2025 Drawings - Delineator Posts.pdf
PDF 81 KB Posted
- Attached to
- RoW Mow Trim and Litter Removal AA Highway
- Solicitation number
- RFB-605-2500000408-1
- Issued by
- Campbell County, Kentucky
About this file
This file contains technical drawings and specifications for flexible delineator posts and mounting details, though the specific agency is not indicated in the provided pages. The drawings show detailed schematics for the installation of delineator posts along curved roadways, including horizontal curves and expressway/freeway sections, with specific mounting and spacing requirements.
The technical drawings illustrate both median and horizontal curve installations with key specifications including: 4" approximate post spacing, painted edge lines, travel lanes, shoulder widths, and flexible delineator post mounting details. The posts are to be installed at approximately 50-foot intervals, with adjustments made for curves and site-specific requirements. The diagrams provide comprehensive mounting specifications including post heights, base attachments, and proper positioning relative to painted road lines. No pricing information, contract terms, or procurement details are included in these technical specification drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025 Drawings Mowing with Trimming.pdf | ||
| 2025 Drawing - Trimming of Bridge Embankments.pdf | ||
| Final_RFB_605_2500000408_1_SO_FORM.PDF | ||
| AA HWY WLS Feb 2020.xlsx | XLSX spreadsheet | |
| How to Submit an Online Response - March 2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .