2025.416.001 Project Manual IFC 20261102-R003.pdf
PDF 3 MB Posted
- Solicitation number
- 2140630
- Issued by
- Tioga County, New York
About this file
This is a Project Manual and Contract Proposal prepared by the Tioga County Department of Public Works for the installation of a new overhead door to the mechanical equipment room mezzanine at the Tioga County Public Safety Building located at 103 Corporate Drive, Owego, New York. The project is locally funded and consists of overhead door installation work. Sealed bids will be received on December 1, 2026, at 11:00 a.m. at the Office of the Commissioner, 477 Route 96, Owego, New York. Contract documents are available electronically beginning November 6, 2026, upon request from Justin Ruggiero at ruggieroj@tiogacountyny.gov. A mandatory pre-bid meeting is scheduled for Thursday, November 12, 2026, at 9:30 a.m. at 103 Corporate Drive, Owego, New York. The contract term is 180 calendar days following the Notice to Proceed, with final completion required when all punch list items are completed and the contractor has demobilized. Bids must remain subject to acceptance for 45 days after the bid opening date, and the Notice of Award will be issued within 45 days of the bid opening.
Bid security of five percent of the bid amount is required in the form of a certified check, bank check, or bid bond. The successful bidder must furnish performance and payment bonds and provide insurance in accordance with the contract specifications, including commercial general liability coverage with limits of $2,000,000 general aggregate and $1,000,000 per occurrence, automobile liability of $1,000,000 combined single limit, umbrella/excess liability of $1,000,000, and workers' compensation statutory coverage. Tioga County is exempt from New York State sales and use taxes, and sales tax shall not be included in the bid amount. Liquidated damages of $500 per day apply for work not completed within the 180-calendar-day completion period. This is a prevailing wage project requiring certified payrolls and compliance with New York State Department of Labor prevailing wage rates (PRC# 2026007228). All bids must be accompanied by a Non-Collusion Statement, and the contractor must comply with equal opportunity and non-discrimination requirements. Tioga County reserves the right to reject any and all bids and to award to the lowest responsible bidder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025.416.001 Drawings IFC 20260318-R001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Proposal
Tioga County
103 CORPORATE DRIVE, O.H. DOOR
Owego, New York
Bid Opening
– Tuesday, December 1st, 2026 @ 11:00 am
Documents Friday, November 6th, 2026
TIOGA COUNTY
DEPARTMENT OF PUBLIC WORKS
Submitted in accordance with New York State Department of Transportation Standard Specifications dated January 1, 2024, including current additions and modifications, and the Highway Law.
DELTA PN.: 2025.416.001
NOVEMBER 6, 2026
Contract Documents for
103 CORPORATE DRIVE, O.H. DOOR
Tioga County Department of Public Works 477 Route 96
Owego, New York 13827
Prepared By:
Delta Engineers, Architects, & Surveyors
860 Hooper Road Endwell, NY 13760
607-231-6605
Richard R. Sanguinito, P.E.
NYS LIC. #073716
March 18, 2026
TABLE OF CONTENTS Page - 1
103 CORPORATE DRIVE - O.H. DOOR
DELTA PN.: 2025.416.001
MARCH 18, 2026
TABLE OF CONTENTS
CONTRACT DOCUMENTS
Table of Contents
List of Drawing Sheets
Advertisement for Bids AB-1
BIDDING REQUIREMENTS
Instructions to Bidders IB-1 thru IB-8
Supplemental Instructions to Bidders SIB-1
Proposal P-1
Bidders Declaration B-1 thru B-2
Bid Bond B-3 thru B-4
Statement of Contractor’s Qualifications B-5 thru B-6
CONTRACT BETWEEN OWNER & CONTRACTOR (Blank Forms) C-1 thru C-5
SUPPLEMENTARY CONDITIONS SC-1 thru SC-5
APPENDIX A
General Contract and Insurance Specifications
APPENDIX B
Prevailing Wage Rates (New York State)
NYSDOL - Prevailing Wages (View PRC Request)
NYSDOL - Prevailing Wages
APPENDIX C
Standard Clauses
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
002513 Prebid Meetings
002600 Procurement Substitution Procedures
003113 Preliminary Schedules
DIVISION 01 - GENERAL REQUIREMENTS
NOT USED
REFER TO NYSDOT Standard Specifications
DIVISION 02 - EXISTING CONDITIONS
DIVISION 03 – CONCRETE
TABLE OF CONTENTS Page - 2
DELTA PN.: 2025.416.001
MARCH 18, 2026
DIVISION 04 - MASONRY
DIVISION 05 - METALS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
DIVISION 08 – OPENINGS
DIVISION 09 - FINISHES
DIVISION 10 - SPECIALTIES
DIVISION 11 - EQUIPMENT
DIVISION 12 - FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14 - CONVEYING EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
DIVISION 22 - PLUMBING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
DIVISION 26 - ELECTRICAL
DIVISION 27 - COMMUNICATIONS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
TABLE OF CONTENTS Page - 3
DELTA PN.: 2025.416.001
MARCH 18, 2026
DIVISION 31 - EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
DIVISION 33 - UTILITIES
TABLE OF CONTENTS Page - 4
LIST OF DRAWING SHEETS 000115 - 1
103 CORPORATE DRIVE - O.H. DOOR
DELTA PN.: 2025.416.001
MARCH 18, 2026
DOCUMENT 000115 - LIST OF DRAWING SHEETS
1.1 LIST OF DRAWINGS
A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of
Contents page of the separately bound drawing set titled G-000, dated March 18, 2026, as modified by subsequent Addenda and Contract modifications.
END OF DOCUMENT 000115
LIST OF DRAWING SHEETS 000115 - 2
103 CORPORATE DRIVE - O.H. DOOR
ADVERTISEMENT FOR BIDS
AB-1
Tioga County Department of Public Works will receive sealed Bids on December 1, 2026, at the Office of the Commissioner, 477 Route 96, Owego NY, up to and including 11:00 a.m., where bids will be publicly opened and read for the following project:
This is a locally funded project that includes new overhead door installation to the mechanical equipment room mezzanine for the Tiago County Public Safety Building.
On or after November 6, 2026. The Contract Documents, consisting of the Advertisement for Bids, Information to Bidders, Bid Agreement, General Conditions, Supplementary Conditions, Bonds, Drawings, Specifications and Addenda may be examined at the following locations:
477 State Route 96
Owego, NY 13827
Copies of the Contract Documents may be obtained electronically upon documents requested from the county via e-mail request to Ruggiero, Justin, ruggieroj@tiogacountyny.gov
Mandatory Pre-Bid Meeting Thursday November 12, 2026, 9:30 AM- 103 Corporate Drive, Owego, New York
Bids must be made in writing on the forms furnished and shall be accompanied by a bid guaranty for an amount not less than five percent (5%) of the amount bid in accordance with the Instructions to Bidders.
The successful Bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds and provide insurance in accordance with the Instructions to Bidders.
All bids must be accompanied by a Non-Collusion Statement in order to be considered.
Tioga County is an Equal Opportunity / Affirmative Action employer.
Tioga County is exempt under Section 1116 of the New York State Tax Law, and therefore, no sales tax shall be included in the bid.
Tioga County reserves the right to reject any and all bids and to accept any Bid or individual item or items which may be deemed most favorable to its best interests.
ADVERTISEMENT FOR BIDS
AB-1
INSTRUCTIONS TO BIDDERS
IB-1
1. DEFINED TERMS
1.1. Terms used in these Instructions to Bidders, which are defined in section 101-02 of the New York
State Standard Specifications and in the Supplementary Conditions, have the meanings assigned to them in the General Provisions. The term "Bidder" means one who submits a Bid directly to
Owner, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Successful
Bidder" means the lowest, qualified, responsible and responsive Bidder to whom Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award. Refer to Section 24
Responsibility Determinations included herein at the end of the document. The term "Bidding
Documents" includes the Advertisement for Bids, Instruction to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). The term
“Contract” refers to any construction or service contract that is required by statute to be let by competitive bid to the lowest responsible bidder. The term “Contracting Agencies” refers to any agency or department of the county which is letting a contract through competitive bidding.
1.2. For the purposes of this contract the term ENGINEER shall refer to Tioga County DPW
Commissioner of Public Works or his designee, 477 Route 96, Owego, New York 13827.
2. COPIES OF BIDDING DOCUMENTS
2.1. Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the Advertisement for Bids, may be obtained from the Owner.
2.2. Complete sets of Bidding Documents must be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.3. Owner and Engineer in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.
3. QUALIFICATIONS OF BIDDERS
3.1. To demonstrate qualifications to perform the work, each Bidder must be prepared to submit within five days of Owner's request written evidence, such as financial data, previous experience, present commitments and other such data as may be called for below (or in the Supplementary
Instructions). Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualifications prior to award of the contract. The enclosed Bidder's Qualification Statement Document shall be completed and submitted with the Bid.
4. EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1. It is the responsibility of each Bidder before submitting a Bid, to (a) examine the Contract
Documents thoroughly, (b) visit the site to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work , (c) consider federal, state and local Laws and Regulations that may affect cost, progress performance or furnishing of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, (e) notify Engineer
IB-2
of all conflicts, errors or discrepancies in the Contract Documents and (f) be familiar with all
Public Utility Requirements.
4.2. Information and data reflected in the Contract Documents with respect to Underground Facilities at or contiguous to the site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities or others. Neither the Owner nor the Engineer assumes responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplemental Conditions.
4.3. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Facilities and other physical conditions, and possible changes in the Contract Documents due to differing conditions appear in Section 104 of the New
York State Standard Specifications.
4.4. Before submitting a Bid, each Bidder will, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and
Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work in accordance with the time, price and other terms and conditions of the Contract Documents.
4.5. The lands upon which the Work is to be performed, right-of-way and easements for access thereto and other lands designated for use by contractor in performing the Work are identified in the
Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by Contractor. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by Owner unless otherwise provided in the Contract Documents.
4.6. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents, and that the
Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the work.
5. INTERPRETATIONS AND ADDENDA
5.1. All questions about the meaning or intent of the Contract Documents are to be directed to the
Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by the
Engineer as having received the Bidding Documents. Questions received less than five days prior to the date for opening of Bids may not be answered. Only questions answered by formal written
Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
5.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner and Engineer.
IB-3
6. INSURANCE
6.1. The Contractor, at its own cost and expense, agrees to the insurance, indemnification and general terms and conditions set forth in the Supplementary Conditions attached hereto entitled “Tioga
County, New York – General Contract and Insurance Specifications”, which are to be incorporated herein by reference as if fully set forth.
7. BID SECURITY
7.1. Each Bid must be accompanied by Bid security made payable to the Owner in an amount of five percent (5%) of the Bidder's maximum Bid price and in the form of a certified or bank check or a Bid Bond (on form attached) issued by a surety.
7.2. The Bid security of the Successful Bidder will be retained until such Bidder has executed the
Contract and furnished the required contract security, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract and furnish the required contract security within fifteen days after the Notice of Award, Owner may annul the
Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other
Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of the seventh day after the Effective Date of the Contract or the forty-sixth day after the Bid opening, whereupon Bid security furnished by such Bidders will be returned. Bid security with Bids which are not competitive will be returned within seven days after the Bid opening.
8. CONTRACT TIME
8.1. The Work shall be completed and ready for final payment 180 calendar days after the Notice to
Proceed as set forth in the Bid Form and the Contract. Final completion will constitute as, all punch list items completed, and the contractor demobilized.
9. LIQUIDATED DAMAGES
9.1. Time is of the essence. Provisions for liquidated damages are set forth in the Contract and section
108-03 of the New York State Standard Specifications. If the Contractor fails to have the work complete within 180 calendar days after the Notice to Proceed, then the Contractor shall pay the Owner five hundred dollars ($500) for each day that the project remains incomplete and not ready for final payment.
10. SUBSTITUTE OR "OR-EQUAL" ITEMS
10.1. The Contract, if awarded, will be on the basis of materials and equipment described in the
Drawings or specified in the Specifications without consideration of possible substitutes.
Substitutes or "or-equal" items of material or equipment may be furnished or used by Contractor if acceptable to Engineer; however application for such acceptance will not be considered by
Engineer until after the Effective Date of the Contract.
11. SUBCONTRACTORS, SUPPLIERS AND OTHERS
11.1. If the Supplemental Conditions require the identity of certain Subcontractors, Suppliers and other persons and organizations (including those who are to furnish the principal items of material and
IB-4
equipment) to be submitted to the Owner in advance of the specified date prior to the Effective
Date of the Contract, the apparent Successful Bidder, and any other Bidder so requested, shall within seven days after the Bid opening submit to Owner a list of all such Subcontractors, Suppliers and other persons and organizations proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such
Subcontractor, Supplier, person or organization if requested by Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, other person or organization, either may before the Notice of Award is given request the apparent
Successful Bidder to submit an acceptable substitute without an increase in Bid price.
If apparent Successful Bidder declines to make any such substitution, Owner may award the contract to the next lowest bidder that proposes to use acceptable Subcontractor, Supplier, and other persons and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Bidder. Any Subcontractor, Supplier, other person or organization listed and to whom Owner or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after reasonable objection and due investigation.
11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor has reasonable objection.
12. BID FORM
12.1. The Bid Form is included with the Bidding Documents; additional copies may be obtained from
Engineer (or the issuing office).
12.2. All blanks on the Bid Form must be completed in ink or by typewriter.
12.3. Bids by corporations must be executed in the corporate name by the president or a vice-president
(or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature.
12.4. Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature.
12.5. All names must be typed or printed below the signature.
12.6. The Bid shall contain an acknowledgment of receipt of all Addenda (the numbers of which must be filled in on the Bid Form).
12.7. The name, address and telephone number of a person responsible for communications regarding the Bid must be shown.
IB-5
13. SUBMISSION OF BIDS
13.1. Bids shall be submitted at the time and place indicated in the Advertisement for Bids and shall be enclosed in an opaque sealed envelope, marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted) and name and address of the
Bidder and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it.
14. MODIFICATION AND WITHDRAWAL OF BIDS
14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.
14.2. If, within twenty-four hours after Bids are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid and the Bid security returned. Thereafter, that Bidder will be disqualified from further bidding on the Work to be provided under the Contract Documents.
15. OPENING OF BIDS
15.1. Bids will be opened and (unless obviously non-responsive) read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids.
16. BIDS TO REMAIN SUBJECT TO ACCEPTANCE
16.1. All bids will remain subject to acceptance for forty-five days after the day of the Bid opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date.
17. AWARD OF CONTRACT
17.1. Owner reserves the right to reject any and all Bids, to waive any and all informalities involving price, time or changes in the work and to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids.
Also, Owner reserves the right to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by Owner. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
17.2. In evaluating Bids, Owner will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
IB-6
17.3. Owner may consider the qualifications and experience of Subcontractors, Suppliers, other persons and organizations proposed for those portions of the Work as to which the identity of
Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Supplemental Conditions. Owner also may consider the operating maintenance requirements, performance data and guarantees of major items of materials equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of
Award.
17.4. Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability Bidders, proposed
Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time.
17.5. If the contract is to be awarded, it will be awarded to the lowest Bidder whose evaluation by
Owner indicates to Owner that the award will be in the best interests of the Project.
17.6. If the contract is to be awarded, Owner will give the Successful Bidder a Notice of Award within forty-five days after the day of the Bid opening.
17.7. The project will be awarded on the lowest responsible base bid.
18. CONTRACT SECURITY
18.1. Section 103-03 of the New York State Standard Specifications sets forth the Owner's requirements as to performance and payment Bonds. When the Successful Bidder delivers the executed Contract to Owner, it must be accompanied by the required performance and payment
Bonds and insurance certificates.
19. SIGNING OF CONTRACT
19.1. When Owner gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Contract with all other written Contract
Documents attached. Within fifteen days thereafter Contractor shall sign and deliver the required number of counterparts of the Contract and attached documents to Owner with the required
Bonds. Within ten days thereafter Owner shall deliver one fully signed counterpart to the
Contractor. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification.
20. SALES AND USE TAXES
20.1. Owner is exempt from New York State Sales and Use Taxes on materials and equipment to be incorporated in the work. Said taxes shall not be included in the Contract Price. Refer to
Supplemental Conditions for additional information.
21. EQUAL OPPORTUNITY CLAUSE
21.1. The Contractor will not discriminate against any employee, applicant for employment sub-contractor, supplier of materials or services or program participant because of actual or perceived:
age, creed, color, disability, ethnicity, familial status, gender, height, immigration or citizenship
IB-7
status, marital status, national origin, race, religion, sexual orientation, socio-economic status, or weight.
22. NON-COLLUSIVE CERTIFICATION
22.1. Bids shall be accompanied by the Bidder’s Declaration as included in these documents.
23. PREVAILING WAGES
23.1. This is a prevailing wage rate project. Bidder attention is directed to the Prevailing Wage Rate
Note. Certified payrolls are required in this contract.
24. RESPONSIBILITY DETERMINATIONS
24.1. In deliberating upon the responsibility of the bidder or a subcontractor, all contracting agencies shall give due consideration to any credible evidence or reliable information that the past or current record of a bidder or proposed contractor includes any of the following:
24.2. Lack of adequate expertise, prior experience with comparable projects or financial resources.
24.3. Criminal conduct in connection with government contract or the conduct of business activities involving the infliction, injury or intentional property damage, in connection with involvement in a pattern of racketeering, labor racketeering, extortion, obstruction of justice or other comparable crimes; bribery, fraud, bid-rigging, embezzlement or other comparable crimes; or serious moral turpitude, fundamental lack of integrity or knowing disregard for the law. Evidence of such conduct may include a judgment of conviction, pending criminal indictment of formal grant of immunity in connection with a criminal prosecution of the bidder or proposed subcontractor, and director or officer, or any holder of five percent (5%) or more of the shares or equity of the bidder or proposed subcontractor, or any affiliate of the bidder or proposed subcontractor.
24.4. Grave disregard for the personal safety of employees, county personnel or members of the public.
Due consideration shall be given to whether available evidence concerning the training of employees, equipment actually in use at the work site and company practices for identifying addressing deficiencies and securing employee compliance demonstrates a genuine commitment to safety or lack of the same.
24.5. Any other significant Labor Law violations, including but not limited to child labor law violations, failure to pay wages or unemployment insurance tax delinquencies.
24.6. Any significant violation of the Workers' Compensation Law, including but not limited to the failure of a bidder or proposed subcontractor to provide proof of workers' compensation or disability benefits coverage.
24.7. Any criminal conduct involving violations of the Environmental Conservation Law or other federal, state or county environmental statutes or repeated or significant civil violations for federal, state or county environmental statutes or regulations.
24.8. The failure of a bidder, contractor or proposed subcontractor to comply with federal, or county statutes or regulations requiring the hiring, training and of persons presumed to be disadvantaged in accordance with federal, state, or county definitions to meet federal, county equal employment opportunity requirements.
IB-8
24.9. The submission of a bid which is mathematically or materially unbalanced.
24.10. The submission of a bid which is so much lower than the agency's confidential Engineer’s estimate for the cost of, or anticipated bids for, the contract that it appears unlikely that the bidder will be able to perform the contract satisfactorily at the price bid.
24.11. Another cause of so serious or compelling a nature that it raises questions about the present responsibility of a contractor or subcontractor, including but not limited to, submission to a contracting agency of a false or misleading statement on a uniform questionnaire, or in some other form, in connection with a bid for or award of a contact or a request for approval of a subcontractor.
24.12. In addition to the factors specified above, contracting agencies may also give due consideration to any other factors considered by the contracting agencies to bear upon responsibility, including but not limited to any mitigating factors brought to the agency's attention by the bidder or proposed subcontractor.
25. UTILITY COORDINATION
25.1. The Contractor shall be responsible for coordination with all affected utility agencies.
SUPPLEMENTAL INSTRUCTIONS TO BIDDERS
SIB-1
These Supplemental Instructions amend or supplement the New York State Standard Specifications and other provisions of the Contract Documents https://www.dot.ny.gov/main/business-center/engineering/specifications/updated-standard-specifications-us as indicated below. All provisions which are not so amended or supplemented remain in full force and effect.
SI-1 In general, the New York State Department of Transportation Standard Specifications (English
Units) of January 1, 2025, and all addenda in effect on the date of advertising for bids, shall apply, except where modified in these specifications. Where reference is made to New York State, State
Department of Transportation, Commissioner, Deputy Chief Engineer Technical Services, etc., Tioga County or their representative shall be substituted.
The provisions of Sections 100, 200, 300, 400, 500, 550 and 600 shall apply except for the non-standard items noted in the Special Specifications. Material details as stipulated in Section 700 shall apply as modified in the plans and specifications.
The Tioga County Commisioner of Public Works or his representative shall make the final interpretations of irregularities, ambiguities or questions arising out of these Specifications and the
NYSDOT Specifications used on this project.
SI-2 The Owner is exempt from payment of FEDERAL, STATE, and LOCAL TAXES and from payment of SALES AND COMPENSATING USE TAXES of the State of New York and of
Cities and Counties on all materials and supplies sold to the Owner pursuant to the provisions of this Contract. These taxes ARE NOT to be included in bids. This exemption does not, however, apply to tools, machinery, equipment or other property leased by or to the Contractor or a
Subcontractor. The Contractor and his Subcontractor shall be responsible for and pay any and all applicable taxes including sales and compensating use taxes on such leased tools, machinery, equipment or other property.
https://www.dot.ny.gov/main/business-center/engineering/specifications/updated-standard-specifications-us
SUPPLEMENTAL INSTRUCTIONS TO BIDDERS
SIB-2
P-1
103 CORPORATE DRIVE - O.H. DOOR
TOTAL BID
BID TO BE WRITTEN IN BOTH WORDS AND FIGURES
BASE BID: _____________________________________________________________ DOLLARS
AND __________________________________________ CENTS
CONTRACTOR’S COMPANY NAME
(PLEASE PRINT OR TYPE)
Acknowledge Addendums issued
Addendum Number DATE Addendum Number DATE
P-1
B-1
BIDDER’S DECLARATION
The undersigned hereby declares that they have carefully examined the Specifications, drawings, plans and schedules, subsurface information and the Contract and other Contract Documents on file in the office of the Commissioner of Public Works, has visited the site and has fully informed themselves of all existing conditions and limitations affecting the work to be done and the labor and material to be furnished, and that the Contractor accepts all such existing conditions and limitations; and that no claim for damages or additional compensation will be made by the
Contractor against the County by reason for any such conditions or limitations, or by reason of any estimates of quantities, tests, or representations made by any officer, employee or agent of the
County; and that the Contractor is satisfied with their ability to perform the work of the contract
Documents in strict accordance with the Plans and Specifications therefore.
The Contractor also acknowledges that they have visited the site of the proposed work and has satisfied themselves as to the nature and location of the work, the general and local conditions, particularly those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads and uncertainties of weather, ground water table or similar physical conditions at the site, the confirmation and condition of the ground, the character, quality and quantity of surface and subsurface materials to be encountered, the character of equipment and facilities needed prior to and during the prosecution of the work and all other matters which can in any way affect the work or the cost thereof under this Contract.
That no officer, agent or employee of the County is interested directly or indirectly in this Proposal or in any labor or materials to which it relates; that the Proposal is made without collusion with any other Bidder or other person and that it is in all respect fair and just.
By submission of this bid, each Bidder and each person signing on behalf of any Bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of their knowledge and belief:
(1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or competition, as to any matter relating to such process with any other
Bidder or with any competitor;
(2) Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other bidders or to any competitor; and
(3) No attempt has been made or will be made by the Bidder to induce any other person, partnership or corporation; to submit or not to submit a bid for the purpose of restricting competition.
B-2
STATE OF ____________________________________________________________
COUNTY OF ____________________________________________________________
TOWN OF ____________________________________________________________
SIGNATURE OF BIDDER ____________________________________
(SEAL) (Title)
(Address)
Sworn to and subscribed before me this ______ day of ___________, 2026.
(Notary Public)
PENAL SUM FORM
EJCDC C-430 Bid Bond (Penal Sum Form)
Prepared by the Engineers Joint Contract Documents Committee.
B-3
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
Tioga County DPW
477 Route 96
Owego NY 13827
BID
Bid Due Date: December 1, 2026
Description: 103 CORPORATE DRIVE - O.H. DOOR, Owego, New York
BOND
Bond Number:
Date (Not earlier than Bid due date):
Penal sum $
(Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this
Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
Note: Above addresses are to be used for giving any required notice. Provide execution by any additional parties, such as joint venturers, if necessary.
PENAL SUM FORM
EJCDC C-430 Bid Bond (Penal Sum Form)
Prepared by the Engineers Joint Contract Documents Committee.
B-4
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the
Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of
Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States
Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such
Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
B-5
STATEMENT OF CONTRACTOR’S QUALIFICATIONS
This statement must be submitted by the Contractor with his proposal. All questions must be answered and the data given must be clear and comprehensive.
1. Name of Bidder
PHONE NO.
2. Permanent main office address
3. When organized or began business
4. If a corporation, where incorporated
5. How many years have you been engaged in the contracting business under your present firm name?
6. Have you ever failed to complete any work awarded to you?
If so, where and why
7. Will you, upon request, submit a detailed financial statement and furnish the following information that may be required by the Owner?
- Contracts on hand: (Indicate location, client, gross amount of each contract, approximate anticipated dates of completion, A/E name, address and contact person).
- List of contracts of a similar nature performed within the past two years with location, client, gross amount, date of completion, A/E name, address and contact person.
- List of major equipment owned and available within 10 days of award of this contract.
- Background and experience of the principal members of your personnel, including the officers.
- Credit available (written evidence).
- Such statements, if required, shall be notarized and delivered to the Owner within three (3) days of written or verbal request.
B-6
(Contractor may, at his discretion, elect to submit information as delineated under No. 7 with his Bid Proposal.)
8. The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the Owner in certification of the recitals comprising this Statement of Contractor’s
Qualifications.
Dated at this day of 20 26.
NAME OF CONTRACTOR
BY
TITLE
C-1
DEPARTMENT OF PUBLIC WORKS
CONTRACT
Gary Hammond, P.E.
Commissioner of Public Works
C-2
CONTRACT
BETWEEN OWNER AND CONTRACTOR
THIS CONTRACT is dated as of the day of in the year 2026 by and between Tioga County (hereinafter called OWNER) and
(hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1 – WORK TO BE DONE
For the total contract price of $_____________to be paid by the OWNER, the CONTRACTOR shall (a) furnish all the materials, appliances, tools and labor of every kind required, and construct and complete in the most substantial and skillful manner, the construction, improvement or reconstruction of the project on or before the completion date of the 180 calendar days after notice to proceed as further described in Article 4, and as generally identified and shown on the contract plans entitled: 103 CORPORATE DRIVE - O.H. DOOR, Owego, New York in accordance with the Contract Documents, which contain the information for bidders; proposal form, contract agreement, and bonds; and payment Items; and (b) do everything required by the Contract and/or Contract Documents as defined herein.
The CONTRACTOR further agrees their bid proposal is not based upon the assumption that any specifications, traffic restrictions, scheduling or phasing/staging requirements will be waived; an extension of Contract Completion Date will be granted; a labor dispensation will be granted; substitution of non-approved products, alternatives or claimed functional equivalents for specified construction materials and methods will be allowed; or any Value Engineering Change Proposals will be approved.
ARTICLE 2 – DOCUMENTS FORMING THE CONTRACT
The Contract (and Contract Documents) shall be deemed to include the advertisement for proposals; the contract proposal, including Special Notes and Special Specifications contained therein; the contractor’s proposal; Tioga County Insurance and indemnification specification; the contract agreement; and the Supplementary Conditions which are attached hereto and made a part hereof; the base line data; the New York State Department of Transportation Standard Specifications including all addenda thereto identified in the contract proposal; the New York State Department of Transportation Standard Sheets; the plans; any amendments issued prior to the date of proposal submission, and all provisions required by law to be inserted in the contract whether actually inserted or not. Whenever separate publications are referenced in the Contract Documents it shall mean those, as amended, which are current on the date of advertisement for bids.
ARTICLE 3 – EXAMINATION OF DOCUMENTS AND SITE
The CONTRACTOR agrees that before making its proposal it carefully examined the contract documents, together with the site of the proposed work, as well as its surrounding territory, and is informed regarding all of the conditions affecting the work to be done and labor and materials to be furnished for the completion of this contract, including the existence of poles, wires, pipes and other facilities and structures of municipal and other public service corporations on, over or under the site, except latent conditions that meet the requirements of §104-03 Differing Site Conditions of the New York State Standard Specifications and that its information was secured by personal and other investigation and research.
ARTICLE 4 – DATE OF COMPLETION
The CONTRACTOR further agrees that it will begin the work herein embraced within ten (10) days of the effective date hereof, unless the consent of the OWNER, in writing, is given to begin at a later date, and that it will prosecute the same so that it shall be entirely completed and performed on or before the completion date shown in Article 1.
No extension beyond the date of completion fixed by the terms of this contract shall be effective unless in writing signed by the OWNER. Such extension shall be for such time and upon such terms and conditions as shall be fixed by the OWNER, C-3 which may include the assessment of liquidated damages and a charge for engineering and inspection expenses actually incurred upon the work, including engineering and inspection expenses incurred upon the work by railroad companies on contracts for grade crossing elimination. Notice of application for such extension shall be filed with the OWNER at least fifteen (15) days prior to the date of completion fixed by the terms of this agreement.
ARTICLE 5 – ALTERATIONS AND OMISSIONS
The said work shall be performed in accordance with the true intent and meaning of the contract documents without any further expense of any nature whatsoever to the OWNER other than the consideration named in this agreement.
The OWNER reserves the right, at any time during the progress of the work, to alter the plans or omit any portion of the work as it may deem reasonably necessary for the public interest - making allowances for additions and deductions with compensation made in accordance with the New York State Department of Transportation Standard Specifications, for this work without constituting grounds for any claim by the CONTRACTOR for allowance for damages or for loss of anticipated profits, or for any variations between the approximate quantities and the quantities of the work as done.
ARTICLE 6 – NO COLLUSION OR FRAUD
The CONTRACTOR hereby agrees that the only person or persons interested as principal or principals in the bid or proposal submitted by the CONTRACTOR for this contract are named therein, and that no person other than those mentioned therein has any interest in the above mentioned proposal or in securing of the award, and that this contract has been secured without any connection with any person or persons other than those named, and that the proposal is in all respects fair and was prepared and the contract was secured without collusion or fraud and that neither any officer nor employee of the OWNER has or shall have a financial interest in the performance of the contract or in the supplies, work or business to which it relates, or in any portion of the profits thereof. (See also §139-a and §139-b of the New York State Finance Law referred to in the New York
State Department of Transportation Standard Specifications which are made a part of this contract.)
ARTICLE 7 – CONTRACT PAYMENTS
As the work progresses in accordance with the contract and in a manner that is satisfactory to the ENGINEER, the OWNER hereby agrees to make payments to the CONTRACTOR therefore, based upon the proposal attached hereto and made a part hereof, as follows: The ENGINEER shall once in each month and on such days as it may fix, determine the quantity of work completed and of material which has actually been put in place in accordance with the terms and conditions of the contract, during the preceding month, and compute the value thereof and pay to the CONTRACTOR the monies due as provided in
§38(7) of the New York State Highway Law. No monthly payment shall be rendered unless the value of the work completed equals 5% of the contract amount or $1,000, whichever is the lesser. Semimonthly payments may be rendered provided (a) the value of the work performed in two successive weeks is more than $50,000 or (b) the ENGINEER deems it to be in the best interests of the OWNER to do so. The CONTRACTOR shall not hold any retainage from any SUBCONTRACTOR.
ARTICLE 8 – NO PAYMENT DUE TO CONTRACTOR’S NON-COMPLIANCE
It is further agreed that so long as any lawful or proper direction concerning the work or material given by the OWNER, or his/her representative, shall remain uncomplied with, the CONTRACTOR shall not be entitled to have said contract payment processed, nor shall any contract payment(s) be processed for work done or material furnished until such lawful or proper direction aforesaid has been fully and satisfactorily complied with.
ARTICLE 9 – FINAL ACCEPTANCE OF WORK
When in the opinion of the OWNER a CONTRACTOR has fully performed the work under the contract, the ENGINEER shall recommend to the OWNER the acceptance of the work so completed. If the OWNER accepts the recommendation of the
ENGINEER, he/she shall thereupon by letter notify the CONTRACTOR, with copies to other interested parties, of such acceptance. Prior to the final acceptance of the work by the OWNER or his/her designee, the contract work may be inspected, accepted and approved by other agencies and/or municipalities who will have jurisdiction of the work after final acceptance.
Final acceptance shall be final and conclusive except for defects not readily ascertainable by the OWNER, actual or constructive, fraud, gross mistakes amounting to fraud or other errors which the CONTRACTOR knew or should have known about. Final acceptance may be revoked by the OWNER at any time prior to the issuance of the final check by the OWNER upon the discovery of such defects, mistakes, fraud or errors in the work.
C-4
ARTICLE 10 – FINAL PAYMENT
After the final acceptance of the work, the ENGINEER shall prepare a final agreement of the work performed and the materials placed and shall determine the value of such work and materials under and according to the terms of the contract. This final agreement shall be certified, as to its correctness, by the CONTRACTOR. Upon approval of such final agreement by the
CONTRACTOR, it shall be submitted to the OWNER for final approval. The right, however, is hereby reserved to the OWNER to reject the whole or any portion of the final agreement, should the said certificate of the Engineer be found or known to be inconsistent with the terms of the agreement or otherwise improperly given. All certificates, upon which partial payments may have been made, shall be subject to correction in the final certificate or final agreement.
ARTICLE 11 – RIGHT TO SUSPEND WORK AND CANCEL CONTRACT
It is further mutually agreed that if at any time during the prosecution of the work the ENGINEER determines that the work upon the contract is not being performed according to the contract, or for the best interest of the OWNER, the execution of the work by the CONTRACTOR may be temporarily suspended by the OWNER, who may then proceed with the work under his/her own direction in such manner as will accord with the contract specifications end be for the best interests of the OWNER;
or he/she may terminate the CONTRACTOR’s employment under the contract while it is in progress, and thereupon proceed with the work, in affirmance of the contract, by contract negotiated or publicly let, by the use of his/her own forces, by calling upon the surety to complete the work in accordance with the plans and specifications or by a combination of any such methods;
or he/she may cancel the contract and either re-advertise or re-let as provided in §38 of the New York State Highway Law, or complete the work under its own direction in such a manner as will accord with the contract specifications and be for the interests of the OWNER; any excess in the cost of completing the contract beyond the…