This Limited-Sources Justification document details a 3-month contract extension for the National Geospatial-Intelligence Agency (NGA) with Compass, Inc. for IPF Staff Support services. The extension, valued at $639,286.24, will cover the period from 09/23/2025 to 12/22/2025 and supports continued Information Technology, Foundation GEOINT Subject Matter Expert, and program management services while NGA completes a recompete of the requirements. The extension requires 2 required positions (FG Chief of Staff Support) and 5 optional positions including Cloud Subject Matter Expert, FG System Transition & Integration Specialist, and others.
The justification emphasizes that Compass, Inc. is the only contractor capable of providing the required services without interruption, given their existing TS/SCI security clearances and specialized knowledge. The extension is being pursued to bridge the gap between the current contract and a forthcoming Mapping, Charting & Geodesy (MC&G) Staff Support contract, which is currently undergoing quotation evaluation and source selection. A market research Request for Information (RFI) issued on 12/20/2024 received 15 industry responses, but no alternative vendor was deemed capable of performing the 3-month extension without a potential lapse in support.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
LIMITED-SOURCES JUSTIFICATION
PURSUANT TO FAR 8.405-6(c) FOR ORDERS OR BPAS WITH AN
ESTIMATED VALUE EXCEEDING THE SIMPLIFIED ACQUISITION THRESHOLD
FAR 8.4 Limited-Sources Justification exceeding SAT, v6.0, 09/10/2024 1 | P a g e
CONTROL NUMBER: JA-FY25-050
THIS ACQUISITION IS CONDUCTED UNDER THE AUTHORITY OF THE MULTIPLE-AWARD SCHEDULE PROGRAM
(41 U.S.C. 152(3), COMPETITIVE PROCEDURES, AND 40 U.S.C. 501, SERVICES FOR EXECUTIVE AGENCIES).
1. IDENTIFICATION OF THE AGENCY AND THE CONTRACTING ACTIVITY.
National Geospatial-Intelligence Agency / Office of Contract Services
2. NATURE AND/OR DESCRIPTION OF THE ACTION BEING APPROVED.
This justification is for a 3-month extension to the IPF Staff Support task order (HM047621F0272), originally awarded to Compass, Inc.
The IPF Staff Support task order provides Information Technology (IT), Foundation GEOINT (FG) Subject
Matter Expert (SME), and program management support to the NGA Foundation GEOINT Integrated
Program Office (IPF). IPF Staff Support was originally competed on the General Services Administration
(GSA) Information Technology (IT) Schedule 70 as a Small Business Set-Aside Fair Opportunity, with award made to Compass on 19 September 2019. The IPF Staff Support task order was awarded against the GSA’s Federal Supply Schedule (FSS) contract number GS35F300GA as a Time & Material (T&M) contract. The Period of Performance (PoP) for the current task order is from 23 September 2019 to 22
September 2025.
This justification is to extend the PoP to end on 22 December 2025 under the same terms and conditions of the GS35F300GA underlying GSA schedule contract and the current HM047621F0272 NGA task order.
This extension action is necessary to complete the ongoing recompete of the staff support requirement as a follow-on contract known as Mapping, Charting & Geodesy (MC&G) Staff Support. The MC&G
Program Executive Office (PEO) will be the successor organization for the reorganized Foundation
GEOINT Integrated Program Office. The follow-on recompete is currently undergoing quotation evaluation and source selection / contract negotiations. Delays in requirements development, receiving pre-acquisition approvals, and source selection, due in part to personnel and reorganization efforts outside of NGA’s control, has interfered with the acquisition schedule for MC&G Staff Support, and continued systems and integration engineering, program management support, and SME support to the
IPF office remains necessary for the daily operations of the office. The extension is expected to provide the necessary time to complete the competitive solicitation and award of the MC&G follow-on contract without a break in support.
3. ESTIMATED VALUE AND PERIOD OF PERFORMANCE OR PROJECTED DELIVERY SCHEDULE.
a. ESTIMATED VALUE: $639,286.24
b. PERIOD OF PERFORMANCE, INCLUDING ALL OPTION PERIODS, OR PROJECTED DELIVERY SCHEDULE:
FAR 8.4 Limited-Sources Justification exceeding SAT
FAR 8.4 Limited-Sources Justification exceeding SAT, v6.0, 09/10/2024 2 | P a g e
09/23/2025 – 12/22/2025
4. IDENTIFICATION OF THE AUTHORITY AND CIRCUMSTANCE THAT JUSTIFIES LIMITING THE SOURCE.
FAR 8.405-6(a)(1)(i)(B) -- Only one source is capable of providing the supplies or services required at the level of quality required.
5. DESCRIPTION OF THE SUPPLIES OR SERVICES REQUIRED TO MEET THE AGENCY’S NEEDS.
The Government requires a continuation of the staff support from Option Period 8 into the 3-month extension, as follows:
REQUIRED NUMBER OF POSITIONS
FG Chief of Staff Support 2
TOTAL FOR REQUIRED 2
OPTIONAL
Cloud Subject Matter Expert 1
FG Subject Matter Expert #2 1
FG System Transition & Integration Specialist 1
Cost Estimator 1
FG3D Subject Matter Expert 1
TOTAL FOR OPTIONAL 5
6. DEMONSTRATION OF THE CONTRACTOR’S UNIQUE QUALIFICATIONS TO PROVIDE THE REQUIRED
SUPPLY OR SERVICE THAT REQUIRES USE OF THE AUTHORITY CITED.
The extension can only be completed by the incumbent contractor, Compass, Inc., without a break in service. Compass, Inc. is the only known source in sufficient quantities for OCI-cleared staff with the necessary TS/SCI security clearances and skills/experience/knowledge required to execute the tasks required in the SOW. To award a contract to and on-board a different contractor for the bridge period would require transition tasks and knowledge transfer that is not possible within the time-frame available.
7. CONTRACTING OFFICER DETERMINATION THAT THE ORDER REPRESENTS THE BEST VALUE
CONSISTENT WITH 8.404(d).
The order prevents a disruption in service at rates that were previously found to be fair and reasonable, as reviewed by the GSA contracting officer and the NGA contracting officer that awarded the base contract with options. The price lists used to price the orders were competed and publicly published for review. The original solicitation that established the task order pricing was awarded through fair opportunity procedures that allowed for price competition. The CO is currently competing a multi-year follow-on to the expiring contract, so interrupting that progress to compete a 3-month bridge contract
FAR 8.4 Limited-Sources Justification exceeding SAT, v6.0, 09/10/2024 3 | P a g e would be administratively costly and not be in the Government’s best interests. The extension represents the best value to meet this short-term need while the follow-on competition is executed.
8. DESCRIPTION OF THE MARKET RESEARCH CONDUCTED AMONG SCHEDULE HOLDERS AND THE
RESULTS OR A STATEMENT OF THE REASON MARKET RESEARCH WAS NOT CONDUCTED.
The MC&G RFI that was issued on 20 December 2024 resulted in 15 responses from industry. While there is expected competition for the follow-on, it was not apparent that a vendor other than the incumbent would be able to perform in the 3-month extension without some transition period that would result in a lapse in support, while performing at the contracted price.
9. ANY OTHER FACTS SUPPORTING THE JUSTIFICATION.
While there is no expected duplication in cost in work product due to the nature of the work performed on a staff support contract, the cost and loss of service in the transition period that is expected in a switch of contractors would be unacceptable for a 3-month PoP.
10. STATEMENT OF THE ACTIONS, IF ANY, THE AGENCY MAY TAKE TO REMOVE OR OVERCOME ANY
BARRIERS THAT LED TO THE RESTRICTED CONSIDERATION BEFORE ANY SUBSEQUENT ACQUISITION
FOR THE SUPPLIES OR SERVICES IS MADE.
The extension is for the purposes of completing a recompete of the requirements to a pool of small-business vendors via GSA eBuy.
11. APPROVING OFFICIAL DETERMINATION OF THE CIRCUMSTANCE THAT APPLIES UNDER FAR 8.405-
6(a)(1).
I, acting as the Contracting Officer, have determined that limiting sources to fewer than those required by FAR 8.405-2, pursuant to the authority of 41 U.S.C. 152(3), is justified based on the following circumstance: FAR 8.405-6(a)(1)(i)(B) -- Only one source is capable of providing the supplies or services required at the level of quality required.
FAR 8.4 Limited-Sources Justification exceeding SAT, v6.0, 09/10/2024 4 | P a g e
CERTIFICATIONS AND APPROVAL
FSS ORDER OR BPA WITH AN ESTIMATED VALUE EXCEEDING THE SAT BUT NOT EXCEEDING $750,000
PM/COR CERTIFICATION:
I certify that any supporting facts and data under my responsibility which form a basis for this Limited-
Sources Justification are accurate and complete to the best of my knowledge and belief.
SIGNATURE: DATE:
Ronda Haley Deputy Business Manager
MC&G
CONTRACTING OFFICER’S CERTIFICATION AND APPROVAL:
I certify that this Limited-Sources Justification is accurate and complete to the best of my knowledge and belief.
SIGNATURE: DATE:
Yue Ming Eng Contracting Officer