This Statement of Work (SOW) details furniture removal and disposal services for the Romano Mazzoli Federal Building at the USACE Louisville District Offices. The contractor will be responsible for removing all office-related furniture from specific rooms (172D, 173B, 173C, 173D, 173G, 173N, 183), including cubicles, desks, chairs, tables, modular units, file cabinets, and shelving units located at 600 Dr. Martin Luther King Jr. Pl, Louisville, KY 40202. The contractor must prioritize environmentally responsible disposal practices, focusing on recycling and donating usable furniture, and is strictly prohibited from profiting in any way from the furniture's disposal.
Key contract requirements include: completing all work within 30 days of contract award, performing work during normal business hours (Monday through Friday, 8:00 a.m. to 4:30 p.m. Eastern Time), maintaining a work schedule regardless of inclement weather, and providing weekly progress reports and a final Certificate of Disposal. The contractor must ensure the offices are left in a broom-swept condition, minimize building damage during removal, and submit detailed documentation tracking the amount and type of furniture disposed of, repurposed, or recycled. The Technical Point of Contact is Scott Walden from the U.S. Army Corps of Engineers, with contact information provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PIEE Directions.docx | DOCX document | |
| Questions.pdf | ||
| Pictures.pdf | ||
| Solicitation - W912QR26QA009.pdf | ||
| 2015-4717.pdf | ||
| SPECIAL INSTRUCTIONS.pdf | ||
| DFARS 252.204-7025.pdf | ||
| REPS AND CERTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
Statement of Work
Furniture Removal and Disposal Services for the Romano Mazzoli Federal Building At USACE Louisville District Offices
18 November 2025
1. The Contractor shall provide all necessary personnel, equipment, supplies, materials, and consumables required to remove designated items from the Romano Mazzoli Federal Building (RMFB). The Contractor is responsible for dismantling and removing the designated items, ensuring the offices are left in a broom-swept condition upon completion of the work.
The Contractor shall take all necessary precautions to dismantle and remove furniture in a manner that minimizes the risk of damage to the building. All work areas must be thoroughly cleaned, including the removal of debris, tools, and equipment used during the process.
The Contractor is required to dispose of or donate all items removed from the Romano Mazzoli Federal Building in a responsible manner. Under no circumstances shall the Contractor sell or profit from any items removed from the building.
2. Performance Work Statement.
The Contractor shall be responsible for the removal of all office-related furniture from 600 Dr. Martin Luther King Jr. Pl, Louisville, KY 40202, including but not limited to cubicles, desks (executive, workstations, reception), chairs (task, conference, lounge), tables (conference, breakroom), modular units, file cabinets, and shelving units from the following rooms:
Rooms:
172D 173B 173C 173D 173G 173N
The Contractor will ensure environmentally responsible disposal practices, prioritizing the recycling and donation of usable furniture. Any remaining furniture shall be disposed of at authorized facilities in compliance with applicable regulations.
The Contractor shall not profit in any way from the disposal of furniture from the Romano
Mazzoli Federal Building, including but not limited to compensation, reimbursement, or trade resulting from its disposal, recycling, scrapping, or salvaging.
The Contractor is required to track and report all furniture removed, providing an accurate accounting of the amount and type of furniture disposed of, repurposed, or recycled. Weekly progress reports detailing the status and quantities of items disposed of, recycled, or donated must be submitted to the USACE point of contact. A final walk-through with the USACE Point of Contact will be coordinated to ensure the space at 600 Dr. Martin Luther King Jr Place is cleared and ready for turnover to building management
Additionally, the Contractor shall submit a Certificate of Disposal certifying that all furniture removed from the Romano Mazzoli Federal Building has been handled in accordance with the terms of the contract, including proper disposal or donation and non-commercial use.
The Certificate of Disposal must, certify the following:
I, [Contractor Representative Name], representing [Contracting Company Name], hereby certify under penalty of perjury that the furniture removed from [Building Name/Location] on [Date(s) of Removal] has been, and will continue to be, handled in accordance with the terms of contract [Contract Number].
1. The aforementioned furniture has not been, and will not be, offered for resale, auction, or any other commercial distribution. This prohibition extends to the sale of individual components or materials derived from the furniture (e.g., metal, wood, fabric).
2. The furniture shall not be dismantled or “scrapped” for monetary gain. Any salvageable materials will be disposed of in a manner consistent with applicable environmental regulations and contract requirements, *without* the intent to derive profit.
3. The furniture is currently being securely stored at [Storage Location Address] and/or has been donated to [Name of Donation Recipient Organization] on [Date(s) of Donation]. (Delete the portion that does not apply).
4. I understand that any violation of this certification may result in penalties as outlined in the contract, including but not limited to financial penalties and/or legal action.
Prices should include mobilization & de-mobilization, fuel, labor, material and equipment The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.
3. Technical Point of Contact (TPOC):
Scott Walden U.S. Army Corps of Engineers 600 Dr Martin Luther King Jr Pl Louisville, KY. 40202 Office Phone: 502.315.6616
Email Address: scott.e.walden@usace.army.mil
4. Pre-Work Conference:
The Contractor shall be required to attend a pre-work conference prior to beginning work during which the Contractor’s plan of work, safety procedures, start date and other items in this contract will be discussed.
5. Antiterrorism (AT) and Operations Security (OPSEC)
a. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
b. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the mailto:scott.e.walden@usace.army.mil installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
c. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something):
All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
d. Pre-screen candidates using E-Verify Program:
Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract Employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
SUPPLEMENTAL SECURITY REQUIREMENTS
All Contractors and subcontractor employee(s) working on this contract who require access to any Louisville District Lake Projects and Lock and Dam Projects shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Louisville District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Louisville District Security Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Louisville District Security https://www.e-verify.gov/
Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.
FOR ALL LOUISVILLE DISTRICT CONTRACTS:
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted access to Louisville District facilities.
The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) US Citizens Security Access Form each employee working on site must have a background investigation form submitted directly to the Louisville District Security Office.
The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.
Contractors shall have background checks completed for their employees annually in the case of Contracts with an initial period of performance (POP) greater than 1 year and those Contracts with Options or Modifications Which Extend the POP beyond 1 year. For instance, if the employee was cleared in May of 2022, they shall be cleared again in May of 2023. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite.
The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Louisville District USACE Security Office for background purposes.
FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC)
The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). Fingerprints are captured electronically at the closest Army Recruiting Station to the contractor’s home of record or at the USACE, Louisville District Security Office.
Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Louisville District Security Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Louisville District Security Office will make recommendations to the PCO or their Designated Representative. The Louisville District Security Office cannot give approval due to http://www.opm.gov/forms/ unfavorable report(s). The Louisville District Security Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information.
The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.
FOREIGN NATIONALS
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N- 550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I- 688A), etc.
In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Louisville District Security Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation, or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Louisville District Security Office by phone, letter, or email at the following numbers/addresses:
CELRL-SM
600 Martin Luther King Jr. Pl Louisville, KY 40202
Primary Email: DLL-CELRL-Security-SM@usace.army.mil mailto:DLL-CELRL-Security-SM@usace.army.mil
Alternate (if no response in 72 hours):
James R. Milner, phone (502) 315-6916; James.R.Milner@usace.army.mil
6. Working Hours.
a. Normal working hours, except as otherwise specified herein, will be Monday through Friday, 8:00 a.m. to 4:30 p.m. Eastern Time. Work inside Government buildings or other secured areas will be performed during the above referenced work hours. Work that interferes with other ongoing functions at the project will be scheduled around normal working hours, as specified by the TPOC.
b. Inclement Weather Work, the Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the TPOC when severe conditions make it impractical or dangerous to perform the work.
7. Contract Start and Completion Dates.
All work shall be completed no later than 30 days of contract award.
mailto:James.R.Milner@usace.army.mil
| SUPPLEMENTAL SECURITY REQUIREMENTS |
| FOR ALL LOUISVILLE DISTRICT CONTRACTS: |
| FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC) |
| FOREIGN NATIONALS |
| CELRL-SM |
File details come from the government source that posted it. Updated .