About this file

This document is Addendum No. 2 for the 2025 Street Program, issued by the City of Owosso, Michigan, which modifies the previously issued bidding documents for a street infrastructure project. The addendum, dated for bid submissions on October 8, 2024 at 3pm, specifically changes the quantities for Bid Item No. 20 (Trenching, Modified) from 47 stations to 4.7 stations, with additional reductions for Howell Street Trenching (from 30 to 3.0 stations) and Lynn Street Trenching (from 17 to 1.7 stations). The document requires bidders to acknowledge receipt of this addendum in the "Signature Page and Legal Status" section of the Bid Proposal, with a warning that failure to do so may result in bid rejection.

The project appears to involve comprehensive street infrastructure improvements, with bid items including subbase construction, aggregate base preparation, HMA base crushing and shaping, asphalt cement stabilization, and various utility-related work such as sewer installation, service conflicts, and drainage structure modifications. The bid documents include detailed quantities for multiple construction elements, such as 15 cubic yards of subbase, 208 square yards of modified aggregate base, 1,822 square yards of HMA base work, and specific utility infrastructure tasks like 129 feet of SDR-26 sewer installation and conflict resolution for sanitary services and gas mains.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM

Addendum No. 2

Owner: City of Owosso Project: 2025 Street Program Engineer: City of Owosso

NOTICE TO ALL PROSPECTIVE BIDDERS

BIDS DUE: October 8, 2024 at 3pm

This Addendum is a part of the Contract Documents and modifies the previously issued Bidding Documents. Acknowledge receipt of this Addendum in the space provided on the “Signature Page and Legal Status” section of the Bid Proposal. Failure to do so may result in rejection of the Bid.

ITEM NO. 1:

Change Bid Item No. 20 (Trenching, Modified) quantity from 47 Sta to 4.7 Sta. Howell Street Trenching, Modified quantity changed from 30 Sta to 3.0 Sta. Lynn Street Trenching, Modified quantity changed from 17 Sta to 1.7 Sta.

Remove page 5 from the bid document and insert the attached revised page 5 due to the above change.

END OF ITEM NO. 1

END OF ADDENDUM NO. 2

Item Description Approx.

Quantity

Unit Unit Price Total Price

11 Subbase, CIP 15 Cyd

12 Aggregate Base, 9 inch, Modified

208 Syd

13 HMA Base Crushing and Shaping, Modified

1822 Syd

14 Asphalt Cement Stabilized Base Course, 4 inch

1822 Syd

15 Asphalt Cement Binder

2913 Gal

16 Material, Surplus and Unsuitable, Rem, LM

40 Cyd

17 Maintenance Gravel 50 Ton

18 Approach, Cl I, LM 32 Cyd

19 Shld, Cl I 99 Ton

20 Trenching, Modified 4.7 Sta

21 Sewer, SDR-26, 10 inch, Tr Det B, Modified

129 Ft

22 Sanitary Service, Conflict

2 Ea

23 Abandoned Gas Main, Conflict

2 Ea

24 Dr Structure, Tap, 10 inch

2 Ea

5 REV

2025 Street Program Addendum 2
revised page 5

File details come from the government source that posted it. Updated .