The document is a set of plan sheets for the 2025 Street Mill and Overlay Program for the Town of Telluride, Colorado. The project involves road rehabilitation work on multiple streets including Prospect Avenue, Smuggler Avenue, E. Pacific Avenue, Townsend Street, N. Pine Street, E. Colorado Avenue, and the Highway 145 Spur. The scope of work includes 1.5-inch full width milling, mill and HMA patch excavation in coordination with public works, HMA overlay ranging from 2-inch to 2.5-inch thickness, and hauling millings to the Highway 145 wide-spot for reuse. The project covers approximately 1,675 tons of Hot Mix Asphalt (HMA) across various street segments, with specific quantities detailed for each street section.
The plan sheets include detailed aerial maps highlighting the exact locations and extents of the proposed work, with blue-lined sections indicating the streets to be milled and overlaid. Additional notes specify technical requirements such as excavation depths, overlay thicknesses, and coordination with public works. A special note on Sheet 5 indicates that due to restaurant parklets on the main street, paving work must take place after October 1, 2025. An alternate option on Sheet 9 suggests removing an existing clay sewer section and replacing it with 8-inch SDR 35 PVC pipe. The project appears to be funded through the town's public works department, with a focus on maintaining and improving the town's street infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025 Street Mill and Overlay Program Bid Packet 3.4.25.pdf | ||
| Addendum No 1.pdf | ||
| Bid Tab for Contractors.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
togren Text Box
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Text Box
COVER
SHEET
togren Image togren Callout
TOWN "WIDE-SPOT"
togren Ellipse togren Line togren Line togren Line togren Line togren Line togren Line togren Line togren PolyLine togren Image togren Typewritten Text Tara Ogren
3.4.25
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Image togren Line togren PolyLine togren PolyLine togren Text Box
NOTES & ESTIMATED QUANTITIES:
PROSPECT AVE & SMUGGLER AVE
1) 1.5-INCH FULL WIDTH MILL - (77 CY)
2) MILL & HMA PATCH - EXCAVATE TO FULL DEPTH AND PATCH IN COORDINATION WITH PUBLIC WORKS (SG 1-INCH) - (10 TONS)
3) HMA 2-INCH OVERLAY (SX 1/2-INCH)
- (253 TONS)
4) HAUL OFFSITE FOR REUSE
togren
SHEET 1
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Image togren PolyLine togren Text Box
NOTES & ESTIMATED QUANTITIES:
E. PACIFIC AVE - WILLOW TO END
1) 1.5-INCH FULL WIDTH MILL - (22 CY)
2) MILL & HMA PATCH - EXCAVATE TO FULL DEPTH AND PATCH IN COORDINATION WITH PUBLIC WORKS - (3 TONS)
3) HMA 2.5-INCH OVERLAY (SX 1/2-INCH) - (73 TONS)
4) HAUL OFFSITE FOR REUSE
SHEET 2
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Image togren PolyLine togren Text Box
NOTES & ESTIMATED QUANTITIES:
TOWNSEND ST - COLUMBIA AVE TO COLORADO AVE
1) 1.0-INCH EDGE MILL ON TOWNSEND. WEST SIDE 9-FOOT WIDTH. EAST SIDE 18-FOOT WIDTH. - (33 CY)
2) HMA 2.5-INCH OVERLAY (SX 1/2-INCH) - (215 TONS)
3) 1.5-INCH MILL INTERSECTION OF TOWNSEND ST AND COLUMBIA AVE. - (10 CY)
4) HMA 2.5-INCH OVERLAY INTERSECTION OF TOWNSEND ST AND COLUMBIA AVE. (SX 1/2-INCH) - (4 TONS)
5) MILL & HMA PATCH - EXCAVATE TO FULL DEPTH AND PATCH IN COORDINATION WITH PUBLIC WORKS (SG 1-INCH) - (3 TONS)
6) HAUL MILLINGS TO HWY 145 WIDE-SPOT
FOR REUSE
PolyLine togren
SHEET 3
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Image togren Text Box
NOTES & ESTIMATED QUANTITIES:
N. PINE ST - GALENA AVE TO COLUMBIA AVE
1) 1.5-INCH FULL WIDTH MILL - (24 CY)
2) MILL & HMA PATCH - EXCAVATE TO FULL DEPTH AND PATCH IN COORDINATION WITH PUBLIC WORKS (SG 1-INCH) - (3 TONS)
3) HMA 2.5-INCH OVERLAY (SX 1/2-INCH) - (78 TONS)
4) HAUL MILLINGS TO HWY 145 WIDE-SPOT FOR REUSE
SHEET 4
PolyLine
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Image togren PolyLine togren Line togren Ellipse togren Ellipse togren Ellipse togren Callout
ADD ALTERNATE:
REMOVE SECTION OF EXISTING CLAY SEWER AND REPLACE WITH APPROXIMATELY 12-FEET OF 8-INCH SDR 35 PVC. SEE SHEET 9 FOR DETAILS.
togren Text Box
NOTES & ESTIMATED QUANTITIES:
E. COLORADO AVE - PINE ST TO WILLOW ST
1) 2.0-INCH MILL FULL WIDTH - (228 CY)
2) MILL & HMA PATCH - EXCAVATE TO FULL DEPTH AND PATCH IN COORDINATION WITH PUBLIC WORKS - (60 TONS)
3) HMA 2.0-INCH OVERLAY FULL WIDTH (SX 1/2-INCH) - (451 TONS)
togren Text Box
SHEET 5
togren Text Box
NOTES CONTINUED:
4) CONTRACTOR TO TAKE THREE (3) CORE SAMPLES, ONE (1) EVERY 300 FEET ALONG COLORADO AVE.
5) HAUL MILLINGS TO HWY 145 WIDE-SPOT FOR REUSE
6) DUE TO RESTAURANT PARKLETS ON MAIN STREET, PAVING WORK MUST TAKE PLACE AFTER OCTOBER 1, 2025 togren Ellipse togren Ellipse togren Ellipse togren Callout
CORE SAMPLE LOCATION
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Image togren Text Box
NOTES & ESTIMATED QUANTITIES:
E. COLORADO AVE - MAPLE ST TO PINON ST
1) 1.0-INCH EDGE MILL ON NORTH SIDE AT 10-FOOT WIDTH - (19 CY)
2) 1.5-INCH FULL WIDTH MILL TO SOUTH EDGE - (48 CY)
3) MILL & HMA PATCH - EXCAVATE TO FULL DEPTH AND PATCH IN COORDINATION WITH PUBLIC WORKS - (30 TONS) togren PolyLine togren Text Box
SHEET 6
togren Text Box
NOTES CONTINUED:
4) HMA 1.5-INCH EDGE OVERLAY AT 10-FOOT WIDTH ON NORTH SIDE (SX 1/2-INCH) - (56 TONS)
5) 2-INCH OVERLAY TO SOUTH EDGE (SX 1/2-INCH) - (128 TONS)
6) HAUL OFFSITE FOR REUSE
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Image togren PolyLine togren Text Box
NOTES CONTINUED:
E. COLORADO AVE - PINON ST TO COLUMBINE ST
1) 1.5-INCH FULL WIDTH MILL - (63 CY)
2) MILL & HMA PATCH - EXCAVATE TO FULL DEPTH AND PATCH IN COORDINATION WITH PUBLIC WORKS - (5 TONS)
3) HMA 2-INCH OVERLAY (SX 1/2-INCH) - (166 TONS)
4) HAUL MILLINGS TO HWY 145 WIDE-SPOT FOR REUSE
togren
SHEET 7
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Image togren Text Box
NOTES & ESTIMATED QUANTITIES:
E. COLORADO AVE - COLUMBINE ST TO LIBERTY BELL LN (INCLUDING BUS TURN AROUND)
1) 1.5-INCH FULL WIDTH MILL - (142 CY)
2) MILL & HMA PATCH - EXCAVATE TO FULL DEPTH AND PATCH IN COORDINATION WITH PUBLIC WORKS - (60 TONS)
2) HMA 2-INCH OVERLAY (SX 1/2-INCH) - (370 TONS)
3) HAUL OFFSITE FOR REUSE
togren PolyLine togren
SHEET 8
TOWN OF TELLURIDE, COLORADO
togren Text Box
TELLURIDE PUBLIC WORKS
2025 STREETS
MILL & OVERLAY PROJECT
togren Snapshot togren Text Box
SHEET 9
togren Ellipse togren Image togren Ellipse togren Ellipse togren Callout
MH 74.4.5
togren Callout MH 74.3.1b togren Image togren Callout
SEVERE OFFSET JOINT AT STA 1+19
togren Text Box
ADD ALTERNATE NOTES:
200 BLOCK - WILLOW ST
1) WORK MUST TAKE PLACE IN COORDINATION AND BEFORE TOWN'S THIRD PARTY CIPP SANITARY SEWER LINING CONTRACTOR.
2)ANTICIPATED START DATE OF CIPP LINING (8-INCH) IS AUGUST 7, 2025.
3) IT IS RECOMMENDED TO START WORK EARLY AUGUST TO AVOID HIGH GROUND WATER CONDITIONS. 2023 GROUND WATER DATA SHOWS APPROXIMATE ELEVATION AT OR BELOW 8749' togren Line togren Callout
BEGIN OPEN CUT AT STA 1+25, END OPEN CUT AT STA 1+12.5
togren Callout
6-INCH STEEL GAS MAIN APPROXIMATELY 5-FEET EAST OF SANITARY SEWER