RFP.pdf
PDF 2 MB Posted
- Attached to
- Engine Exhaust Silencer Replacement BLDG. 157
- Solicitation number
- 2025-PZI-1511
About this file
This is a Request for Proposal (RFP) from the Air Force Life Cycle Management Center at Hanscom Air Force Base seeking proposals from Nelson Global Products for a Firm Fixed Price contract to replace engine exhaust silencers in Building 157. The required items include two engine exhaust silencers (exact fit per SOW specifications), four 14-inch ANSI flange gasket kits, and two rain caps.
The proposal must be submitted electronically by March 7, 2025 at 4:00 PM to the Contract Specialist Ryan Wang and Contracting Officer Eva Leavitt. Evaluation factors include active/current SAM Registration (requiring CAGE/DUNS documentation) and technical understanding of the SOW requirements. The procurement is structured as a single CLIN (0001) covering all products listed in the Statement of Work. Questions should be directed to ryan.wang.1@us.af.mil or eva.leavitt@us.af.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOCA.pdf | ||
| SOW for Engine Exhaust Silencer Replacement BLDG. 157 (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE
MANAGEMENT CENTER
HANSCOM AIR FORCE BASE
MASSACHUSETTS
MEMO FOR: Nelson Global Products, Inc.
Attn: David Sloan 1560 Williams Drive Stoughton, Wisconsin 53589, United States
AFLCMC/PZIB
FROM: 16 Eglin Street
Hanscom, AFB MA 01731
SUBJECT: Request for Proposal – Hanscom Air Force Base Building 157 Engine Exhaust Silencer Replacement
1. This is a Request for Proposal for a Firm Fixed Price contract for the Hanscom Air Force Base Building 157 Engine Exhaust Silencer Replacement.
2. The intent of this contract is to procure two engine exhaust silencers, exact fit, in accordance with the specs on the SOW (attached), four 14 inch ANSI flange gasket kit (see attached SOW for specs), and two rain caps (see attached SOW for specs).
3. The CLIN structure will be as follows: CLIN 0001 - All product listed in Statement of Work.
4. Proposal must be received by contracting no later than 4:00 PM, 7 March 2025.
a. Please prepare your proposal according to the following requirements.
b. Contractor shall submit completed pricing data for all items listed on the bid schedule/
SOW.
c. The Contractors proposal will be evaluated based on these factors:
i. Active/current SAM Registration – Provide company’s CAGE/DUNS or copy of SAM registration to show certification under the appropriate NAICS.
ii. Overall SOW Technical Understanding – Provide a technical understanding of the overall technical requirements identified in the SOW.
This is not a direction to proceed with the efforts as described in the RFP. That direction, if authorized, will be in the form of contract award.
Please provide an electronic copy of your proposal via email to the Contract Specialist and Contracting Officer at the addresses provided below.
If you have any questions or require additional information, please contact Ryan Wang at ryan.wang.1@us.af.mil or the Contracting Officer, Eva Leavitt at eva.leavitt@us.af.mil.
Attachments:
1. Statement of Work (SOW)
Eva K. Leavitt Contracting Officer
AFLCMC/PZIB
File details come from the government source that posted it. Updated .