2025 Survey Equipment.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- RFQ - 17A - 25102400000000000094
- Issued by
- Maine
About this file
This is a survey equipment specification document for a 2025 procurement. The document outlines required surveying instruments and software for acquisition. The primary equipment includes 10 units of Trimble R980, Model 50 receivers with rechargeable batteries and hard cover cases, one Trimble TCS510 Controller, one SECO Claw Cradle Assembly for TSC5 (PN: 5200-46), 19 units of Trimble Alloy Upgrades to enable Beidou functionality, and one license of Trimble Access Field Software designed for surveying data collection, stakeout operations, and real-time collaboration. Each item references attached data sheets and documentation for detailed specifications and technical requirements.
No pricing terms, contract duration, response deadlines, bidder meetings, award dates, set-asides, or funding source information is provided in this equipment specification document. The file serves exclusively as a bill of materials and equipment list for the 2025 survey equipment procurement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 17A 251024_0094 Trimble R980_TCS510 Controller_Software.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Item Number of Units
Trimble R980, Model 50, ROW
| See attached Data Sheet for Trimble R980 |
| includes 2 rechargable batteries and hard cover case |
Item Number of Units
Trimble TCS510 Controller
See attached Data Sheet for Trimble TCS510 Controller
SECO Claw Cradle Assembly for TSC5 PN: 5200-46
Item Number of Units
Trimble Alloy Upgrade
Trimble Alloy Upgrade enable Beidou
Item Number of Units
Trimble Access Field Software
| Trimble Access Software - Surveying field software designed for |
| efficient data collection, stakeout and real-time collaboration |
| See attached documentation |
File details come from the government source that posted it. Updated .