2025 Street Program Addendum 1.pdf
PDF 101 KB Posted
- Attached to
- 2025 Street Program Bid
- Solicitation number
- 2024-37
- Issued by
- Sanilac County, Michigan
About this file
Addendum No. 1 for the 2025 Street Program is issued by the City of Owosso, Michigan, with the city serving as both the owner and engineer of the project. This addendum, dated for the bid due date of October 8, 2024 at 3pm, formally adds a "2025 Street Program Questions" document to the contract documents. The addendum instructs prospective bidders to acknowledge receipt of this addendum in the "Signature Page and Legal Status" section of the bid proposal, with a warning that failure to do so may result in bid rejection.
The accompanying questions document addresses a technical specification concern regarding Hot Mix Asphalt (HMA) performance grades for street approaches. A bidder raised a question about differing performance grades (PG) between mainline and approach sections for Howell and Lynn Streets, highlighting practical challenges with minimum tonnage and simultaneous paving. The city's response clarifies that PG 64-28 may be used for driveway approaches, effectively providing flexibility in asphalt performance grade selection to facilitate more straightforward and cost-effective bidding and construction processes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025 Street Program_IFB Plans_9-9-2024_signed.pdf | ||
| 2025 Street Program Bid Documents.pdf | ||
| 2025 Street Program Addendum 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM
Addendum No. 1
Owner: City of Owosso Project: 2025 Street Program Engineer: City of Owosso
NOTICE TO ALL PROSPECTIVE BIDDERS
BIDS DUE: October 8, 2024 at 3pm
This Addendum is a part of the Contract Documents and modifies the previously issued Bidding Documents. Acknowledge receipt of this Addendum in the space provided on the “Signature Page and Legal Status” section of the Bid Proposal. Failure to do so may result in rejection of the Bid.
ITEM NO. 1:
Add “2025 Street Program Questions” to the Contract Documents.
END OF ITEM NO. 1
END OF ADDENDUM NO. 1
2025 Street Program Questions
Q: The HMA application table for both Howell and Lynn Streets has the performance grade (PG) for the "HMA Approach" different from the PG for the mainline. PG 58-28 for the approach vs. PG 64-28 for the mainline.
With the very minimum tonnage for HMA Approaches, and the fact that it's under the same pay item, that's going to be VERY difficult. We'll be paving the approaches at the same time that we're paving the mainline, so we won't be able to differentiate the asphalt between the two. I respectively suggest that all asphalt performance grades be the same for cost effectiveness along with ease of ordering.
A: PG 64-28 may be used for driveway approaches.