2025.416.001 Drawings IFC 20260318-R001.pdf

PDF 2 MB Posted

Attached to
Tioga County 103 Corporate Drive - Overhead Door Construction
Solicitation number
2140630
Issued by
Tioga County, New York

About this file

This is an architectural drawing document for the Tioga County Department of Public Works overhead door installation project located at 103 Corporate Drive, Owego, New York. The project involves the removal of an 8'-0" x 7'-4" portion of an existing concrete masonry unit (CMU) exterior wall and the installation of an insulated coiling door system with manual pull chain operation. The basis of design specifies a Cornell Iron Model ESD20CR overhead door with 316 stainless steel or clear anodized aluminum curtain material, an R-value of 8, and wind load capacity up to 40 pounds per square foot. The door will be mounted on the face of the wall with a manual chain operator (Cornell Iron Model CG). The project requires repair and repointing of masonry to facilitate door installation, as well as priming and painting of bent metal around the perimeter of the CMU opening using Sherwin-Williams products with owner-selected color. A mandatory pre-bid meeting is scheduled for November 12, 2026, at 9:30 a.m. at the project site, with sealed bids due December 1, 2026, at 11:00 a.m. at the Tioga County Department of Public Works office. Contract documents are available electronically through a request to Justin Ruggiero at ruggieroj@tiogacountyny.gov on or after November 6, 2026.

The drawing set includes general notes and specifications requiring all work to comply with the 2020 Existing Building Code and 2020 Energy Conservation Construction Code of New York State. The contractor must furnish and install complete systems, coordinate with all trades before starting construction, obtain required local or municipal inspection certificates, and provide testing, adjusting, and balancing services. All materials and equipment must be new and first-class quality unless otherwise noted, with strict adherence to manufacturer specifications and installation methods. The project requires one-year unconditional guarantee on all labor and materials against defects in workmanship. Contractors must visit the job site prior to bidding, verify existing field conditions, and assume responsibility for any additional costs resulting from failure to verify scope of work. The bid must be accompanied by a 5% bid guaranty and a non-collusion statement. Tioga County is a locally funded project entity exempt from New York State sales tax, and the county reserves the right to reject any or all bids.

View the file

Other files

File Type Posted
2025.416.001 Project Manual IFC 20261102-R003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF DRAWINGS

ARCHITECT/ENGINEER PROJECT LOCATION OWNER

G-001

860 Hooper Road Endwell, New York 13760

Tel: 607.231.6600 Fax: 607.231.6650

Email: mail@delta-eas.com www.delta-eas.com

CERTIFICATE OF AUTHORIZATION #: 019598 PROJECT

LOCATION

/1

/2

:0

:5

P M

103 CORPORATE

DRIVE, OWEGO, NY

13827

2026.03.18

TIOGA COUNTY O.H. DOOR

103 CORPORATE DRIVE, OWEGO,

NY 13827

TIOGA COUNTY

DELTA PROJECT NO. 2025.416.001

ISSUE FOR CONSTRUCTION

ARCHITECTURAL

A-001 GENERAL NOTES AND SPECIFICATIONS

A-100 REMOVAL AND RENOVATION PLANS

A-201 INTERIOR ELEVATIONS

A-301 WALL SECTION - OVERHEAD DOOR

GENERAL

G-001 COVER SHEET

STRUCTURAL

S-101 LINTEL PLAN AND DETAILS

REVISIONNO. DATE

ISSUE FOR CONSTRUCTION2

DRAWING UPDATES1 2026.03.06

2026.03.18

1. TO THE BEST KNOWLEDGE, INFORMATION AND BELIEF THE

ARCHITECTURAL AND BUILDING SYSTEMS SHOWN ON THESE

DOCUMENTS HAVE BEEN PREPARED IN ACCORDANCE WITH THE

REQUIREMENTS OF THE NEW YORK STATE CODES AND

REFERENCE STANDARDS

2. ALL WORK SHALL COMPLY WITH OR SURPASS THE

REQUIREMENTS OF THE NEW YORK STATE CODES AND

REFERENCE STANDARDS. CONFORM TO APPLICABLE CODE FOR

THE WORK DESCRIBED WITHIN THE CONTRACTION DOCUMENTS.

3. SYSTEMS SHALL COMPLY WITH THE LATEST VERSION OF THE

FOLLOWING CODES:

A. 2020 EXISTING BUILDING CODE OF NEW YORK STATE

B. 2020 ENERGY CONSERVATION CONSTRUCTION CODE

OF NEW YORK STATE

4. ALL WORK SHALL MEET THE REQUIREMENTS OF THE AFORE

MENTIONED CODES AND ALL CODES AND STANDARDS

REFERENCED IN THE SPECIFICATIONS. ALTHOUGH THE DETAILS

OF SUCH WORK MAY NOT BE SHOWN ON THE DRAWINGS OR

REFERENCED IN THE SPECIFICATIONS

5. CONFLICTS BETWEEN THE APPLICABLE CODES, STANDARDS,

AND THE PLANS AND SPECIFICATIONS MUST BE BROUGHT TO

THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING

WITH THE WORK IN QUESTION.

6. CONFLICTING STANDARDS: IN CASE OF CONFLICT BETWEEN

THE CONTRACT DOCUMENTS AND A GOVERNING CODE OR

ORDINANCE, THE MORE STRINGENT STANDARD SHALL APPLY.

CODE COMPLIANCE

1. CONCEALED, INTERIOR INSTALLATIONS: CONCEALED FROM

VIEW AND PROTECTED FROM PHYSICAL CONTACT BY BUILDING

OCCUPANTS. EXAMPLES INCLUDE ABOVE CEILINGS AND IN

DUCT SHAFTS.

2. EXPOSED, INTERIOR INSTALLATIONS: EXPOSED TO VIEW

INDOORS. EXAMPLES INCLUDE FINISHED OCCUPIED SPACES

AND FIRE PROTECTION EQUIPMENT ROOMS.

3. FINISHED SPACES: SPACES OTHER THAN FIRE PROTECTION,

FIRE PROTECTION AND ELECTRICAL EQUIPMENT ROOMS,

FURRED SPACES, PIPE AND DUCT SHAFTS, UNHEATED SPACES

IMMEDIATELY BELOW ROOF, SPACE ABOVE CEILINGS,

UNEXCAVATED SPACES, CRAWL SPACES, AND TUNNELS.

4. FURNISH: CONTRACTOR SHALL SUPPLY (PURCHASE) ITEM AND

TURN OVER TO OTHERS FOR INSTALLATION

5. INSTALL: OTHERS SHALL PURCHASE ITEM AND THE

CONTRACTOR SHALL PLACE ITEM IN POSITION FOR SERVICE

AND OR USE

6. PROVIDE: CONTRACTOR SHALL FURNISH (PURCHASE) AND

COMPLETELY INSTALL ITEM

7. OWNER: TIOGA COUNTY DEPARTMENT OF PUBLIC WORKS.

8. STORAGE: TO PROVIDE A SAFE WAREHOUSING LOCATION TO

PROTECT EQUIPMENT AND COMPONENTS THAT ARE TO BE

IMPLEMENTED AS PART OF THE PROJECT. THIS INCLUDES BUT

NOT LIMITED TO EXISTING ITEMS TO BE RELOCATED BY THE

OWNER/CONTRACTOR AND ITEMS PURCHASED BY THE

OWNER/CONTRACTOR.

GENERAL DEFINITIONS

1. DELIVERY, STORAGE, AND PROTECTION

A. ACCEPT PRODUCTS ON SITE IN FACTORY-FABRICATED

PROTECTIVE CONTAINERS, WITH FACTORY-INSTALLED

SHIPPING SKIDS AND LIFTING LUGS. INSPECT FOR

DAMAGE.

B. STORE IN CLEAN DRY PLACE AND PROTECT FROM

WEATHER AND CONSTRUCTION TRAFFIC. HANDLE

CAREFULLY TO AVOID DAMAGE TO COMPONENTS,

ENCLOSURES, AND FINISH.

C. STORAGE OF EQUIPMENT: STORAGE OF EQUIPMENT

FOR THE JOB IS THE RESPONSIBILITY OF THE

CONTRACTOR AND SHALL BE SCHEDULED FOR

DELIVERY TO THE SITE AS THE EQUIPMENT IS

REQUIRED. DAMAGE TO THE EQUIPMENT DELIVERED

TO THE SITE OR IN TRANSPORT TO THE JOB SHALL BE

THE RESPONSIBILITY OF THE CONTRACTOR.

D. DELIVER PIPES AND TUBES WITH FACTORY-APPLIED

END CAPS. MAINTAIN END CAPS THROUGH SHIPPING,

STORAGE, AND HANDLING TO PREVENT PIPE END

DAMAGE AND TO PREVENT ENTRANCE OF DIRT,

DEBRIS, AND MOISTURE.

E. STORE PLASTIC PIPES PROTECTED FROM DIRECT

SUNLIGHT. SUPPORT TO PREVENT SAGGING AND

BENDING.

2. PERFORMANCE

A. ALL WORK SHALL BE PERFORMED IN COOPERATION

WITH THE OWNER, ARCHITECT AND OTHER SEPARATE

CONTRACTORS.

B. THE CONTRACTOR SHALL COORDINATE WORK WITH

THE CONSTRUCTION SCHEDULE ESTABLISHED BY THE

OWNER AND ARCHITECT, AND SHALL IMMEDIATELY

REPORT ANY DELAYS IN MATERIALS RECEIPT

INCLUDING CIRCUMSTANCES CAUSING THE DELAYS.

3. INSPECTIONS

A. THE CONTRACTOR SHALL HAVE THE REQUIRED LOCAL

OR MUNICIPAL INSPECTION PROCESSED AND PRESENT

OWNER WITH CERTIFICATE INDICATING APPROVAL OF

SUCH GOVERNING BODIES.

B. NEW YORK BOARD OF FIRE UNDERWRITERS INSPECT

COMPLETED INSTALLATION AND PRESENT OWNER

WITH CERTIFICATE OF INSPECTION SHOWING

APPROVAL.

GENERAL REQUIREMENT NOTES

1. THE INTENT OF THESE CONTRACT DOCUMENTS IS FOR THE

CONTRACTOR TO FURNISH AND INSTALL COMPLETE SYSTEMS.

ALL SYSTEMS SHALL BE COMPLETE IN ALL RESPECTS,

OPERATING, TESTED, ADJUSTED, APPROVED BY THE

AUTHORITIES HAVING JURISDICTION AND READY FOR

BENEFICIAL USE BY THE OWNER.

2. THE CONTRACTOR SHALL OBTAIN AND REVIEW ALL CONTRACT

DOCUMENTS, INCLUDING PROJECT MANUAL, PLANS AND

SPECIFICATIONS OF ALL TRADES BEFORE SUBMITTING BID.

REFER TO SPECIFICATIONS, PROJECT MANUAL AND PLANS,

INCLUDING ALL EQUIPMENT SCHEDULES FOR MECHANICAL AND

ELECTRICAL INFORMATION. CONTRACTOR SHALL WALK

THROUGH BUILDING PRIOR TO SUBMITTING BID.

3. ALL OF THE CONTRACT DRAWINGS AND SPECIFICATIONS ARE

COMPLIMENTARY TO FORM A TOTAL DESIGN PACKAGE. IT IS

THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE

WHICH TRADE CONTRACTOR IS RESPONSIBLE FOR VARIOUS

PORTIONS OF THE WORK.

4. ALL WORK AND ACTION DEPICTED AND DESCRIBED SHALL BE

PERFORMED BY THE CONTRACTOR UNLESS SPECIFICALLY

NOTED OTHERWISE.

5. DRAWINGS ARE BASED ON FIELD OBSERVATION AND EXISTING

BUILDING DRAWINGS.

6. COORDINATION

A. THE CONTRACTOR SHALL COORDINATE LOCATIONS OF

EQUIPMENT WITH ALL TRADES BEFORE STARTING

CONSTRUCTION. ANY MODIFICATIONS TO THE

EQUIPMENT LAYOUT REQUIRED FOR INSTALLATION

ARE TO BE PERFORMED AT NO ADDITIONAL COST TO

THE OWNER.

B. WHEN CONFLICTS OCCUR BETWEEN THE DRAWINGS

AND/OR SPECIFICATIONS IT SHALL BE BROUGHT TO

THE ATTENTION OF THE ENGINEER. THE CONTRACTOR

SHALL CARRY AS PART OF THE BID THE LARGER

QUANTITY AND/OR MORE EXPENSIVE ITEM(S).

C. DURING CONSTRUCTION/INSTALLATION OF SYSTEMS

IN THE WORK PHASE THE CONTRACTORS SHALL

COORDINATE BETWEEN TRADE DRAWINGS FOR

INSTALLATION OF SYSTEM. THIS SHALL BE

REPRESENTED ON THE COORDINATION DRAWINGS TO

BE DEVELOPED BY THE CONTRACTOR.

7. BASE BID AMOUNT SHALL INCLUDE ALL ADDITIONAL WORK

REQUIRED BY THE AUTHORITIES HAVING JURISDICTION

PERTAINING TO THE COMPLETION OF THIS PROJECT.

8. PROJECT CONDITIONS

A. VERIFY LOCATION OF EXISTING UTILITIES BEFORE

PROCEEDING WITH THE WORK.

B. VERIFY SCOPE OF WORK: CONTRACTOR SHALL VISIT

THE JOB SITE PRIOR TO SUBMITTING A BID TO

ASCERTAIN EXISTING FIELD CONDITIONS AND TO

DETERMINE THE SCOPE OF THE WORK, AND TO

BECOME FAMILIAR WITH THE EXISTING CONDITIONS

THAT WILL AFFECT HIS WORK AND, THEREFORE, THE

BID. ADDITIONAL COST RESULTING FROM THE

CONTRACTOR’S FAILURE TO VERIFY THE SCOPE OF

THE WORK SHALL BE THE CONTRACTOR’S

RESPONSIBILITY AND SHALL BE PAID BY THE

CONTRACTOR.

C. THE WORK SPECIFIED HEREIN AND INDICATED ON

DRAWINGS SHALL BE COMPLETED, TESTED AND MADE

READY FOR OPERATION PRIOR TO TURN OVER TO THE

OWNER. UNLESS SPECIFICALLY INDICATED,

MATERIALS AND EQUIPMENT SHALL BE NEW AND FIRST

CLASS QUALITY.

D. THE OWNER SHALL DIRECT THE CONTRACTOR WHERE

CONSTRUCTION MATERIALS TO BE INSTALLED SHALL

BE STAGED AND STOCKPILED DURING CONSTRUCTION.

E. THE WORK SPECIFIED HEREIN AND INDICATED ON

DRAWINGS SHALL BE COMPLETED, TESTED AND MADE

READY FOR OPERATION PRIOR TO TURN OVER TO THE

OWNER. UNLESS SPECIFICALLY INDICATED, MATERIALS

AND EQUIPMENT SHALL BE NEW AND FIRST CLASS

QUALITY.

9. FOLLOW FIGURED DIMENSIONS AND DO NOT SCALE CONTRACT

DOCUMENTS. DIMENSIONS ARE NOT ADJUSTABLE WITHOUT THE

APPROVAL OF THE ARCHITECT UNLESS NOTED OTHERWISE.

10. ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE

APPLICABLE CODES IN THE ORDINANCES AND THE

REGULATORY AGENCIES HAVING JURISDICTION.

11. INITIATING WORK CONSTITUTES CONTRACTOR ACCEPTANCE OF

THE EXISTING CONDITIONS ASSOCIATED WITH THE WORK IN

QUESTION.

12. REPORT DISCREPANCIES TO ENGINEER BEFORE DISTURBING

EXISTING INSTALLATION.

13. FILE REQUIRED CERTIFICATES OF INSURANCE.

14. OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND

INSPECTIONS.

15. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL

DIMENSIONS.

16. SAFETY

A. THE CONTRACTOR IS RESPONSIBLE FOR OVERSEEING

THE SAFE OPERATION OF ALL EQUIPMENT IN HIS USE.

B. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING

ALL OF THE EQUIPMENT IN HIS USE IN A SAFE

CONDITION.

C. KEEP DEAD FRONT EQUIPMENT IN PLACE WHEN

EQUIPMENT IS ENERGIZED.

D. CONDUCT ALL CONSTRUCTION OPERATIONS IN A SAFE

MANNER FOR EMPLOYEES, AS WELL AS OTHER WORK-

PERSONS OR ANYONE VISITING THE JOG SITE.

PROVIDE BARRIERS, FLAGS, TAPE, ETC. AS REQUIRED

FOR SAFETY.

E. CONTRACTORS SHALL FOLLOW OWNER’S SAFETY

REQUIREMENTS DURING CONSTRUCTION.

F. CONFORM TO OWNER’S SAFETY PROCEDURES IF

HAZARDOUS OR CONTAMINATED MATERIALS ARE

DISCOVERED

GENERAL PLAN NOTES

1. MATERIALS

A. ALL MATERIALS AND EQUIPMENT SHALL BE IN STRICT

ACCORDANCE WITH THE PARAMETERS HEREINAFTER

SPECIFIED AND AS SHOWN ON THE DRAWINGS.

B. MATERIALS AND EQUIPMENT FURNISHED/PROVIDED

SHALL BE NEW UNLESS NOTED OTHERWISE.

C. FLANGES SHALL BE OF U.S. OR CANADIAN

MANUFACTURER ONLY. NO FLANGES FROM CHINA

2. ACCESSORIES

A. IT IS THE INTENT OF THIS SPECIFICATION THAT

SYSTEMS AND EQUIPMENT SHALL BE COMPLETE WITH

ALL ACCESSORIES REQUIRED TO INSURE A COMPLETE

SYSTEM.

3. MANUFACTURERS

A. ACCEPTABLE MANUFACTURERS: SUBJECT TO

COMPLIANCE WITH REQUIREMENTS, MANUFACTURERS

OFFERING PRODUCTS THAT MAY BE INCORPORATED

INTO THE WORK INCLUDE, BUT ARE NOT LIMITED TO,

THE MANUFACTURERS SPECIFIED.

B. BASIS OF DESIGN: SUBJECT TO COMPLIANCE WITH

REQUIREMENTS, PROVIDE PRODUCTS BY THE

MANUFACTURERS SPECIFIED.

4. BASIS OF DESIGN EQUIPMENT

A. MANUFACTURER AND MODEL NUMBER OF EQUIPMENT

INCLUDED IN SCHEDULE IS THE BASIS OF DESIGN FOR

PROJECT.

B. ADJUSTMENT SHALL BE MADE BY THE CONTRACTOR

FOR EQUIPMENT OTHER THAN THE BASES OF DESIGN

TO COMPLY THE INSTALLED EQUIPMENT

MANUFACTURER’S REQUIREMENTS.

PRODUCT GENERAL NOTES

GENERAL PLAN NOTES (CONT.)

15. PROFESSIONALISM AND APPEARANCE OF WORK:

A. WORKMANSHIP OF ALL INSTALLATIONS SHALL BE IN

ACCORDANCE WITH ACCEPTED PRACTICES OF THIS

TRADE. INSTALLATION METHODS SHALL CONFORM TO

MANUFACTURERS’ SPECIFICATIONS.

B. THE CONTRACTOR SHALL PROVIDE THE JOB WITH

QUALIFIED JOURNEYMEN AND HELPERS IN THIS TRADE

FOR THE DURATION OF THE JOB. IT IS THE

CONTRACTOR’S RESPONSIBILITY TO COMMUNICATE

WITH AND KEEP THE JOB SUPERINTENDENT

APPRAISED OF CHANGES OR CLARIFICATIONS.

16. CONFORM TO BUILDING STRUCTURE: THE CONTRACTOR SHALL

INSTALL THE SYSTEM IN SUCH A MANNER AS TO CONFORM TO

THE BUILDING(S) STRUCTURE, AVOID OBSTRUCTIONS,

PRESERVE HEADROOM, KEEP OPENINGS AND PASSAGES

CLEAR, AND CONFORM TO THE BUILDING CODE.

17. THE CONTRACTOR IS TO USE MATERIALS THAT ARE

COMPATIBLE WITH THE EXISTING IN PLACE MATERIALS.

18. METHODS OF CONSTRUCTION: UNLESS OTHERWISE NOTED OR

SHOWN, THESE DRAWINGS AND SPECIFICATIONS DO NOT

INDICATE METHODS OF CONSTRUCTION. THE CONTRACTOR

SHALL SUPERVISE AND DIRECT THE WORK, AND BE SOLELY

RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS,

TECHNIQUES, SEQUENCES, PROCEDURES AND SAFE WORK

PRACTICES

19. INCIDENTAL ITEMS: INCIDENTAL ITEMS NOT INDICATED ON

DRAWINGS, NOT MENTIONED IN THE SPECIFICATIONS THAT CAN

BE LEGITIMATELY AND REASONABLY INFERRED TO BELONG TO

THE WORK DESCRIBED OR NECESSARY IN GOOD PRACTICE TO

PROVIDE A COMPLETE SYSTEM, SHALL BE FURNISHED AND

INSTALLED AS THOUGH ITEMIZED HERE IN EVERY DETAIL.

20. PROTECTION

A. ALL MATERIALS, EQUIPMENT AND ACCESSORIES SHALL

BE SUITABLY PROTECTED AND COVERED DURING

CONSTRUCTION.

B. DAMAGE RESPONSIBILITY: THE CONTRACTOR SHALL

BE RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED

BY HIM OR HIS WORKMEN TO THE FACILITY, BUILDING

SURFACES OR EQUIPMENT DURING THE COURSE OF

CONSTRUCTION, AND SHALL BE FULLY RESPONSIBLE

FOR REPAIRING OR REPLACING AS REQUIRED TO

INSURE RESTORATION TO ORIGINAL CONDITION.

C. DAMAGED ITEMS: WHERE ITEMS SCHEDULED FOR

REUSE ARE FOUND TO BE IN DAMAGED CONDITION,

THE CONTRACTOR SHALL CALL THE ATTENTION OF

THE OWNER TO SUCH ITEMS AND RECEIVE FURTHER

INSTRUCTIONS PRIOR TO REMOVAL. ITEMS DAMAGED

DURING REMOVAL SHALL BE REPAIRED OR REPLACED

BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE

OWNER.

D. REPAIR DAMAGES: PROMPTLY REPAIR DAMAGE TO

ADJACENT FACILITIES BY DEMOLITION OPERATIONS AT

NO COST TO THE OWNER.

21. THE WORK SPECIFIED HEREIN AND INDICATED ON DRAWINGS

SHALL BE COMPLETED, TESTED AND MADE READY FOR

OPERATION PRIOR TO TURN OVER TO THE OWNER. UNLESS

SPECIFICALLY INDICATED, ALL MATERIALS AND EQUIPMENT

SHALL BE NEW AND FIRST CLASS QUALITY. EQUIPMENT MAY BE

RE-USED ONLY AS SPECIFIED HEREIN OR SHOWN ON THE

DRAWINGS.

22. SYSTEMS: THE CONTRACTOR SHALL BE RESPONSIBLE TO

PROVIDE COMPLETE AND OPERABLE SYSTEMS, INCLUDING

OPERATIONAL PROPERTIES TO THE EXTENT NECESSARY TO

LINK MULTIPLE COMPONENTS OF A SYSTEM TOGETHER AND TO

INTERFACE WITH OTHER SYSTEMS.

23. GUARANTEE: CONTRACTOR SHALL UNCONDITIONALLY

GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST

DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF

ONE YEAR.

GENERAL SUBMITTAL NOTES

1. PRODUCT DATA:

A. SUBMIT TO ARCHITECT/ENGINEER FOR REVIEW FOR

THE LIMITED PURPOSE OF CHECKING FOR

CONFORMANCE WITH INFORMATION GIVEN AND THE

DESIGN CONCEPT EXPRESSED IN THE CONTRACT

DOCUMENTS.

B. MARK EACH COPY TO IDENTIFY APPLICABLE

PRODUCTS, MODELS, OPTIONS, AND OTHER DATA.

SUPPLEMENT MANUFACTURERS’ STANDARD DATA TO

PROVIDE INFORMATION SPECIFIC TO THIS PROJECT.

C. SUBMITTALS THAT ARE NOT PROPERLY MARKED WITH

ALL PERTINENT INFORMATION IDENTIFIED WILL BE

RETURNED.

D. IN ADDITION, THE SUBMITTAL SHALL BEAR THE

PROJECT NAME, THE CONTRACTOR'S NAME, THE DATE

REVIEWED BY THE CONTRACTOR, THE CONTRACTOR'S

CONTROL NUMBER (IF APPLICABLE), AND A STAMP

WITH THE CONTRACTOR'S SIGNATURE CERTIFYING

THAT THE ITEM HAS BEEN REVIEWED AND IT COMPLIES

WITH THE REQUIREMENTS OF THE CONTRACT

DOCUMENTS.

2. MANUFACTURER’S INSTRUCTIONS

A. SUBMIT PRINTED INSTRUCTIONS FOR DELIVERY,

STORAGE, ASSEMBLY, INSTALLATION, START-UP,

ADJUSTING, AND FINISHING, TO THE

ARCHITECT/ENGINEER FOR PRODUCT DATA.

3. SUBMITTALS FOR REVIEW

A. PRODUCT DATA: PUBLISHED LITERATURE: INDICATE

DIMENSIONS, WEIGHTS, CAPACITIES, RATINGS, GAGES

AND FINISHES OF MATERIALS, ELECTRICAL

CHARACTERISTICS AND CONNECTION REQUIREMENTS.

B. SHOP DRAWINGS: INDICATE ASSEMBLY, DIMENSIONS,

WEIGHT LOADING, REQUIRED CLEARANCES,

CONSTRUCTION DETAILS, FIELD CONNECTION DETAILS,

ELECTRICAL CHARACTERISTICS AND CONNECTION

REQUIREMENTS.

C. ANY SUBMITTALS NOT CLEARLY MARKED AS

INDICATED ABOVE WILL BE RETURNED TO THE

CONTRACTOR FOR RESUBMISSION.

D. THE CONTRACTOR SHALL SUBMIT A CONTRACTOR’S

SAFETY PROGRAM, INCLUDING BUT NOT LIMITED TO:

E. CONFINED SPACE ACCESS

F. HOT WORK & FIRE WATCH PROCEDURES

G. LOTO PROCEDURES. (LOCK OUT / TAG OUT)

4. CLOSEOUT SUBMITTALS

A. PROVIDE 3-RING BINDER WITH THE FOLLOWING ITEMS

TO BE USED AS FACILITY OPERATION AND

MAINTENANCE MANUAL

B. PRODUCT DATE: PROVIDE ONE COPY OF FINAL

APPROVED PRODUCT DATA SUBMITTALS FOR

PRODUCTS LISTED UNDER PART 2 OF DIVISION 21

TECHNICAL SPECIFICATIONS

C. MANUFACTURER’S INSTRUCTIONS: INCLUDE

INSTALLATION INSTRUCTIONS

D. MANUFACTURER’S DATA: INCLUDE INSTRUCTIONS FOR

LUBRICATION, REPLACE PARTS, MOTOR AND DRIVE

REPLACEMENT, SPARE PARTS LIST, AND WIRING

DIAGRAMS.

5. SUBSTITUTIONS

A. SUBMITTAL OF SUBSTITUTE EQUIPMENT SHALL BE

MADE TEN (10) WORKING DAYS PRIOR TO BID FOR

CONSIDERATION AND PLACEMENT IN AN ADDENDUM

TO ALL BIDDERS IF ACCEPTABLE.

B. SUBMITTAL SHALL INCLUDE

a. PERFORMANCE DATA

b. PHYSICAL DATA

c. NARRATIVE OF DEFICIENCIES COMPARED TO

BASIS OF DESIGN

d. NARRATIVE OF BENEFITS COMPARED TO

BASIS OF DESIGN

C. BIDDER SHALL CERTIFIES:

a. PROPOSED SUBSTITUTION HAS BEEN FULLY

INVESTIGATED AND DETERMINED TO BE

EQUAL OR SUPERIOR IN ALL RESPECTS TO

SPECIFIED PRODUCT.

b. SAME WARRANTY WILL BE FURNISHED FOR

PROPOSED SUBSTITUTION AS FOR SPECIFIED

PRODUCT.

c. SAME MAINTENANCE SERVICE AND SOURCE

OF REPLACEMENT PARTS, AS APPLICABLE, IS

AVAILABLE.

d. PROPOSED SUBSTITUTION WILL HAVE NO

ADVERSE EFFECT ON OTHER TRADES AND

WILL NOT AFFECT OR DELAY PROGRESS

SCHEDULE.

e. PROPOSED SUBSTITUTION DOES NOT AFFECT

DIMENSIONS AND FUNCTIONAL CLEARANCES.

f. PAYMENT WILL BE MADE BY GENERAL

CONTRACTOR FOR CHANGES TO BUILDING

DESIGN, INCLUDING A/E DESIGN, DETAILING,

AND CONSTRUCTION COSTS CAUSED BY THE

SUBSTITUTION.

CLOSEOUT NOTES

1. TESTING, ADJUSTING AND BALANCING

A. CONTRACTOR SHALL TEST, ADJUST AND BALANCE

EQUIPMENT AND SYSTEMS TO ACHIEVE THE SPECIFIED

PERFORMANCE. CONTRACTOR SHALL EMPLOY AND

PAY FOR SERVICES OF MANUFACTURER’S

REPRESENTATIVE OR AN INDEPENDENT FIRM TO

PROVIDE TESTING, ADJUSTING AND BALANCING.

FACTORY BALANCED MOTORS SHALL BE REBALANCED

AFTER INSTALLATION TO CONFIRM BALANCE WITHIN

FACTORY TOLERANCES.

B. CONTRACTOR SHALL PROVIDE, AT CONTRACTOR’S

EXPENSE, SUCH ADDITIONAL SERVICES AS ARE

NEEDED TO ASSURE PROPER TESTING, ADJUSTING

AND BALANCING.

C. ALL TESTING, ADJUSTING AND BALANCING SHALL BE

SCHEDULED WITH OWNER AT LEAST 7 DAYS IN

ADVANCE.

D. REPORTS SHALL BE SUBMITTED TO OWNER

INDICATING OBSERVATIONS AND RESULTS OF TESTS

AND PERFORMANCE, BOTH BEFORE AND AFTER

ADJUSTMENT AND BALANCING, AND SHALL

SPECIFICALLY INDICATE COMPLIANCE OR NON-

COMPLIANCE WITH THE REQUIREMENTS OF THE

CONTRACT DOCUMENTS.

E. CONTRACTOR SHALL:

a. TEST ALL SYSTEMS AND EQUIPMENT TO

ASSURE PROPER OPERATION, AND TO

COMPLY WITH APPLICABLE CODES AND

STANDARDS.

b. PRETEST ALL SYSTEMS BEFORE

NOTIFICATION TO THE OWNER OR THE

OWNER’S REPRESENTATIVE FOR

OBSERVATION OF FINAL TESTING.

c. NOTIFICATION SHALL BE IN WRITING TO

ALLOW SUFFICIENT TIME FOR WITNESSING BY

OWNER OR THE OWNER’S REPRESENTATIVE.

d. PROVIDE REQUIRED TESTING APPARATUS TO

PROPERLY TEST ALL SYSTEMS.

e. SCHEDULE TESTING TO AVOID DELAYS AND

TO EXPEDITE PROGRESS OF THE WORK.

f. CORRECT ALL DAMAGE CAUSED BY OR

DURING THE TESTING AT NO ADDITIONAL

COST.

2. DEMONSTRATION AND TRAINING

A. DEMONSTRATE OPERATION AND MAINTENANCE OF

EQUIPMENT AND SYSTEMS TO OWNER PERSONNEL

AND PROVIDE ALL REQUIRED TRAINING PRIOR TO DATE

OF PARTIAL UTILIZATION OR SUBSTANTIAL

COMPLETION.

B. TRAINING SHALL BE SCHEDULED AT LEAST FOURTEEN

DAYS IN ADVANCE. CONTRACTOR SHALL PROVIDE ON-

SITE TRAINING CLASSES FOR OWNER PERSONNEL ON

THE PROPER OPERATION AND MAINTENANCE OF ALL

NEW EQUIPMENT PROVIDED AS A PART OF THIS

CONTRACT.

C. DEMONSTRATE ALL EQUIPMENT AND SYSTEMS AND

TRAIN OWNER PERSONNEL IN A ROOM LOCATED AT

THE SITE ALONG WITH HANDS-ON TRAINING IN THE

FIELD. DEMONSTRATION AND TRAINING IS TO BE

PROVIDED BY REPRESENTATIVES OF THE

CONTRACTOR AND/OR MANUFACTURERS WHO ARE

QUALIFIED AND KNOWLEDGEABLE ABOUT THE

EQUIPMENT AND SYSTEMS AND THEIR OPERATION AND

MAINTENANCE SPECIFICALLY FOR THIS PROJECT.

WHEN SPECIFICALLY REQUIRED IN THE INDIVIDUAL

SPECIFICATION SECTIONS, MANUFACTURER’S

REPRESENTATIVES MUST BE USED FOR THIS

DEMONSTRATION AND TRAINING..

D. FOR EQUIPMENT OR SYSTEMS REQUIRING SEASONAL

CHANGES IN OPERATION, PERFORM

DEMONSTRATIONS FOR OTHER SEASONS AS SOON AS

APPROPRIATE CONDITIONS FOR SUCH

DEMONSTRATIONS EXIST, IN THE OPINION OF THE

ENGINEER/ARCHITECT.

E. DEMONSTRATE START-UP, OPERATION, CONTROL,

ADJUSTMENT, TROUBLE-SHOOTING, SERVICING,

MAINTENANCE AND SHUTDOWN OF EACH ITEM OF

EQUIPMENT AND EACH SYSTEM.

F. UTILIZE OPERATION AND MAINTENANCE DATA AS

BASIS FOR TRAINING. REVIEW DATA WITH OWNER

PERSONNEL IN DETAIL TO EXPLAIN ALL ASPECTS OF

OPERATION AND MAINTENANCE.

G. PREPARE AND INSERT ADDITIONAL DATA IN

OPERATIONS AND MAINTENANCE MANUALS WHEN

NEED BECOMES APPARENT DURING DEMONSTRATION

AND TRAINING.

H. THE AMOUNT OF TIME FOR DEMONSTRATION AND

TRAINING ON EACH ITEM OF EQUIPMENT AND SYSTEM

SHALL BE THAT REQUIRED TO FULLY DEMONSTRATE

THE ITEM OR SYSTEM, TO COVER ALL TOPICS IN THE

APPROVED TRAINING OUTLINE OR LESSON PLAN AND

TO ANSWER QUESTIONS RAISED BY OWNER

PERSONNEL. WHEN SPECIFIC DURATIONS ARE

IDENTIFIED IN THE INDIVIDUAL SECTIONS, THOSE

DURATIONS SHALL BE CONSIDERED MINIMUMS.

I. THE OWNER STAFF MAY VIDEO TAPE ALL

DEMONSTRATIONS AND TRAINING SESSIONS, TO BE

UTILIZED AS FUTURE TRAINING TAPES.

3. ORIENTATION INSTRUCTION

A. CONTRACTOR SHALL PROVIDE THE SERVICES OF

QUALIFIED PERSONS TO DEMONSTRATE THE

OPERATION OF INSTALLED EQUIPMENT AND

APPARATUS.

B. ADVANCE NOTICE OF NOT LESS THAN 48 HOURS

SHOULD BE GIVEN TO THE OWNER OR THE OWNER’S

REPRESENTATIVE PRIOR TO SCHEDULING THE

DEMONSTRATION. NO EQUIPMENT OR APPARATUS

WILL BE ACCEPTED UNTIL DEMONSTRATION HAS BEEN

PERFORMED AND ACCEPTED.

CLOSEOUT NOTES (CONT.)

4. PROJECT CLOSE OUT INSPECTIONS

A. GENERAL: IN ORDER TO ENSURE THAT ALL CONTRACT

REQUIREMENTS ARE MET AND THAT THE WORK IS

COMPLETE AND ACCEPTABLE, THE FOLLOWING

INSPECTIONS WILL BE MADE IN ADDITION TO THE

NORMAL DAILY INSPECTIONS. THE PURPOSE OF THESE

INSPECTIONS IS TO FURNISH CONTRACTOR, IN

WRITING, LISTS OF CONTRACT EXCEPTIONS, OMIS-

SIONS AND INCOMPLETION IN ORDER TO REACH

CONTRACT COMPLETION IN AN EXPEDITIOUS AND

SATISFACTORY MANNER AND TO ESTABLISH A

PHYSICAL COMPLETION DATE.

B. PUNCH LIST INSPECTION: WILL BE MADE WHEN THE

WORK IS REASONABLY COMPLETE AS DETERMINED BY

THE ENGINEER AND/OR THE DESIGNED

REPRESENTATIVE. A COPY OF THE DETAILED

INSPECTION LIST WILL BE FURNISHED TO THE

CONTRACTOR AND WHEN THIS INSPECTION

PROGRESSES OVER ANY LENGTH OF TIME, COPIES OF

THE LIST WILL BE FURNISHED AS THE INSPECTION

PROGRESSES SO THAT THE CONTRACTOR MAY

PROCEED WITH THE REQUIRED WORK WITHOUT

DELAY.

C. PHYSICAL COMPLETION INSPECTION: WHEN

CONTRACTOR CONSIDERS THAT THE WORK OR A

DESIGNATED PORTION IS ACCEPTABLE TO THE OWNER

AS SUBSTANTIALLY COMPLETE, THE CONTRACTOR

SHALL SUBMIT TO THE ARCHITECT, ENGINEER AND

OWNER OR THE OWNER’S REPRESENTATIVE A LIST OF

ITEMS TO BE COMPLETED OR CORRECTED. THE

FAILURE TO INCLUDE ANY ITEMS ON SUCH LIST DOES

NOT ALTER THE RESPONSIBILITY OF THE

CONTRACTOR TO COMPLETE ALL WORK IN

ACCORDANCE WITH THE CONTRACT DOCUMENTS.

D. FINAL COMPLETION INSPECTION:

a. THE CONTRACTOR SHALL ADVISE THE

ARCHITECT, ENGINEER AND THE OWNER OR

THE OWNER’S REPRESENTATIVE IN WRITING

WHEN ALL WORK DESIGNATED AS

INCOMPLETE DURING THE PHYSICAL COM-

PLETION INSPECTION HAS BEEN COMPLETED.

b. ALL CHANGE ORDER WORK MUST BE

IDENTIFIED AND COMPLETED 2 WEEKS

BEFORE THE FINAL INSPECTION.

. INSPECTIONS BY CONTRACTOR

A. NEW YORK BOARD OF FIRE UNDERWRITERS INSPECT

COMPLETED INSTALLATION AND PRESENT OWNER

WITH CERTIFICATE OF INSPECTION SHOWING

APPROVAL.

B. REQUIRED LOCAL OR MUNICIPAL INSPECTION

PROCESSED AND PRESENT OWNER WITH CERTIFICATE

INDICATING APPROVAL OF SUCH GOVERNING BODIES.

1. UNLESS OTHERWISE INDICATED, THE CONTRACTOR SHALL

PROVIDE CUTTING AND PATCHING OF THE EXISTING FACILITY

FOR THEIR RESPECTIVE WORK. PATCHING SHALL MATCH

EXISTING MATERIALS, FINISHES, AND METHODS OF

CONSTRUCTION UNLESS NOTED OTHERWISE.

2. CUTTING AND PATCHING SHALL BE PERFORMED BY THE

QUALIFIED TRADE CONTRACTOR.

3. ANY DAMAGE CASED BY DEMOLITION SHALL BE PATCHED AND

PAINTED TO MATCH EXISTING.

4. THE CONTRACTOR SHALL PATCH AND REPAIR DAMAGED

SURFACES AND PENETRATIONS LEFT AFTER REMOVALS WITHIN

THE WORK AREA. THE CONTRACTOR IS TO USE MATERIALS

THAT ARE COMPATIBLE WITH THE EXISTING IN PLACE

MATERIALS. REFER TO ARCHITECTURAL

DRAWINGS/SPECIFICATIONS FOR PROPER PATCHING AND

REPAIR. FIRESTOP IF LOCATED IN/ON A FIRE RATED SURFACE.

5. ANY EXISTING UNUSED FLOOR/WALL OPENINGS LEFT BY

DEMOLITION OF EXISTING SYSTEMS SHALL BE PATCHED TO

MATCH EXISTING. IF WALL IS A FIRE RATED WALL, PATCH SHALL

MAINTAIN WALL FIRE RATING.

6. CONNECTION OF NEW SERVICES TO EXISTING SHALL BE IN A

NEAT AND APPROVED MANNER WITH DISTURBED SERVICES

RESTORED TO ORIGINAL CONDITION.

7. PERFORM CUTTING AND PATCHING WORK AS NOTED AND AS

NECESSARY FOR THE INSTALLATION OF THE WORK.

8. CUT, CHANNEL, CHASE, AND DRILL CEILINGS, AND OTHER

SURFACES NECESSARY FOR SYSTEM INSTALLATIONS.

PERFORM CUTTING BY SKILLED MECHANICS OF TRADE

INVOLVED.

9. REPAIR AND/OR REPLACE AT NO COST TO OWNER ALL

EQUIPMENT AND MATERIALS DAMAGED DURING

CONSTRUCTION.

10. THE CONTRACTOR IS RESPONSIBLE FOR CUTTING AND

PATCHING OF EXISTING BUILDING STRUCTURE TO FACILITATE

AND TO CONCEAL THE WORK DESCRIBED WITHIN THESE

DOCUMENTS. SURFACES TO BE PATCHED SHALL BE FINISHED

TO MATCH THE EXISTING SURFACE. OWNER HAS FINAL SAY AS

TO THE ACCEPTABILITY OF THE FINISHED PATCHED WORK.

11. PIPES AND CONDUITS FOR THE BUILDING SYSTEMS SHALL BE

CONCEALED WITHIN FINISHED SPACES UNLESS SPECIFICALLY

NOTED OTHERWISE.

CUTTING AND PATCHING GENERAL NOTES

1. COORDINATE INSTALLATION OF WORK WITH OTHER TRADES.

2. PROVIDE SUPPORT/BRACING OF EQUIPMENT AND BUILDING

SERVICES FOR SEISMIC RESTRAINT AS REQUIRED BY CODE.

3. ALL EQUIPMENT, MATERIALS AND RELATED SYSTEMS

COMPONENTS SHALL BE NEW UNLESS SPECIFICALLY NOTED

OTHERWISE.

4. ALL EQUIPMENT SHALL BE LOCATED IN ACCESSIBLE

LOCATIONS. WHEN A PIECE OF EQUIPMENT MUST BE LOCATED

ABOVE AN INACCESSIBLE CEILING OR WALL THEN THE

APPROPRIATE ACCESS DOOR SHALL BE PROVIDED. THESE

SHALL BE COORDINATED WITH THE ARCHITECT.

5. MAINTAIN MANUFACTURERS RECOMMENDED SERVICE

CLEARANCES.

6. LOCATION AND SIZES OF ALL FLOOR, WALL AND ROOF

PENETRATIONS SHALL BE COORDINATED WITH ALL OTHER

TRADES INVOLVED.

7. EQUIPMENT INSTALLATION - COMMON REQUIREMENTS

A. INSTALL EQUIPMENT TO ALLOW MAXIMUM POSSIBLE

HEADROOM UNLESS SPECIFIC MOUNTING HEIGHTS

ARE NOT INDICATED.

B. INSTALL EQUIPMENT LEVEL AND PLUMB, PARALLEL

AND PERPENDICULAR TO OTHER BUILDING SYSTEMS

AND COMPONENTS IN EXPOSED INTERIOR SPACES,

UNLESS OTHERWISE INDICATED.

8. ERECTION OF METAL SUPPORTS AND ANCHORAGES

A. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL

STEEL.

B. CUT, FIT, AND PLACE MISCELLANEOUS METAL

SUPPORTS ACCURATELY IN LOCATION, ALIGNMENT,

AND ELEVATION TO SUPPORT AND ANCHOR FIRE

PROTECTION MATERIALS AND EQUIPMENT.

C. FIELD WELDING: COMPLY WITH AWS D1.1.

9. GROUTING

A. CLEAN SURFACES THAT WILL COME INTO CONTACT

WITH GROUT.

B. PROVIDE FORMS AS REQUIRED FOR PLACEMENT OF

GROUT.

C. AVOID AIR ENTRAPMENT DURING PLACEMENT OF

GROUT.

D. PLACE GROUT, COMPLETELY FILLING EQUIPMENT

BASES.

E. PLACE GROUT ON CONCRETE BASES AND PROVIDE

SMOOTH BEARING SURFACE FOR EQUIPMENT.

F. PLACE GROUT AROUND ANCHORS.

G. CURE PLACED GROUT.

EQUIPMENT GENERAL NOTES

1. THIS PROJECT HAS BEEN SPECIFIED TO BE AN ASBESTOS FREE

CONSTRUCTION. ALL CONTRACTORS AND SUB-CONTRACTORS

ARE CAUTIONED THAT ANY PRODUCT CONTAINING EVEN A

TRACE OF ASBESTOS ARE PROHIBITED FROM USE ON THIS

PROJECT. ALL SUPPLIERS AND CONTRACTORS SHALL ENSURE

THAT ANY PROPOSED PRODUCTS HAVE BEEN ANALYZED AND

CERTIFIED ASBESTOS FREE BY THE MANUFACTURE. THE

ENGINEER AND OWNER RESERVES THE RIGHT TO REQUEST A

FLAT STATEMENT GUARANTEE OF ASBESTOS FREE MATERIALS

PRIOR TO FINAL PAYMENT OF WORK

2. THE ENGINEER OR OWNER HAVE THE RIGHT TO HAVE ANY

MATERIAL TESTED BY A TESTING LABORATORY OF THEIR

CHOICE TO DETERMINE THE PRESENCE OF ASBESTOS IN

MATERIALS/PRODUCTS DELIVERED TO THE SITE. IF A POSITIVE

RESULT FOR ASBESTOS IS DETERMINED, THE CONTRACTOR

SHALL BE REQUIRED TO REMOVE ALL SUCH

MATERIAL/PRODUCTS AND REPLACE WITH ACCEPTABLE

ASBESTOS FREE MATERIALS AND/OR PRODUCTS.

3. IF ASBESTOS IS FOUND IN ANY MATERIAL OR PRODUCT BY THE

CONTRACTOR, ALL REMOVAL, TESTING, MONITORING OF

REMOVALS AND ASBESTOS ABATEMENT COST SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

ASBESTOS FREE PROJECT NOTES

1. PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIERS

WHERE REQUIRED TO PREVENT DUST POLLUTION OF

SURROUNDING OCCUPIED AREAS. SEAL AIR-TIGHT. PARTITIONS

MUST BE INSTALLED IN ACCORDANCE WITH FIRE PROTECTION

AND EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS

ACCESS TO EXITS DURING CONSTRUCTION.

2. WORK AREAS ARE TO BE KEPT FREE OF DEBRIS AT ALL TIMES

AND ARE TO BE LEFT BROOM CLEAN AT THE END OF EACH

WORKING DAY.

3. TAKE PROPER MEASURES TO PREVENT DUST MIGRATION TO

AREAS OUTSIDE THE CONSTRUCTION AREA BY CLOSING ALL

OPENINGS IN DUCTS, WALLS, FLOORS AND CEILINGS. PROVIDE

CONTINUOUS EXHAUST TO EXTERIOR TO MAINTAIN NEGATIVE

PRESSURE IN CONSTRUCTION AREA.

5. DO NOT CLOSE OR OBSTRUCT EGRESS WIDTH TO ANY BUILDING

OR SITE EXIT.

6. REMOVE IN ORDERLY AND CAREFUL MANNER.

7. REMOVE MATERIALS AS WORK PROGRESSES.

8. REMOVE DEMOLISHED MATERIALS FROM SITE EXCEPT WHERE

SPECIFICALLY NOTED OTHERWISE

9. DO NOT BURN OR BURY MATERIALS ON SITE.

10. THE OWNER SHALL TO DIRECT THE CONTRACTOR WHERE

CONSTRUCTION MATERIALS, FURNITURE AND EQUIPMENT TO

BE INSTALLED SHALL BE STAGED AND STOCKPILED DURING

CONSTRUCTION.

11. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING

ELEMENTS TO BE REMOVED. REFER TO OTHER TRADE

DRAWINGS FOR OTHER REMOVALS, INCLUDING MODIFICATIONS

THAT MAY EXTEND BEYOND AREAS SHOWN.

GENERAL REMOVAL NOTES

12. FOR DURATION OF PROJECT, EXISTING CONSTRUCTION AND/OR

EQUIPMENT TO REMAIN FROM DAMAGE OR CONSTRUCTION

ACTIVITIES. WHERE CONSTRUCTION ACTIVITIES RESULT IN

DAMAGE TO EXISTING CONSTRUCTION TO BE RETAINED,

REPLACE/REPAIR EXISTING CONSTRUCTION TO RETURN IT TO

ITS ORIGINAL CONDITION. WHERE REMOVAL OF EXISTING

CONSTRUCTION, PIPING, DUCTWORK, AND OTHER ITEMS

CREATES OPENINGS IN WALLS, FLOORS OR CEILINGS, PATCH

OPENINGS IMMEDIATELY WITH SAME MATERIALS AS ADJACENT

CONSTRUCTION AND/OR TO MAINTAIN REQUIRED FIRE RATING.

13. COORDINATE WITH OWNER FOR EQUIPMENT TO BE SALVAGED

AND RETURNED TO OWNER. THE OWNER WILL RETAIN ALL

SALVAGE THAT IS OF VALUE AS DESIGNATED BY THE USER OR

BUILDING ENGINEER. REMOVE FROM THE BUILDING AND

DISPOSE OF IN A LAWFUL MANNER ALL DEBRIS AND/OR ITEMS

NOT RETAINED BY OWNER.

14. INSTALL ADHESIVE MATS INSIDE AND OUTSIDE EACH ACCESS

DOOR TO CONSTRUCTION AREA.

GENERAL REMOVAL NOTES (CONT.)

1. THIS PROJECT IS A RENOVATION OF OF AN EXISTING FACILITY.

IT IS THE INTENT OF THE DEMOLITION DRAWING TO LEAVE ALL

MATERIALS OUTSIDE THE LIMITS OF THIS CONTRACT IN

EXISTING OPERATING CONDITION.

2. BEFORE SUBMITTING HIS BID THE CONTRACTOR SHALL VISIT

THE SITE AND BECOME THOROUGHLY FAMILIAR WITH THE

EXISTING CONDITIONS UNDER WHICH THE PROJECT IS TO BE

COMPLETED.

3. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY

ASSUMPTIONS, OMISSIONS OR ERRORS HE MAKES AS A RESULT

OF HIS FAILURE TO BECOME FULLY FAMILIAR WITH THE

EXISTING CONDITIONS.

4. PROPERLY DISPOSE OF ALL DEMOLISHED EQUIPMENT AND

MATERIALS IN COMPLIANCE WITH CODES AND REGULATIONS.

5. RELOCATE EXISTING EQUIPMENT, PIPING, WIRING AND RELATED

SYSTEMS TO REMAIN AS REQUIRED FOR CONSTRUCTION.

EXTEND FEEDER/CONDUIT AND PROVIDE RECONNECTIONS FOR

SYSTEM TO BE FULLY OPERATIONAL. ALL RELOCATED

EQUIPMENT SHALL BE PROTECTED DURING CONSTRUCTION.

6. INCLUDE ALL WORK REQUIRED TO ALLOW PHASED

CONSTRUCTION WHERE NECESSARY. COORDINATE WITH

GENERAL CONTRACTOR/CONSTRUCTION MANAGER FOR

PHASING REQUIREMENTS.

7. GENERAL CONTRACTOR IS RESPONSIBLE OF PATCHING,

REPAIRING, CAPPING, ETC. PER DEMOLITION AND

CONSTRUCTION.

8. WORK NOT INDICATED ON A PART OF THE DRAWING BUT

REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN AT

CORRESPONDING PLACES TO BE PROVIDED AT NO ADDITIONAL

COST.

9. COORDINATE OPERATIONS WITH THE OWNER SUCH AS BUT NOT

LIMITED TO, WORK AREAS USED FOR STORAGE, ACCESS TO

AND FROM WORK AREAS, TIMING OF WORK, SPECIAL

CONSIDERATIONS OF NOISY OPERATIONS, INTERRUPTIONS FOR

MECHANICAL, PLUMBING, AND ELECTRICAL SERVICES.

FLAMMABLE OR TOXIC MATERIALS ARE NOT PERMITTED TO BE

STORED INSIDE THE BUILDING.

GENERAL RENOVATION NOTES

1. UNLESS NOTED OTHERWISE, BASIS OF DESIGN IS SHERWIN-

WILLIAMS.

2. COLOR(S) AS SELECTED BY OWNER UNLESS NOTED

OTHERWISE.

3. REFER TO SPECIFIC NOTES AND DETALS FOR PRODUCT TYPES

AND LOCATIONS.

4. INSTALL PRODUCTS IN ACCORDANCE WITH MANUFACTURERS

PRINTED INSTRUCTIONS.

GENERAL PAINTING NOTES

Drawing Title

Drawing No.

Project Name

Email: mail@delta-eas.com www.delta-eas.com

Seal

Project No.

Date

Phase

UNAUTHORIZED ALTERATION OF

THIS DRAWING IS A VIOLATION OF THE NEW

YORK STATE EDUCATION LAW, SECTION

7209, SUBDIVISION 2.

860 Hooper Road Endwell, New York 13760

Tel: 607.231.6600 Fax: 607.231.6650

(I T

IS

A

V

IO

L A

T

IO

N O

F T

H E

L A

W F

O R

A N

Y P

E R

S O

N U

N L

E S

S H

E O

R S

H E

IS

A

C T

IN

G

U N

D E

R T

H E

D

IR

E C

T

IO

N O

F A

L

IC

E N

S E

D P

R O

F E

S S

IO

N

A L

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R T

O A

L T

E R

A N

IT

E

M

IN

A N

Y W

A Y

IF

A N

IT

E

M B

E A

R

IN

G T

H E

S E

A L

O F

A N

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R

IS

A L

T E

R E

D T

H E

A L

T E

R

IN

G E

N G

IN

E

E R

O R

L

A N

D S

U R

V E

Y O

R S

H A

L L

A F

F

IX

T O

T H

E

IT

E M

H

IS

O R

H E

R S

E A

L A

N D

T H

E N

O T

A T

IO

N

A

L T

E R

E D

B Y

F

O L

L O

W E

D B

Y H

IS

O

R H

E R

S

IG

N A

T U

R E

A N

D T

H E

D A

T E

O F

S U

C H

A L

T E

R A

T

IO

N A

N D

A S

P E

C

IF

IC

D

E S

C R

IP

T

IO

N

O F

T H

E A

L T

E R

A T

IO

N

CERTIFICATE OF AUTHORIZATION #: 019598

Dsg By Ckd By

/1

/2

:0

:5

P

M

A-001

GENERAL NOTES AND

SPECIFICATIONS

TIOGA COUNTY O.H. DOOR

103 CORPORATE DRIVE, OWEGO, NY 13827

2025.416.001

2026.03.18

KEM CSL

GENERAL ARCHITECTURAL NOTES

A. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. NOTIFY THE

ARCHITECT OF DISCREPANCIES PRIOR TO COMMENCING WORK.

EXISTING CONDITIONS THAT WOULD AFFECT THE EXECUTION OF THE

WORK MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT

PRIOR TO COMMENCING THE WORK.

B. DIMENSIONS GIVEN ON PLANS ARE FROM FINISHED FACE TO FINISHED

FACE UNLESS OTHERWISE NOTED. DIMENSIONS ARE NOT ADJUSTABLE

WITHOUT THE APPROVAL OF THE ARCHITECT UNLESS OTHERWISE

NOTED.

C. PROVIDE BLOCKING IN WALLS AS REQUIRED TO SUPPORT WALL

MOUNTED ITEMS. LOCATE EQUIPMENT AND COORDINATE BLOCKING

LOCATIONS IN FIELD.

D. DIMENSIONS LOCATING DOORS OR INTERIOR WINDOWS ARE TO

OUTSIDE EDGE OF FRAME UNLESS NOTED OTHERWISE. REFER TO

DOOR & WINDOW SHEETS FOR FRAME TYPE, SIZE AND DETAILS.

E. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

No. Revision Date

1 DRAWING UPDATES 2026.03.06

2 ISSUE FOR CONSTRUCTION 2026.03.18

ISSUE FOR CONSTRUCTION

R1

V .I .F

E X

IS

T

IN

G

W A

L L K

N O

C K

O U

T

EXISTING JOINT FOR WALL KNOCKOUT

EXISTING JOINT FOR WALL KNOCKOUT

EXISTING DUCT TO REMAIN

A-201

WALL MOUNTED CONTROL PANEL

MECHANICAL EXTERIOR

EXISTING DUCT OVERHEAD

1' - 10 3/4"

WALL MOUNTED CONTROL PANEL

A-201

M A

S O

N R

Y O

P E

N

IN

G

V .I .F

MECHANICAL EXTERIOR

A-301

MTL ANGLE AT HEAD, JAMB

AND SILL MECHANICALLY

FASTENED. REFER TO

STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

TYP.

EXISTING BRICK VENEER, TYP.

EXISTING CMU WALL, TYP.

EXISTING DUCT OVERHEAD

EXISTING DUCT TO REMAIN

Drawing Title

Drawing No.

Project Name

Email: mail@delta-eas.com www.delta-eas.com

Key Plan

Seal

Project No.

Date

Phase

UNAUTHORIZED ALTERATION OF

THIS DRAWING IS A VIOLATION OF THE NEW

YORK STATE EDUCATION LAW, SECTION

7209, SUBDIVISION 2.

860 Hooper Road Endwell, New York 13760

Tel: 607.231.6600 Fax: 607.231.6650

(I T

IS

A

V

IO

L A

T

IO

N O

F T

H E

L A

W F

O R

A N

Y P

E R

S O

N U

N L

E S

S H

E O

R S

H E

IS

A

C T

IN

G

U N

D E

R T

H E

D

IR

E C

T

IO

N O

F A

L

IC

E N

S E

D P

R O

F E

S S

IO

N

A L

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R T

O A

L T

E R

A N

IT

E

M

IN

A N

Y W

A Y

IF

A N

IT

E

M B

E A

R

IN

G T

H E

S E

A L

O F

A N

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R

IS

A L

T E

R E

D T

H E

A L

T E

R

IN

G E

N G

IN

E

E R

N

D S

U R

V E

Y O

R S

H A

L L

A F

F

IX

T O

T H

E

IT

E M

H

IS

O R

H E

R S

E A

L A

N D

T H

E N

O T

A T

IO

N

A

L T

E R

E D

B Y

F

O L

L O

W E

D B

Y H

IS

O

R H

E R

S

IG

N A

T U

R E

A N

D T

H E

D A

T E

O F

S U

C H

A L

T E

R A

T

IO

N A

N D

A S

P E

C

IF

IC

D

E S

C R

IP

T

IO

N

O F

T H

E A

L T

E R

A T

IO

N

CERTIFICATE OF AUTHORIZATION #: 019598

Dsg By Ckd By

SCALE: N.T.S.

/1

/2

:0

:5

P

M

A-100

REMOVAL AND RENOVATION

PLANS

TIOGA COUNTY O.H. DOOR

103 CORPORATE DRIVE, OWEGO, NY 13827

2025.416.001

2026.03.18

KEM CSL

SCALE: 1/2" = 1'-0"A-100

1 FIRST FLOOR REMOVAL PLAN

SCALE: 1/2" = 1'-0"A-100

2 FIRST FLOOR RENOVATION PLAN

NORTH

0'

SCALE: 1/2" = 1'-0"

6" 1' 4'2'

A-100 REMOVAL KEY NOTES

R1 REMOVE 8'-0" X 7'-4" PORTION OF EXISTING CMU EXTERIOR WALL SYSTEM.

A-100 RENOVATION KEY NOTES

1 PROVIDE 8'-0" X 7'-4" INSULATED COILING DOOR SYSTEM WITH MANUAL PULL

CHAIN IN CMU WALL OPENING. BASIS OF DESIGN: CORNELL IRON MODEL: ESD20CR

2 REPAIR/REPOINT MASONARY AS REQUIRED TO FACILITATE THE INSTALLATION OF

O.H. DOOR.

3 PRIME AND PAINT BENT METAL AROUND PERIMETER OF CMU OPENING. COLOR

SELECTED BY OWNER.

OVERHEAD COILING DOOR

BASIS OF DESIGN

MANUFACTURER: CORNELL IRON

MODEL: ESD20CR

OPERATION: MANUAL CHAIN

CURTAIN: 316 STAINLESS OR CLEAR ANODIZED ALUMINUM

HOOD: TO MATCH CURTAIN MATERIAL

R-VALUE: 8

WIND LOAD: UP TO 40 PSF

MOUNTING: FACE OF WALL

OVERHEAD DOOR OPERATOR:

BASIS OF DESIGN

MANUFACTURER: CORNELL IRON

MODEL: MANUAL OPERATOR - CONTROLGARD - MODEL CG

OPERATION: MANUAL CHAIN

PAINT

BASIS OF DESIGN

MANUFACTURER: SHERWIN-WILLIAMS

APPLICATION:

1ST COAT PRIMER: SHERWIN-WILLIAMS KEM KROMIK UNIVERSAL METAL PRIMER

B50-Z100.

2ND & 3RD COATS: SHERWIN-WILLIAMS PRO INDUSTRIAL ACRYLIC SEMI-GLOSS

B66-650. 6-12 MILS WET, 2-4 MILS DRY PER COAT.

No. Revision Date

1 DRAWING UPDATES 2026.03.06

MEZZANINE LEVEL PLAN

100' - 0"

8' - 0"

E X

IS

T

IN

G

W A

L L K

N O

C K

O U

T

2' - 0"

EXISTING WALL KNOCKOUT

6' - 0" 6' - 0"

R1

WALL MOUNTED CONTROL PANEL

EXISTING LINTEL

107' - 4"

LINE OF DUCT BEYOND

A-301

MEZZANINE LEVEL PLAN

100' - 0"

LINE OF DUCT BEYOND

WALL MOUNTED CONTROL PANEL

EXISTING LINTEL

107' - 4"

MASONRY OPENING

8' - 0"

V.I.F.

+/- 6' - 0"

M A

S O

N R

Y O

P E

N

IN

G

A-301

Drawing Title

Drawing No.

Project Name

Email: mail@delta-eas.com www.delta-eas.com

Key Plan

Seal

Project No.

Date

Phase

UNAUTHORIZED ALTERATION OF

THIS DRAWING IS A VIOLATION OF THE NEW

YORK STATE EDUCATION LAW, SECTION

7209, SUBDIVISION 2.

860 Hooper Road Endwell, New York 13760

Tel: 607.231.6600 Fax: 607.231.6650

(I T

IS

A

V

IO

L A

T

IO

N O

F T

H E

L A

W F

O R

A N

Y P

E R

S O

N U

N L

E S

S H

E O

R S

H E

IS

A

C T

IN

G

U N

D E

R T

H E

D

IR

E C

T

IO

N O

F A

L

IC

E N

S E

D P

R O

F E

S S

IO

N

A L

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R T

O A

L T

E R

A N

IT

E

M

IN

A N

Y W

A Y

IF

A N

IT

E

M B

E A

R

IN

G T

H E

S E

A L

O F

A N

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R

IS

A L

T E

R E

D T

H E

A L

T E

R

IN

G E

N G

IN

E

E R

N

D S

U R

V E

Y O

R S

H A

L L

A F

F

IX

T O

T H

E

IT

E M

H

IS

O R

H E

R S

E A

L A

N D

T H

E N

O T

A T

IO

N

A

L T

E R

E D

B Y

F

O L

L O

W E

D B

Y H

IS

O

R H

E R

S

IG

N A

T U

R E

A N

D T

H E

D A

T E

O F

S U

C H

A L

T E

R A

T

IO

N A

N D

A S

P E

C

IF

IC

D

E S

C R

IP

T

IO

N

O F

T H

E A

L T

E R

A T

IO

N

CERTIFICATE OF AUTHORIZATION #: 019598

Dsg By Ckd By

SCALE: N.T.S.

/1

/2

:0

:5

P

M

A-201

INTERIOR ELEVATIONS

TIOGA COUNTY O.H. DOOR

103 CORPORATE DRIVE, OWEGO, NY 13827

2025.416.001

2026.03.18

KEM CSL

SCALE: 1/2" = 1'-0"A-201

1 INTERIOR ELEVATION REMOVAL

SCALE: 1/2" = 1'-0"A-201

2 INTERIOR ELEVATION RENOVATION

A-201 REMOVAL KEY NOTES

R1 REMOVE 8'-0" X 7'-4" PORTION OF EXISTING CMU EXTERIOR WALL SYSTEM.

A-201 RENOVATION KEY NOTES

1 PROVIDE 8'-0" X 7'-4" INSULATED COILING DOOR SYSTEM WITH MANUAL PULL

CHAIN IN CMU WALL OPENING. BASIS OF DESIGN: CORNELL IRON MODEL: ESD20CR

2 REPAIR/REPOINT MASONARY AS REQUIRED TO FACILITATE INSTALLATION OF O.H.

DOOR.

0'

SCALE: 1/2" = 1'-0"

6" 1' 4'2'

No. Revision Date

1 DRAWING UPDATES 2026.03.06

MEZZANINE LEVEL PLAN

100' - 0"

EXISTING LINTEL

107' - 4"

MTL ANGLE AT HEAD, JAMB

AND SILL MECHANICALLY

FASTENED. REFER TO

STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

TYP.

EXISTING BRICK VENEER

EXISTING 8" CMU WALL

Drawing Title

Drawing No.

Project Name

Email: mail@delta-eas.com www.delta-eas.com

Key Plan

Seal

Project No.

Date

Phase

UNAUTHORIZED ALTERATION OF

THIS DRAWING IS A VIOLATION OF THE NEW

YORK STATE EDUCATION LAW, SECTION

7209, SUBDIVISION 2.

860 Hooper Road Endwell, New York 13760

Tel: 607.231.6600 Fax: 607.231.6650

(I T

IS

A

V

IO

L A

T

IO

N O

F T

H E

L A

W F

O R

A N

Y P

E R

S O

N U

N L

E S

S H

E O

R S

H E

IS

A

C T

IN

G

U N

D E

R T

H E

D

IR

E C

T

IO

N O

F A

L

IC

E N

S E

D P

R O

F E

S S

IO

N

A L

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R T

O A

L T

E R

A N

IT

E

M

IN

A N

Y W

A Y

IF

A N

IT

E

M B

E A

R

IN

G T

H E

S E

A L

O F

A N

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R

IS

A L

T E

R E

D T

H E

A L

T E

R

IN

G E

N G

IN

E

E R

N

D S

U R

V E

Y O

R S

H A

L L

A F

F

IX

T O

T H

E

IT

E M

H

IS

O R

H E

R S

E A

L A

N D

T H

E N

O T

A T

IO

N

A

L T

E R

E D

B Y

F

O L

L O

W E

D B

Y H

IS

O

R H

E R

S

IG

N A

T U

R E

A N

D T

H E

D A

T E

O F

S U

C H

A L

T E

R A

T

IO

N A

N D

A S

P E

C

IF

IC

D

E S

C R

IP

T

IO

N

O F

T H

E A

L T

E R

A T

IO

N

CERTIFICATE OF AUTHORIZATION #: 019598

Dsg By Ckd By

SCALE: N.T.S.

/1

/2

:0

:5

P

M

A-301

WALL SECTION - OVERHEAD

DOOR

TIOGA COUNTY O.H. DOOR

103 CORPORATE DRIVE, OWEGO, NY 13827

2025.416.001

2026.03.18

KEM CMWSCALE: 1" = 1'-0"A-301

1 WALL SECTION - OVERHEAD DOOR

0'

SCALE: 1" = 1'-0"

3" 6" 2'1'

A-301 RENOVATION KEY NOTES

1 PROVIDE 8'-0" X 7'-4" INSULATED COILING DOOR SYSTEM WITH MANUAL PULL

CHAIN IN CMU WALL OPENING. BASIS OF DESIGN: CORNELL IRON MODEL: ESD20CR

2 REPAIR/REPOINT MASONARY AS REQUIRED TO FACILITATE THE INSTALLATION OF

O.H. DOOR.

3 PRIME AND PAINT BENT METAL AROUND PERIMETER OF CMU OPENING. COLOR

SELECTED BY OWNER.

No. Revision Date

1 DRAWING UPDATES 2026.03.06

EXISTING 8" CMU WALL

FULLY GROUTED REINFORCED

WITH #4's AT 8"

8' - 0"

EXISTING BOND BEAM

REINFORCED WITH (2)# 5

MEZZ

(SEE PLAN)

S-101

S-101 8

EXISTING

CMU WALL

PROPOSED

OPENING

MATERIAL OPTIONS

VENEER MORTAR: QUIKRETE, FAST SET REPAIR MORTAR MIX.PREMIXED WHITE ADHESIVE

MORTAR, RAPID SET HIGH-PERFORMANCE, FAST-SETTING MORTAR MIX OR EQUIVALENT

ANCHOR BOLT EPOXY: HIT-HY 200-R EPOXY ADHESIVE. SET-XP® HIGH-STRENGTH EPOXY

ADHESIVE. SIKA- ANCHOR FIX-1 HIGH STRENGTH FAST CURING ANCHORING ADHESIVE.

ANCHOR RODS: 3/4 in AND ½” HAS-E Carbon Steel, ASTM F1554 Grade 55. Zinc-Plated Threaded Anchor Rod. SIMPSON 3/4 in AND ½” Hot-Dip Galvanized Retrofit Bolt

6'-0" 7'-4" MASONRY

KNOCK OUT PANEL

WITH CONTROL JOINT

EACH SIDES

EXISTING BOND BEAM

CONNECTION TO CMU WALL

UNTIL ALL DEAD LOAD HAS

BEEN APPLIED TO THE ROOF

TOP/DECK ELEV. = 902'-8"

TOP OF PLANK ELEV. = 890'-8"

GROUT, TYP.

1 COURSE 2" CMU

OFFSET VERT. REINF. AS

REQ'D TO CLEAR PRECAST

PLANKS - MINIMUM 3"

GROUT SPACE REQ'D

BETWEEN CMU AND END OF

PLANK (TYP.)

CONT. BOND BM.

W/2 #5 BARS (TYP.)

8" PRECAST PRESTRESSED CONCRETE PLANK

2" STRUCTURAL TOPPING

#4 BAR - 1'-4" X 1'-4"

GROUTED INTO EA.

PLANK JOINT (TYP.)

CMU W/#4 BARS

VERTICAL IN FILLED

CORE @ 8" O.C. (TYP.)

CONT. BOND BM.

W/2 #5 BARS (TYP.)

CONT. BOND BM

W/2 #5 BARS

1 1/2" X 22 GA. PAINTED WIDE

RIB STEEL ROOF DECK

L3"X3"X1/4" CONT. W/

1/2" DIA X3" HILTI

SLEEVE ANCHORS

1. CAREFULLY REMOVE THE DESIGNATED CONCRETE MASONRY UNIT (CMU) FROM THE EXISTING KNOCK OUT IN THE WALL AND EXTEND THE OPENING TO THE SPECIFIED DIMENSIONS ON THE SOUTH SIDE.

2. THE EXISTING CONTINUOUS REINFORCED BOND BEAM (WITH TWO #5 REBARS) IS SUFFICIENT TO SERVE

AS THE LINTEL FOR THE NEW OPENING.

3. INSTALL TEMPORARY SHORING AND SUPPORT SYSTEMS FOR THE EXTERIOR BRICK VENEER TO ENSURE

STABILITY DURING CONSTRUCTION.

4. BENT PLATE INSTALLATION (UPPER):

a. PROVIDE THE PREFABRICATED BENT PLATE AS DETAILED IN THE DRAWINGS.

b. DRILL HOLES THROUGH THE VENEER AT THE FOUR DESIGNATED BOLT LOCATIONS.

c. SECURE THE BENT PLATE BY DRILLING PILOT HOLES INTO THE EXISTING BOND BEAM AND

INSTALLING EPOXY- ANCHORED BOLTS.

d. RESTORE THE BRICK VENEER AT THE BOLT LOCATIONS FOLLOWING INSTALLATION.

5. PROVIDE AND INSTALL THE LOWER BENT PLATE AT THE BOTTOM OF THE OPENING AS INDICATED IN THE

PLANS.

6. FURNISH AND INSTALL THE OVERHEAD DOOR ACCORDING TO THE ARCHITECTURAL DRAWINGS.

7. THE INSTALLATION PROCEDURE IS BASED ON THE AVAILABLE INFORMATION PROVIDED IN THE EXISTING

DRAWING. SHOULD THE ACTUAL, EXISTING CONDITIONS DIFFER FROM THOSE SPECIFIED, THE

CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD.

INSTALLATION PROCEDURE

EXISTING CONT BOND

BEAM W/ #5's

EXISTING 8" CMU WALL

WITH #4's AT 8"

EXISTING 8"

PRESTRESSED

CONCRETE

PLANKS

MEZZL

(SEE PLAN)

EXISTING ROOF

JOISTS

1' - 2 1/2"

EXISTING BRICK

VENEER

1/4" THICK BENT PALE

7 1/8" 1

/2

7 3/32"

/2

2 1/2"

3/16 2

EA

(4) 1/4" STIFFENERS

EQUALLY SPACED

AT THE SPAN

(4) 3/4" DIA POST INSTALL

ANCHOR BOLT

EQUALLY SPACED,

EPOXY AND EMBED 5" MIN

MEZZL

(SEE PLAN)

(4)1/2" DIA BOLT

EQUALLY SPACED,

EMBED 5" MIN

EXISTING 2"

TOPPING

EXISTING 1 COURSE 2" CMU

EXISTING GROUT

FILL THE GAPE W/

QUIKRET-5000 FAST

SETTING CONCRETE

MIX OR EQUIVALENT

Drawing Title

Drawing No.

Project Name

Email: mail@delta-eas.com www.delta-eas.com

Key Plan

Seal

Project No.

Date

Phase

UNAUTHORIZED ALTERATION OF

THIS DRAWING IS A VIOLATION OF THE NEW

YORK STATE EDUCATION LAW, SECTION

7209, SUBDIVISION 2.

860 Hooper Road Endwell, New York 13760

Tel: 607.231.6600 Fax: 607.231.6650

(I T

IS

A

V

IO

L A

T

IO

N O

F T

H E

L A

W F

O R

A N

Y P

E R

S O

N U

N L

E S

S H

E O

R S

H E

IS

A

C T

IN

G

U N

D E

R T

H E

D

IR

E C

T

IO

N O

F A

L

IC

E N

S E

D P

R O

F E

S S

IO

N

A L

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R T

O A

L T

E R

A N

IT

E

M

IN

A N

Y W

A Y

IF

A N

IT

E

M B

E A

R

IN

G T

H E

S E

A L

O F

A N

E N

G

IN

E E

R O

R L

A N

D S

U R

V E

Y O

R

IS

A L

T E

R E

D T

H E

A L

T E

R

IN

G E

N G

IN

E

E R

N

D S

U R

V E

Y O

R S

H A

L L

A F

F

IX

T O

T H

E

IT

E M

H

IS

O R

H E

R S

E A

L A

N D

T H

E N

O T

A T

IO

N

A

L T

E R

E D

B Y

F

O L

L O

W E

D B

Y H

IS

O

R H

E R

S

IG

N A

T U

R E

A N

D T

H E

D A

T E

O F

S U

C H

A L

T E

R A

T

IO

N A

N D

A S

P E

C

IF

IC

D

E S

C R

IP

T

IO

N

O F

T H

E A

L T

E R

A T

IO

N

CERTIFICATE OF AUTHORIZATION #: 019598

Dsg By Ckd By

/1

/2

:0

:4

P

M

S-101

LINTEL PLAN AND DETAILS

TIOGA COUNTY O.H. DOOR

103 COORPORATE DRIVE , OWEGO, NY 13827

2025.416.001

2025.12.04

NRN RS

SCALE: 1/4" = 1'-0"S-101

5 LINTEL ELEVATION

SCALE: 1/4" = 1'-0"S-101

4 OPENING PLAN

SCALE: 3/4" = 1'-0"S-101

2 EXISTING KNOCKOUT

SCALE: 3/4" = 1'-0"S-101

1 EXISTING KNOCK OUT PLAN

SCALE: 3/4" = 1'-0"S-101

3 EXISTING WALL SECTION

No. Revision Date

SCALE: 3/4" = 1'-0"S-101

6 LINTEL BEAM SECTION

kmaby Text Box

01 G-001-R001 IFC COVER SHEET
02 A-001-R001 IFC GENERAL NOTES AND SPECIFICATIONS
03 A-100-R001 IFC REMOVAL AND RENOVATION PLANS
04 A-201-R001 IFC INTERIOR ELEVATIONS
05 A-301-R001 IFC WALL SECTION - OVERHEAD DOOR
06 S-101-R001 IFC LINTEL PLAN AND DETAILS

File details come from the government source that posted it. Updated .