2025 Street Improv-GeneralConditions.pdf

PDF 2 MB Posted

Attached to
Village of Lexington 2025 Street Improvements
Solicitation number
2025-27
Issued by
Sanilac County, Lansing City, Michigan

About this file

This file is a comprehensive set of bid documents for the Village of Lexington 2025 Street Improvements project in Sanilac County, Michigan, prepared by Townley Engineering, LLC. The project involves street improvement work on multiple roads including Barmilvian, Boynton, Denissen, Lake, Union, and William Streets, which will include pulverizing and cold milling existing HMA surfaces, sidewalk work, and some storm sewer improvements. Sealed bids will be received until 3:00 pm local time on Monday, May 19th, 2025, at the Village of Lexington Hall. The total estimated work includes 4,500 tons of HMA and various street rehabilitation activities across approximately 10 different street segments. Bidding documents are available from Townley Engineering after April 30th, 2025, and can be downloaded as PDF files after registration.

The project will be awarded on a unit price basis, with detailed pricing schedules provided for each street segment that include specific line items such as pulverizing, grading, hauling, subbase work, HMA placement, shoulder work, and restoration. The total project budget is not explicitly stated, but bidders are required to provide unit prices for each detailed work item. The contract includes provisions for substantial completion by November 1st, 2025, with final completion by November 15th, 2025. Liquidated damages are set at $1,000 per day for substantial completion delays and $1,200 per day for final completion delays. Contractors must provide bid security, demonstrate qualifications, and comply with all local, state, and federal regulations. The Village of Lexington will be the primary contracting entity, with Townley Engineering serving as the project engineer.

View the file

Other files

File Type Posted
C-111 Advertisement Streets 2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR

PROJECT: Village of Lexington 2025 Street Improvements

Barmilvian, Boynton, Denissen, Lake, Union, William

LOCATION: Village of Lexington, Sanilac County

Michigan

OWNER:

Village of Lexington

ENGINEER:

TOWNLEY ENGINEERING, LLC

PREPARED: April 2025

EJCDC® C-111, Suggested Advertisement for Bids for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1

VILLAGE OF LEXINGTON, MICHIGAN

2025 Street Improvements

ADVERTISEMENT FOR BIDS

Sealed Bids for the construction of the Village of Lexington Street Improvements will be received, by the Village of Lexington, at the office of the Village of Lexington Hall, located at 7227 Huron Street, Lexington, MI 48450, until 3:00 pm local time on Monday, May 19th, 2025, at which time the Bids received will be publicly opened and read. The Project consists of improvements to Barmilvian, Boynton, Denissen, Lake, Union and William Streets involving but not limited to the following work items:

Pulverizing and Cold Mill HMA surfaces 4500 Tons HMA

Sidewalk and some Storm Sewer work.

The Issuing Office for the Bidding Documents is: Townley Engineering, LLC, scott@townleyengineering.com, www.townleyengineering.com. Prospective Bidders may obtain copies of the Bidding Documents from the Issuing Office as described below.

Bidding Documents also may be examined at the Construction Association of Michigan and the Lansing and Grand Rapids Builder’s Exchange. Builder’s Exchanges are authorized to share the contract documents with other exchanges.

Bidding Documents may be ordered via email after April 30, 2025, by contacting with the Issuing Office at scott@townleyengineering.com, with Lexington 2025 street improvements in the subject line. Following registration, complete sets of Bidding Documents may be downloaded from the Issuing Office’s website as portable document format (PDF) files. Partial sets of the Bidding Documents will not be available from the Issuing Office.

Bid security shall be furnished in accordance with the Instructions to Bidders. The Owner reserves the right to accept or reject any bid which is considered in the best interest of the Owner.

Owner: Villag of Lexington

By: Vicki Scott

Title: Clerk

Date: April 30, 2025

+ + END OF ADVERTISEMENT FOR BIDS + +

EJCDC® C-200, Instructions to Bidders for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

TOC Page1 of 1

INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT

TABLE OF CONTENTS

Page

Article 1— Defined Terms

Article 2— Bidding Documents

Article 3— Qualifications of Bidders

Article 4— Pre-Bid Conference ...................................................................... Error! Bookmark not defined.

Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

Article 6— Bidder’s Representations and Certifications

Article 7— Interpretations and Addenda

Article 8— Bid Security

Article 9— Contract Times

Article 10— Substitute and “Or Equal” Items

Article 11— Subcontractors, Suppliers, and Others

Article 12— Preparation of Bid

Article 13— Basis of Bid

Article 14— Submittal of Bid

Article 15— Modification and Withdrawal of Bid

Article 16— Opening of Bids

Article 17— Bids to Remain Subject to Acceptance

Article 18— Evaluation of Bids and Award of Contract

Article 19— Bonds and Insurance

Article 20— Signing of Agreement

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ARTICLE 1—DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.

ARTICLE 2—BIDDING DOCUMENTS

2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents

(together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is

Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.

2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.

2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by

Owner.

2.04 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Bidding Documents or make them available for examination.

Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from a plan room are encouraged to register as plan holders at the Issuing Office. Owner is not responsible for omissions in Bidding Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.

2.05 Electronic Documents

A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding

Documents are available, such documents will be made available to the Bidders as Electronic

Documents in the manner specified.

1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader.

B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in

Paragraph 2.03 above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.

ARTICLE 3—QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within

[5] days of Owner’s request, Bidder must submit the following information:

A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.

B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the

Effective Date of the Contract.

C. Bidder’s state or other contractor license number, if applicable.

D. Subcontractor and Supplier qualification information.

E. Other required information regarding qualifications.

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

ARTICLE 4—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

4.02 Existing Site Conditions

A. Subsurface and Physical Conditions

1. Owner will make copies of drawings referenced above available to any Bidder on request. These drawings are not part of the Contract Documents. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data, interpretations, opinions, or information shown or indicated in such drawings.

B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in

Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.

4.03 Site Visit and Testing by Bidders

A. Bidder is recommended to visit the Site and conduct a thorough visual examination of the

Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.

B. Bidders visiting the Site are required to arrange their own transportation to the Site.

C. All access to the Site other than during a pre-scheduled site visit with the owenr must be performed during normal working hours.

D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

E. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

F. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

ARTICLE 5—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

5.01 Express Representations and Certifications in Bid Form, Agreement

A. The Bid Form that each Bidder will submit contains express representations regarding the

Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.

B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.

ARTICLE 6—INTERPRETATIONS AND ADDENDA

6.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the

Bidding Documents.

6.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to

Engineer in writing. Contact information and submittal procedures for such questions are as follows:

A. [Insert contact information for submittal of questions to Engineer; describe any permissible or required special procedures, such as submittal via a Bidding Documents

Website.]

6.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders via the bidding documents

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

website. Questions received less than (3) three days prior to the date for opening of Bids may not be answered.

6.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract

Documents unless set forth in an Addendum that expressly modifies or supplements the Contract

Documents.

ARTICLE 7—BID SECURITY

7.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of [number] percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the

General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.

7.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required

Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if

Bidder defaults.

7.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the

Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

7.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.

ARTICLE 8—CONTRACT TIMES

8.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.

8.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial

Completion, or completion of the Work in readiness for final payment, are set forth in the

Agreement.

ARTICLE 9—SUBSTITUTE AND “OR EQUAL” ITEMS

9.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.

9.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of

“or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 10—SUBCONTRACTORS, SUPPLIERS, AND OTHERS

10.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective

Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

10.02 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening:

A. Milling and Pulverizing

B. HMA supplier

C. Concrete Supplier

10.03 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such

Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent

Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

10.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the

Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.

Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in

Paragraph 7.07 of the General Conditions.

ARTICLE 11—PREPARATION OF BID

11.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

11.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the

Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the

Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.

11.03 A Bid must be executed and signed by an individual having the authority to do so on the Bidders behalf. If requested by the owner evidence of authority to sign must be given within 2 days of the opening.

11.04 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.

11.05 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.

11.06 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.

11.07 If requested by the owner, the Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.

ARTICLE 12—BASIS OF BID

12.01 Unit Price

A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the

Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

12.02 Allowances

A. For cash allowances the Bid price must include such amounts as the Bidder deems proper for

Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General

Conditions.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ARTICLE 13—SUBMITTAL OF BID

13.01 The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the

Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the

Bid Form.

13.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the

Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated in the

Advertisement.

13.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the

Bidder unopened.

ARTICLE 14—MODIFICATION AND WITHDRAWAL OF BID

14.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

14.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.

14.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.

ARTICLE 15—OPENING OF BIDS

15.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 16—BIDS TO REMAIN SUBJECT TO ACCEPTANCE

16.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 17—EVALUATION OF BIDS AND AWARD OF CONTRACT

17.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner reserves the right to accept all or portions of said bid and has the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

17.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.

17.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the

Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then

Owner will reject the Bid as nonresponsive.

17.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.

17.05 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the

Bid Form or prior to the Notice of Award.

B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

17.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

17.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 18—BONDS AND INSURANCE

18.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.

18.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.

ARTICLE 19—SIGNING OF AGREEMENT

19.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 30 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful

Bidder, together with printed and electronic copies of the Contract Documents as stated in

Paragraph 2.02 of the General Conditions.

ARTICLE 20—THIS AREA RESERVED

EJCDC® C-410, Bid Form for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

BID FORM FOR CONSTRUCTION CONTRACT

The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to

Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 1—OWNER AND BIDDER

1.01 This Bid is submitted to: The Village of Lexington, Sanilac County, Michigan

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2—ATTACHMENTS TO THIS BID

2.01 The following documents are submitted with and made a condition of this Bid:

A. Required Bid security;

B. Acknowledge of Addendum(s)

C. List of Proposed Subcontractors;

D. List of Proposed Suppliers;

ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES

3.01 Unit Price Bids

A. Bidder will perform the following Work at the indicated unit prices:

1. BARMILVIAN STREET: Huron to Lake Street

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

1 Pulverize HMA surface SYD 2,072 $ $

Grading and Compaction of Pulverized surface SYD 2,072 $ $

Loading, Hauling milled material to Municipality CYD 230 $ $

4 Subbase work SYD 488 $ $

5 3 inches of HMA 4EML & 5EML TON 388 $ $

6 1ft - Aggregate Shoulder 3in depth SYD 255 $ $

7 Restoration LSUM 1 $ $

8 Maintaining Traffic LSUM 1 $ $

Proposed Construction Cost $

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

2. W. BOYNTON STREET: Union to Main Street

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

1 Pulverize HMA surface SYD 4,015 $ $

Grading and Compaction of Pulverized surface SYD 4,015 $ $

Loading, Hauling milled material to Municipality CYD 450 $ $

4 Subbase work SYD 1,470 $ $

5 Adjust Manhole cover Each 2 $ $

24 in Storm water Structure and Casting Each 1 $ $

7 Connection to Existing Structure Each 1 $ $

8 10" Storm Sewer LF 40 $ $

Remove & Replace Curb & Gutter, Conc., Det F4 LF 25 $ $

10 5' Sidewalk REM SFT 2,000 $ $

5' Sidewalk Conc., 6 inch ADA standards SFT 2000 $ $

Grade swale north edge of pavement LF 500 $ $

HMA Drive approaches swale N.

Side TON 30 $ $

14 4 inches of HMA 4EML & 5EML TON 1070 $ $

15 1ft - Aggregate Shoulder 3in depth SYD 125 $ $

16 Restoration LSUM 1 $ $

17 Maintaining Traffic LSUM 1 $ $

Proposed Construction Cost $

3. E. BOYNTON STREET: Main to Washington Street

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

1 Cold Milling Asphalt Surface SYD 1,254 $ $

Loading, Hauling milled material to Municipality CYD 450 $ $

5 Adjust Manhole cover Each 2 $ $

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

10 5' Sidewalk REM SFT 200 $ $

5' Sidewalk Conc., 6 inch ADA standards SFT 200 $ $

14 2 inches of HMA 5EML TON 150 $ $

15 1ft - Aggregate Shoulder 3in depth SYD 50 $ $

16 Restoration LSUM 1 $ $

17 Maintaining Traffic LSUM 1 $ $

Proposed Construction Cost $

4. E. DENISSEN STREET: Union to Main Street.

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

1 Pulverize HMA surface SYD 3,497 $ $

Grading and Compaction of Pulverized surface SYD 3,497 $ $

Loading, Hauling milled material to Municipality CYD 388 $ $

4 Subbase work SYD 488 $ $

5 Adjust Manhole cover Each 4 $ $

6 Adjust water valve box Each 2 $ $

7 3 inches of HMA 4EML & 5EML TON 655 $ $

8 1ft - Aggregate Shoulder 3in depth SYD 230 $ $

9 Restoration LSUM 1 $ $

10 Maintaining Traffic LSUM 1 $ $

Proposed Construction Cost $

5. W. DENISSEN STREET: Union Street to W. End thence North 255ft

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

Cold Milling Asphalt Surface 2 inches SYD 3,893 $ $

Loading, Hauling milled material to Municipality CYD 210 $ $

Base preparation around curve and north towards lagoons 255'

3 Subbase work SYD 550 $ $

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

4 Adjust Manhole cover Each 2 $ $

5 Adjust water valve box Each 1 $ $

6 2 inches of HMA 5EMLwearing TON 465 $ $

4 inches of HMA 4EML leveling and base west end TON 110 $ $

Leveling course around curve and north towards lagoons 255'

8 1ft - Aggregate Shoulder 3in depth SYD 290 $ $

9 Restoration LSUM 1 $ $

10 Maintaining Traffic LSUM 1 $ $

Proposed Construction Cost $

6. LAKE STREET: Union to East for 850ft

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

1 Pulverize HMA surface SYD 1,010 $ $

N. Lane watermain trench

Grading and Compaction of Pulverized surface SYD 1,010 $ $

Loading, Hauling milled material to Municipality CYD 220 $ $

Cold Milling Asphalt Surface 2 inches SYD 1,830 $ $

S. Lane and Parallel Parking in front of School $ $

5 Subbase work SYD 245 $ $

6 Adjust Manhole cover Each 2 $ $

7 Adjust water valve box Each 2 $ $

8 2 inches of HMA 4EML leveling TON 140 $ $

9 2 inches of HMA 5EML Wearing TON 340 $ $

10 1ft - Aggregate Shoulder 3in depth SYD 122 $ $

11 Restoration of Gravel Driveways SYD 100 $ $

12 Restoration LSUM 1 $ $

13 Maintaining Traffic LSUM 1 $ $

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

7. W. LAKE STREET: Barmilivan west including Cul-de-Aac

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

1 Pulverize HMA surface SYD 1,172 $ $

Grading and Compaction of Pulverized surface SYD 1,172 $ $

Loading, Hauling milled material to Municipality CYD 130 $ $

4 Subbase work SYD 245 $ $

5 Adjust Manhole cover Each 0 $ $

6 Adjust water valve box Each 0 $ $

7 3 inches of HMA 4EML & 5EML TON 220 $ $

8 1ft - Aggregate Shoulder 3in depth SYD 70 $ $

9 Restoration LSUM 1 $ $

10 Maintaining Traffic LSUM 1 $ $

Proposed Construction Cost $

8. N. UNION STREET: Huron to Denissen Street

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

1 Pulverize HMA surface SYD 3,095 $ $

Grading and Compaction of Pulverized surface SYD 3,095 $ $

Loading, Hauling milled material to Municipality CYD 520 $ $

4 Subbase work SYD 488 $ $

5 Adjust Manhole cover Each 3 $ $

6 Adjust water valve box Each 6 $ $

7 6 inches of HMA 4EML & 5EML TON 1175 $ $

8 Restoration LSUM 1 $ $

9 Maintaining Traffic LSUM 1 $ $

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

9. S. UNION STREET: Boynton to Huron Street

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

Cold Milling Asphalt Surface 2 inches SYD 1,070 $ $

Loading, Hauling milled material to Municipality CYD 60 $ $

3 2 inches of HMA 5EML TON 130 $ $

4 Maintaining Traffic LSUM 1 $ $

Proposed Construction Cost $

10. WILLIAM DRIVE: Denissen south including Cul-de-Sac

Item No. Description of work Unit

Estimated Quantity

Estimated Unit Cost Cost

1 Pulverize HMA surface SYD 1,273 $ $

Grading and Compaction of Pulverized surface SYD 1,276 $ $

Loading, Hauling milled material to Municipality CYD 145 $ $

4 Subbase work SYD 245 $ $

5 3 inches of HMA 4EML & 5EML TON 235 $ $

6 1ft - Aggregate Shoulder 3in depth SYD 65 $ $

7 Restoration LSUM 1 $ $

8 Maintaining Traffic LSUM 1 $ $

Proposed Construction Cost $

B. Bidder acknowledges that:

1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover

Contractor’s overhead and profit for each separately identified item.

2. Estimate quantities are not guaranteed and are solely for the purpose of comparison of

Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.

3.02 Total Bid Price (Lump Sum and Unit Prices)

Total Bid Price (Total of all Lump Sum and Unit Price Bids) $

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

3.03 The Contract Price will be the Cost of the Work, determined as provided in Paragraph 13.01 of the

General Conditions, together with the following fee, and subject to the Guaranteed Maximum

Price.

ARTICLE 4—TIME OF COMPLETION

4.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

4.02 Bidder accepts the provisions of the Agreement as to liquidated damages.

ARTICLE 5—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF

ADDENDA

5.01 Bid Acceptance Period

A. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

5.02 Instructions to Bidders

A. Bidder accepts all of the terms and conditions of the Instructions to Bidders.

5.03 Receipt of Addenda

A. Bidder hereby acknowledges receipt of the following Addenda:

Addendum Number Addendum Date

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

6.01 Bidder’s Representations

A. In submitting this Bid, Bidder represents the following:

1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.

2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.

4. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical

Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as Contractor; and

(c) Bidder’s (Contractor’s) safety precautions and programs.

5. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract

Times, and in accordance with the other terms and conditions of the Contract.

6. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

7. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.

8. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

9. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

6.02 Bidder’s Certifications

A. The Bidder certifies the following:

1. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.

2. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.

3. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.

a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process.

b. Fraudulent practice means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition.

c. Collusive practice means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels.

d. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

BIDDER hereby submits this Bid as set forth above:

Bidder:

(typed or printed name of organization)

By:

(individual’s signature)

Name:

(typed or printed)

Title:

(typed or printed)

Date:

(typed or printed)

If Bidder is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.

Attest:

(individual’s signature)

Name:

(typed or printed)

Title:

(typed or printed)

Date:

(typed or printed)

Address for giving notices:

Bidder’s Contact:

Name:

(typed or printed)

Title:

(typed or printed)

Phone:

Email:

Address:

Bidder’s Contractor License No.: (if applicable)

EJCDC® C-435, Bid Bond (Damages Form).

Copyright© 2018 National Society of Professional Engineer, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

BID BOND (DAMAGES FORM)

Bidder Surety

Name: [Full formal name of Bidder] Name: [Full formal name of Surety]

Address (principal place of business): Address (principal place of business):

[Address of Bidder’s principal place of business] [Address of Surety’s principal place of business]

Owner Bid

Name: Village of Lexington Project (name and location):

Address (principal place of business): Village of Lexington 2025 Street Improvements

7227 Huron Street

Lexington, Michigan 48450

Bid Due Date: May 16th 2025

Bond

Bond Amount:

Date of Bond:

Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this Bid Bond, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.

Bidder Surety

(Full formal name of Bidder) (Full formal name of Surety) (corporate seal)

By: By:

(Signature) (Signature) (Attach Power of Attorney)

Name: Name:

(Printed or typed) (Printed or typed)

Title: Title:

Attest: Attest:

(Signature) (Signature)

Name: Name:

Title:

Notes: (1) Note: Addresses are to be used for giving any required notice. (2) Provide execution by any additional parties, such as joint venturers, if necessary.

EJCDC® C-510, Notice of Award.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

NOTICE OF AWARD

Date of Issuance:

Owner: Village of Lexington Owner’s Project No.:

Engineer: Townley Engineering Engineer’s Project No.:

Project: Street Improvements

Contract Name: 2025 Street Improvements

Bidder:

Bidder’s Address:

You are notified that Owner has accepted your Bid dated [________________] for the above Contract, and that you are the Successful Bidder and are awarded a Contract for:

The Village of Lexington 2025 Street Improvements

The Contract Price of the awarded Contract is $[_____________________]. Contract Price is subject to adjustment based on the provisions of the Contract, including but not limited to those governing changes, Unit Price Work, and Work performed on a cost-plus-fee basis, as applicable.

The Notice of Award, and one copy of the Contract Documents accompanies this Notice of Award, or has been transmitted or made available to Bidder electronically.

☐ Drawings will be delivered separately from the other Contract Documents.

You must comply with the following conditions precedent within 15 days of the date of receipt of this

Notice of Award:

1. Deliver to Owner [3 copies] of the Agreement, signed by Bidder (as Contractor).

2. Deliver with the signed Agreement(s) the Contract security (such as required performance and payment bonds) and insurance documentation, as specified in the Instructions to Bidders and in the General Conditions, Articles 2 and 6.

3. Other conditions precedent (if any): [None]

Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited.

Within 10 days after you comply with the above conditions, Owner will return to you one fully signed counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in Paragraph 2.02 of the General Conditions.

Owner: Village of Lexington

By (signature):

Name (printed):

Copy: Engineer

EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

AGREEMENT BETWEEN OWNER AND CONTRACTOR

FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)

This Agreement is by and between Village of Lexington (“Owner”) and [______________________]

(“Contractor”).

Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary

Conditions.

Owner and Contractor hereby agree as follows:

ARTICLE 1—WORK

1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Village of Lexington 2025 Street Improvements

ARTICLE 2—THE PROJECT

2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Village of Lexington 2025 Street Improvements

ARTICLE 3—ENGINEER

3.01 The Owner has retained Townley Engineering LLC (“Engineer”) to act as Owner’s representative, assume all duties and responsibilities of Engineer, and have the rights and authority assigned to

Engineer in the Contract.

3.02 The part of the Project that pertains to the Work has been designed by Townley Engineering LLC

“Engineer”

CONTRACT TIMES

4.01 Time is of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.

4.02 Contract Times: Dates

A. The Work will be substantially complete on or before [November 1st 2025], and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before [November 15th 2025].

4.04 Milestones

A. Parts of the Work must be substantially completed on or before the following Milestone(s):

1. Milestone 1 [Start Date – after July 4th Celebration]

2. Milestone 2 [All work to be consecutive once started]

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

4.05 Liquidated Damages

A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and

Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time.

Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):

1. Substantial Completion: Contractor shall pay Owner $1000 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial

Completion, until the Work is substantially complete.

2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $1200 for each day that expires after such time until the Work is completed and ready for final payment.

4. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive, and will not be imposed concurrently.

B. If Owner recovers liquidated damages for a delay in completion by Contractor, then such liquidated damages are Owner’s sole and exclusive remedy for such delay, and Owner is precluded from recovering any other damages, whether actual, direct, excess, or consequential, for such…

This is the start of the file's text. The full file is on GovTribe.