DATE ADDITIONS REVISIONS
Drain Commissioner
St. Clair County
ROBERT WILEY
SP
ILLW
AY
R
IVE
R
CLIN
T
ON
ST. CLAIR
LAKE
C L I N
T O
N
T W
P
PROJECT LOCATION
N
R E I
M O
L D
R
C R O C K E R
B L V D
J E F F
E R S
A V E
15 MILE RD.
GLENWOOD RD.
METROPOLITAN PKWY.
LIST OF DRAWINGSCLINTON RIVER SPILLWAY INTERCOUNTY DRAINAGE BOARD
Water Resources Commissioner
Oakland County
JIM NASH
NO SCALE
NOT SCALE
Public Works Commissioner
Macomb County
CANDICE S. MILLER
R E
L I E
F
A I N
H A
R R I S
O N
C L I N
T O
N
R O
S E
V I L
L E
MICHIGAN
MACOMB COUNTY,
555 HULET DRIVE
BLOOMFIELD HILLS, MICH.
PHONE: (248) 454-6300
WEB SITE: http://www.hrcengr.com
P.O. BOX 824
48303 - 0824
PREPARED BY:
HRC JOB No. 20221060
Drain Commissioner
Lapeer County
ANDY WAGNER
Agriculture and Rural Development
Michigan Department of
Intercounty Drain Program Manager
BRADY HARRINGTON
C L
IN
T
IV
E R
S P
IL
L W
Y
C
IM
A
S
IL
IE
N C
Y
P
R O J E
C T
P
R O J E
C T
H
R C
J
B o
STATE HIGHWATER INFRASTRUCTURE GRANT
CLIMATE RESILIENCY PROJECT
CLINTON RIVER SPILLWAY
04-14-2025 OWNER REVIEW
Coastal Waters Coordinator
MELISSA LETOSKY
Coastal Management Program Unit
EGLE
CONSULTANTS
Know what'sbelow.
before you dig.Call
(TOLL FREE)
811or
1-800-482-7171
BEFORE YOU DIG
(3 WORKING DAYS)
72 HOURS
CALL MISS DIG
CALL811.COM
R
OHWM = 574.4 PER DRUMMOND CARPENTER ENGINEERING & RESEARCH
NOTICE:
AND COMPLETENESS PRIOR TO CONSTRUCTION.
PARTIES UTILIZING THIS INFORMATION SHALL FIELD VERIFY THE ACCURACY
COMPLETENESS OR ACCURACY OF THE UTILITIES SHOWN ON THIS DRAWING.
AVAILABLE. NO GUARANTEE IS MADE, OR SHOULD BE ASSUMED, AS TO THE
BEEN TAKEN FROM VISUAL OBSERVATION AND RECORD MAPPING WHERE
ALL EXISTING UTILITIES SHOWN ON THIS TOPOGRAPHIC SURVEY HAVE
NOTICE:
OF SPILLWAY, 400' +/- SOUTH OF METROPOLITAN PARKWAY / 16 MILE ROAD.
FOUND BRASS DISK @ NORTH END OF BRIDGE ABUTMENT SOUTH SIDE
(BRIDGE IS SOUTH OF METROPOLITAN PKWY / 16 MILE ROAD)
WATER TANK, 80' +/- SOUTH OF PEDESTRIAN BRIDGE OVER SPILLWAY.
"+" ON TOP OF CONCRETE HEADWALL @ NW CORNER, 25' +/- NE OF
585.17
590.10
BM #301
BM #300
BENCH MARK ELEVATION DESCRIPTION
BENCH MARKS (BM)
DATUM: NAVD88 GPS DERIVED
H A
R P
E
METROPOLIT
AN
PKWY.
06-11-2025
AND / OR
PERMIT SUBMITTALS
09-16-2025 REVISED PER COMMENTS
ISSUED FOR BIDS10-07-2025
SESC DETAILS
SEED MIXES
PROJECT DETAILS
PROPOSED WORK
EXISTING CONDITIONS
PROJECT NOTES
OVERALL PROJECT PLAN
COVER SHEET
09 - 11
05 - 08
03 - 04
10-10-2025 REISSUED FOR BIDS
-O
C T -2
:4
U S
M j r e c
D E
S I
G N
F I
I
M S
V i\
D a ta h r c c o lo r .t b l
H R
C .t b l
Q U
E U
P
L
C L R T
B L
V C J u n e S u b m it ta l\ c c o v e r .d g n
T I
-O
C T -2
:4
U S j r e c
D E
S I
G N
F I
M S
V i\
D a ta h r c c o lo r .t b l
H R
C .t b l
Q U
E U
L
C L R T
B L
V C J u n e S u b m it ta l\ c c o v e r .d g n
T I
CLEMENS
MT
LINE
CENTER
SHORES
ST CLAIR
HAVEN
NEW
B L V D
C R
O C
K E
R
ST. CLAIR
LAKE
BASE
AIR FORCE
SELFRIDGE JEFFERSON
A V E
C L
IN
T O
N
RIVER
M
ETROPOLI
TAN
MILLAR RD.
PKWY.
W A
S H I N
G T
P
R
P
G R
A
U N
K
W A
S H I N
G T
P
SAL
T
R
IV
E R
R O
Y-LE
N O X
C R
E E
K
R
P
HARDER
ALWARDT
HAMMON
TH
OE
L
M C B
R
ID
E
HARRIS
H O
W A R
DE
C K E R T
PRESTON
P R
ICE
HEALY
C O O N
N O
R T
H B
R A
N C
H
CLINTON
RI
VE
R
M
ID
D
LE
B R
A N C H
C A S
S
BANISTER
SHOEMAKER
WILCOX
DUNN
L E
W
IS
CAFLIC
DECKER
G
LO
E D E
D
IT
C H
LONGSTAFF
NO. 2
DUNN
C R
IT
T E
N D
E N
P
IN
G
LE
H E
Y D E
N R E
IC
H
M
IL
L E
R
COATES
H A F
E L
D
R
T
IL
C H
R O S E
DITCH
Z A
N D
E R
BOBCE
AN
MACOMB AIRPORT
RAY TWP.
C L
IN
T
IV
E R
MACOMB TWP.
CLINTON TWP.
M A
C O
P
S H
E L
P
K
IR
K H
A M
M A
C O
C H
E S
T E
R F I E
P
C R
A P
A U
D C
R
L E
N
X
P
H A
R R I S
P
H
AR
R
IN
GT
ON
S W
E E
N Y
T E S
K
CRANBERRY
M
AR
S H
KUKUK
F
AU
LM
AN
PELLIER
KENNER
G R
O T
H
M
IL
L E
R
N O
R T
H B
R A
N C
H
M
ID
D L E
B R
ANCH
L I T
T
H E
Y D
E N
R E I
H
DUNHAM RD.
G R E E N F
IE
L D
R D
C L I N
T
P
CLINTON TWP.
D R
D R
RED RUN
D R
S H
O O
K
G
IB
B O
N S
K
IR
K H
A M
W E
S T
BRANCH
C R A N D A
LL
S T
A R
K
BARK
E A S
T B
R A
N C
H
C O O N
T U
C K
E R
JONES D
R
HARMS
D
R
F U
L L E
R
P
IT
T S
S U
T H
E R
L A
N D
O E
M
IG
S A L T
R
IV
E R
P
IP
E L
IN
E
SUGAR
HOOKER RD.S
U
G A R
B
U S
H
R
D
F O
S T
B A
K
B A
K
AVE.
W E
R D
E R
M
Z U
H L
K
CHAPMAN RD.
W A S
H
IN
G T
O N
M A
C O
P
M E
L D
R U
M
LENOX TWP.
C H
E S
T E
R F I E
P
MIDDLE
BRANCH
C L
IN
T O
N
R
IV
E R
H O
W L
A N
D D
R .D
IS
CAN
N
ON
L A
W S
O N
YAT
E S
KING DR.
OLD CANAL
GREENS
D
IT
C H
WOODALL RD.
C A
M P
G R
O U
K I T
T
PARK DR.
M A
C O
M A
C O
WEST UTIC
A R
D.
SHELBY TWP.
S H
E L
P
WASHINGTON TWP. SHELBY TWP.
M T . V
E R
N
PLUM
G
IB
S O
N
C H
R
IS
S M
A N
B
IG
B E
A V E
R
M C C O Y
M A
C O
MACOMB CO.
MACOMB CO.
W A
S H I N
G T
P
RAY TWP.
MACOMB TWP.
MACOMB TWP.
CLINTON TWP.
M A
C O
P
S H
E L
P
CHESTERFIELD TWP.
M A
C O
P
C H
E S
T E
R F I E
P
S H
E L
P
WASHINGTON TWP.
MACOMB CO.
MACOMB CO.
D R
D R
. HEIDE DR.
INDIAN
TRAIL
RD.
D R
DR.
D R
BR.
T U P
P
D R
D R
D R
C R
D E
D R
DR.
UTICA DR.
DR.
D R
DR.
DR.
DR.
DR.
DR.
LONGSTAFF DR.
DR.
DR.
D R
DR.
SHOOKE DR.
D R
D R
D R .F
IE
B L E
C O
D R
D R
D R
N
IC
D R
A R N D T
D R
H A
DR.
D R
.DR.
DR.
DR.
DR.
DR.
D R
D R
LANDING STRIP
C R
DEER
CR.
HART
D R
B
O W
M
A N
D
IT
C
H
WACKER DR.
DR.
BUSH
R D
F
IS
D R
HART DR.
D R
DR.
DR.
C R
MOORE DR.
D R
B R
D R
D R
D R
D R
DR.
DR.
DR.
D R
W A
R R
P
DR.
B E
C L I N
T
P
STONY CREEK
LAKE
D E Q U
IN
D R E
R D
M A
C O
UTICA
STERLING HEIGHTS
EASTPOINTE
FRASER
ROSEVILLE
WARREN
DAVIS
23 MILE RD.
23 MILE RD.
23 MILE RD.
23 MILE RD.
22 MILE RD.
22 MILE RD.
29 MILE RD.
29 MILE RD.
29 MILE RD.
28 MILE RD.
28 MILE RD.
27 MILE RD.
27 MILE RD.
27 MILE RD.
26 MILE RD.
26 MILE RD.
26 MILE RD.
25 MILE RD.
25 MILE RD.
25 MILE RD.
25 MILE RD.
24 MILE RD.
24 MILE RD.
21 MILE RD.21 MILE RD.
21 MILE RD.
HALL RD.
19 MILE RD.
19 MILE RD.
18 MILE RD.
18 MILE RD.
17 MILE RD.
17 MILE RD.
METROPOLITAN PKWY.
16 MILE RD.
MILE RD.15
15 MILE RD.
15 MILE RD.
14 MILE RD.
14 MILE RD.
13 MILE RD.
13 MILE RD.
H A
R P
E
J E F F
E R S
E
MASONIC BLVD.
MASONIC BLVD.
13 MILE RD.
12 MILE RD.
12 MILE RD.
12 MILE RD.
11 MILE RD.
MARTIN RD.
FRAZHO RD.
10 MILE RD.H
A
R P
E
10 MILE RD.
10 MILE RD.
9 MILE RD.
9 MILE RD.
9 MILE RD.K
E
L
J E
F F
E R
S
E
M O
U
R Y
R Y
M O
U
V
D O
D G
V
H O
O V
H O
O V
STEPHENS DR.
S C
H O
E N
H E
M O R A V
IA
N
D R
UTICA RD.
H A
Y
S
G A
R F I E
CANAL RD.
R O
M
A
K E
L
L I T
T
E
GLENWOOD RD.
QUINN RD.
CLIN
T
ON
R
IVE
R
SP
ILLW
AY
R E I
M O
I R
W
H E
Y D
E N
R E I
R O
M
A
C A
F A I R
C H I
S N
O V
H A
Y
G A
R F I E
CANAL RD.
S C
H O
E N
H E
V
M O
U
S H
E L
S C
H O
E N
H E
N O
R
E
C A S S
A
VE
U T I
G A
R F I E
H A
Y
G R
A T I
E
J E F F E R S O N
A V E
A L
T M
S A
N. R
IVER R
D.
S. RIV
ER RD.
CLINTON
RIVER
CLINTON
RIVER
S C
H E
U
HAGEN RD.
C H
E S
T E
R F I E
B A
T
G R
A T I
E
24 MILE RD.
C O T T
O N
R
D
C L
IN
T O
N
R
IV
E R
D E
Q U I N
D
NEW
HAVEN RD.
NEW HAVEN RD.
B A
T
R O
S E
O
J E
W E
H A
Y
R O
M
A
K U
N S
T M
W O
L C
O
R
N T
T E
L L
B A
T
L O
A
HOBARTH RD.
R I D
G
HICKEY RD.
G R
A
U
S
T E
.R
G R
A
U
S
T E
G R
A
U
S
T E
G R
A
U
S
T E
C O
N R
A I L
C O
N R
A I L
C O
N R
A I L
C L
IN
T O
N R
IV
E R
R D
T I L
AIRPORT
BERZ-MACOMB
MC KINLEY
AIRPORT
B R
O U
G H
T
L U
C H
T M
M O
U
N O
R
E
F O
H A
R R I S
THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE MDOT 2020 STANDARD
COOPERATION BY THE CONTRACTOR: NO ADDITIONAL COMPENSATION WILL BE PAID TO
ENCOUNTERING OF EXISTING UTILITIES THAT MAY OR MAY NOT BE SHOWN ON THE PLANS.
LIMITATIONS ON PRIVATE WORK: DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR
SHALL NOT PERFORM WORK BY PRIVATE AGREEMENT WITH PROPERTY OWNERS ADJACENT
TO THE PROJECT WITHOUT PRIOR OWNER CONSENT. WORK MAY BE ALLOWED WHEN
REQUESTED, BUT ONLY WITH WRITTEN CONSENT.
THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS IN SUCH A MANNER TO COMPLY WITH
THE CONTRACTOR SHALL BE REQUIRED TO NOTIFY THE LOCAL FIRE & POLICE DEPARTMENTS,
THE CONTRACTOR SHALL, BEFORE EACH DAYS WORK, OR WHEN MOVING TO A NEW AREA
OF WORK, DETERMINE AND EVALUATE THE LOCATION OF ALL UNDERGROUND FACILITIES
IN THE AREA. IF LOCATION STAKES HAVE BEEN MOVED OR DO NOT APPEAR CORRECT,
THE CONTRACTOR SHALL NOT EXCAVATE UNTIL ALL UTILITIES HAVE HAD AN OPPORTUNITY
TO CHECK OR RESTAKE THEIR LOCATIONS. ANY DELAYS INCURRED, DUE TO THE CHECKING
OR RESTAKING OF UTILITIES SHALL NOT BE A BASIS FOR ADDITIONAL COMPENSATION.
THERE WILL BE NO ADJUSTMENT IN THE CONTRACT UNIT PRICE REGARDLESS OF THE
PERCENTAGE OF INCREASE OR DECREASE ABOVE OR BELOW THE CONTRACT QUANTITY
FOR ANY ITEM OF WORK.
IT IS THE INTENT THAT ALL GOVERNMENT CORNERS ON THIS PROJECT BE PRESERVED
GENERAL
IN CONSTRUCTION DUE TO THE
HEREIN.
SPECIFICATIONS, DETAILS OR SPECIAL PROVISIONS AND THE SPECIFICATIONS CONTAINED
SPECIFICATIONS FOR CONSTRUCTION UNLESS OTHERWISE SPECIFIED IN THE STANDARD
OR IN THE PROPOSAL OR FOR ANY REASONABLE DELAYS
THE CONTRACTOR FOR ANY DELAY OR INCONVENIENCE DUE TO MATERIAL SHORTAGES
RESTRICTIONS WHILE PERFORMING ANY CONSTRUCTION OPERATIONS WITHIN THIS
TRAFFIC MAINTENANCE & CONTROL
MISCELLANEOUS
PROTECTION AND RESTORATION OF PROPERTY:
UTILITIES
(517) 304-2946
EAST LANSING, MICHIGAN 48823
SUITE 400
612 WEST LAKE LANSING ROAD
CHRIS LENTINE
NORLIGHT TELECOMMUNICATIONS
(989) 879-8798
PINCONNING, MICHIGAN 48650
100 SECOND STREET
MICHAEL BERGERON
CENTURYTEL MICHIGAN NETWORK
(810) 244-3500
FLINT, MICHIGAN 48532
1295 S. LINDEN ROAD
GREG SERICH
McLEOD USA
THE FOLLOWING UTILITY COMPANIES MAY HAVE FACILITIES WITHIN THE PROJECT LIMITS:
EMER:
(248) 433-5618
ROYAL OAK, MICHIGAN 48073
4600 COOLIDGE HWY.
ROYAL OAK OFFICE
JOHN HILL
CONSUMER ENERGY CO.
EMER: (800) 477-4747
(586) 457-3256
SYLVAN LAKE, MICHIGAN 48320
1970 ORCHARD LAKE ROAD
MARK COLLINS
DETROIT EDISON UNDERGROUND
(248) 427-2982
FARMINGTON HILLS, MICHIGAN 48335
37849 INTERCHANGE DRIVE
JIM HAMMOND
DETROIT EDISON
EMER: (800) 515-7272
(248) 456-0820
PONTIAC, MICHIGAN 48342
54 N. MILL ST., BOX 33
JEFF HEATH
AT&T
ALL GAS FACILITIES SHALL BE PROTECTED AND SUPPORTED PER MICHCON OR CONSUMER
ENERGY STANDARDS AS APPLICABLE.
RESPECTIVE AGENCIES.
PRIOR TO WORK ON FACILITIES BELONGING TO THE ABOVE AGENCIES, A MINIMUM OF
72 HOURS NOTICE MUST BE GIVEN IN ORDER TO INSURE PROPER INSPECTION BY THE
CONCRETE, GRADE S3, SHALL BE USED TO ENCASE UTILITIES THAT ARE IN CLOSE
PROXIMITY TO THE PROPOSED CONSTRUCTION ONLY AS DIRECTED BY THE ENGINEER.
ALL EXPLORATORY WORK REQUIRED FOR LOCATING EXISTING UTILITIES SHALL NOT BE
PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE CONSTRUCTION OF THE PROJECT.
STRUCTURES THAT ARE NOT SPECIFICALLY INDICATED AS SUCH ON THE PLANS.
OWNERS OF PUBLIC UTILITIES WILL NOT BE REQUIRED TO MOVE ADDITIONAL POLES AND
UTILITIES NOT REQUIRING RELOCATION WILL NOT BE DISTURBED.
THE CONTRACTOR SHALL LOCATE ALL ACTIVE UNDERGROUND UTILITIES PRIOR TO STARTING
"MISS DIG" ALERT SYSTEM.
FOR PROTECTION OF UNDERGROUND UTILITIES, THE CONTRACTOR SHALL DIAL 800-482-7171
A MINIMUM OF 3 WORKING DAYS, EXCLUDING SATURDAYS, SUNDAYS AND HOLIDAYS, PRIOR
PROPOSED TO OCCUR CONCURRENTLY WITH OTHER ITEMS OF WORK.
THE LOCATION OF ALL PUBLIC UTILITIES SHOWN ON THESE PLANS IS TAKEN FROM THE
MEETING NOTING ALL CHANGES TO PROPOSED SCHEDULE OF WORK PROPOSED OR WORK
ANY OMISSION OR VARIATIONS FROM THE LOCATIONS SHOWN.
PURSUANT TO ACT 53 OF THE PA OF 1974 AS A CONDITION OF THIS CONTRACT, NOTICE
THIS CONTRACT. PHONE (800)-482-7171 OR 811 72 HOURS BEFORE
CONSTRUCTION.
TO EXCAVATING IN THE VICINITY OF UTILITY LINES. ALL "MISS DIG" PARTICIPATING WILL
THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THEIR
RESPONSIBILITY OF NOTIFYING UTILITY OWNERS WHO MAY NOT BE A PART OF THE
IN ACCORDANCE WITH
SHALL BE GIVEN TO "MISS DIG" PRIOR TO UNDERGROUND WORK TO BE PERFORMED
THOSE
WORK, AND SHALL CONDUCT THEIR OPERATIONS IN SUCH A MANNER AS TO INSURE THAT
RESTORATIONHABITAT STRUCTURES
THE CONTRACTOR SHALL NOTE THE PRESENCE OF ALL OVERHEAD UTILITY LINES.
ALL UTILITIES WITHIN THE ZONE OF INFLUENCE OF PROPOSED WORK ARE TO BE FIELD
LOCATED AND HAND DUG. INCLUDED IN THE UNIT BID PRICES FOR APPROPRIATE ITEMS.
CONSTRUCTION STAKING
PROJECT.
THE CONTRACTOR SHALL MAINTAIN ALL STAKING THROUGH THE DURATION OF THE
WILL PROVIDE 72 HOURS NOTICE OF STAKING NEEDS PRIOR TO WORK COMMENCING.
TREATMENTS SHALL BE STAKED BY THE ENGINEER IN THE FIELD. THE CONTRACTOR
GRADING LIMITS, ELEVATIONS, LOCATIONS OF RELOCATED STRUCTURES AND BANK
EXCAVATED MATERIALS
CONTRACTORS WORKING IN THE SURROUNDING AREA.
CONTRACTOR SHALL COORDINATE THEIR CONSTRUCTION ACTIVITIES WITH OTHER
THE OWNER & HUBBELL, ROTH AND CLARK, INC. WILL NOT BE HELD RESPONSIBLE FOR
RESPONSIBILITY IN CASE UTILITIES HAVE BEEN CONSTRUCTED, RELOCATED OR REMOVED.
THEIR RESPONSIBILITY TO SATISFY THEMSELVES AS TO THEIR ACCURACY OR OF THEIR
BEST AVAILABLE DATA. THIS INFORMATION DOES NOT RELIEVE THE CONTRACTOR OF
CONTRACTOR TO SUBMIT DETAILED CONSTRUCTION SEQUENCE AT THE PRECONSTRUCTION
AND THAT, WHERE NECESSARY, MONUMENT BOXES BE PLACED OR ADJUSTED AT THE
CONTRACTORS EXPENSE WHETHER SHOWN OR NOT.
CLOSURES OR TEMPORARY TRAFFIC CONTROL MEASURES.
POST OFFICE, COUNTY AND THE MUNICIPALITIES 24 HOURS IN ADVANCE OF PROPOSED ROAD
ALL FEDERAL, STATE AND LOCAL CODES FOR NOISE LEVELS, VIBRATIONS OR ANY OTHER
CONTRACT. COSTS TO BE INCLUDED IN THE RESPECTIVE ITEM OF WORK.
EGLE DRAIN EXEMPTIONS
WITH THE BEST MANAGEMENT PRACTICES.
MODIFIED AND INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING IF PERFORMED
THE FUNCTION AND APPROXIMATE CAPACITY OF THE DRAIN AS CONSTRUCTED OR
DEPTH AND BOTTOM WIDTH OF A DRAIN AND APPURTENANT STRUCTURES TO RESTORE
"MAINTENANCE OF A DRAIN" MEANS THE PHYSICAL PRESERVATION OF THE LOCATION,
TO QUALIFY FOR THIS EXEMPTION.
REASONABLE PERIOD OF TIME AFTER DAMAGE OCCURS IN ORDER
DRAINS. EMERGENCY RECONSTRUCTION MUST OCCUR WITHIN A
EMERGENCY RECONSTRUCTION OF RECENTLY DAMAGED PARTS OF
REPAIR OF STABILIZATION STRUCTURES.
APPROXIMATE CAPACITY OF THE DRAIN IS NOT INCREASED.
FUNCTION OF THE DRAIN IS NOT CHANGED AND THE ORIGINAL
REPLACEMENT OF EXISTING CONTROL STRUCTURES, IF THE ORIGINAL
THE FOOTPRINT OF THE PREVIOUS WORK.
PIPED SECTION IS BEING REPAIRED AND ALL WORK OCCURS WITHIN
ARMORING, LINING OR PIPING IF A PREVIOUSLY ARMORED, LINED OR
MORE THAN 24 ADDITIONAL FEET PER CULVERT.
CULVERT REPLACEMENT, INCLUDING CULVERT EXTENSIONS OF NOT
MATERIALS).
STABILIZATION MUST BE COMPATIBLE WITH EXISTING BANK OR BED
BANK STABILIZATION TO ADDRESS EROSION (MATERIALS USED FOR
RESHAPING SIDE SLOPES.
SEDIMENT REMOVAL TO ORIGINAL CONTOURS.
DRUMS WITH BATTERY OPERATED AMBER FLASHERS (ONE PER) AS INDICATED ON PLANS.
DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE PLASTIC
FLAG CONTROL, BARRICADES AND LIGHTS TO PROTECT THE TRAFFIC AND THE WORK AS
CONSTRUCTION PLANS, THE CONTRACTOR SHALL ALSO PROVIDE NECESSARY SIGNS,
THE SPECIFICATIONS. IN ADDITION TO THE BARRICADES AND SIGNS SPECIFIED ON THE
DEPARTMENT OF ROADS STANDARDS AND ANY TRAFFIC TYPICAL PLANS INCLUDED IN
CONSTRUCTION PLANS, MMUTCD (LATEST EDITION), SPECIFICATION 2550, MACOMB COUNTY
TRAFFIC WILL BE MAINTAINED DURING THE CONSTRUCTION IN ACCORDANCE WITH THE
THE CONSTRUCTION INFLUENCE AREA (C.I.A.) SHALL CONSIST OF THE WIDTH OF THE
PROPOSED RIGHT-OF-WAY FROM THE PROJECT POINT OF BEGINNING TO THE POINT OF
ENDING OR AS OTHERWISE INDICATED ON THE PLANS AND A SUFFICIENT DISTANCE BEFORE
OTHERWISE DESCRIBED.
AND AFTER THE PROJECT TO WARN MOTORISTS OF THE CONSTRUCTION AHEAD OR AS
EXISTING ITEMS DISTURBED BY CONSTRUCTION ON THE PROJECT SHALL BE TEMPORARILY
RESET BEYOND THE LIMITS OF CONSTRUCTION OR AS DIRECTED BY THE PROJECT ENGINEER.
ITEMS SHALL BE RESET OR REPLACED IN KIND BY THE CONTRACTOR IF ANY DAMAGE OCCURS
WITHIN SEVEN (7) DAYS OF COMPLETION OF WORK WITHIN THE AFFECTED AREA. THE TEMPORARY
RESETTING AND FINAL PLACEMENT OF THE ITEMS WILL BE CONSIDERED INCLUDED IN THE COST
OF THE PROJECT.
WHEN HMA BOND COAT IS SPECIFIED ON THE PLANS OR REQUIRED BY THE ENGINEER IN THE
CONSTRUCTION OF THE PROJECT, IT WILL NOT BE PAID FOR SEPARATELY, BUT SHALL BE
INCLUDED IN THE UNIT BID PRICE FOR HMA PAVING WHERE APPLICABLE.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE PROPERTY BEYOND
TREES AND SHRUBBERY.
THE LIMITS OF CONSTRUCTION, INCLUDING, BUT NOT LIMITED TO EXISTING FENCING, LAWN, ALL TIMES.
OCCUR IN THE FLOOD PLAIN LIMITS. FLOW IN THE FLOOD PLAIN SHALL BE MAINTAINED AT
UNLESS INDICATED ON THE PLANS, NO STORAGE OF MATERIALS, EQUIPMENT, ETC. SHALL
FOR PROPOSED WORK IN AREAS CLOSE TO UTILITY POLES, NO EXCAVATIONS WITHIN TEN
(10) FEET AND NO BORES WITHIN (3) FEET FROM THE UTILITY POLES ARE ALLOWED.
TO MAINTAIN NATURAL APPEARANCE. ALL TREES INDICATED TO BE PROTECTED ON THE
ALL TREES AND SHRUBS REQUIRED TO BE TRIMMED / PRUNED SHALL BE DONE IN A MANNER
MEASURES INSTALLED PER THE CONTRACT SPECIFICATIONS.
PLANS OR AS DIRECTED BY THE PROJECT ENGINEER SHALL HAVE TEMPORARY PROTECTIVE
WITH THE LATEST EDITION OF THE MMUTCD AND LOCAL REQUIREMENTS.
DAMAGED BY THEIR OPERATIONS DURING CONSTRUCTION. SIGNS TO BE IN ACCORDANCE
THE CONTRACTOR IS RESPONSIBLE TO REPAIR OR REPLACE ANY EXISTING TRAFFIC SIGNS
PRIOR TO THE START OF CONSTRUCTION.
ACCESS TO AREAS OUTSIDE OF PROJECT LIMITS MUST BE APPROVED BY THE ENGINEER
STATIONING
360 FT EAST OF THE SHADY SIDE PARK PEDESTRIAN BRIDGE.
NORTHWEST ALONG THE C OF THE SPILLWAY ENDING AT STA. 65+00 W APPROXIMATELY
CSO+00 LOCATED BETWEEN I-94 AND METROPOLITAN PARKWAY. STATIONING CONTINUES
STATIONING THEN PROCEEDS NORTHWEST ALONG THE C OF THE SPILLWAY TO STA.
OF THE JEFFERSON AVE. RIGHT OF WAY AND THE C OF THE CLINTON RIVER SPILLWAY.
CONSTRUCTION PLANS DATED 5, JULY 1951 WITH STA. 45+00 E LOCATED AT THE CENTER
STATIONING IS BASED ON UNITED STATES ARMY CORPS OF ENGINEERS (USACE)
L
L
L
OR USED AS NEEDED. THEY ARE:
PLANS. THESE ITEMS SHALL BE CONSTRUCTED AS DIRECTED BY THE PROJECT ENGINEER
SEVERAL PAY ITEMS INCLUDED IN THE PROPOSAL ARE NOT SPECIFICALLY SHOWN ON THE
PROJECT NOTES
NO SCALE
C L
IN
T O
N
R
IV
E R
S P
ILLW
A Y
LOCATION
PROJECT
Maintaining Traffic
DESCRIPTION UNITQTY.
Ft
Ea
No.
2Erosion Control, Gravel Access Approach (As Needed)4
BIO-ENGINEERING - ROOTWAD REVETMENT
HEAVY EQUIPMENT ACCESS AND OPERATION
APPROVED BY THE ENGINEER AND SHALL BE PAID AT UNIT PRICES PROVIDED.
NECESSARY FOR SITE ACCESS SHALL BE MINIMIZED TO THE EXTENT POSSIBLE,
THE AREA AND DURATION OF DISTURBANCE AT ALL TIMES. ALL OTHER TREE CLEARING
THE CONTRACTOR SHALL STAY WITHIN THE LIMITS OF DISTURBANCE AND MINIMIZE
BY HEAVY EQUIPMENT IN HABITAT AREAS.
THE CONTRACTOR SHALL USE REASONABLE MEASURES TO AVOID SOIL COMPACTION
Control Measures" AND ALL APPLICABLE SPECIFICATIONS.
SHALL BE IN COMPLIANCE WITH SPECIAL PROVISION - "Prevent Spreading of Invasive Species
ALL HEAVY EQUIPMENT AND VEHICLES ENTERING AND EXITING THE PROJECT AREA
REVIEW AT THE PRECONSTRUCTION MEETING.
RESTORATION. THE CONTRACTOR SHALL PROVIDE ACCESS PLANS AND DETAILS FOR
CONTRACTOR TO SUPPORT HIS OPERATIONS WHILE MINIMIZING DISRUPTION AND
NEAR THE SPILLWAY. THE ACCESS PATHS SHALL BE GRADED AND STABILIZED BY THE
NECESSARY MAY BE USED TO PROTECT THE EDGE OF THE SPILLWAY WHEN WORKING
POTENTIAL HAZARDS TO WATER QUALITY. TEMPORARY RIPRAP OR OTHER MEANS AS
DEEM UNACCEPTABLE DUE TO LEAKING FLUIDS, ACCUMULATED SEDIMENT, OR OTHER
HABITATS. THE OWNER RESERVES THE RIGHT TO EXCLUDE ANY EQUIPMENT THEY
CONTRACTOR SHALL USE EQUIPMENT SUITABLE FOR WORK ADJACENT TO AQUATIC
WITH A SWIVEL BUCKET AND HYDRAULIC THUMB OR OTHER APPROVED EQUIPMENT.
TRACK HOES IF USED FOR HABITAT STRUCTURE INSTALLATION SHALL BE EQUIPPED
THEIR OPERATIONS SELECTED.
COMPENSATED FOR EXCESS CLEARING, GRADING AND / OR RESTORATION DUE TO
BE INCLUDED IN OTHER LINE ITEMS AS NECESSARY. THE CONTRACTOR WILL NOT BE
ALL COSTS ASSOCIATED WITH THE CONTRACTOR'S CHOSEN MEANS OF ACCESS SHALL
SEQUENCE OF CONSTRUCTION OPERATIONS
CONSTRUCTION STAGING AND ACCESS
MISCELLANEOUS AND AS NEEDED ITEMS OF WORK
PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES.
PROPOSED WORK MUST BE APPROVED BY THE OWNER AND THE PROJECT ENGINEER
SPILLWAY AND THE SURROUNDING AREAS. THESE "MEANS AND METHODS" FOR THE
METHODS" TO ACCESS AND PERFORM THE PROPOSED WORK ALONG THE CLINTON RIVER
AT THE PRECONSTRUCTION MEETING THE CONTRACTOR SHALL PROVIDE A "MEANS AND
PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES.
THE PRECONSTRUCTION MEETING FOR THE OWNER AND PROJECT ENGINEER'S APPROVAL
SCHEDULE, PHASING PLAN, STAGING AREA PLAN AND SEQUENCE OF CONSTRUCTION AT
AND BANK STABILIZATION METHODS. THE CONTRACTOR SHALL SUBMIT A PROJECT
RIVER SPILLWAY CLIMATE RESILIENCY PROJECT" REQUIRING DIFFERENT TYPES OF WORK
THERE ARE MULTIPLE AREAS OF WORK PROPOSED ALONG BOTH BANKS OF THE "CLINTON
INCIDENTAL TO PROJECT COSTS.
TO BE PLACED DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WITH THE OWNER
UNLESS SPECIFICALLY WORKING IN THE RIGHT OF WAY. THE OWNER HAS PROJECT SIGNAGE
TO HAVE LIGHTS OR FLASHERS MOUNTED ON THE ROADS TO BE OPEN TO LOCAL TRAFFIC
THE PROJECT ENGINEER WILL BE INCLUDED IN THE APPROPRIATE BID ITEMS. ALL DEVICES
CONTRACTOR BASED ON HIS OPERATIONS, STAGING AND SITE ACCESS, OR AS DIRECTED BY
CONTROL DEVICES NECESSARY TO CONSTRUCT THE PROJECT AS DETERMINED BY THE
TO THE PROJECT COSTS UNLESS OTHERWISE SPECIFIED. THE COSTS OF ALL TRAFFIC
TRAFFIC MAINTENANCE AND CONTROL FOR THIS PROJECT WILL BE CONSIDERED INCIDENTAL
AND THE PROJECT ENGINEER. PAID FOR AS "Bank Stabilization, Rootwad Revetment - Lft".
BE BROUGHT IN FROM OFFSITE. ALL MATERIALS MUST BE APPROVED BY THE OWNER
EXISTING ONSITE MATERIAL IF AVAILABLE. OTHERWISE, ROOTWADS WILL HAVE TO
ROOTWAD REVETMENT BANK STABILIZATION STRUCTURES MAY BE HARVESTED FROM
TREES, LOGS, STUMPS AND ANY OTHER MATERIAL NECESSARY TO CONSTRUCT THE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
PER STRUCTURE IN ACCORDANCE WITH DETAILS AND SPECIFICATIONS. SEE CONTRACT
TO PREVENT FLOTATION. USE DUCKBILL ANCHORS; USING A MINIMUM OF TWO (2) ANCHORS
ALL DISTURBED AND RELOCATED STRUCTURES SHALL BE SECURELY FASTENED IN PLACE
WHERE THE NEW LOCATION SHALL BE.
IF STRUCTURES NEED TO BE RELOCATED, THE PROJECT ENGINEER SHALL DETERMINE
MOUNDS ETC. AND SHALL BE REMOVED, SALVAGED AND REINSTALLED AS REQUIRED.
THESE HABITAT STRUCTURES INCLUDE LOG PILES, TREE STUMPS, WHOLE TREES, SAND
IN ORDER TO COMPLETE THE PROPOSED CONSTRUCTION WORK.
MAY BE REQUIRED TO BE REMOVED, SALVAGED AND REINSTALLED AND / OR RELOCATED
THERE ARE EXISTING HABITAT STRUCTURES THROUGHOUT THE PROJECT LIMITS THAT
Construction Fencing (As Needed) 100
Dlr
Erosion Control, Silt Fence (As Needed) Ft
Mobilization (5% Max.) Lsum1
Lsum
Lsum
Bank Stabilization, Riprap (As Needed) 20 Cyd
10 Syd
Prevent Spreading of Invasive Species Control Measures
Mulch Blanket, High Velocity 300
Native Prairie Mix Ac
PERMITS
USACE PERMIT No. : (PENDING)
MCPWO SOIL EROSION CONTROL PERMIT No.: (PENDING)
12 FOR ADDITONAL SEED MIX INFORMATION.
ENGINEER AND SEEDED AND MULCHED PER THE CONTRACT SPECIFICATIONS. SEE SHEET
SPREAD ALONG THE UPLAND AREAS OF THE SITES AT THE DIRECTION OF THE PROJECT
UPON COMPLETION OF WORK, EXCAVATED SOILS IN STOCKPILE AREAS SHALL BE EVENLY
AREAS MAY BE NECESSARY WHERE THEY ARE TO REMAIN FOR MORE THAN ONE MONTH.
NECESSARY TO PREVENT RUNOFF. TEMPORARY SEEDING AND MULCHING OF STOCKPILE
AND / OR OTHER CONTAINMENT MEASURES SHALL BE INSTALLED AND MAINTAINED AS
CONTRACTOR AND APPROVED BY THE ENGINEER. EROSION CONTROL SILT FENCING
AREAS ALONG WITH AREAS FOR IMPORTED MATERIALS SHALL BE DETERMINED BY THE
WITHIN THE LIMITS OF DISTURBANCE. EXACT LOCATIONS OF EXCAVATED SOIL STOCKPILE
WORK SHALL BE TEMPORARILY STOCKPILED IN NON-FORESTED, NON-WETLAND AREAS
EXCAVATED MATERIALS FROM OFF-LINE HABITAT POOL DREDGING AND OTHER PROPOSED
AS NEEDED. COSTS FOR THIS SHALL BE INCLUDED IN THE SPECIFIC PAY ITEMS.
THE CONTRACTOR SHALL CHECK ON SEED AND PLANT GROWTH AND SUPPLEMENT
ALL DISTURBED AREAS TO BE RESTORED WITHIN SEVEN (7) DAYS OF COMPLETION.
COMPENSATION WILL BE ALLOWED FOR THIS ACTIVITY.
AS SPECIFIED OR AS DIRECTED BY THE ENGINEER. NO ADDITIONAL PAYMENT OR
BEYOND THE NORMAL CONSTRUCTION LIMITS OF THIS PROJECT SHALL BE RESTORED
ALL AREAS DISTURBED BY THE CONTRACTOR AND / OR THEIR SUBCONTRACTORS
BE TAKEN FROM THE RIVER / SPILLWAY FOR THE PLANTINGS.
ALL EXCEPTIONS MUST BE APPROVED BY THE PROJECT ENGINEER. WATER MAY
NOT OCCUR ON SATURDAYS, SUNDAYS OR IMMEDIATELY AFTER RAIN EVENTS.
FOLLOWING TWO (2) WEEKS AFTER THE DAILY WATERING. WATERING SHALL
FOURTEEN (14) DAYS WITH AN ADDITIONAL FOUR (4) WATERING EVENTS IN THE
SHALL WATER THE PLANTINGS AND SEEDING AREAS DAILY FOR A MINIMUM OF
INCLUDED IN THE COST OF CONSTRUCTION FOR THIS PROJECT. CONTRACTOR
CONTRACT FOR THESE ITEMS. WATER REQUIRED FOR COMPACTION SHALL BE
WATER REQUIRED FOR PLANTINGS AND SEEDING SHALL BE INCLUDED IN THE
SPECIFICATIONS.
SHALL BE REPLACED TO THE MACOMB COUNTY DEPARTMENT OF ROADS
REPLACED IN KIND AND AT THE EXPENSE OF THE CONTRACTOR. PAVEMENT
ALL PAVEMENT DAMAGED DURING CONTRACTOR'S OPERATIONS SHALL BE
PROJECT ITEM.
CONSTRUCTION FENCING. THIS SHALL BE CONSIDERED INCIDENTAL TO THE
REMOVE ANY HAUL ROADS OR ACCESS ROADS, MATERIAL STOCKPILES AND
IN THE UNIT PRICE BID FOR "Restoration - Lsum".
ALL COSTS FOR THE LABOR, EQUIPMENT AND MATERIALS SHALL BE INCLUDED
AND ESTABLISH FINE GRADE AND RESTORE PER PLANS AND SPECIFICATIONS.
REMOVE ALL CONSTRUCTION EQUIPMENT, EXCESS MATERIALS, DEBRIS, ETC.
5. SEE SHEET 12 FOR ADDITONAL SEED MIX INFORMATION.
DETAILS AND SPECIFICATIONS.
4. RESTORATION IN OTHER AREAS SHALL BE PER THE PLAN NOTES,
SPECIFICATIONS.
WITH SPECIFIED SEED MIXES AND HYDROMULCH PER THE
3. ALL DISTURBED AREAS IN THE FLOOD PLAIN SHALL BE RESTORED
SPECIFIED BY LOCATION.
INCIDENTAL TO THE PROJECT COSTS, UNLESS OTHERWISE
REQUIRED TO RESTORE ANY DAMAGE SHALL BE CONSIDERED
RESTORED PER DETAILS. ALL LABOR, EQUIPMENT AND MATERIALS
2. ANY DAMAGE TO EXISTING TRAILS, PATHS AND ROADS SHALL BE
DUE TO THEIR CONSTRUCTION ACTIVITIES.
PARKING LOTS, CURBS, UTILITIES OR ANY OTHER INFRASTRUCTURE
1. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGED PAVEMENT,
AND SHALL BE PAID FOR AS INDICATED BELOW:
RESTORATION OF THE SITE SHALL BE IN ACCORDANCE WITH THE FOLLOWING
Permits (Allowance)
AcClearing and Grubbing (As Needed) 1
1Restoration Lsum
3.50
AVENUE BRIDGE.
THE PROPOSED WORK JUST WEST OF THE JEFFERSON
ALTERNATE 02: ALTERNATE 02 WORK SHALL CONSIST OF THE PORTION OF
PLANTINGS. APPROXIMATELY 2.99 ACRES.
ALTERNATE 01: ALTERNATE 01 WORK SHALL CONSIST OF ADDITIONAL TREE
DONE UNDER ALTERNATE 02.
THE JEFFERSON AVENUE BRIDGE. THAT WORK WILL BE
ABOVE MINUS THE PORTION OF THE WORK JUST WEST OF
BASE BID: THE BASE BID SHALL INCLUDE ALL THE WORK DESCRIBED
THE PROJECT IS PROPOSED TO BE BID IN THREE (3) PARTS, DESCRIBED AS FOLLOWS:
ROOTWAD REVETMENTS ALONG WITH OFF-LINE POOL DREDGING AND TREE PLANTINGS.
PROPOSED WORK SHALL INCLUDE BANK STABILIZATION USING RIPRAP, COIR LOGS AND
ST. CLAIR.
OF THE CLINTON RIVER SPILLWAY FROM THE CONFLUENCE OF THE CLINTON RIVER TO LAKE
THE CLINTON RIVER SPILLWAY CLIMATE RESILIENCY PROJECT INVOLVES THE MAINTENANCE
PROJECT DESCRIPTION
PROTECTION AND RESTORATION OF PROPERTY:
MISCELLANEOUS CONT.
ALL UTILITY CROSSINGS TO HAVE A MINIMUM OF 18" VERTICAL CLEARANCE TYPICAL.
THE GEOTECHNICAL FIRM IF AVAILABLE.
CONTRACTOR IS TO REVIEW SOIL BORING DATA & RECOMMENDATIONS AS PREPARED BY
ALL GRAVEL ACCESS DRIVES TO BE 1" x 3" STONE WITH GEOTEXTILE FABRIC PER DETAILS.
MAINTAIN PEDESTRIAN ACCESS TO THE REMAINDER OF THE SITE.
THE CONTRACTOR SHALL LIMIT THEIR OPERATIONS TO THE WORK AREAS SPECIFIED AND
5,000
2,000
MISCELLANEOUS AND AS NEEDED QUANTITIES - BASE BID
DESCRIPTION UNITQTY.No.
Native Prairie Mix
MISCELLANEOUS AND AS NEEDED QUANTITIES - ALTERNATE 02
0.50 Ac
ONCE FINAL GRADING HAS BEEN ESTABLISHED.
9. REMOVE ALL TEMPORARY SOIL EROSION AND SEDIMENT CONTROL MEASURES
8. REMOVE ALL DEWATERING EQUIPMENT, IF ANY, AS SOON AS FEASIBLE.
AREAS EXCEPT ON STEEPER SLOPES WHERE BLANKETS WILL BE REQUIRED.
SURFACE SOIL PROFILES. APPLY HYDRAULIC MULCH TO ALL DISTURBED UPLAND
FOUR (4) INCHES OF COMPOST AND / OR TOPSOIL TO CREATE SUBSOIL AND
7. UPON FINAL GRADING, ALL DISTURBED UPLAND SOILS ARE TO BE AMENDED WITH
THE OWNER SHALL DETERMINE THE AREAS OF TREE PLANTINGS.
LANDSCAPE ARCHITECT AND / OR PROJECT ENGINEER PER THE PROJECT DETAILS.
6. INSTALL TREES AND PLANTINGS IN THE UPLAND AREAS AS DIRECTED BY THE
UNLESS APPROVED BY THE PROJECT ENGINEER.
SLOPE OF PATHS AND MAINTENANCE ACCESS ROADS SHOULD NOT EXCEED 5%
PROJECT ENGINEER BASED ON THE AVAILABILITY OF SUITABLE MATERIALS. THE
CONTOURS AND GRADING MAY NEED TO BE ADJUSTED AND APPROVED BY THE
5. CONTOUR AND GRADE UPLAND AREAS AS SHOWN ON THE PLANS. THE FINAL
ETC. AS SHOWN ON THE PLANS AND PER THE PROJECT DETAILS.
4. INSTALL BANK STABILIZATION, i.e. COIR LOGS, ROOTWAD REVETMENTS, RIPRAP, UPLAND AREAS.
3. EXCAVATE OFF-LINE HABITAT POOLS AND CONTAIN DREDGED SOILS IN APPROVED
SHALL BE MOBILE AND MOVED THROUGHOUT THE PROJECT AS REQUIRED.
PRIOR TO ANY EXCAVATION AND STREAM BANK WORK. THE TURBIDITY CURTAIN
2. THE CONTRACTOR SHALL INSTALL AN EROSION CONTROL, TURBIDITY CURTAIN
MEASURES FOUND TO HAVE FAILED SHALL BE REPAIRED IMMEDIATELY.
EROSION AND SEDIMENTATION CONTROL MEASURES DAILY. ANY EROSION CONTROL
ENGINEER AND PER DETAILS. THE CONTRACTOR SHALL CHECK AND MAINTAIN SOIL
SOIL EROSION AND SEDIMENT CONTROL MEASURES AS DIRECTED BY THE PROJECT
1. INSTALL CONSTRUCTION FENCING, GRAVEL ACCESS DRIVES AND ALL TEMPORARY
THE SEQUENCE OF CONSTRUCTION HAS BEEN APPROVED BY ALL PARTIES INVOLVED.
PRECONSTRUCTION MEETING FOR PRIOR APPROVAL. NO WORK MAY COMMENCE UNTIL
SEQUENCE OF CONSTRUCTION TO THE OWNER AND PROJECT ENGINEER AT THE
WISHES TO PROVIDE AN ALTERNATIVE TO THIS SEQUENCE THEY MUST PRESENT THEIR
THE FOLLOWING SEQUENCE OF CONSTRUCTION IS RECOMMENDED. IF THE CONTRACTOR
OR AS DIRECTED BY THE OWNER AND / OR THE PROJECT ENGINEER.
EQUIPMENT ACCESS SHALL BE LIMITED TO THOSE AREAS SHOWN ON THE PLANS
ANY EQUIPMENT WHILE PERFORMING THEIR WORK.
THE CONTRACTOR SHALL MINIMIZE THE AREA AND DURATION OF DISTURBANCE BY
555 HULET DRIVE
BLOOMFIELD HILLS, MICH.
P.O. BOX 824
48303 - 0824
PHONE: (248) 454-6300
FAX (1st. Floor): (248) 454-6312
DATE ISSUED FOR /ADDITIONS / REVISIONS
DESIGNED
DRAWN
CHECKED
APPROVED
HRC JOB NO. SCALE
NO.
SHEETDATE
OF
C 2025 Hubbell, Roth & Clark, Inc. All Rights Reserved
P T jr e c
V
C
S h e e t s c g e n n o t e s .d g n
:5
(248) 454-6359FAX (2nd. Floor):
WEB SITE: www.hrcengr.com
20221060
FEBRUARY 2025
DRAINAGE BOARD
INTERCOUNTY
CLINTON RIVER SPILLWAY
RURAL DEVELOPMENT
AGRICULTURE AND
MICHIGAN DEPT. OF
COMMISSIONER
PUBLIC WORKS
MACOMB COUNTY
DRAIN COMMISSIONER
LAPEER COUNTY
DRAIN COMMISSIONER
ST. CLAIR COUNTY
WATER RESOURCES COMMISSIONER
OAKLAND COUNTY
N.
RIVER R
D.
CLIN
TON RIVER
S. RIVER RD.
ST. CLAIR
LAKE
N
J E F F E
R S
E
C R
O C
K E R
B L
V D
15 MILE RD.
GLENWOOD RD.
METROPOLITAN PKWY.
H A
R P
E R
A V
E
C L I
N T
P
H A
R R I
S
P
R E I
M O
.CLEMENS
MT.
06-11-2025 PERMIT SUBMITTALS
REVISED PER COMMENTS09-16-2025
10-07-2025 ISSUED FOR BIDS
10-10-2025 REISSUED FOR BIDS
MICHIGAN
HRC
J.A.R.
NJ.K.
J.F.B.
MACOMB COUNTY
GRANT
INFRASTRUCTURE
STATE HIGH WATER
PROJECT
CLIMATE RESILIENCY
SPILLWAY
CLINTON RIVER
OWNER REVIEW04-14-2025
N
EXISTING CONDITION PHOTO 02 - WEIR TRAILEXISTING CONDITION PHOTO 01 - RIVER JUNCTION EXISTING CONDITION PHOTO 03 - WEIR TRAIL EROSION EXISTING CONDITION PHOTO 04 - HABITAT POOL EXISTING CONDITION PHOTO 05 - HABITAT POOL
EXISTING CONDITION PHOTO 06 - BANK EROSION
EXISTING CONDITION PHOTO 07 - BANK EROSION
1" = 100'
20010050250
N
1" = 100'
20010050250
F O
R C
O N
T
IN
U A
T
IO
N S
E E P
L A
N B
E L
O W
Off-Line Habitat Pools
Weir
Building
Weir Control
Off-Line Habitat Pools
Off-Line Habitat Pools
Off-Line Habitat Pools
Fishing Pier
Bituminous PathBituminous Path
Bituminous Path
Bituminous Path
CLINTON RIVER SPILLWAY
C L
IN
T O
N R
IV
E R
M
IL
E R
O A
D M
E T R
O P
O L
IT
A N P
A R
K W
A Y
H A R P E R A
V E
N U E
Parking Lot
CLINTON RIVER SPILLWAY
F O
R C
O N
T
IN
U A
T
IO
N S
E E P
L A
N A
B O
V E
1" = 100'
METROPOLITAN PARKWAY
16 MILE ROAD /
CLINTON RIVER TO
EXISTING CONDITIONS
09A 10A
EXISTING CONDITION PHOTO 09 - STORM OUTFALL EXISTING CONDITION PHOTO 10 - STORM OUTFALL
EXISTING CONDITION PHOTO 08 - STORM OUTFALL EXISTING CONDITION PHOTO 09A - STORM OUTFALL EXISTING CONDITION PHOTO 10A - STORM OUTFALL EXISTING CONDITION PHOTO 11 - BANK EROSION
Off-Line Habitat Pools
C L
IN
T O
N
R
IV
E R
S P
ILLW
A Y
LOCATION
SHEET
F O
R C
O N
T
IN
U A
T
IO
N S
E E S
H E
E T X
X
U N
IO
N L
A K E R
D
C L
IN
T O
N T
W P
H A R
R
IS
O N T
W P
555 HULET DRIVE
BLOOMFIELD HILLS, MICH.
P.O. BOX 824
48303 - 0824
PHONE: (248) 454-6300
FAX (1st. Floor): (248) 454-6312
DATE ISSUED FOR /ADDITIONS / REVISIONS
DESIGNED
DRAWN
CHECKED
APPROVED
HRC JOB NO. SCALE
NO.
SHEETDATE
OF
C 2025 Hubbell, Roth & Clark, Inc. All Rights Reserved
P T jr e c
V
C
S h e e t s
H R
C
F ig
E x .d g n
:2
(248) 454-6359FAX (2nd. Floor):
WEB SITE: www.hrcengr.com
20221060
FEBRUARY 2025
DRAINAGE BOARD
INTERCOUNTY
CLINTON RIVER SPILLWAY
RURAL DEVELOPMENT
AGRICULTURE AND
MICHIGAN DEPT. OF
COMMISSIONER
PUBLIC WORKS
MACOMB COUNTY
DRAIN COMMISSIONER
LAPEER COUNTY
DRAIN COMMISSIONER
ST. CLAIR COUNTY
WATER RESOURCES COMMISSIONER
OAKLAND COUNTY
THE ACCURACY AND COMPLETENESS PRIOR TO CONSTRUCTION.
PARTIES UTILIZING THIS INFORMATION SHALL FIELD VERIFY
ACCURACY OF THE UTILITIES SHOWN ON THIS DRAWING.
OR SHOULD BE ASSUMED, AS TO THE COMPLETENESS OR
RECORD MAPPING WHERE AVAILABLE. NO GUARANTEE IS MADE,
SURVEY HAVE BEEN TAKEN FROM VISUAL OBSERVATION AND
ALL EXISTING UTILITIES SHOWN ON THIS TOPOGRAPHIC
NOTICE:
Know what'sbelow.
before you dig.Call
(TOLL FREE)
811or
1-800-482-7171
BEFORE YOU DIG
(3 WORKING DAYS)
72 HOURS
CALL MISS DIG
CALL811.COM
R
N.
RIVER R
D.
CLIN
TON RIVER
S. RIVER RD.
ST. CLAIR
LAKE
N
J E F F E
R S
E
C R
O C
K E R
B L
V D
15 MILE RD.
GLENWOOD RD.
METROPOLITAN PKWY.
H A
R P
E R
A V
E
C L I
N T
P
H A
R R I
S
P
R E I
M O
.CLEMENS
MT.
OHWM = 574.4 PER DRUMMOND CARPENTER ENGINEERING & RESEARCH
NOTICE:
06-11-2025 PERMIT SUBMITTALS
MICHIGAN
HRC
J.A.R.
NJ.K.
J.F.B.
MACOMB COUNTY
GRANT
INFRASTRUCTURE
STATE HIGH WATER
PROJECT
CLIMATE RESILIENCY
SPILLWAY
CLINTON RIVER
OWNER REVIEW04-14-2025
35+00 W
40+00 W45+00 W50+00 W55+00 W
60+00 W
5+00 W10+00 W15+00 W20+00 W25+00 W30+00 W jrec Text Box 09-16-2025 jrec Text Box
REVISED PER COMMENTS
jrec Text Box 10-07-2025 jrec Text Box
ISSUED FOR BIDS
jrec Text Box
REISSUED FOR BIDS
jrec Text Box 10-10-2025
F
R C
O N
T
IN
U A
T
IO
N S
E E S
H E
E T X
X -X
X
F O
R C
O N
T
IN
U A
T
IO
N S
E E P
L A
N B
E L
O W
EXISTING CONDITION PHOTO 13 - BANK EROSION EXISTING CONDITION PHOTO 14 - BANK EROSION EXISTING CONDITION PHOTO 16 - BANK EROSIONEXISTING CONDITION PHOTO 15 - CONC. SPILLWAY
N
1" = 100'
20010050250
N
1" = 100'
20010050250
1" = 100'
TO JEFFERSON AVENUE
METROPOLITAN PARKWAY
16 MILE ROAD /
EXISTING CONDITIONS
LOCATION
SHEET
S P
ILLW
A Y
R
IV
E R
C L
IN
T O
N
I-9 (J
A M
E S G . O 'H
A R
A F
R E E
W A
Y
PEDESTRIAN BRIDGE
FREEDOM TRAIL
CLINTON RIVER SPILLWAY
FREEDOM TRAIL
WATER STORAGE TANK
HARRISON TWP.
H A
R R
IS
O N R
E L
IE
F D
R A
IN
R O
S E
V
IL
L E C
L
IN
T O
N
EXISTING CONDITION PHOTO 18 - BANK EROSIONEXISTING CONDITION PHOTO 17 - STORM OUTFALL
EXISTING CONDITION PHOTO 12 - BANK EROSION
EXISTING CONDITION PHOTO 19 - HABITAT POOL
F O
R C
O N
T
IN
U A
T
IO
N S
E E P
L A
N A
B O
V E
CLINTON RIVER SPILLWAY
LAKE ST. CLAIR
Off-Line Habitat Pools
J E
F F
E R
S O
N A
V E
N U
E
FREEDOM TRAIL
15+00 E
20+00 E 25+00 E
10+00 E
5+00 ECS0+00
555 HULET DRIVE
BLOOMFIELD HILLS, MICH.
P.O. BOX 824
48303 - 0824
PHONE: (248) 454-6300
FAX (1st. Floor): (248) 454-6312
DATE ISSUED FOR /ADDITIONS / REVISIONS
DESIGNED
DRAWN
CHECKED
APPROVED
HRC JOB NO. SCALE
NO.
SHEETDATE
OF
C 2025 Hubbell, Roth & Clark, Inc. All Rights Reserved
P T jr e c
V
C
S h e e t s
H R
C
F ig
E x .d g n
D D
D D
FAX (2nd. Floor): (248) 454-6359
WEB SITE: www.hrcengr.com
20221060
FEBRUARY 2025
DRAINAGE BOARD
INTERCOUNTY
CLINTON RIVER SPILLWAY
RURAL DEVELOPMENT
AGRICULTURE AND
MICHIGAN DEPT. OF
COMMISSIONER
PUBLIC WORKS
MACOMB COUNTY
DRAIN COMMISSIONER
LAPEER COUNTY
DRAIN COMMISSIONER
ST. CLAIR COUNTY
WATER RESOURCES COMMISSIONER
OAKLAND COUNTY
THE ACCURACY AND COMPLETENESS PRIOR TO CONSTRUCTION.
PARTIES UTILIZING THIS INFORMATION SHALL FIELD VERIFY
ACCURACY OF THE UTILITIES SHOWN ON THIS DRAWING.
OR SHOULD BE ASSUMED, AS TO THE COMPLETENESS OR
RECORD MAPPING WHERE AVAILABLE. NO GUARANTEE IS MADE,
SURVEY HAVE BEEN TAKEN FROM VISUAL OBSERVATION AND
ALL EXISTING UTILITIES SHOWN ON THIS TOPOGRAPHIC
NOTICE:
Know what'sbelow.
before you dig.Call
(TOLL FREE)
811or
1-800-482-7171
BEFORE YOU DIG
(3 WORKING DAYS)
72 HOURS
CALL MISS DIG
CALL811.COM
R
N.
RIVER R
D.
CLIN
TON RIVER
S. RIVER RD.
ST. CLAIR
LAKE
N
J E F F E
R S
E
C R
O C
K E R
B L
V D
15 MILE RD.
GLENWOOD RD.
METROPOLITAN PKWY.
H A
R P
E R
A V
E
C L I
N T
P
H A
R R I
S
P
R E I
M O
.CLEMENS
MT.
OHWM = 574.4 PER DRUMMOND CARPENTER ENGINEERING & RESEARCH
NOTICE:
06-11-2025 PERMIT SUBMITTALS
REVISED PER COMMENTS09-16-2025
10-07-2025 ISSUED FOR BIDS
10-10-2025 REISSUED FOR BIDS
MICHIGAN
HRC
J.A.R.
NJ.K.
J.F.B.
MACOMB COUNTY
GRANT
INFRASTRUCTURE
STATE HIGH WATER
PROJECT
CLIMATE RESILIENCY
SPILLWAY
CLINTON RIVER
OWNER REVIEW04-14-2025
50+00 E 55+00 E
45+00 E
35+00 E 30+00 E
40+00 E
2"
D
W
H
APPROVED
CHECKED
DRAWN
DESIGNED
DATE
HRC JOB NO.
DATE
SCALE
ADDITIONS AND/OR REVISIONS
SHEET
NO.
OF
555 HULET DRIVE
BLOOMFIELD HILLS, MICH.
P.O. BOX 824
48303 - 0824
PHONE: (248) 454-6300
WEB SITE: www.hrcengr.com
FAX (1st. Floor): (248) 454-6312 FAX (2nd. Floor): (248) 454-6359
HRC
J.A.R.
N.J.K.
J.F.B.
20221060
FEBRUARY 2025
MICHIGANMACOMB COUNTY
CLINTON RIVER
SPILLWAY
HABITAT RESTORATION
PROJECT
Know what's below.
before you dig.Call
CALL811.COM
CALL MISS DIG
72 HOURS
(3 WORKING DAYS)
BEFORE YOU DIG
1-800-482-7171 or 811
(TOLL FREE)
NOTICE:
ALL EXISTING UTILITIES SHOWN ON THIS TOPOGRAPHIC SURVEY
HAVE BEEN TAKEN FROM VISUAL OBSERVATION AND RECORD
MAPPING WHERE AVAILABLE. NO GUARANTEE IS MADE, OR
SHOULD BE ASSUMED, AS TO THE COMPLETENESS OR
ACCURACY OF THE UTILITIES SHOWN ON THIS DRAWING.
PARTIES UTILIZING THIS INFORMATION SHALL FIELD VERIFY
PROJECT
LOCATION
MACOMB COUNTY
PUBLIC WORKS
COMMISSIONER
ST. CLAIR COUNTY
DRAIN COMMISSIONER
LAPEER COUNTY
DRAIN COMMISSIONER
OAKLAND COUNTY
WATER RESOURCES COMMISSIONER
MICHIGAN DEPT. OF
AGRICULTURE AND
RURAL DEVELOPMENT
CLINTON RIVER SPILLWAY
INTERCOUNTY
DRAINAGE BOARD
FLOW
BANK
3'-4'
6'- 8'
3 TRUNK LENGTH
AutoCAD SHX Text Along Bank Areas with > 3 ft of Bank/Bottom Horizontally Exposed, > 2 ft Vertical Cutbanks, and Lacking Mature Woody Vegetation - Install Rootwad Revetment along Channel Bank ~100 linear ft
AutoCAD SHX Text Existing Conditions Bank Erosion
AutoCAD SHX Text Insall Coir Log Bank Stabilization with Native Planting Plugs. Preserve Existing Woody Vegetation.
AutoCAD SHX Text
ROOTWAD REVETMENT DETAIL
AutoCAD SHX Text
OHWM 574.00
AutoCAD SHX Text Channel Bottom (Varies)
AutoCAD SHX Text
AVG LOW WATER 572.00
AutoCAD SHX Text
FOOTER LOG OR BOULDER
AutoCAD SHX Text
ANCHOR POST
AutoCAD SHX Text
DRAINAGE AGGREGATE LAYER, ENCAPSULATED WITH FILTERWEAVE GEOTEXTILE
AutoCAD SHX Text TRUNK WITH ROOTWAD, 20' MIN LENGTH. MIN. 3/4 LENGTH BURIED. TRUNKS ALIGNED 15-25 DEGREES TO CHANNEL BANK
AutoCAD SHX Text
TUBELING 10' O.C. OR LIVE STAKES 5' O.C.
AutoCAD SHX Text
NOTE: BANK HEIGHT VARIES. TIE INTO EXISTING SLOPE
AutoCAD SHX Text
10" 3LB/CU FT VEGETATED COIR LOG, SPECIES PER SPECFICATIONS
AutoCAD SHX Text
AutoCAD SHX Text
2 DESIRED
AutoCAD SHX Text
AutoCAD SHX Text
1 MAX
AutoCAD SHX Text
COIR LOG DETAIL
AutoCAD SHX Text
2" NATIVE HERBACEOUS PLUGS PER NOTES. 2' O.C.
AutoCAD SHX Text
NON-VEGETATED COIR LOG
AutoCAD SHX Text
HARDWOOD STAKES
AutoCAD SHX Text
TUBELING 20' O.C.
AutoCAD SHX Text
LIVE STAKES TO TOP OF BANK, PER NOTES. BANK HEIGHT VARIES
AutoCAD SHX Text
10" 3LB/CU FT VEGETATED COIR LOG, SPECIES PER SPECFICATIONS, PLUGS 2' O.C.
AutoCAD SHX Text
NON-VEGETATED COIR LOG
AutoCAD SHX Text
BIODEGRADABLE EROSION CONTROL MAT WITH NATIVE SEED
AutoCAD SHX Text
EDGE OF WATER
AutoCAD SHX Text Channel Bottom (Varies)
AutoCAD SHX Text Contruct Ledgestone Erosion Control From Top of Slope to Shoreline OHWM
AutoCAD SHX Text
STONE TOE TO OHWM
AutoCAD SHX Text
STONE LEVELING SHIM (TYPICAL) AS REQUIRED
AutoCAD SHX Text
MINIMUM OVERLAP EACH STONE
AutoCAD SHX Text
COMPACTED GRAVEL SUBBASE
AutoCAD SHX Text
2" MIN.
AutoCAD SHX Text
TOP OF SLOPE
AutoCAD SHX Text
LEDGE ROCK EROSION CONTROL DETAIL
AutoCAD SHX Text STONE DEPTH (D) VARIES - 12" (MIN) - 18" (MAX) STONE HEIGHT (H) VARIES - 5" (MIN) - 8" (MAX) STONE WIDTH (W) VARIES - 36" (MIN) - 48" (MAX)
AutoCAD SHX Text Existing Conditions Bank Erosion
AutoCAD SHX Text TOTAL WIDTH/EXTENT OF LEDGESTONE VARIES - AS NEEDED TO ADDRESS EXISTING EROSION AREAS. DIMENSIONS TO BE CONFIRMED IN THE FIELD.
AutoCAD SHX Text 2025 Hubbell, Roth & Clark, Inc. All Rights Reserved
AutoCAD SHX Text C
AutoCAD SHX Text C:\Users\NaomiBailey\Drummond Carpenter, PLLC\Drummond Carpenter, PLLC Team Site - Documents (1)\Proj\0262 HRC CR Spillway\Task 2\CAD\Proposed_DC_20250411.dwg
AutoCAD SHX Text Kate Bailey
AutoCAD SHX Text
6/4/2025 9:27 AM
AutoCAD SHX Text HRC_OLW.ctb
AutoCAD SHX Text
ORIGINAL PLOT SIZE: ARCH D (24.00 X 36.00 INCHES)
AutoCAD SHX Text R
AutoCAD SHX Text
N. RIVER RD.
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
S. RIVER RD.
AutoCAD SHX Text
LAKE ST. CLAIR
AutoCAD SHX Text N
AutoCAD SHX Text
JEFFERSON AVE.
AutoCAD SHX Text
CROCKER BLVD.
AutoCAD SHX Text
SPILLWAY
AutoCAD SHX Text
15 MILE RD.
AutoCAD SHX Text
GLENWOOD RD.
AutoCAD SHX Text
METROPOLITAN PKWY.
AutoCAD SHX Text
HARPER
AutoCAD SHX Text
AVE.
AutoCAD SHX Text
CLINTON TWP.
AutoCAD SHX Text
HARRISON TWP.
AutoCAD SHX Text
REIMOLD RD.
AutoCAD SHX Text
MT. CLEMENS
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text TRUNK WITH ROOTWAD, 20' MIN LENGTH. MIN. 3/4 LENGTH BURIED. TRUNKS ALIGNED 15-25 DEGREES TO CHANNEL BANK
AutoCAD SHX Text
FOOTER LOG 12"-18" DIA. AND 8'-10' MIN LENGTH
AutoCAD SHX Text
DRAINAGE AGGREGATE LAYER, ENCAPSULATED WITH FILTERWEAVE GEOTEXTILE
AutoCAD SHX Text
ROOTWAD FAN 4' DIA MIN
AutoCAD SHX Text
ANCHOR BOULDERS 18"-24" DIA. SEE SECIFICATION MIN. 3 PER FOOTER LOG.
jrec Text Box
NO SCALE
jrec Text Box
PROJECT DETAILS
jrec Rectangle jrec Text Box
CLINTON RIVER
SPILLWAY
jrec Text Box
CLIMATE RESILIENCY
PROJECT
jrec Text Box
STATE HIGH WATER
INFRASTRUCTURE
GRANT
jrec Text Box 06-11-2025 jrec Text Box
PERMIT SUBMITTALS
jrec Text Box jrec Text Box 09-16-2025 jrec Text Box
REVISED PER COMMENTS
jrec Text Box 10-07-2025 jrec Text Box
ISSUED FOR BIDS
jrec Text Box
REISSUED FOR BIDS
jrec Text Box 10-10-2025 jrec Text Box PAID FOR UNDER THE PAY ITEM "Bank Stabilization, Rootwad Revetment - Lft" jrec Text Box PAID FOR UNDER THE PAY ITEM "Bank Stabilization, Coir Logs - Lft" jrec
PAID FOR UNDER THE PAY ITEM "Bank Stabilization, Rock Outcropping - Ton"
BANK HEIGHT VARIES
(STREAM BED)
SECTION VIEW
PLAN VIEW
FLOW
BASEFLOW
BANKFULL/FLOODPLAIN BENCH
EROSION CONTROL BLANKET
6" TOPSOIL
SUBGRADE
INSTALL EROSION CONTROL
BLANKET IN 6" TRENCH,
STAKE, BACKFILL, AND
COMPACT
LIVE STAKE PLANTINGS OR POLE PLANTINGS
(TYP. - SEE DETAIL) IN DISTURBED AREAS
FOOTER BOULDER DEPTH 10" MIN BELOW
STREAM BED TO PREVENT FAILURE DUE TO
LONG-TERM BED DEGRADATION/SCOUR
ROCK TOE PROTECTION DEPTH
SHALL CONFORM TO FOOTER
BOULDER DEPTH
BLEND BOULDERS INTO
EXISTING STREAM BANK
EXISTING GROUND
EROSION CONTROL BLANKET
6" TOPSOIL AND NATIVE SEED MIX
FOOTER BOULDERS
18" MIN DIA. (TYP.)
TOP BOULDERS (TYP.)
TOP BOULDERS
10" - 18" DIA (TYP.)
EMBED AND STAKE EROSION CONTROL BLANKET 6" MIN.
INTO SUBGRADE AND BELOW GRADE (TYP.)
NATIVE SEED MIX
FILL VOIDS WITH SMALLER
STONE 2"-8" DIA.
(TYP.)
TOTAL WIDTH/EXTENT OF RIPRAP VARIES -
AS NEEDED TO ADDRESS EXISTING
EROSION AREAS. DIMENSIONS TO BE
CONFIRMED IN THE FIELD.
APPROVED
CHECKED
DRAWN
DESIGNED
DATE
HRC JOB NO.
DATE
SCALE
ADDITIONS AND/OR REVISIONS
SHEET
NO.
OF
555 HULET DRIVE
BLOOMFIELD HILLS, MICH.
P.O. BOX 824
48303 - 0824
PHONE: (248) 454-6300
WEB SITE: www.hrcengr.com
FAX (1st. Floor): (248) 454-6312 FAX (2nd. Floor): (248) 454-6359
HRC
J.A.R.
N.J.K.
J.F.B.
20221060
FEBRUARY 2025
MICHIGANMACOMB COUNTY
CLINTON RIVER
SPILLWAY
HABITAT RESTORATION
PROJECT
Know what's below.
before you dig.Call
CALL811.COM
CALL MISS DIG
72 HOURS
(3 WORKING DAYS)
BEFORE YOU DIG
1-800-482-7171 or 811
(TOLL FREE)
NOTICE:
ALL EXISTING UTILITIES SHOWN ON THIS TOPOGRAPHIC SURVEY
HAVE BEEN TAKEN FROM VISUAL OBSERVATION AND RECORD
MAPPING WHERE AVAILABLE. NO GUARANTEE IS MADE, OR
SHOULD BE ASSUMED, AS TO THE COMPLETENESS OR
ACCURACY OF THE UTILITIES SHOWN ON THIS DRAWING.
PARTIES UTILIZING THIS INFORMATION SHALL FIELD VERIFY
PROJECT
LOCATION
MACOMB COUNTY
PUBLIC WORKS
COMMISSIONER
ST. CLAIR COUNTY
DRAIN COMMISSIONER
LAPEER COUNTY
DRAIN COMMISSIONER
OAKLAND COUNTY
WATER RESOURCES COMMISSIONER
MICHIGAN DEPT. OF
AGRICULTURE AND
RURAL DEVELOPMENT
CLINTON RIVER SPILLWAY
INTERCOUNTY
DRAINAGE BOARD
AutoCAD SHX Text
RIPRAP DETAIL
AutoCAD SHX Text Construct Riprap Bank Protection
AutoCAD SHX Text Existing Conditions Bank Erosion
AutoCAD SHX Text 2025 Hubbell, Roth & Clark, Inc. All Rights Reserved
AutoCAD SHX Text C
AutoCAD SHX Text C:\Users\NaomiBailey\Drummond Carpenter, PLLC\Drummond Carpenter, PLLC Team Site - Documents (1)\Proj\0262 HRC CR Spillway\Task 2\CAD\Proposed_DC_20250411.dwg
AutoCAD SHX Text Kate Bailey
AutoCAD SHX Text
5/27/2025 10:47 AM
AutoCAD SHX Text HRC_OLW.ctb
AutoCAD SHX Text
ORIGINAL PLOT SIZE: ARCH D (24.00 X 36.00 INCHES)
AutoCAD SHX Text R
AutoCAD SHX Text
N. RIVER RD.
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
S. RIVER RD.
AutoCAD SHX Text
LAKE ST. CLAIR
AutoCAD SHX Text N
AutoCAD SHX Text
JEFFERSON AVE.
AutoCAD SHX Text
CROCKER BLVD.
AutoCAD SHX Text
SPILLWAY
AutoCAD SHX Text
15 MILE RD.
AutoCAD SHX Text
GLENWOOD RD.
AutoCAD SHX Text
METROPOLITAN PKWY.
AutoCAD SHX Text
HARPER
AutoCAD SHX Text
AVE.
AutoCAD SHX Text
CLINTON TWP.
AutoCAD SHX Text
HARRISON TWP.
AutoCAD SHX Text
REIMOLD RD.
AutoCAD SHX Text
MT. CLEMENS
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
AutoCAD SHX Text jrec Text Box 09-16-2025 jrec Text Box 06-11-2025 jrec Text Box
PERMIT SUBMITTALS
jrec Text Box
REVISED PER COMMENTS
jrec Text Box
PROJECT DETAILS
jrec Text Box
NO SCALE
jrec Text Box jrec Text Box 10-07-2025 jrec Text Box
ISSUED FOR BIDS
jrec Text Box
REISSUED FOR BIDS
jrec Text Box 10-10-2025 jrec
PAID FOR UNDER THE PAY ITEM " Bank Stabilization, Riprap (As Needed) - Cyd"
PLANT ALL SHRUBS VERTICAL.
SCARIFY BOTTOM AND SIDEWALLS OF PLANTING PIT.
4" BARK MULCH TO COVER ENTIRE PLANTING
HOLE. TAPER MULCH TO BASE OF PLANT.
BACKFILL WITH MIX OF 50% IMPORTED TOPSOIL
AND 50% EXCAVATED SITE SOIL & TAMP LIGHTLY
PRUNE ALL DEAD OR DAMAGED BRANCHES
WATER TO SATURATE BACKFILL MATERIAL
WITH IN 8 HOURS OF PLANTING
IF CONTAINER STOCK IS ROOT BOUND, MAKE
4 VERTICAL CUTS IN EACH ROOT BALL WITH
SHARP BLADE
PROVIDE 3" SOIL SAUCER AROUND EACH PLANT
SHRUB PLANTING DETAIL
NOT TO SCALE
12"
OPEN PLANTING PIT
TO BE TWICE THE SIZE OF PLUG ROOT
BACKFILL WITH EX. SOIL
5" TYP.
NOTES:
ENSURE THAT ROOTS ARE POINTING DOWNWARD IN
THE HOLE. WHEN CLOSING PLANTING HOLE,
ENSURE NO AIR POCKETS ARE LEFT IN HOLE.
WATER TO SATURATE BACKFILL MATERIAL
WITHIN 1 HOUR OF PLANTING
3" TYP.
ROOT COLLAR SQUARE TO FINISH GRADE
PROVIDE 3" SOIL SAUCER AROUND
EACH PLANT
PLUG PLANTING DETAIL
NOT TO SCALE
SECTION VIEW
TWO UNTREATED PINE OR DOUGLAS FIR
STAKES. INSTALL 2" AWAY FROM THE
EDGE OF THE ROOT BALL.
PLAN VIEW
2" X 2" WOODEN STAKES.
STAKES SHALL BE
UNTREATED PINE OR
DOUGLAS-FIR.
SECURE CROSS MEMBER TO VERTICAL
STAKES USING THREE INCH LONG WOOD
SCREWS.
WIDTH SHALL VARY
DEPENDING ON ROOT BALL
SIZE.
WATER BACKFILL TO SETTLE SOIL
PRIOR TO PLACEMENT OF MULCH
4" MULCH TO COVER ENTIRE
PLANTING HOLE. TAPER MULCH TO
TRUNK. CREATE CONTINUOUS 6"
EARTH SAUCER.
TREE SHALL BE PLANTED WITH TOP OF
ROOT BALL AT OR NO GREATER THAN 4"
ABOVE FINISH GRADE - NEVER LOWER.
SCARIFY BOTTOM AND
SIDEWALLS OF PLANTING PIT.
REMOVE TOP 1/3 OF BURLAP OR
ENTIRE RAP IF NON-BIODEGRADEABLE
AFTER PLACING TREE IN PIT
6" EARTH PEDESTAL OF UNDISTURBED OR
COMPACTED SOIL.
12"
MIN.
TREE WRAP FROM BASE TO FIRST
BRANCH.
PLANTING MIXTURE
REMOVE SOIL FROM TOP OF ROOT BALL
TO EXPOSE ROOT FLARE
4'
TREE PLANTING DETAIL
NOT TO SCALE
APPROVED
CHECKED
DRAWN
DESIGNED
DATE
HRC JOB NO.
DATE
SCALE
ADDITIONS AND/OR REVISIONS
SHEET
NO.
OF
555 HULET DRIVE
BLOOMFIELD HILLS, MICH.
P.O. BOX 824
48303 - 0824
PHONE: (248) 454-6300
WEB SITE: www.hrcengr.com
FAX (1st. Floor): (248) 454-6312 FAX (2nd. Floor): (248) 454-6359
HRC
J.A.R.
N.J.K.
J.F.B.
20221060
FEBRUARY 2025
MICHIGANMACOMB COUNTY
CLINTON RIVER
SPILLWAY
HABITAT RESTORATION
PROJECT
Know what's below.
before you dig.Call
CALL811.COM
CALL MISS DIG
72 HOURS
(3 WORKING DAYS)
BEFORE YOU DIG
1-800-482-7171 or 811
(TOLL FREE)
NOTICE:
ALL EXISTING UTILITIES SHOWN ON THIS TOPOGRAPHIC SURVEY
HAVE BEEN TAKEN FROM VISUAL OBSERVATION AND RECORD
MAPPING WHERE AVAILABLE. NO GUARANTEE IS MADE, OR
SHOULD BE ASSUMED, AS TO THE COMPLETENESS OR
ACCURACY OF THE UTILITIES SHOWN ON THIS DRAWING.
PARTIES UTILIZING THIS INFORMATION SHALL FIELD VERIFY
PROJECT
LOCATION
MACOMB COUNTY
PUBLIC WORKS
COMMISSIONER
ST. CLAIR COUNTY
DRAIN COMMISSIONER
LAPEER COUNTY
DRAIN COMMISSIONER
OAKLAND COUNTY
WATER RESOURCES COMMISSIONER
MICHIGAN DEPT. OF
AGRICULTURE AND
RURAL DEVELOPMENT
CLINTON RIVER SPILLWAY
INTERCOUNTY
DRAINAGE BOARD
AutoCAD SHX Text
TREE PLANTING AREAS
AutoCAD SHX Text
PLANTING NOTES
AutoCAD SHX Text
1. PLANT TREES AT RANDOM SPACING, 15 FT - 25 FT ON CENTER, AT LEAST TWO ROWS PLANT TREES AT RANDOM SPACING, 15 FT - 25 FT ON CENTER, AT LEAST TWO ROWS FROM WATER'S EDGE INLAND. 2. TREES SHALL BE 2" CALIPER, OR APPROVED ALTERNATIVE, BUT NO SMALLER THAN TREES SHALL BE 2" CALIPER, OR APPROVED ALTERNATIVE, BUT NO SMALLER THAN BAREROOT, MULTIBRANCHED TREES OF 6'-8' HEIGHT. 3. TREES SHALL BE PLANTED ACCORDING TO PLANTING DETAIL OR NURSERY INSTRUCTIONS, TREES SHALL BE PLANTED ACCORDING TO PLANTING DETAIL OR NURSERY INSTRUCTIONS, AND PLACED WITH ANY NECESSARY STAKING AND DEER PROTECTION. 4. SPECIES SHALL BE A MIX OF: SPECIES SHALL BE A MIX OF: NORTHERN HACKBERRY Celtis occidentalis 15% Celtis occidentalis 15% 15% SILVER MAPLE Acer saccharinum 15% Acer saccharinum 15% 15% SWAMP WHITE OAK Quercus bicolor 15% Quercus bicolor 15% 15% BLACKGUM Nyssa sylvatica 15% Nyssa sylvatica 15% 15% RED OAK Quercus rubra 15% Quercus rubra 15% 15% BASSWOOD Tilia americana 15% Tilia americana 15% 15% BLACK SPRUCE Picea mariana 5% Picea mariana 5% 5% CANADIAN SERVICEBERRY Amelanchier canadensis 5% Amelanchier canadensis 5% 5% 5. COMMON HACKBERYY, SILVER MAPLE, AND SWAMP WHITE OAK SHALL BE PLANTED ON THE COMMON HACKBERYY, SILVER MAPLE, AND SWAMP WHITE OAK SHALL BE PLANTED ON THE WATERWARD SIDE OF PLANTING AREAS. RED OAK, BASSWOOD, AND BLACKGUM SHALL BE PLANTED ON THE UPLAND SIDE OF PLANTING AREAS. WHITE SPRUCE AND SERVICEBERRY SHAL LBE INTERPLANTED AT RANDOM SPACING. 6. TOTAL QUANTITY APPROXIMATELY 500 TREES. TOTAL QUANTITY APPROXIMATELY 500 TREES.
AutoCAD SHX Text
NATIVE WETLAND HERBACEOUS PLUGS FOR BANK STABILIZATION (COIR LOGS)
AutoCAD SHX Text MAINTENANCE AND WARRANTY PERIOD: 1. MAINTENANCE PERIOD: ENSURE THAT ALL TREES, SHRUBS, SEEDING, AND HERBACEOUS PLANTS INSTALLED MAINTENANCE PERIOD: ENSURE THAT ALL TREES, SHRUBS, SEEDING, AND HERBACEOUS PLANTS INSTALLED UNDER THIS CONTRACT WILL BE HEALTHY AND IN FLOURISHING CONDITION OF ACTIVE GROWTH FOR TWO (2) FULL GROWING SEASONS (MAY THROUGH OCTOBER) FROM DATE OF PLANTING INSTALLATION ACCEPTANCE. THE CONTRACTOR SHALL RESPOND WITHIN TWO (2) WEEKS OF WRITTEN REQUESTS BY THE OWNER FOR REPLACEMENT OR REPAIR. IF THE CONTRACTOR FAILS TO RESPOND WITHIN THIS TIME, THE OWNER MAY PROCEED WITH REPLACEMENT WORK AND BILL THE CONTRACTOR. 2. WARRANTY PERIOD: ENSURE THAT ALL TREES, SHRUBS, SEEDING, AND HERBACEOUS PLANTS INSTALLED UNDER WARRANTY PERIOD: ENSURE THAT ALL TREES, SHRUBS, SEEDING, AND HERBACEOUS PLANTS INSTALLED UNDER THIS CONTRACT WILL BE HEALTHY AND IN FLOURISHING CONDITION OF ACTIVE GROWTH FOR ONE (1) FULL GROWING SEASON (MAY THROUGH OCTOBER) FROM DATE OF MAINTENANCE PERIOD ACCEPTANCE. THE CONTRACTOR SHALL RESPOND WITHIN TWO (2) WEEKS OF WRITTEN REQUESTS BY THE OWNER FOR REPLACEMENT OR REPAIR. IF THE CONTRACTOR FAILS TO RESPOND WITHIN THIS TIME, THE OWNER MAY PROCEED WITH REPLACEMENT WORK AND BILL THE CONTRACTOR. 3. ALL DELAYS IN COMPLETION OF PLANTING OPERATIONS WHICH EXTEND THE PLANTING INTO MORE THAN ONE ALL DELAYS IN COMPLETION OF PLANTING OPERATIONS WHICH EXTEND THE PLANTING INTO MORE THAN ONE PLANTING SEASON SHALL EXTEND THE WARRANTY PERIOD CORRESPONDINGLY. 4. REPLACEMENTS: AS SOON AS WEATHER CONDITIONS PERMIT, REPLACE, WITHOUT COST TO OWNER, ALL DEAD REPLACEMENTS: AS SOON AS WEATHER CONDITIONS PERMIT, REPLACE, WITHOUT COST TO OWNER, ALL DEAD PLANTS AND ALL PLANTS NOT IN A VIGOROUS, THRIVING CONDITION, AS DETERMINED BY THE ENGINEER DURING AND AT THE END OF THE MAINTENANCE AND WARRANTY PERIODS. 5.