About this file
This is a Request for Proposal (RFP) issued by the Confederated Tribes of Siletz Indians (CTSI) for Construction Manager/General Contractor (CM-GC) services for the Siletz Community Health Clinic Renovation project. The project involves renovating approximately 6,750 square feet of shell space on the ground floor of an existing three-story clinic located at 200 Gwee-Shut Dr. in Siletz, Oregon. The RFP was issued on March 5, 2025, with proposals due by 12:00 p.m. Pacific time on March 20, 2025. A non-mandatory site walk is scheduled for March 12, 2025, and interviews may be conducted on March 27, 2025, with CTSI Board approval anticipated on April 18, 2025.
The RFP includes a comprehensive evaluation process that prioritizes Indian preference, with points awarded for qualifications, TERO compliance, native preference, cost, and project delivery. Proposers will be evaluated on various criteria including firm background, healthcare renovation experience, staffing plan, local knowledge, project approach, safety plans, and fees. The fee structure includes a percentage of direct construction costs, with a not-to-exceed price for pre-construction services. The contract will utilize a modified AIA A101 and A201 agreement, and proposers must provide detailed information about their firm's capabilities, including bonding capacity, insurance rates, and previous project experience. The selection will be made based on best value to CTSI, with a focus on collaborative project delivery and comprehensive construction management services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP3778-Comprehensive-Classification-Review.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal (RFP) for
“RFP 2025-03-05”
Siletz Clinical Health Clinic Renovation
Construction Manager/General Contractor (“CM-GC”) Services
Confederated Tribes of Siletz Indians
Issued: March 5, 2025
Due: By 12 p.m. Pacific time, March 20, 2024
For further information contact:
Brad Thomas, Project Architect, SĀJ Architecture, bradt@saj-arch.com.
mailto:bradt@saj-arch.com
Siletz CHC Renovation – GC/CM – RFP March 5, 2024
Table of Contents
Notice to Proposers
Procurement Timeline
Project Description
Project Team
Communications with the Owner
Project Schedule
Procurement Considerations
Proposal Requirements, Contents, and Considerations
Other Provisions
Exhibits
Exhibit A – Proposal Form
Exhibit B – Scope of Work Clarifications & Drawings
Exhibit C – Schedule
Exhibit D – Insurance Requirements
Exhibit E – CM-GC Cost Matrix
Proposers will be evaluated based on best value to CTSI based on a combination of qualifications, TERO compliance, native preference, cost, and schedule for the delivery of services as presented in the RFP response, interview, references and other information available to CTSI.
The Confederated Tribe of Siletz Indians (CSI) Community Health Department is seeking a qualified firm to provide General Contractor/Construction Manager services to complete the Siletz Community Health Clinic Renovation project located at the site located at 200 Gwee-Shut Dr. Siletz, OR 97380.
NOTICE TO PROPOSERS - All Proposals shall be:
• E-mailed to Miranda E. Williams, Executive Health Director, CTSI at MIRANDAW@CTSI.NSN.US
• Proposals will be received until March 20, 2025 at 12:00 p.m. Pacific time.
• The RFP documents may be obtained via an e-mail request to Brad Thomas, Project Architect, SĀJ Architecture, bradt@saj-arch.com.
CTSI may reject any or all proposals upon a finding it is in the public interest to do so and to rescind the award of any contract at any time before the execution of said contract by all parties with no liability against CTSI.
PROCUREMENT TIMELINE:
3/5/2025 Issue Request for Proposal (RFP)
3/12/2025 Site walk – non-mandatory.
3/14/2025 Last date to submit questions regarding the RFP or propose changes to the contract documents.
3/18/2025 Final addendum issued
3/20/2025 Proposals due by 12 p.m. Pacific time
3/27/2025 Interviews if required
4/18/2025 CTSI Board approval
CTSI reserves the right to modify this schedule at its discretion. Proper notification of changes in the response schedule will be made via addendum.
Project Description The Confederated Tribe of Siletz Indians (CTSI) owns and operates an existing three-story Community
Health Clinic (CHC). The Community Health Department is expanding and requires additional, and more functional, office space. An existing, approximately 6,750-square-foot shell space on the lower, ground floor has been proposed to house this department. The space is intended to house office space supporting offices for many of the public health programs and working groups, including Community
Health Advocates, Harm Reduction, CARE, Healthy Traditions Diabetes, Nutrition, Farm Department, transportation, etc. In addition, the space will house common spaces to support these programs’ functioning and broader public health goals. The desire is for a selected GM/CM firm to serve as an advisor during preconstruction in addition to submitting a GMP for acceptance, negotiation, or rejection by owner for the construction of the renovation project.
Project Team
1. Owner: Confederated Tribe of Siletz Indians
2. Architect: SĀJ Architecture
3. MEP Engineering: Laminar Flow Engineering
4. Structural Engineering: Walker Structural Engineering
5. Special Inspector: TBD
6. Commissioning Agent: TBD
General Contractor/Construction Manager (CM-GC) Package and Budget
The general scope being procured via this RFP is the services of a qualified CM-GC to work with the project team during design to inform the design team and owner as to costs, constructability, schedule, and all other relevant issues to assure that the construction phase can be completed as planned and without disruption or changes. During the design phase the CM-GC will develop estimates, schedules, and a GMP for the construction phase of the project.
Communications with the Owner
Proposers are required to conduct the preparation of their Proposals with professional integrity and free of lobbying activities. Communication with the Owner regarding this Project shall be directed to the Architect. Do not communicate about the Project or the Procurement with any other members of the Project Team or their employees, members, elected officials, or representatives.
Communication regarding the Procurement or the Project with any Project Team member, other than the designated Architect contact may cause the firm involved to be disqualified from submitting under this Procurement.
Project Schedule
Exhibit C contains the current project design schedule. In the response, the CM-GC shall confirm that they are able to meet the constraints, timeframes, durations, sequencing and all other aspects of the project to deliver their services as expressed in the schedule.
Procurement Considerations
This RFP is issued in compliance with the CTSI procurement policy and requirements. The proposer shall complete and submit the proposal form attached in Exhibit A with the proposer’s response to this RFP via email to Miranda E. Williams, Executive Health Director, CTSI at MIRANDAW@CTSI.NSN.US no later than March 20, 2025 at 12:00 p.m. Pacific time.
This project will utilize an AIA A101 modified for CM-GC delivery & AIA A201.
EVALUATION AND SELECTION PROCESS
The proposals will be evaluated by CTSI with points assigned based upon the criteria in this RFP.
Those proposals submitted that do not meet mandatory requirements outlined will not be evaluated.
The evaluation shall include a review of all documents submitted. CTSI will invite recommended finalists for interviews based solely upon its evaluation of the selection criteria. CTSI may, at its sole discretion, forego the interview process. The proposals received will be subjectively evaluated by the Evaluation Committee with points assigned based upon the criteria in this RFP. Those proposals submitted that do not meet mandatory requirements outlined in the RFP will not be evaluated. The Evaluation Committee may choose to interview contractors that exceed the minimum qualification threshold of 80% of the points available. Selection of the successful firms will be entirely at the discretion of the CTSI , and CTSI reserves the right to waive minor irregularities in the selection process and to reject any and all proposals.
Proposal Requirements, Contents, and Considerations
The Proposer shall provide the following information in the order listed below. Where the Proposer is asked to provide information there shall be a full discussion (and attachments where necessary).
The format of the proposals, including attachments, shall not exceed twenty-five (25) single sided standard size (8 1/2” x 11”) pages, minimum Calibri 12-point font.
Proposers shall e-mail the signed proposal, with all pages numbered and combined into a single PDF document, to MIRANDAW@CTSI.NSN.US. Hard copy submissions or electronic formats other than PDF will not be accepted.
mailto:MIRANDAW@CTSI.NSN.US mailto:MIRANDAW@CTSI.NSN.US
Each section will be scored by the number of points listed next to the information the points listed are the maximum amount that can be given during evaluation.
1. Cover Letter (information only): Confirm your firm’s interest in the project and commitment to meet all requirements. Provide firm’s contact information for use related to the selection process.
2. Indian Preference: It is the policy of the CTSI and its enterprises to enter into contracts and agreements with bona fide Indian contractors, business, or vendors when practicable.
CTSI shall comply with the Nation’s Indian preference policy in awarding contract or entering into agreements on behalf of CTSI. The policy requires bona fide Indian contractors, business, or vendors be given preference in the awarding or entering into procurement contractor or agreements where practical and in the following order:
A. Members of the CTSI B. Providers for the members of the CTSI C. Others enrolled in a federally recognized tribe D. All others
3. Firm Background and Proximity (5 points): Provide a brief description of your firm, including ownership structure, service area, length of time in the industry, and annual revenue and bonding capacity for the past five years. If you are proposing in a joint venture or teaming arrangement, provide a clear description of the legal and business relationship between the respective firms. Also provide the following information about your firm’s location and range of work:
A. Address of firm’s headquarters or corporate office.
B. Address of local company office that will oversee and manage the Program.
C. Current geographic range of your entire company’s work.
D. Current geographic range of work managed by the local company office.
4. Confederated Tribes of Siletz Indians Experience or Equivalent Native American Experience (5 points): If you have relevant tribal construction experience, please provide examples and articulate how that benefits this project. If not, please illustrate how your company’s experience will benefit the Confederated Tribes of Siletz Indians.
5. Clinic / Healthcare / Office Renovation Experience (15 points): Describe your firm’s experience working on medical/healthcare renovation projects. Provide details for a minimum of three
(3) examples and no more than five (5). Include the following information:
A. Name, location and brief description B. Describe how your firm used the CM-GC process (or equivalent project process) to provide value in both the pre-construction and construction phase.
C. Amounts of initial estimate, initial GMP, and final GMP at completion D. Start date, initial substantial and final completion dates, and final substantial and final completion dates E. Relevance of the project to the team members identified in the proposers RFP response.
F. Project contact information (name, email, phone for each of the following):
i. Owner
ii. Architect
6. Staffing Plan and Key Personnel (20 points):
A. Provide an organizational chart showing your proposed key staff members, to include by not limited to, preconstruction project manager, project manager, estimator, and superintendent. Indicate if they will be stationed in the home office or on site during the construction phase. Explain what percentage of their time will be dedicated to this project.
B. Provide detailed resumes for all staff shown on the project organizational chart, including length of time with the firm, qualifications, and relevant experience on comparable projects.
C. Proposer shall clearly state that all staff members are available and committed to the project for the duration of the project (as required by their position). Key staff members shall not be changed.
7. Local Issues (10 points): Describe your firm’s knowledge of local construction conditions, local labor market and local/regional subcontractors and suppliers. Explain how you will use this knowledge to benefit the project.
8. Project Approach (20 points): Describe how your firm utilizes the CM-GC process to create value during the pre-construction & construction phase. Include the following information:
A. Trust: Describe your firm’s approach to providing services on behalf of CTSI, acting in their best interest, including but not limited to your efforts and techniques to foster and maintain trust within the project team to maintain a positive and effective working environment throughout the delivery of the services and project.
Provide a minimum of 3 examples where you have successfully implemented this approach.
B. Estimating: Describe your estimating process in alignment with the GMP for this project. How do you ensure a transparent estimating process and that the owner and design team are constantly aware of the project costs as the project evolves through design?
C. Contingency, Allowances: Describe your firm’s proposed use of contingencies and allowances within the GMP. How do you propose the contingencies are managed, what are the allowable uses and who has control of their use?
D. Design Assistance: Describe your firm’s approach to assisting the Design Team during the pre-construction/design phases of the project to identify and resolve potential design and constructability issues. Describe your firm’s approach to the reliability and reliance that the Owner and design team should have in the information provided by the CM-GC during the pre-construction/design phase.
E. Project Management: Describe your firm’s project management and scheduling system. How will you ensure the project is completed on schedule and in a well-organized and orderly manner? Elaborate on technology tools utilized to assist with this process.
F. Cost Control: Describe your cost reporting system. How will you keep CTSI apprised of current and projected costs during the construction phase? How will you avoid change orders?
G. Quality Control: Describe how will you ensure appropriate quality, minimal punch lists and timely close-out. Elaborate on technology tools utilized to assist with this process.
H. Schedule: Describe how your firm will ensure that the project schedule is maintained and how you will communicate schedule information to the project team. Provide a draft schedule to show preconstruction activities, estimating activities, and major milestones activities, with anticipated durations of each activity.
9. Project Safety & Communication Plan (10 points)
A. Describe your plan to safely and efficiently complete the work, while operating in an occupied medical facility.
B. Provide a brief description of your firm’s accident prevention program and drug/alcohol program. Provide your firm’s EMR Lost Time Accident Rate for each of the past 5 years.
10. Fees and Compensation (20 points): Provide responses to this section in a matrix format.
A. Pre-construction Costs: Provide a not-to-exceed price for pre-construction services. Include a breakdown of hourly rates for personnel as well as a list of reimbursable expenses that would be included in the not-to exceed price.
B. Fee: State the fee as a percentage of the direct construction costs. No other mark-up will be allowed. The CM-GC will be required to provide accounting documentation to substantiate that all cost inputs to the project will be at the CM-GC’s actual bare cost. The CM-GC will not be allowed to include “rates” for labor, bonding or insurance programs. Tool and equipment charges will be required to be comparable to market rental rates.
i. The fee shall cover, at a minimum, those items excluded from the Cost of the Work and General Conditions as defined in the agreement and as clarified in the CM-GC Cost Matrix, (attached as Exhibit E). The matrix shall provide the Proposers greater clarity about which costs will be reimbursed and which costs will not.
ii. After Contract award and before the GMP is established, the maximum not-to- exceed amount for General Conditions will be established and set forth in a contract amendment.
C. General Conditions/Staffing Costs: Provide a detailed estimate of construction phase staffing, your proposed staffing plan and the CM-GC Cost Matrix. Include assumed durations and proposed hourly costs, including labor burden. If applicable, provide estimated travel, housing and per diem costs as separate line items.
D. Bond and Insurance Rate:
i. Provide the cost of the 100% Payment and Performance Bond as a percent of the direct construction costs plus fee.
ii. Provide a brief explanation of your firm’s policy on sub-contractor bonding.
iii. Provide a letter from your bonding company confirming their ability to provide 100% payment and performance bond for the project.
iv. Provide the cost of all insurance (including Builder’s risk) as a percent of the direct construction costs plus fee. See Exhibit D for insurance requirements.
v. Provide the cost of the Builder’s Risk coverage, the deductible, and the limits.
Other Provisions
A. Acceptance of Proposal Specifications, Terms and Conditions:
The successful Proposer acknowledges and accepts all provisions within, and referenced within, this RFP. No revision will be considered or incorporated unless the successful Proposer expressly states within their proposal a specific suggested alternate term. If the proposer suggests a revision then they shall include the specific reference to the term in the RFP, provide the proposed revised verbiage, and justification for consideration by
CTSI.
B. Anti-Discrimination:
In connection with this RFP and in the performance of any subsequent contract, Proposers shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, marital status, sexual preference, and/or being physically challenged. Proposers shall take action to ensure that all applicants are treated equally during employment without regard to such status.
C. Compliance with Applicable Laws:
In connection with this RFP and the contract, Proposers shall comply with all applicable laws in all aspects in connection with the procurement process of this project and the performance of the contract whether such laws are stated herein or not.
D. Proposal Opening:
The proposals will be submitted electronically.
E. Form of Contract:
The form of contract between the Contractor and the Owner will be the modified version of the AIA A101-2017 (modified to reflect CM-GC delivery) and AIA A201-2017 (modified).
By submitting a proposal the Proposer agrees that the form of contract is acceptable and shall so acknowledge in the proposal form. Short listed contractors will have an opportunity to comment on the proposed contract language.
See section A above for provisions to provide suggested revisions to the Form of Contract. Negotiations on contract terms are at the Owner’s sole discretion. Proposers should not anticipate that any portion of the proposed Contract will be changed or modified. By submitting a Proposal, the Proposer represents and warrants that it will enter into the Contract provided by the Owner subject to the terms set forth in its proposal.
The selected contractor’s proposal will become an exhibit of the contract agreement to memorialize and incorporate the performance commitments, scope of services, qualifications, and team members into the provisions of the agreement. The document Order of Precedence is described in the contract agreement.
F. CTSI’s Rights:
CTSI may investigate the qualifications of any Proposer under consideration, may require confirmation of information furnished by a Proposer, and may require additional evidence of qualifications to perform the work described in this RFP.
CTSI reserves the right, in its sole and absolute discretion and without recourse by Proposers, to take any of the following actions:
i. Reject any or all Proposals;
ii. Issue a new procurement;
iii. Cancel, modify, or withdraw the RFP;
iv. Issue addenda, supplements, and modifications to this RFP;
v. Modify the RFP process;
vi. Appoint a selection committee and evaluation teams to review RFPs and seek the assistance of outside technical experts in the response evaluations;
vii. Hold meetings and exchange correspondence with the Proposers to seek an improved understanding and evaluation of the responses;
viii. Seek or obtain data from any source that has the potential to improve the understanding and evaluation of the responses;
ix. Waive irregularities in responses;
x. In the negotiations for the contract with the selected proposer to change the dates for performance from that set forth in Section III hereof; and/or
xi. Refuse to issue a contract at all.
CTSI is not obligated to enter into any contract, and under no circumstances shall it have any obligation to pay for any costs or expenses incurred by any Proposer in the preparation or submission of a response to this RFP or in anticipation of a contract.
Proposers are solely responsible for all costs and expenses of any nature associated with responding to this RFP, attending briefing(s), providing supplemental information, and all subsequent costs and expenses. By submitting a response to this RFP, a Proposer disclaims any right to be paid for such costs by CTSI or anyone else.
G. Investigation:
The Proposer shall make all investigations necessary to understand the scope of the work, the proposal documents, and existing conditions to provide the complete scope of work including protection of the existing elements to remain from damage during the performance of this work.
H. Late Proposals:
Proposals received after the time and date set for proposal closing will not be considered for award. Delays in electronic transmission are the responsibility of the proposer. The official clock will be the clock on the computer utilized by Miranda E. Williams, Executive Health Director, CTSI as documented by the receipt time attached to the email submission through the MS Outlook program.
I. Mistakes, errors and omissions in solicitation:
Any mistakes, errors and omissions in this solicitation must be reported immediately to
CTSI.
J. Publicity:
New releases relating to this RFP will not be made without prior approval by, and in coordination with, CTSI.
K. Proposal Validity:
All proposals shall remain valid for a period of 90 days following the RFP deadline.
L. Written Questions, Comments and Addenda, Rules of Contact:
Questions and comments pertaining to this solicitation must be submitted in writing via email, according to the Proposal and Award Timeline to: Brad Thomas, Project Architect, SĀJ Architecture, bradt@saj-arch.com.
Proposers shall not contact any CTSI or CHC staff members, elected officials, representatives, or members during the selection process.
If, in CTSI’s opinion, additional information or interpretation is necessary, such information will be supplied in the form of Addenda. Addenda shall have the same binding effect as though contained in the main body of the Request for Proposals. The successful Proposer shall acknowledge Receipt of all addenda issued, either with the proposal, or separately, in writing, prior to the time and date set for proposal closing. Addenda shall be sent within a reasonable time to allow prospective proposers to consider them in preparing their proposals.
ORAL INSTRUCTION OR INFORMATION CONCERNING THE REQUEST FOR
PROPOSALS OR THE PROJECT GIVEN OUT BY OFFICERS, EMPLOYEES OR AGENTS
OF CTSI TO PROSPECTIVE PROPOSERS SHALL NOT BIND CTSI AND SHALL NOT BE
RELIED UPON.
Siletz CHC Renovation – CM-GC – RFP Page 1 of 2 of Exhibit A
March 5, 2025
Exhibit A – Proposal Form
Responses to the Request for Proposal must contain a signed scan of this page as the first pages of the PDF.
Firm Name:
The Undersigned offers and agrees to provide General Contractor/Construction Manager Services for the Community Health Clinic including, but not limited to the work described within this RFP and its attachments (including addendums acknowledge below) in compliance with the requirements of these same documents and the requirements of all Authorities Having Jurisdiction.
The Proposer understands that any false statement may disqualify this proposal from consideration or be cause for contract termination.
The proposer certifies that it does not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, handicap, financial ability, age or other no-job-related factors.
Oregon License Number:
Expiration Date:
1. Has your firm ever been disqualified by a public or tribal entity from bidding or proposing on a project?
(yes/no). If the answer is yes, explain the circumstances, project, contracting agency and date. State then reason for disqualification and if the disqualification has ended. Attach the explanation on a separate sheet to this form.
2. Has your firm ever been terminated from a public or tribal contract? (yes/no). If the answer is yes, explain the circumstances, project, contracting entity and date. State then reason for termination.
Attach the explanation on a separate sheet to this form.
3. Has your firm ever been involved in litigation involving a public or tribal contract? Has a claim been made against any payment or performance bond taken out by your firm? Has a legal claim been made against your firm for alleged contract breach or substandard performance, or has a claim been made against your firm for dishonesty, fraud, or misappropriation in relation to a construction contract?
(yes/no). If the answer is yes, provide a full explanation on a separate sheet entitled “Claims”.
4. I acknowledge receipt of the following Addendum(s):
Number Date
Page 2 of 2 of Exhibit A
March 5, 2025
5. The proposer is a bona fide Indian contractor as described above (yes/no): .
If yes, include copy of documentation to evidence greater than 50% Indian ownership, or evidence to show qualification under the provider designation as appropriate.
6. List all proposer provided attachments to this proposal:
Firm Name: Phone:
Address:
By (print): Title:
Signed: Date: _
Page 1 of Exhibit B
March 5, 2024
Exhibit B
SCOPE OF WORK CLARIFICATIONS
1. The project scope includes renovation of approximately 6,750 SF of shell space on the ground floor of the clinic.
2. The Contractor shall include all work required to complete all activities associated with the work described in the RFP and its Exhibits, including all referenced documents, standards, codes, etc.
3. The successful bidder will be required to provide a payment and performance bond.
4. At the end of each workday the Contractor shall secure the site, the building, and all work in a manner that is clean, safe, and professional. At the completion of the work the Contractor shall leave the site and the improvements in a broom swept condition with all debris removed, all temporary items secured and in operating condition, salvaged items (if not already delivered to the owner) shall be neatly stacked and secured.
5. The Contractor shall not perform work which is commonly understood to be particularly loud or disruptive during hours in which the building is typically occupied except as proposed and agreed to in writing with the owner prior to acceptance of the GMP.
6. The contractor shall create a detailed pre-existing conditions report that documents any and all damage, cracks, or other concerns prior to any activity. Damage not identified in this report will be required to be repaired to the Owner’s satisfaction by the Contractor within the scope of the Contractor’s proposal. This report shall be submitted to the Owner and Architect within 5 workdays of the Notice to Proceed and at least 2 workdays prior to the start of any work onsite.
7. The Contractor shall provide a post-construction condition report similar to the pre-construction conditions report. This report shall be provided no later than 5 days after completion of the work.
8. The contractor shall provide a schedule of work prior to starting work showing the planned work for each day of work.
9. The contractor shall utilize a collaborative electronic project management system, such as Procore for the duration of the project.
Page 2 of Exhibit B
March 5, 2024
10. The contractor shall complete a daily report and compile and submit each week’s reports to the Owner and Architect each week. The report shall include:
a. Conditions: Weather, start time, end time, etc.
b. Systems (Water, Sewer, Power, Gas, Fire Protection, Fire Alarm, Security, Monitoring, Phone, etc…):
i. Note any service or system operation that was interrupted, or confirm no interruptions occurred on each system
ii. Times it was interrupted and restored
c. Work:
i. The planned work for the day (per the schedule)
ii. Actual work performed
iii. Hindrances to completing scheduled work
iv. Work not completed that was planned
d. Workforce:
i. List all contractors onsite
ii. Number of all workers onsite (including management) and if onsite for a portion of the day note arrival and departure times
iii. Name of each worker onsite
e. Safety:
i. Note any concerns with safety that occurred throughout the day
f. Daily wrap up:
i. Confirmation that the site was properly secured at the end of each work day
ii. Confirmation that the surrounding public areas and ROW were inspected and were unimpacted by the construction activities; periodically throughout the day and at the end of the work day
g. Visitors:
i. List anyone else that was at the site throughout the day that is not identified in Section d. Name, employer/affiliation, arrival time, departure time, and purpose.
h. Photos:
i. Provide daily photos of the work activity onsite documenting the work completed
11. Disposal reporting:
a. Every other week provide receipts for disposal of all recycled materials removed from the site with a summary report that compiles and summarizes the information in a format that is coordinated with the Owner.
ABBREVIATIONS
IGL
IMB
INCL
INSUL
INT
IPT
IR
IRGWB
JST
JT
KO
KS
LAB
LAM
LAV
LF
LGL
LH
LIN
LT
MAR
MAT
MAX
MB
MDF
MDO
MECH
MFR
MH
MIN
MIR
MISC
MRGWB
MTL
MW
N
NA
NIC
NO
NOM
NSV
NTS
OC
OD
OFCI
OFOI
OH
OP
OPG
OPP
OSB
PAR
PART
PBG
PB
PC
PERF
PERP
PH
PL
PLAM
PLYWD
PNL
PWD
PR
AB
ABS
ACM
ACP
ACP
ACT
AD
ADJ
ADJT
ADP
AFF
AGG
AL
ALT
AP
AR
ARGWB
ARCH
ATB
AWP
BIT
BL
BLDG
BLK'G
BM
BMU
BOT
BR
BUR
C/S
CAB
CB
CG
CHB
CJ
CL
CLF
CLG
CLR
CMT
CMU
CO
COL
CONC
CONST
CONT
CONTR
CORR
COVE SV
CPT
CR
CT
CTSK
CUST
CW
D
DBL
DEMO
DF
DIA
DIM
DISP
DN
DR
DS
DTL
DW
DWG
DWR
E
ANCHOR BOLT
ACRYLONITRILE-BUTADIENE-
STYRENE
ASBESTOS CONTAINING MATERIAL
ACOUSTICAL CEILING PANEL
ASPHALT CONCRETE PAVEMENT
ACOUSTICAL TILE
AREA DRAIN
ADJACENT
ADJUSTABLE
ACOUSTICAL DIFFUSION PANEL
ABOVE FINISH FLOOR
AGGREGATE
ALUMINUM
ALTERNATE
ACCORDION PARTITION
ABUSE RESISTANT
ABUSE RESISTANT GYPSUM WALL
BOARD
ARCHITECT (URAL)
ASPHALT TREATED BASE
ACOUSTICAL WALL PANEL
BITUMINOUS
BLINDS
BUILDING
BLOCKING
BEAM
BRICK MASONRY UNIT
BOTTOM
BRICK
BUILT UP ROOFING
CLOCK/SPEAKER
CABINET
CATCH BASIN
CORNER GUARD
CHALKBOARD
CONTROL JOINT
CENTER LINE
CHAIN LINK FENCE
CEILING
CLEAR (ANCE)
CERAMIC MOSAIC TILE
CONCRETE MASONRY UNIT
CLEAN OUT
COLUMN
CONCRETE
CONSTRUCTION
CONTINUOUS/CONTINUATION
CONTRACTOR
CORRIDOR
COVE SHEET VINYL
CARPET
CLASSROOM
CERAMIC TILE
COUNTER SINK
CUSTODIAN
COLD WATER
DEEP
DOUBLE
DEMOLITION
DRINKING FOUNTAIN
DIAMETER
DIMENSION
DISPENSER
DOWN
DOOR
DOWNSPOUT
DETAIL
DISHWASHER
DRAWING
DRAWER
EAST
EA
EF
EIFS
EJ
ELECT
ELEV
EM
EMC
EMH
EP
EPNL
EQ
EQUIP
ER
ESR
EXIST
EXPS
EXT
FA
FCB
FCS
FCP
FD
FDN
FE
FEC
FF
FG
FGP
FH
FIN
FLR
FO
FOF
FOM
FOS
FPP
FR
FRCP
FRP
FRT
FS
FT
FTG
FURR
FW
GA
GALV
GB
GC
GCMU
GL
GLB
GSH
GVL
GWB
HB
HC
HDR
HDWE
HDWD
HM
HORIZ
HR
HT
HVAC
HW
HWH
ID
EACH
EXHAUST FAN
EXT. INSUL. FINISH SYSTEM
EXPANSION JOINT
ELECTRIC (AL)
ELEVATION
ELEVATOR
ENTRY MAT
ELECTRO MAGNETIC CLOSER
ELECTRO MAGNETIC HOLDER
EPOXY PAINT
ELECTRICAL PANEL
EQUAL
EQUIPMENT
EPOXY RESIN
ELASTOMERIC SHEET ROOFING
EXISTING
EXPOSED STRUCTURE
EXTERIOR
FIRE ALARM
FIBER CEMENT BOARD
FIBER CEMENT SIDING
FIBER CEMENT PANELS
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FLOOR
FINISH GRADE
FIRE ALARM GRAPHIC PANEL
FIRE HYDRANT
FINISH (ED)
FLOOR
FACE OF __________
FACE OF FINISH
FACE OF MASONRY
FACE OF STUD
FOLDING PANEL PARTITION
FALL RESTRAINT
FIBER REINFORCED CEMENT PANEL
FIBER REINFORCE PANEL
FIRE RESISTANT TREATMENT
FIRESTOP(-PING)
FOOT, FEET
FOOTING
FURRING
FOLDING WALL
GAUGE
GALVANIZED
GRAB BAR
GENERAL CONTRACT(OR)
GLAZED CMU
GLASS, GLAZING
GLU-LAM BEAM
GYPSUM SHEATHING
GRAVEL
GYPSUM WALL BOARD
HOSE BIBB
HANDICAP
HEADER
HARDWARE
HARDWOOD
HOLLOW METAL
HORIZONTAL
HANDRAIL
HEIGHT
HEATING, VENTILATING & AIR
CONDITIONING
HOT WATER
HOT WATER HEATER/TANK
INSIDE DIAMETER
INSULATED GLASS
INTERACTIVE MEDIA BOARD
INCLUDE (ED, ING)
INSULATE (D) (ION)
INTERIOR
INTUMESCENT PAINT
IMPACT RESISTANT
IMPACT RESISTANT GYPSUM WALL
BOARD
JOIST
JOINT
KNOCK OUT
KNEE SPACE
LABORATORY
LAMINATE (D)
LAVATORY
LINEAR FOOT (FEET)
LAMINATED GLASS
LEFT HAND
LINOLEUM
LIGHT
MODIFIED ASPHALT ROOFING
MATERIAL
MAXIMUM
MARKER BOARD
MDF
MEDIUM DENSITY OVERLAY
PLYWOOD
MECHANICAL
MANUFACTURE(-R)
MANHOLE
MINIMUM
MIRROR
MISCELLANEOUS
MOISTURE-RESISTANT GYPSUM
WALLBOARD
METAL
MICROWAVE
NORTH
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NOMINAL
NON-SKID SHEET VINYL
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER / OVERFLOW
DRAIN
OWNER FURNISHED / CONTRACTOR
INSTALLED
OWNER FURNISHED / OWNER
INSTALLED
OVERHEAD / OPPOSITE HAND
OPERABLE PARTITION
OPENING
OPPOSITE
ORIENTED STRAND BOARD
PARALLEL
PARTITION
PROTECTIVE BUMPER GUARD
PEGBOARD (TEMPERED
HARDBOARD)
PRECAST
PERFORATE (D)
PERPENDICULAR
PANIC HARDWARE
PROPERTY LINE / PLATE
PLASTIC LAMINATE
PLYWOOD
PANEL
PLYWOOD
PAIR
PRESSURE TREATED
PROJECTION SCREEN
POUNDS PER SQUARE FOOT
POUND PER SQUARE INCH
PAINT
PAPER TOWEL DISPENSER
PAPER TOWEL DISPENSER /
RECEPTACLE
POLYVINYL CHLORIDE (PLASTIC)
PROTECTIVE WALLCOVERING
PROTECTIVE WALL PANELS
QUARRY TILE
RISER
RUBBERIZED ASPHALT
UNDERLAYMENT
RESILIENT BASE
ROOF DRAIN
REFERENCE / REFRIGERATOR
REINFORCE(D)
REQUIRED
RESILIENT TREADS, RISERS, TILE
(LANDINGS)
RIGHT HAND
ROOM
ROUGH OPENING
RIGHT OF WAY
RIGHT
SINK / SOUTH
SEALER/HARDENER
SUSPENDED ACOUSTICAL CEILING
SPECIAL COATING
SCHEDULE (D)
SOUND BLOCK CMU
SOAP DISPENSER
SECTION
SQUARE FOOT (FEET)
SHEATHING
SHOWER
SHEET
SIMILAR (CONDITIONS VARY)
SLOPE
SANITARY NAPKIN DISPENSER
SANITARY NAPKIN RECEPTACLE
SPECIFIED / SPECIFICATIONS
SQUARE
STAINLESS STEEL
STAIN
STAIN & LACQUER
STAIN & VARNISH
STANDARD
STEEL
STORAGE
STRUCTURAL
SUSPEND(ED)
SHEET VINYL
TREAD
TOWEL BAR
TILE BACKER BOARD
TACKBOARD
TERPOLYMER COATING
TELEPHONE
TRANSPARENT FINISH
TONGUE & GROOVE
TEMPERED GLASS
THICK
TOP OF _______________
TRANSLUCENT SKYLIGHT PANEL (S)
(ING)
TRANSLUCENT WALL PANEL (S)
(ING)
TOILET TISSUE DISPENSER
TACKABLE WALL PANEL
PRT
PS
PSF
PSI
PT
PTD
PTR
PVC
PWC
PWP
QT
R
RAU
RB
RD
REF
REINF
REQ
RES.T
RH
RM
RO
ROW
RT
S S/H
SAC
SC
SCHED
SCMU
SD
SEC
SF
SH
SHR
SHT
SIM
SL
SND
SNR
SPEC
SQ
SS
ST
ST/L
ST/V
STD
STL
STOR
STRUCT
SUSP
SV
T
TB
TBB
TBD
TC
TEL
TF
TG
TGL
THK
TO
TRSP
TRWP
TTD
TWP
TYPICAL
UNLESS OTHERWISE NOTED
URINAL
VARIES
VAPOR BARRIER/RETARDER
VINYL COMPOSITION TILE
VENEER
VENTED RUBBER BASE
VERTICAL
VERIFY IN FIELD
VENEER PLASTER
VAPOR RETARDER
VARNISH SYSTEM
VINYL WALL COVERING
WEST
WITH
WITHOUT
WOOD / WOOD FLOORING
WIRE GLASS
WINDOW
WIRE MESH
WIRE MESH PARTITION
WATER RESISTANT
WATER RESISTANT GYPSUM WALL
BOARD
WAINSCOT
WELDED WIRE FABRIC
WOVEN WIRE MESH
YARD
TYP
UON
UR
VAR
VB
VCT
VEN
VRB
VERT
VIF
VP
VR
VS
VWC
W W/ W/O
WD
WGL
WIN
WM
WMP
WR
WRGWB
WSCT
WWF
WWM
YD
VICINITY MAP
A keynoting system is used on the drawings for materials, references and notes. Refer to the keynote legend on the drawing for the information which relates to each keynote on the respective drawing. Each keynote consists of a 6-digit number. The 6-digit number relates to the specifications section which generally covers the item that is referenced. The letter suffix does not relate to any corresponding reference letter in the specifications. The organization of the keynoting system on the drawings, with the keynote reference numbers related to the specification sections numbering system, shall not control the contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade.
The Architect’s current Master List, which includes Keynotes not used on this project, is included in the specifications following Section 014200 - References.
DRAWING KEYNOTING SYSTEM
F.
O
.S
WALL GRID IS ASSOC. W/
NUMBERED GRID RUN
SEQUENTIALLY FROM
WEST TO EAST
LETTERED GRID RUN
SEQUENTIALLY FROM
NORTH TO SOUTH
GRID LINES
GRID LINES SHOWS STRUCTURAL BAYS
ARCHITECTURAL SYMBOLS
ROOM NUMBER NORTH ARROW
ROOF TYPE
WALL TYPE
DOOR NO. WINDOW TYPE LOUVER TYPE
1t
BUILDING SECTION NO.
SHEET WHERE DRAWN
BUILDING SECTION
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL
A
E8W8 S 2
1t
XX
X.XX
XX
X.XX
Room name
150 SF
R-00
PROJECT ADDRESS 200 GWEE-SHUT
SILETZ, OR 97380
GOVERNING CODE
EXISTING ZONING
CLASSIFICATION
BUILDING USE
OCCUPANCY GROUPS
TYPE OF CONSTRUCTION
SEWER DISTRICT
WATER DISTRICT
PROJECT DATA
TAX PARCELS 10-10-10-00-00201-00
OSSC AS ADOPTED BY CTSI
COMMUNITY HEALTH CLINIC AND SUPPORTING
ACCESSORY FUNCTIONS
EXISTING:
B OCCUPANCY, HEALTH CLINIC, OFFICES
A ACCESSORY OCCUPANCY, MEETING
PROPOSED:
EXISTING:
B OCCUPANCY, HEALTH CLINIC, OFFICES
A ACCESSORY OCCUPANCY, MEETING
V-B SPRINKLERED
DEFERRED SUBMITTALS
FIRE SPRINKLER SYSTEM
FIRE ALARM SYSTEM
MEP EQUIPMENT ANCHORAGE, BRACING, SEISMIC DESIGN,
INSTRUMENTATION, AND CONTROLS
LEGAL DESCRIPTION
U.S. LOT 8 AND THE SOUTH ONE-HALF OR U.S. LOT 7, SECTION 10,
TOWNSHIP 10 SOUTH, RANGE 10 WEST, WILLAMETTE MERIDIAN, IN
THE COUNTY OF LINCOLN AND STATE OF OREGON, CONTAINING 29.92
ACRES, MORE OR LESS.
PROJECT DESCRIPTION
PROJECT PROPOSES A RENOVATION AND BUILD-OUT OF
APPROXIMATELY 6750 SF OF EXISTING B OCCUPANCY SHELL
SPACE AT THE BOTTOM PARTIALLY-BASEMENTED FLOOR OF A
3-STORY COMMUNITY HEALTH CLINIC. PROPOSED AREAS
INCLUDE OFFICES FOR VARIOUS PUBLIC HEALTH
DEPARTMENTS AS WELL AS LIMITED CLIENT-FACING CONSULT
AND OFFICE SPACES AND AN ACCESSORY BREAK ROOM AND
MEETING SPACE.
INDEX OF DRAWINGS
SILETZ CHC RENOVATIONSILETZ CHC RENOVATION
CONFEDERATED TRIBES OF SILETZ INDIANS
DRAWING INDEX
01_GENERAL
G0.00 COVER SHEET
G0.01 BUILDING CODE ANALYSIS
G0.02 ADA AND CODE DIAGRAMS
G0.03 BATHROOM DIAGRAMS
G0.05 KITCHEN DIAGRAMS
G1.10 CODE COMPLIANCE PLAN - LEVEL 1
05_DEMOLITION
AD2.10 DEMOLITION FLOOR PLAN - GROUND FLOOR
AD3.10 DEMOLITION REFLECTED CEILING PLAN - GROUND FLOOR
06_ARCHITECTURAL
A1.00 ARCHITECTURAL SITE PLAN
A2.10 FLOOR PLAN - GROUND FLOOR - OVERALL FLOOR PLAN
A3.10 REFLECTED CEILING PLAN GROUND FLOOR
A6.10 INTERIOR ELEVATIONS
A6.60 RESTROOM PLANS AND ELEVATIONS
A7.01 FINISH FLOOR PLAN - GROUND FLOOR
07 MEP
MEP0.00 MEP SCOPE NARRATIVE
D ra w in g Ti tle
Sheet No.
© 2024 SĀJ Architecture, LLC
D
2 3 5 64
C
B
A
D at e
D ra w n
By
R ev is ed
Pr oj ec t N o.
St am p
2/
/2
2:
:3
PM C
O
VE
R S
H
EE
T
G0.00
SI
LE
TZ
C H C R
EN
O
VA
TI
O N
D
RA
W
IN
G S
SI
LE
TZ
C O M M U N
IT
Y H
EA
LT
H C
LI
N
IC
/0
5/
BT 26
721 SW Industrial Way Ste. 130 Bend, OR 97702
(541) 330-6506
329 NE Couch St. Ste. 331 Portland, OR 97232
(503) 595-0270
BEND
PORTLAND
SITE
D R A W
IN
G R
EV
IS
IO
N S
D at e
D es cr ip tio n
EXHIBIT B
1.
2.
CHAPTER 3 - OCCUPANCY CLASSIFICATION & USE
304.1 BUSINESS GROUP B
OFFICE
CLINIC, OUTPATIENT
303.1.2 SMALL ASSEMBLY SPACES
STAFF RESPITE, CONFERENCE ROOMS, & STAFF LOUNGE
THE FOLLOWING ROOMS AND SPACES SHALL NOT BE CLASSIFIED
AS ASSEMBLY OCCUPANCIES:
A ROOM OR SPACE USED FOR ASSEMBLY PURPOSES WITH AN
OCCUPANT LOAD OF LESS THAN 50 PERSONS AND ACCESSORY
TO ANOTHER OCCUPANCY SHALL BE CLASSIFIED AS A GROUP B
OCCUPANCY OR AS PART OF THAT OCCUPANCY.
A ROOM OR SPACE USED FOR ASSEMBLY PURPOSES THAT IS
LESS THAN 750 SQUARE FEET (70 M2) IN AREA AND ACCESSORY
TO ANOTHER OCCUPANCY SHALL BE CLASSIFIED AS A GROUP B
OCCUPANCY OR AS PART OF THAT OCCUPANCY.
ASSEMBLY SPACES THAT ARE LESS THAN 750 SQUARE FEET IN
AREA SHALL BE CLASSIFIED ACCESSORY TO BUSINESS
OCCUPANCY.
303.4 GROUP A-3, ACCESSORY OCCUPANCY <10% AREA OF FLOOR
COMMUNITY HALL
CHAPTER 4 - SPECIAL DETAILED REQUIREMENTS BASED ON
OCCUPANCY & USE
CHAPTER 5 - GENERAL BUILDING HEIGHTS AND AREA LIMITATIONS
504 BUILDING HEIGHTS AND NUMBER OF STORIES
THE HEIGHT, IN FEET, AND THE NUMBER OF STORIES OF A
BUILDING SHALL BE DETERMINED BASED ON THE TYPE OF
CONSTRUCTION, OCCUPANCY CLASSIFICATION AND WHETHER
THERE IS AN AUTOMATIC SPRINKLER SYSTEM INSTALLED
THROUGHOUT THE BUILDING.
504.3 HEIGHT IN FEET
OCCUPANCY B + TYPE V-B CONSTRUCTION + SPRINKLERED 65FT
(ACTUAL HEIGHT: 53 FT (E) – NO CHANGE PROPOSED)
504.4 NUMBER OF STORIES
OCCUPANCY B + TYPE V-B CONSTRUCTION + SPRINKLERED 3
STORIES
(ACTUAL STORIES: 3-STORY (E) – NO CHANGE PROPOSED)
506.2 ALLOWABLE AREA DETERMINATION
OCCUPANCY B + TYPE V-B CONSTRUCTION + SM 27,000 FT
TABULAR
IF = .75 (OPEN FRONTAGE 30 ’ ALL SIDES)
AA = A T + (NS x I F)
AA = 27,000 + (9,000 X .75)
AA = 33,750 SF PER FLOOR UP TO 3 STORIES, 101,250 SF TOTAL
ACTUAL EXISTING FLOOOR AREA:
GROUND FLOOR: 13,258 SF
SECOND FLOOR: 16,258 SF
THIRD FLOOR: 18,000 SF
TOTAL: 45,102 SF – NO CHANGE PROPOSED
508.2 ACCESSORY OCCUPANCIES
ACCESSORY OCCUPANCIES ARE THOSE OCCUPANCIES THAT ARE
ANCILLARY TO THE MAIN OCCUPANCY OF THE BUILDING OR
PORTION THEREOF. ACCESSORY OCCUPANCIES SHALL COMPLY
WITH THE PROVISIONS OF SECTIONS 508.2.1 THROUGH 508.2.4.
508.2.2 ALLOWABLE BUILDING HEIGHT
THE ALLOWABLE HEIGHT AND NUMBER OF STORIES OF THE
BUILDING CONTAINING ACCESSORY OCCUPANCIES SHALL BE IN
ACCORDANCE WITH SECTION 504 FOR THE MAIN OCCUPANCY OF
THE BUILDING.
508.2.3 ALLOWABLE BUILDING AREA
THE ALLOWABLE AREA OF THE BUILDING SHALL BE BASED ON THE
APPLICABLE PROVISIONS OF SECTION 506 FOR THE MAIN
OCCUPANCY OF THE BUILDING. AGGREGATE ACCESSORY
OCCUPANCIES SHALL NOT OCCUPY MORE THAN 10 PERCENT OF
THE FLOOR AREA OF THE STORY IN WHICH THEY ARE LOCATED
AND SHALL NOT EXCEED THE TABULAR VALUES FOR NON
SPRINKLERED BUILDINGS IN TABLE 506.2 FOR EACH SUCH
ACCESSORY OCCUPANCY.
ACCESSORY SPACES DO NOT EXCEED MORE THAN 10 PERCENT OF
THE AGGREGATE FLOOR AREA.
GROUND FLOOR: 13,258 SF
10% OF AGGREGATE FLOOR AREA: 1,325 SF
XX SF (NET GATHERING SPACE) / 13,258 SF (ACTUAL AREA) = X%
TABLE 508.2.4 SEPARATION OF OCCUPANCIES (HOURS)
NO SEPARATION IS REQUIRED BETWEEN ACCESSORY
OCCUPANCIES AND THE MAIN OCCUPANCY
509 INCIDENTAL USES
NO INCIDENTAL USES PROPOSED
CHAPTER 6 - TYPES OF CONSTRUCTION
TABLE 601 FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS (HOURS)
CONSTRUCTION TYPE V-B
PRIMARY STRUCTURAL FRAME 0 HOURS BEARING WALLS
EXTERIOR 0 HOURS
INTERIOR 0 HOURS
NONBEARING WALLS AND PARTITIONS (EXTERIOR) SEE TABLE
705.5 NONBEARING WALLS AND PARTITIONS (INTERIOR) 0 HOURS
FLOOR CONSTRUCTION AND SECONDARY MEMBERS 0 HOURS
ROOF CONSTRUCTION AND SECONDARY MEMBERS 0 HOURS
602.5 TYPE V
TYPE V CONSTRUCTION IS THAT TYPE OF CONSTRUCTION IN WHICH
THE STRUCTURAL ELEMENTS, EXTERIOR WALLS AND INTERIOR WALLS
ARE OF ANY MATERIALS PERMITTED BY THIS CODE.
1.
1.
2.
3.
4.
1.
2.
CHAPTER 8 - INTERIOR FINISHES
803.1.2 INTERIOR WALL AND CEILING FINISH MATERIALS TESTED IN
ACCORDANCE WITH ASTM E84 OR UL 723
INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE
CLASSIFIED IN ACCORDANCE WITH ASTM E84 OR UL 723. SUCH
INTERIOR FINISH MATERIALS SHALL BE GROUPED IN THE
FOLLOWING CLASSES IN ACCORDANCE WITH THEIR FLAME SPREAD
AND SMOKE- DEVELOPED INDICES.
• CLASS A = FLAME SPREAD INDEX 0 —25; SMOKE-DEVELOPED
INDEX 0 —450.
• CLASS B = FLAME SPREAD INDEX 26 —75; SMOKE-DEVELOPED
INDEX 0 —450.
• CLASS C = FLAME SPREAD INDEX 76 —200; SMOKE-DEVELOPED
INDEX 0 —450.
EXCEPTION: MATERIALS TESTED IN ACCORDANCE WITH SECTION
803.1.1 AND AS INDICATED IN SECTIONS 803.1.3 THROUGH 803.13.
TABLE 803.13 INTERIOR WALL AND CEILING FINSIH REQUIREMENTS
BY OCCUPANCY GROUP B, BUSINESS
INTERIOR EXIT STAIRWAYS AND RAMPS AND EXIT PASSAGEWAYS
B
CORRIDORS AND ENCLOSURE FOR EXIT ACCESS STAIRWAYS AND
RAMPS C ROOMS AND ENCLOSED SPACES C
GROUP A-3, ASSEMBLY ACCESSORY OCCUPANCY
INTERIOR EXIT STAIRWAYS AND RAMPS AND EXIT PASSAGEWAYS
B
CORRIDORS AND ENCLOSURE FOR EXIT ACCESS STAIRWAYS AND
RAMPS B ROOMS AND ENCLOSED SPACES C
CHAPTER 9 - FIRE PROTECTION SYSTEMS
AN EXISTING AUTOMATIC SPRINKLER SYSTEM IS PROVIDED
THROUGHOUT THE BUILDING, PER SECTION 903.
CHAPTER 10 - MEANS OF EGRESS
1004.2.1 INTERVENING SPACES OR ACCESSORY AREAS
WHERE OCCUPANTS EGRESS FROM ONE OR MORE ROOMS, AREAS
OR SPACES THROUGH OTHERS, THE DESIGN OCCUPANT LOAD
SHALL BE THE COMBINED OCCUPANT LOAD OF INTERCONNECTED
ACCESSORY OR INTERVENING SPACES. DESIGN OF EGRESS PATH
CAPACITY SHALL BE BASED ON THE CUMULATIVE PORTION OF
OCCUPANT LOADS OF ALL ROOMS, AREAS OR SPACES TO THAT
POINT ALONG THE PATH OF EGRESS TRAVEL.
TABLE 1004.5 MAXIMUM FLOOR AREA ALLOWANCE PER OCCUPANT
ACCESSORY STORAGE AREAS 300 GROSS
ASSEMBLY WITHOUT FIXED SEATS
• UNCONCENTRATED (TABLES AND CHAIRS) 15 NET
• CONCENTRATED (CHAIRS ONLY) 7 NET
• STANDING SPACE 5 NET
BUSINESS AREAS (CONCENTRATED) 150 GROSS
EDUCATIONAL (VOCATIONAL) 50 NET
INSTITUTIONAL (OUTPATIENT) 100 GROSS
1004.9 POSTING OF OCCUPANT LOAD
EVERY ROOM OR SPACE THAT IS AN ASSEMBLY OCCUPANCY SHALL
HAVE THE OCCUPANT LOAD OF THE ROOM OR SPACE POSTED IN A
CONSPICUOUS PLACE, NEAR THE MAIN EXIT OR EXIT ACCESS
DOORWAY FROM THE ROOM OR SPACE, FOR THE INTENDED
CONFIGURATIONS. POSTED SIGNS SHALL BE OF AN APPROVED
LEGIBLE PERMANENT DESIGN AND SHALL BE MAINTAINED BY THE
OWNER OR THE OWNER'S AUTHORIZED AGENT.
1005 MEANS OF EGRESS SIZING
ALL PORTIONS OF THE MEANS OF EGRESS SYSTEM SHALL BE
SIZED IN ACCORDANCE WITH THIS SECTION.
EXCEPTIONS:
AISLES AND AISLE ACCESSWAYS IN ROOMS OR SPACES USED
FOR ASSEMBLY PURPOSES COMPLYING WITH SECTION 1030.
1006.2.1 EGRESS BASED ON OCCUPANT LOAD AND COMMON PATH
OF EGRESS TRAVEL DISTANCE
TWO EXITS OR EXIT ACCESS DOORWAYS FROM ANY SPACE SHALL
BE PROVIDED WHERE THE DESIGN OCCUPANT LOAD OR THE
COMMON PATH OF EGRESS TRAVEL DISTANCE EXCEEDS THE
VALUES LISTED IN TABLE 1006.2.1. THE CUMULATIVE OCCUPANT
LOAD FROM ADJACENT ROOMS, AREAS OR SPACES SHALL BE
DETERMINED IN ACCORDANCE WITH SECTION 1004.2.
EXCEPTIONS:
THE NUMBER OF EXITS FROM FOYERS, LOBBIES, VESTIBULES
OR SIMILAR SPACES NEED NOT BE BASED ON CUMULATIVE
OCCUPANT LOADS FOR AREAS DISCHARGING THROUGH SUCH
SPACES, BUT THE CAPACITY OF THE EXITS FROM SUCH SPACES
SHALL BE BASED ON APPLICABLE CUMULATIVE OCCUPANT
LOADS.
THIS EXCEPTION DOES NOT APPLY.
UNOCCUPIED MECHANICAL ROOMS AND PENTHOUSES ARE NOT
REQUIRED TO COMPLY WITH THE COMMON PATH OF EGRESS
TRAVEL DISTANCE MEASUREMENT.
THIS EXCEPTION DOES NOT APPLY.
TABLE 1006.2.1 SPACES WITH ONE EXIT OR EXIT ACCESS DOORWAY
OCCUPANCY MAX OCC. LOAD OF SPACE MAX COMMON P.O.E.T.
ASSEMBLY 49 75 FT
BUSINESS 49 100 FT
1007.1.1 TWO EXITS OR EXIT ACCESS DOORWAYS
WHERE TWO EXITS, EXIT ACCESS DOORWAYS, EXIT ACCESS
STAIRWAYS OR RAMPS, OR ANY COMBINATION THEREOF, ARE
REQUIRED FROM ANY PORTION OF THE EXIT ACCESS, THEY SHALL
BE PLACED A DISTANCE APART EQUAL TO NOT LESS THAN ONE-
HALF OF THE LENGTH OF THE MAXIMUM OVERALL DIAGONAL
DIMENSION OF THE BUILDING OR AREA TO BE SERVED MEASURED
IN A STRAIGHT LINE BETWEEN THEM. INTERLOCKING OR SCISSOR
STAIRWAYS SHALL BE COUNTED AS ONE EXIT STAIRWAY.
EXCEPTIONS:
THIS EXCEPTION DOES NOT APPLY.
WHERE A BUILDING IS EQUIPPED THROUGHOUT WITH AN
AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH
SECTION 903.3.1.1 OR 903.3.1.2, THE SEPARATION DISTANCE
SHALL BE NOT LESS THAN ONE-THIRD OF THE LENGTH OF THE
MAXIMUM OVERALL DIAGONAL DIMENSION OF THE AREA
SERVED.
1008 MEANS OF EGRESS ILLUMINATION
1008.1 MEANS OF EGRESS ILLUMINATION
ILLUMINATION SHALL BE PROVIDED IN THE MEANS OF EGRESS IN
ACCORDANCE WITH SECTION 1008.2. UNDER EMERGENCY POWER,
MEANS OF EGRESS ILLUMINATION SHALL COMPLY WITH SECTION
1008.3.
1008.2 ILLUMINATION REQUIRED
THE MEANS OF EGRESS SERVING A ROOM OR SPACE SHALL BE
ILLUMINATED AT ALL TIMES THAT THE ROOM OR SPACE IS
OCCUPIED.
1.
2.
1.
2.
1.
2.
3.
4.
5.
1008.2.1 ILLUMINATION LEVEL UNDER NORMAL POWER
THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL BE NOT LESS
THAN 1 FOOTCANDLE (11 LUX) AT THE WALKING SURFACE. ALONG
EXIT ACCESS STAIRWAYS, EXIT STAIRWAYS AND AT THEIR
REQUIRED LANDINGS, THE ILLUMINATION LEVEL SHALL NOT BE
LESS THAN 10 FOOTCANDLES (108 LUX) AT THE WALKING SURFACE
WHEN THE STAIRWAY IS IN USE.
1008.3 EMERGENCY POWER FOR ILLUMINATION
THE POWER SUPPLY FOR MEANS OF EGRESS ILLUMINATION SHALL
NORMALLY BE PROVIDED BY THE PREMISES' ELECTRICAL SUPPLY.
1008.3.1 GENERAL
IN THE EVENT OF POWER SUPPLY FAILURE IN ROOMS AND SPACES
THAT REQUIRE TWO OR MORE EXITS OR ACCESS TO EXITS, AN
EMERGENCY ELECTRICAL SYSTEM SHALL AUTOMATICALLY ILLUMINATE
ALL OF THE FOLLOWING AREAS:
3. EXIT ACCESS STAIRWAYS AND RAMPS.
1008.3.2 BUILDINGS
IN THE EVENT OF POWER SUPPLY FAILURE IN BUILDINGS THAT
REQUIRE TWO OR MORE EXITS OR ACCESS TO EXITS, AN EMERGENCY
ELECTRICAL SYSTEM SHALL AUTOMATICALLY ILLUMINATE ALL OF THE
FOLLOWING AREAS:
4. VESTIBULES AND AREAS ON THE LEVEL OF DISCHARGE USED FOR
EXIT DISCHARGE IN ACCORDANCE WITH SECTION 1028.2.
1009.1 ACCESSIBLE MEANS OF EGRESS REQUIRED
ACCESSIBLE MEANS OF EGRESS SHALL COMPLY WITH THIS
SECTION. ACCESSIBLE SPACES SHALL BE PROVIDED WITH NOT
LESS THAN ONE ACCESSIBLE MEANS OF EGRESS. WHERE MORE
THAN ONE MEANS OF EGRESS IS REQUIRED BY SECTION 1006.2 OR
1006.3 FROM ANY ACCESSIBLE SPACE, EACH ACCESSIBLE PORTION
OF THE SPACE SHALL BE SERVED BY NOT LESS THAN TWO
ACCESSIBLE MEANS OF EGRESS.
1010 DOORS, GATES, AND TURNSTILES
1010.1.1.1 PROJECTIONS INTO CLEAR OPENING
THERE SHALL NOT BE PROJECTIONS INTO THE REQUIRED CLEAR
OPENING WIDTH LOWER THAN 34 INCHES (864 MM) ABOVE THE
FLOOR OR GROUND. PROJECTIONS INTO THE CLEAR OPENING
WIDTH BETWEEN 34 INCHES (864 MM) AND 80 INCHES (2032 MM)
ABOVE THE FLOOR OR GROUND SHALL NOT EXCEED 4 INCHES (102
MM).
EXCEPTION : DOOR CLOSERS, OVERHEAD DOOR STOPS, POWER
DOOR OPERATORS, AND ELECTROMAGNETIC DOOR LOCKS SHALL
BE PERMITTED TO BE 78 INCHES (1980 MM) MINIMUM ABOVE THE
FLOOR.
1010.1.3 FORCES TO UNLATCH AND OPEN DOORS
THE FORCES TO UNLATCH DOORS SHALL COMPLY WITH THE
FOLLOWING:
WHERE DOOR HARDWARE OPERATES BY PUSH OR PULL, THE
OPERATIONAL FORCE TO UNLATCH THE DOOR SHALL NOT
EXCEED 15 POUNDS (67 N).
WHERE DOOR HARDWARE OPERATES BY ROTATION, THE
OPERATIONAL FORCE TO UNLATCH THE DOOR SHALL NOT
EXCEED 28 INCH-POUNDS (315 N-CM).WHERE DOOR HARDWARE
OPERATES BY ROTATION, THE OPERATIONAL FORCE TO
UNLATCH THE DOOR SHALL NOT EXCEED 28 INCH-POUNDS (315
N-CM).
THE FORCE TO OPEN DOORS SHALL COMPLY WITH THE
FOLLOWING:
FOR INTERIOR SWINGING EGRESS DOORS THAT ARE MANUALLY
OPERATED, OTHER THAN DOORS REQUIRED TO BE FIRE RATED,
THE FORCE FOR PUSHING OR PULLING OPEN THE DOOR SHALL
NOT EXCEED 5 POUNDS (22 N).
FOR OTHER SWINGING DOORS, SLIDING DOORS OR FOLDING
DOORS, AND DOORS REQUIRED TO BE FIRE RATED, THE DOOR
SHALL REQUIRE NOT MORE THAN A 30- POUND (133 N) FORCE
TO BE SET IN MOTION AND SHALL MOVE TO A FULL-OPEN
POSITION WHEN SUBJECTED TO NOT MORE THAN A 15-POUND
(67 N) FORCE.
1013 EXIT SIGNS
1013.1 WHERE REQUIRED
EXITS AND EXIT ACCESS DOORS SHALL BE MARKED BY AN
APPROVED EXIT SIGN READILY VISIBLE FROM ANY DIRECTION OF
EGRESS TRAVEL. THE PATH OF EGRESS TRAVEL TO EXITS AND
WITHIN EXITS SHALL BE MARKED BY READILY VISIBLE EXIT SIGNS
TO CLEARLY INDICATE THE DIRECTION OF EGRESS TRAVEL IN
CASES WHERE THE EXIT OR THE PATH OF EGRESS TRAVEL IS NOT
IMMEDIATELY VISIBLE TO THE OCCUPANTS. INTERVENING MEANS
OF EGRESS DOORS WITHIN EXITS SHALL BE MARKED BY EXIT
SIGNS. EXIT SIGN PLACEMENT SHALL BE SUCH THAT ANY POINT IN
AN EXIT ACCESS CORRIDOR OR EXIT PASSAGEWAY IS WITHIN 100
FEET (30 480 MM) OR THE LISTED VIEWING DISTANCE OF THE SIGN,
WHICHEVER IS LESS, FROM THE NEAREST VISIBLE EXIT SIGN.
EXCEPTIONS:
EXIT SIGNS ARE NOT REQUIRED IN ROOMS OR AREAS THAT
REQUIRE ONLY ONE EXIT OR EXIT ACCESS.
MAIN EXTERIOR EXIT DOORS OR GATES THAT ARE OBVIOUSLY
AND CLEARLY IDENTIFIABLE AS EXITS NEED NOT HAVE EXIT
SIGNS WHERE APPROVED BY THE BUILDING OFFICIAL.
THIS EXCEPTION DOES NOT APPLY.
THIS EXCEPTION DOES NOT APPLY.
THIS EXCEPTION DOES NOT APPLY.
1013.4 RAISED CHARACTER & BRAILLE SIGNS
WHERE EXIT SIGNS ARE PROVIDED AT AN AREA OF REFUGE WITH
DIRECT ACCESS TO A STAIRWAY, AN EXTERIOR AREA FOR
ASSISTED RESCUE, AN EXIT STAIRWAY OR RAMP,…