202581456 BDP.pdf
PDF 415 MB Posted
- Attached to
- National Western Center Pedestrian Bridge
- Solicitation number
- 202581456
- Issued by
- Colorado
About this file
The provided file appears to be a document related to the National Western Center Pedestrian Bridge project in Denver, Colorado. The project involves constructing a single-span pedestrian bridge crossing three sets of railroad tracks, connecting the 48th and Brighton RTD Station with the National Western Campus Plaza. Key construction elements include landing plazas with elevator towers, HVAC systems, adjacent staircases, lighting installations, IT/fiber connectivity for communications and security, a new 10-foot-wide sidewalk extending to Brighton Boulevard, and a 30-foot-wide service road on the east side of the east landing plaza.
No specific pricing terms, funding sources, or set-aside details are present in the provided document. The file focuses primarily on the physical infrastructure and technical specifications of the pedestrian bridge project, highlighting its location and primary construction components within the Denver metropolitan area. Additional financial and procurement details would likely be found in separate project documentation or bidding materials not included in this file.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 202581456 CCD ROCIP Insurance Manual DRAFT.pdf | ||
| 202581456 BF.pdf | ||
| 202581456 Unit Item Pricing.xlsx | XLSX spreadsheet | |
| 202581456 FHWA Funding Grant.pdf | ||
| 202581456 CCD ROCIP Safety Manual 2025.09.30.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .