
IPLV @ AHRI
HP
RPM
FT. H O
3600 54 44 720 17.5 0.00010 346 460/3 16.5
3600 54 44 720 17.5 0.00010 346 460/3 16.5
ES 720 100 1 18 1750 30 78 4GC 5x4x1 1 5x4x1 1
PATTERSON
ES 720 100 1 18 1750 30 78 4GC 5x4x1 1 5x4x1 1
B
I L
E R
O M
PINE HALL-SOCIAL WORK
UNIVERSITY POLICE
FINISHED FLOOR= 180.79'
18" PINE
30' UTILITY EASEMENT
S T E A
M
T U
N N E L
TANK
GAS
"C
R
"C
S
PIPES
CONDENSER
EXISTING 10" U.G.
ODUM LIBRARY
CT-SU-1
TP-SU-1
TP-SU-2
PROPANE TANK
EXISTING
FENCE
CHAIN LINK
EXISTING
HWR
HWS
4"
4"UG
DN
P:\25106\25106m11.dgn
DATE PLOTTED
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106m11.dgn
AS SHOWN
LTF
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
WSH
WSH
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
CT-2 CT-1
T P
T P
L
L
L
L
L
W
M1.1
SITE PLAN - HVAC
PARTIAL
PARTIAL SITE PLAN - HVAC
SCALE:
= 1'-0
8 0 4 8 16
N
CHR-02-1
CHR-02-2
C H
R
C H S
CHR
CHS
(TYPICAL)
SLEEVE SEAL
MECHANICAL
(TYPICAL)
PIPE SUPPORT
NEW
NEW
(TYPICAL)
CONCRETE PAD
COOLING TOWERS & CONCRETE BASIN
INSTALLED REMOVE EXISTING
AFTER NEW CHILLERS ARE
CHS
CHR
(TYPICAL)
PIPE SUPPORT
TRANSFORMER ST-16
EXISTING PAD MOUNTED
8" UG CHW
6"
6"
P:\25106\25106m21.dgn
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106m21.dgn
AS SHOWN
LTF
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
WSH
WSH
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
2 3 4 5 61.91.3 1.5
ABOVE
STUDIO
SLAB ON GRADE
CRAWL SPACE
SLAB ON GRADE
M2.1
SCALE:
= 1'-0
8 0 4 8 16
N
NEW WORK - HVAC
CRAWL SPACE -
PARTIAL
ODUM LIBRARY -
ODUM LIBRARY - PARTIAL CRAWL SPACE - NEW WORK - HVAC
EXISTING TO REMAIN
NEW WORK
POINT OF CONNECTION
LINE LEGEND
H W
R
H W S
H W
R
H W S
4"
PIPE ANCHOR
4" HWR/S-UP
C S
C R
C H
R
CHS
CHR
H W
H W
6" CHR
6"CHS
C H S
2"DHWR
4"DHW
EXISTING UG STEAM & CR
BOX
TRANS.
EXISTING
HOLD HIGH AGAINST STRUCTURE
XFMR
G E
N E
R A
T O
R
SAN
C S
C R
HWS
HWR
BEFORE CONNECTION
CONFIRM FLOW DIRECTION
DN
4" w/72"x52" OA AVD (TYP)
EXISTING 42"x52" OA LOUVER
CAPPED
EXISTING
E X
IS
T
IN
G
MECHANICAL ROOM
EXISTING 8" UP TO
10" PIPES UP
EXISTING
4" PIPES UP
EXISTING
PIPES UP
EXISTING
PIPIES DN
EXISTING
PIPIES DN
EXISTING
CH & HW
EXISTING
SLEEVE SEALS
MECHANICAL
C H S
C H R
C H S
C H R
C H S
C H
P:\25106\25106m31.dgn
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106m31.dgn
AS SHOWN
LTF
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
WSH
WSH
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
SCALE:
= 1'-0
4 0 2 4 8
M3.1
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
HVAC
NEW WORK -
BOILER PLANT -
LARGE SCALE -
LARGE SCALE - BOILER PLANT - NEW WORK - HVAC
ACP
HWR
HWS
H W
S
H W
R
H W
R
H W S
4"
SLEEVE SEALS
MECHANICAL
SWITCH
SHUTDOWN
BOILER
MUW
BLR-3
FUTURE
H W
R
6"
AIR SEPARATOR
TANGENTIAL
VFD HP-1
VFD HP-2
SWITCH
SHUTDOWN
BOILER
4"
6"
6"
4"
6"
SWITCH
SHUTDOWN
BOILER
(TYPICAL)
WALL PIPE SUPPORT
PIPE STANCHION
6"
F L
U E
U E
D1
TO PE/ED BUILDING
CT
CT
BLOWDOWN
EXISTING
TANK TO REMAIN
EXISTING BACKUP
"D
H R
PANEL
SEQUENCER
EXISTING BFP
RISER TO REMAIN
EXISTING HWR/S
FOP
EXISTING
EXISTING
EXISTING
FROM CAMPUS
EXISTING 4" PCR
8" 50# TO CAMPUS
EXISTING
TO GYM
TO LIBRARY
PANEL LCI
EXISTING
PANEL MPB
EXISTING
EXISTING HW EXPANSION TANK
EXISTING BYBASS CHEMICAL FEEDER
EXISTING
EXISTING
EXISTING
PANEL PE
EXISTING
HP-2HP-1
EXISTING EXISTING
ACP
VFD
VFD
CP-OL-1
CP-OL-2
BLR-2
BLR-1
CHR
CHS
CHS
C H
R C
H R
CHR
CHS
C H S
SLEEVE SEALS
MECHANICAL
SLEEVE SEALS
MECHANICAL
FOR CONTINUATION
SEE SHEET M1.1
FOR CONTINUATION
SEE SHEET M1.1
SLEEVE SEALS
MECHANICAL
C H
R
C H
R
C H S
XT
EXPANSION TANK
MUW
AIR SEPARATOR
TANGENTIAL
6"
8"
6"
8"
6"
FEEDER
CHEMICAL
BYPASS
6"
6"
6"
8"
PANEL BP
EXISTING
P:\25106\25106m32.dgn
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106m32.dgn
AS SHOWN
LTF
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
WSH
WSH
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
NETWK.
MECH.
MECH
MAIN
ELEC.
NETWK.
MECH.
MECH
MAIN
ELEC.
RV
PUMPED CONDENSATE
EXISTING UG STEAM AND
T
8" CHS
8" CHR
T
SF
EXISTING 36/16 UP TO AHU-2
ACP-HTG-1
V
EXISTING FAN SF-1
EXISTING 4" HW DOWN TO CRAWL SPACE
EXISTING EXPANSION TANK
EXISTING RELIEF VALVE
8" CHR UP FROM TO CRAWL SPACE
8" CHS DOWN TO CRAWL SPACE
AH-1, 3, 4, &6 AND OLD LIBRARY
FROM LIBRARY ADDITION
AH-1, 3, 4, &6 AND OLD LIBRARY
TO LIBRARY ADDITION
H W
S
H W
R
2•"
SD
RAO
H W
R
H W
S
4"
4"
H W
S
H W
R
4"
HWR
HWS
HP-LIB-1
72x40 INTAKE LOUVER
HM1LM1
EXISTING
EXISTING
TO REMAIN
EXISTING SHEET METAL PLENUM
EXISTING SHEET METAL PLENUM
EXISTING SHEET METAL PLENUM DIVIDER
LOUVER TO REMAIN
EXISTING 72x40 EXHAUST
TO REMAIN
BALANCED RELIEF DAMPER
EXISTING 42"x36" COUNTER
EXISTING CONCRETE CURB TO REMAIN
EXISTING EUH-1 TO REMAIN
ACP
"C
H S
EF-4
CHILLER ACP
"C
S
"C
R
R V
RV
8"CHR
FM
FM
14/14
FM
PUMPED CONDENSATE
EXISTING UG STEAM AND
6"CHR
6"CHR
"C
S
"C
R
MUW
"C
H R
ACP
T
8" CHS
8" CHR
T
SF
"C
H R
C P
L
IB
S P
L
IB
S P
L
IB
RV
6"CHR
RV
CHR-1
EXISTING
EXISTING 36/16 UP TO AHU-2
ACP-HTG-1
V
EXISTING FAN SF-1
DOWN TO CRAWL SPACE
EXISTING 4" HW DOWN TO CRAWL SPACE
EXISTING EXPANSION TANK
EXISTING RELIEF VALVE
8" CHR UP FROM TO CRAWL SPACE
8" CHS DOWN TO CRAWL SPACE
AH-1, 3, 4, &6 AND OLD LIBRARY
FROM LIBRARY ADDITION
AH-1, 3, 4, &6 AND OLD LIBRARY
TO LIBRARY ADDITION
H W
S
H W
R
2•"
SD
RAO
4 0 2 4 8
SCALE:
= 1'-0
H W
R
H W
S
4"
4"
H W
S
H W
R
4"
VALVES IN VERTICAL
PROVIDE BUTTERFLY
MECHANICAL ROOM 154 - DEMOLITION - HVAC
LARGE SCALE - ODUM LIBRARY -
HWR
HWS
HP-LIB-1
72x40 INTAKE LOUVER
CHR-2
EXISTING
M3.2
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
4 0 2 4 8
SCALE:
= 1'-0
MECHANICAL ROOM 154 - NEW WORK - HVAC
LARGE SCALE - ODUM LIBRARY -
NEW WORK - HVAC
DEMOLITION &
MECH. RM. 154 -
ODUM LIBRARY -
LARGE SCALE -
HM1LM1
EXISTING
EXISTING
C P
L
IB
REMOVE EXISTING CT-2 VFD
REMOVE EXISTING CT-1 VFD
REMOVE EXISTING TP-2 STARTER
REMOVE EXISTING TP-1 STARTER
REMOVE EXISTING CONCRETE PAD
CHILLED WATER EXPANSION TANK
REMOVE EXISTING SUSPENDED
VENT DUCT
REMOVE EXISTING REFRIGERANT
LEAK MONITOR
REMOVE EXISTING REFRIGERANT
REMOVE EXISTING CHILLER
TO REMAIN
REFRIGERANT LEAK INDICATOR
MOUNTED REMOTE
ABANDON EXISTING FLUSH
PURGE SWITCH
REFRIGERANT
REMOVE EXISTING
EXISTING SHEET METAL PLENUM
EXISTING SHEET METAL PLENUM
EXISTING SHEET METAL PLENUM DIVIDER
LOUVER TO REMAIN
EXISTING 72x40 EXHAUST
TO REMAIN
BALANCED RELIEF DAMPER
EXISTING 42"x36" COUNTER
REMOVE EXISTING
CHEMICAL FEEDER
REMOVE EXISTING
CP-L1B-2 STARTER
REMOVE EXISTING
PIPING BACK TO FLOOR SLAB & CAP
REMOVE CONDENSER WATER
REMOVE EXISTING FRT
EXISTING CONCRETE CURB TO REMAIN
WATER MAKE-UP STATION
REMOVE EXISTING CHILLED
REMOVE EXISTING LINE SIZE AIR PURGER
EXISTING EUH-1 TO REMAIN
CAP PIPING
CAP PIPING
CAP PIPING
P:\25106\25106m41.dgn
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106m41.dgn
AS SHOWN
LTF
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
WSH
WSH
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
M4.1
HVAC
FLOW DIAGRAM -
CHILLED WATER SYSTEM
SUMMARIES
INPUT/OUTPUT
DDC PANELS
ACP
OUTPUTS INPUTS SOFTWARE
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT. LOGS
F A
IL
U
M
D E (S
T E S
A
N D
N O
T E S
T R
E
G
S Y
S T
G
A P
IC
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
P
A
K E
U P
S E
T P
O
IN
T
J
U S
T
D
C
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
W
IM
IT
R U
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
U
S
A R
T
S T
O P
D A
Y
N
IG
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
P
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
C U
R R
E
L A
Y
D
IF
F
P
R E S
S U
R E
S P
E
N T
R O
L
S T
E A
M
W A
T
O W
O P
E R
A T
IN
A T
U S
D R
IV
E
S
T A
T U
S
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
S P
E E
D
IN
D
IC
A T
IO
N
G
O W
U S
A
F
B T
U
K W
H
S T
A T
U S
TAG
TT 1
TT 2
TT 3
TT 5
1. FAILURE MODES:
O - OPEN OR ON
C - CLOSE OR OFF
L - LAST COMMAND
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
NOTES:
ELECTRIC POWER TO THE DDC PANEL.
3. PROVIDE FULL INTEGRATION THROUGH THE VFD BACNET INTERFACE CARD FOR INPUT OF ALL VFD
OPERATING PARAMETERS TO THE BAS.
TT 7
TT 6
TT 4
CHILLED WATER RETURN - CAMPUS LOOP
CHILLED WATER SUPPLY - CAMPUS LOOP
CHILLED WATER PUMP - CAMPUS LOOP
CHILLED WATER PUMP - CAMPUS LOOP
FRT-1
DP-1
CHILLER
CHILLER
CHILLER WATER FLOW RATE
DIFFERENTIAL PRESSURE
CHILLED WATER RETURN - CHR-1
CHILLED WATER SUPPLY - CHR-1
CHILLED WATER RETURN - CHR-2
CHILLED WATER SUPPLY - CHR-2
CHILLED WATER BYPASS
VLV-3
CHR ISOLATION VALVE (SLOW ACTING)
BYPASS VALVE C
C
SUCTION DIFFUSER
RELIEF VALVE
SET 80#
TO AND FROM
AIR HANDLING
EQUIPMENT
CHR
CHS
CHR
AAV
BLADDER TYPE EXPANSION
TANK. MINIMUM TANK VOLUME
ACCEPTANCE 130 GALLONS.
TT
AI
TT
AI
AI
FRT
CHEMICAL FEEDER
VSD
DIAIDO AO
CP
VSD
DIAIDO AO
CP
MUW
AI
TT
AI
TT
AI
TT
AI
TT
"C
H S
"C
H R
"C
H S
"C
H R
CHS
1"1"
TANGENTIAL AIR SEPARATOR
250 GALLONS, MINIMUM
1•" TO DOMESTIC WATER
45 PSI FILL PRESSURE
ROUTE TO DRAIN
1"
AIAO
VLV
VLV
AIAO
VLV
AIAO
CONCRETE
HOUSKEEPING PAD
CHILLED WATER FLOW DIAGRAM - HVAC
NOT TO SCALE
CHR-FA-2 CHR-FA-1
VLV-1, 2
CP-FA-1
CP-FA-2
CHR-FA-1
CHR-FA-2
CP-FA-1
CP-FA-2
TT
AI
8" 8"
8"
8"
8"
P:\25106\25106m51.dgn
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106m51.dgn
AS SHOWN
LTF
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
WSH
WSH
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
M5.1
HVAC
DETAILS-
AIR COOLED CHILLER ISOMETRIC
DRAIN VALVE WITH HOSE
CONNECTION AT LOW POINT
M.A.V. AT
HIGH POINTS
(FOR ESTIMATING PURPOSES ONLY. PROVIDE PIPING ARRANGEMENT FOR UNIT FURNISHED.)
C H S
C H
R
CABLE ON PIPING
OUTDOORS ABOVE
GRADE
FLANGE ON GROUND
CONDUCTOR TO EVAPORATOR
ELECTRIC HEATING
GRADE
NOT TO SCALE
REDUCER
‚" COPPER TUBING
•" GATE VALVE
•" 4" NIPPLE
CIRCULATING WATER PIPING
NOTES:
1.
2.
VENT ALL HIGH POINTS AS INDICATED ABOVE.
IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
ELEVATION TYPICAL AIR VENT
A
BC
E
TO SYSTEM
B -ƒ" TO DISCHARGE OF PUMP.
C -ƒ" TO SUCTION OF PUMP.
F - RISER CLAMP. WELD TO 2X3/4 " FLAT
OFFSET BRACKET TO WALL.
A - CHEMICAL FEEDER TANK.
D -ƒ" TO FLOOR DRAIN.
D
4"MIN.
WELD
F
BALL VALVES
E -‚" BALL VALVE FOR VENT.
BY-PASS CHEMICAL FEEDER
WALL
AS SYSTEM PIPE.
MANUAL AIR VENT
TERMINATE DRAIN WITH HOSE END
CONNECTION 18" ABOVE FLOOR.
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
CEILING. LOCATE VALVE AND TERMINATE DRAIN
HERE, UNLESS NOTED OTHERWISE AND POSITION
VALVE FOR VERTICAL DOWN DISCHARGE.
•" PIPE SAME MATERIAL
2•"
VERTICAL
PIPE
SUPPORT
WELDED PIPETHREADED / BRAISED
PIPING
BALL VALVE (EXPOSED) OR
GATE VALVE (CONCEALED)
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
6"MAX.
SERVICE TEE
ECCENTRIC REDUCER
•" STREET ELL.
AUTOMATIC AIR VENT
MAINS
•"x2" NIPPLE
„"MPT x ‚" FLARE ELL.
‚" COPPER TO FLOOR
AUTOMATIC AIR VENT
NOT TO SCALE
3 4
NOT TO SCALE
NOT TO SCALE
DRAIN OR OUTSIDE AS SHOWN.
NOT TO SCALE
INSULATED PIPE
STEEL
4" C4 STEEL CHANNEL
ROUND CONCRETE PIER
3" STEEL PIPE
2'
6"
12"
18"
END VIEW
4" C4 STEEL CHANNEL
ROUND CONCRETE PIER
NOT TO SCALE
OUTDOOR HVAC PIPE SUPPORT DETAIL
BACKFLOW PREVENTER
1"1"
MAKE - UP WATER STATION
GAUGE COCK
ƒ"
PRESSURE REDUCING
VALVE. SET AT
1"
AIR GAP DRAIN
FITTING
1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR
TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE
CLAMPS SAME MATERIAL AS PIPE.
PSI.
GAUGE
GATE VALVE
GATE VALVE
TO FILL POINT
OF SYSTEM
BALL VALVE
QUICK FILL
CONNECTION
TO DOMESTIC COLD
WATER SUPPLY
TYPICAL DRAIN VALVE CONNECTION
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
ƒ" GATE VALVE
ADAPTER TO ƒ" HOSE THREAD
PROVIDE HOSE CAP NUT
NOTES:
DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
NOT TO SCALE
WELDED PIPING
ELEVATION
THREADED PIPING
ELEVATION
NOT TO SCALE
NOT TO SCALE
CONCRETE BASE
4"
4" 4"
LIQUID TIGHT,NEOPRENE COATED
FLEXIBLE CONDUIT
BEVEL
WATER PUMP(S) ONLY
18 GA. S.S. DRIP PAN
(CHILLED WATER PUMP(S)
ONLY)
GAUGE COCK
RIGID CONDUIT STUB
TO 3" ABOVE BASE
AS SPECIFIED
•" SCH. 40 TO DRAIN (CHILLED
PLAN
END SUCTION PUMP
NOT TO SCALE
NOT TO SCALE
ELEVATION
TYPICAL END SUCTION PUMP-
FLEXIBLE CONNECTION
FLEXIBLE COUPLING AND
COUPLING GUARD
PRESSURE GAUGE
TEST PLUG
‚" BALL VALVE, TYPICAL
ADJUSTABLE FOOT FULL SIZE BLOWDOWN
‚" DRAIN
1"
SUCTION DIFFUSER
WITH STRAINER
2"
EXISTING CONCRETE BASE
18 GA. S.S. DRIP
PAN (CHILLED WATER
PUMP(S) ONLY)
1/2" DRAIN TAPPING
PIPE TO FLOOR DRAIN
TO FLOOR DRAIN
PIPE INSULATION
BALL OR BUTTERFLY
CIRCUIT SETTER
NOT TO SCALE
SECTION THROUGH TRENCH
18" MIN.
FINISHED GRADE
6"
COMPACTED SAND
18"
MIN.
CL CL
COMPACTED
BACKFILL
18" MINIMUM
ELASTOMERIC SEAL ELEMENT
BOLT
PRESSURE PLATE
WALL
PIPE WITH INSULATION
CL
MECHANICAL SLEEVE SEAL
NOT TO SCALE
DRILLED HOLE
CAST/CORE
P:\25106\25106e01.dgn
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106e01.dgn
AS SHOWN
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
SHD
BCO
SHD
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
P O
L E
P O
L E
P O
L E
P O
L E
CKT
MSB
NOTES
Minimum KAIC:
CKT
LOCATION:
TRIP
MOUNTED
AMPS
TRIP
1#8G
3#4
RISER
SEE
RISER
SEE
1#8G
3#4
WIRE
1 1/4"
1 1/4"
CD.
MULTISECTION CONN AMPS
MULTISECTION CONN V A
PANEL SECTION CONN AMPS
PANEL SECTION CONN V A
SPACE
PROVISIONAL
FUTURE PUMP
SPACE
PROVISIONAL
FUTURE PUMP
BOILER ROOM
SOUTH END OF
PUMP CP-OL-2
PLANT YARD
CHILLER CHR-2
PLANT YARD
CHILLER CHR-1
BOILER ROOM
SOUTH END OF
PUMP CP-OL-1
SERVES
WIRE
PH,
11080
11080
11080
151000
151000
151000
151000
151000
151000
11080
11080
11080
AMPS
VOLT-
324160
324160
11080
151000
151000
11080
A
PHASE LOAD V.A.
324160
324160
11080
151000
151000
11080
B
FED BY
324160
324160
11080
151000
151000
11080
C
PAD MTD TRANSFORMER
AMPS
VOLT-
NORTH END
BOILER HOUSE
SUPPRESSION
SURGE
SPACE
PROVISIONAL
FUTURE 3-POLE
SPACE
PROVISIONAL
FUTURE CHILLER
SERVES
MAIN BREAKER
CD. WIRE
FLOOR/PAD
E0.1
T
POWER RISER DIAGRAM
NOT TO SCALE
TRANSFORMER
PAD MOUNT
EXISTING 2500KVA
2000A
MSB-CHR
NEW
ELECTRICAL
RISER -
SCHEDULES AND
CHR-OL-1
NEW CHILLER
CHR-OL-2
NEW CHILLER
LIGHTING FIXTURE SCHEDULE
MARK LAMPS FIXTURE TYPE-SEE SPECIFICATIONS MOUNTING REMARKSVOLT.
B
OR APPROVED EQUAL
KENALL MILLENIUM FINITE FN9 SERIES
LUMARK ASWP SERIES
LITHONIA WPX1 SERIES
DARK BRONZE COLOR. WET LOCATION RATED.
LED WALL PACK. FULL CUT OFF. TRIM ARCHITECTURAL DESIGN.
GRADE
EXTERIOR
FROM
MEASURED
AT 10'-0" AFF
WALL MOUNT
WALL
TIMER ON EXTERIOR
CONTROLLED BY
24W
3000K
2900 LUMENS
LED UNV
EXTERIOR
ODUM LIBRARY
NEW CHILLER YARDBOILER HOUSE
6 SETS: 4#500KCMIL, 4"C
#3/0
NEW GROUNDING TRIAD 2 SETS: 4#500KCMIL, 1#1/0G, 4"C
2 SETS: 4#500KCMIL, 1#1/0G, 4"C
ALL WIRING SHALL BE COPPER.
B
I L
O M
PINE HALL-SOCIAL WORK
UNIVERSITY POLICE
FINISHED FLOOR= 180.79'
18" PINE
S T E A
M
T U
N N E L
TANK
GAS
"C
R
"C
S
PIPES
CONDENSER
EXISTING 10" U.G.
ODUM LIBRARY
CT-SU-1
TP-SU-1
TP-SU-2
PROPANE TANK
EXISTING
FENCE
CHAIN LINK
EXISTING
HWR
HWS
4"
4"UG
DN
P:\25106\25106e11.dgn
DATE PLOTTED
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106e11.dgn
AS SHOWN
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
SHD
BCO
SHD
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
CT-2 CT-1
T P
T P
L
L
L
L
L
W
CHR-02-1
CHR-02-2
NEW
NEW
E1.1
SCALE:
= 1'-0
8 0 4 8 16
N
PARTIAL SITE PLAN - ELECTRICAL
ELECTRICAL
SITE PLAN -
PARTIAL
TRANSFORMER ST-16
EXISTING PAD MOUNTED
SWEEP 90'S. SEE RISER DIAGRAM.
ANY BENDS SHALL BE WIDE
PATH IS DIAGRAMMATIC.
ALL BOXES, HANGARS, AND SUPPORTS.
CRAWLSPACE OF ODUM LIBRARY. REMOVE
ACCESSBILE CONDUIT, INCLUDING IN THE
REMOVE DISCONNECT SWITCHES. REMOVE
MECHANICAL ROOM SHOWN ON SHEET E3.2.
TO PANEL HM1 IN THE ODUM LIBRARY
TOWER FANS AND TOWER PUMPS BACK
REMOVE FEEDER WIRE FOR COOLING
EXISTING TO REMAIN
P:\25106\25106e31.dgn
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106e31.dgn
AS SHOWN
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
SHD
BCO
SHD
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
ACP
HWR
HWS
H W
S
H W
R
H W
R
H W S
4"
SLEEVE SEALS
MECHANICAL
SWITCH
SHUTDOWN
BOILER
MUW
BLR-3
FUTURE
6"
AIR SEPARATOR
TANGENTIAL
VFD HP-1
VFD HP-2
SWITCH
SHUTDOWN
BOILER
4"
6"
6"
4"
6"
SWITCH
SHUTDOWN
BOILER
(TYPICAL)
WALL PIPE SUPPORT
PIPE STANCHION
6"
U E
U E
D1
TO PE/ED BUILDING
CT
CT
BLOWDOWN
EXISTING
TANK TO REMAIN
EXISTING BACKUP
"D
H R
PANEL
SEQUENCER
EXISTING BFP
RISER TO REMAIN
EXISTING HWR/S
FOP
EXISTING
EXISTING
EXISTING
FROM CAMPUS
EXISTING 4" PCR
8" 50# TO CAMPUS
EXISTING
TO GYM
TO LIBRARY
PANEL LCI
EXISTING
PANEL MPB
EXISTING
EXISTING HW EXPANSION TANK
EXISTING BYBASS CHEMICAL FEEDER
EXISTING
EXISTING
EXISTING
PANEL PE
EXISTING
HP-2HP-1
EXISTING EXISTING
ACP
VFD
VFD
CP-OL-1
CP-OL-2
BLR-2
BLR-1
PANEL BP
EXISTING
SCALE:
= 1'-0
4 0 2 4 8
E3.1
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
ELECTRICAL
NEW WORK -
BOILER PLANT -
LARGE SCALE -
LARGE SCALE - BOILER PLANT - NEW WORK - ELECTRICAL
NOTES:(THIS SHEET ONLY)
SERVICE ENTRANCE #2 IS LOCATED IN MAIN BOILER ROOM IN THIS BUILDING."
LETTERS THAT READS "SERVICE ENTRANCE 1 OF 2, SERVED FROM ST-4.
AFFIX TO THE PANEL A PHENOLIC ENGRAVED SIGN, RED WITH WHITE
UNION TRANSFORMER YARD. THE CONTRACTOR SHALL PROVIDE AND
FROM PAD MOUNTED TRANSFORMER ST-4 LOCATED IN THE STUDENT
THIS EXISTING 800A MAIN DISTRIBUTION PANEL MPB IS SUPPLIED
END OF THIS BUILDING."
ST-16. SERVICE ENTRANCE #1 IS LOCATED IN THE TOOL ROOM ON THE SOUTH
WHITE LETTERS THAT READS "SERVICE ENTRANCE 2 OF 2, SERVED FROM
PROVIDE AND AFFIX TO THE GEAR A PHENOLIC ENGRAVED SIGN, RED WITH
TRANSFORMER ST-16 LOCATED AT ODUM LIBRARY. THE CONTRACTOR SHALL
THE NEW 2000A SWITCHGEAR SHALL BE SUPPLIED FROM PAD MOUNTED
ROOM". AFFIX TO THE OUTSIDE OF THE DOOR.
WHITE LETTERS THAT READS "SERVICE ENTRANCE 1 OF 2 LOCATED IN THIS
THE CONTRACTOR SHALL PROVIDE A PHENOLIC ENGRAVED SIGN, RED WITH
ON PANEL DIRECTORY. RECORD CIRCUIT NUMBER ON AS-BUILTS.
#10,•"C FROM SPARE 20A/1P BREAKER IN EXISTING PANEL BP. RECORD LOAD
BACKSIDE OF THE VFD BACKBOARD ABOVE CHEMICAL FEED TANK. PROVIDE
PROVIDE QUAD RECEPTACLE FOR CHEMICAL FEED CONTROLS. MOUNT ON THE
DIRECTORY. RECORD CIRCUIT NUMBER ON AS-BUILTS.
FROM SPARE 20A/1P BREAKER IN EXISTING PANEL BP. RECORD LOAD ON PANEL
PROVIDE HARDWIRED POWER TO HVAC CONTROL PANEL, ACP. PROVIDE #10,•"C
NUMBER ON AS-BUILTS.
IN EXISTING PANEL BP. RECORD LOAD ON PANEL DIRECTORY. RECORD CIRCUIT
LIGHTS AT NEW CHILLER YARD. PROVIDE #10,•"C FROM SPARE 20A/1P BREAKER
TIMER SWITCH IN WEATHERPROOF ENCLOSURE TO CONTROL NEW EXTERIOR
T6
WP
B
B
P:\25106\25106e32.dgn
DGN FILE
12-FEB-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25106\25106e32.dgn
AS SHOWN
25106
V A
L D
O S
T A S
T A
T E U
N
IV
E R
S
IT
Y
V a ld o s ta
G e o rg ia
SHD
BCO
SHD
02.12.2026
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
V S
U P ro je c t
N o
M R
R -2
-0
O d u m L ib ra ry C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
C U
M E
N T S
NETWK.
MECH.
MECH
MAIN
ELEC.
NETWK.
MECH.
MECH
MAIN
ELEC.
EUH-1
EXISTING CONCRETE CURB
PURGE SWITCH
EXISTING REFRIGERANT
REFRIGERANT LEAK INDICATOR
EXISTING FLUSH MOUNTED REMOTE
RELIEF DAMPER
42"x36" COUNTER BALANCED
ACP-HTG-1
EXISTING FAN SF-1
EXISTING CONCRETE CURB
EXISTING CONCRETE PAD TO REMAIN
HP-LIB-1
72x40 INTAKE LOUVER
72x40 EXHAUST LOUVER
HM1LM1
ACP
EF-4
CHILLER ACP
ACP
EUH-1
S P
L
IB
CHR-1
EXISTING
EXISTING CT-2 VFD
EXISTING TP-2 STARTER
EXISTING CONCRETE CURB
PURGE SWITCH
EXISTING REFRIGERANT
REFRIGERANT LEAK INDICATOR
EXISTING FLUSH MOUNTED REMOTE
RELIEF DAMPER
42"x36" COUNTER BALANCED
CP-L1B-2 STARTER
EXISTING
ACP-HTG-1
EXISTING FAN SF-1
EXISTING CT-1 VFD
EXISTING TP-1 STARTER
EXISTING CONCRETE CURB
EXISTING CONCRETE PAD TO REMAIN
4 0 2 4 8
SCALE:
= 1'-0
MECHANICAL ROOM 154 - DEMOLITION - ELEC
LARGE SCALE - ODUM LIBRARY -
HP-LIB-1
72x40 INTAKE LOUVER
CHR-2
EXISTING
72x40 EXHAUST LOUVER
E3.2
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
4 0 2 4 8
SCALE:
= 1'-0
MECHANICAL ROOM 154 - NEW WORK - ELEC
LARGE SCALE - ODUM LIBRARY -
NEW WORK - ELEC
DEMOLITION &
MECH. RM. 154 -
ODUM LIBRARY -
LARGE SCALE -
HM1LM1
S P
L
IB
NOTES:(THIS SHEET ONLY)
BREAKERS IN OFF POSITION.
IN THE PANELS WHERE CONDUIT WAS REMOVED. LEAVE SPARE
INDICATE SPARES WHERE EQUIPMENT WAS REMOVED. CLOSE HOLES
FED FROM THESE TWO PANELS. UPDATE PANEL DIRECTORIES TO
UNLESS NOTED OTHERWISE, EQUIPMENT SHOWN TO BE REMOVED IS
REMOVE ALL BOXES, HANGARS, AND SUPPORTS.
REMOVE BRANCH CIRCUIT CONDUIT AND WIRE TO SOURCE PANEL.
HANGARS, AND SUPPORTS.
ASSOCIATED DISCONNECTS AND STARTERS. REMOVE ALL BOXES,
REMOVE FEEDER CONDUIT AND WIRE TO SOURCE PANEL. REMOVE
OFF POSITION.
LABEL ON EACH CHILLER BREAKER TO "SPARE". LEAVE BREAKERS IN
CLOSE THE CONDUIT HOLES IN THE MAIN SWITCHGEAR. REPLACE THE
THE MAIN SWITCHGEAR. SEAL CONDUIT OPENINGS IN THE WALL.
NORTH WALL. REMOVE THE FEEDER WIRE AND CONDUIT BACK TO
4-INCH CONDUITS OVERHEAD, COMING INTO THIS ROOM FROM THE
EACH CHILLER IS SUPPLIED FROM THE MAIN SWITCHGEAR, WITH TWO
C P
L
IB
C P
L
IB
LEAK MONITOR
REFRIGERANT
2 TYP. 4 PUMPS
| 25106aCov |
| 25106m01 |
| 25106m11 |
| 25106m21 |
| 25106m31 |
| 25106m32 |
| 25106m41 |
| 25106m51 |
| 25106e01 |
| 25106e11 |
| 25106e31 |
| 25106e32 |
File details come from the government source that posted it. Updated .