2025.416.001 Drawings IFC 20260318-R001.pdf
PDF 2 MB Posted
- Solicitation number
- 2140630
- Issued by
- Tioga County, New York
About this file
This is an architectural drawing document for the Tioga County Department of Public Works overhead door installation project located at 103 Corporate Drive, Owego, New York. The project involves the removal of an 8'-0" x 7'-4" portion of an existing concrete masonry unit (CMU) exterior wall and the installation of an insulated coiling door system with manual pull chain operation. The basis of design specifies a Cornell Iron Model ESD20CR overhead door with 316 stainless steel or clear anodized aluminum curtain material, an R-value of 8, and wind load capacity up to 40 pounds per square foot. The door will be mounted on the face of the wall with a manual chain operator (Cornell Iron Model CG). The project requires repair and repointing of masonry to facilitate door installation, as well as priming and painting of bent metal around the perimeter of the CMU opening using Sherwin-Williams products with owner-selected color. A mandatory pre-bid meeting is scheduled for November 12, 2026, at 9:30 a.m. at the project site, with sealed bids due December 1, 2026, at 11:00 a.m. at the Tioga County Department of Public Works office. Contract documents are available electronically through a request to Justin Ruggiero at ruggieroj@tiogacountyny.gov on or after November 6, 2026.
The drawing set includes general notes and specifications requiring all work to comply with the 2020 Existing Building Code and 2020 Energy Conservation Construction Code of New York State. The contractor must furnish and install complete systems, coordinate with all trades before starting construction, obtain required local or municipal inspection certificates, and provide testing, adjusting, and balancing services. All materials and equipment must be new and first-class quality unless otherwise noted, with strict adherence to manufacturer specifications and installation methods. The project requires one-year unconditional guarantee on all labor and materials against defects in workmanship. Contractors must visit the job site prior to bidding, verify existing field conditions, and assume responsibility for any additional costs resulting from failure to verify scope of work. The bid must be accompanied by a 5% bid guaranty and a non-collusion statement. Tioga County is a locally funded project entity exempt from New York State sales tax, and the county reserves the right to reject any or all bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025.416.001 Project Manual IFC 20261102-R003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF DRAWINGS
ARCHITECT/ENGINEER PROJECT LOCATION OWNER
G-001
860 Hooper Road Endwell, New York 13760
Tel: 607.231.6600 Fax: 607.231.6650
Email: mail@delta-eas.com www.delta-eas.com
CERTIFICATE OF AUTHORIZATION #: 019598 PROJECT
LOCATION
/1
/2
:0
:5
P M
103 CORPORATE
DRIVE, OWEGO, NY
13827
2026.03.18
TIOGA COUNTY O.H. DOOR
103 CORPORATE DRIVE, OWEGO,
NY 13827
TIOGA COUNTY
DELTA PROJECT NO. 2025.416.001
ISSUE FOR CONSTRUCTION
ARCHITECTURAL
A-001 GENERAL NOTES AND SPECIFICATIONS
A-100 REMOVAL AND RENOVATION PLANS
A-201 INTERIOR ELEVATIONS
A-301 WALL SECTION - OVERHEAD DOOR
GENERAL
G-001 COVER SHEET
STRUCTURAL
S-101 LINTEL PLAN AND DETAILS
REVISIONNO. DATE
ISSUE FOR CONSTRUCTION2
DRAWING UPDATES1 2026.03.06
2026.03.18
1. TO THE BEST KNOWLEDGE, INFORMATION AND BELIEF THE
ARCHITECTURAL AND BUILDING SYSTEMS SHOWN ON THESE
DOCUMENTS HAVE BEEN PREPARED IN ACCORDANCE WITH THE
REQUIREMENTS OF THE NEW YORK STATE CODES AND
REFERENCE STANDARDS
2. ALL WORK SHALL COMPLY WITH OR SURPASS THE
REQUIREMENTS OF THE NEW YORK STATE CODES AND
REFERENCE STANDARDS. CONFORM TO APPLICABLE CODE FOR
THE WORK DESCRIBED WITHIN THE CONTRACTION DOCUMENTS.
3. SYSTEMS SHALL COMPLY WITH THE LATEST VERSION OF THE
FOLLOWING CODES:
A. 2020 EXISTING BUILDING CODE OF NEW YORK STATE
B. 2020 ENERGY CONSERVATION CONSTRUCTION CODE
OF NEW YORK STATE
4. ALL WORK SHALL MEET THE REQUIREMENTS OF THE AFORE
MENTIONED CODES AND ALL CODES AND STANDARDS
REFERENCED IN THE SPECIFICATIONS. ALTHOUGH THE DETAILS
OF SUCH WORK MAY NOT BE SHOWN ON THE DRAWINGS OR
REFERENCED IN THE SPECIFICATIONS
5. CONFLICTS BETWEEN THE APPLICABLE CODES, STANDARDS,
AND THE PLANS AND SPECIFICATIONS MUST BE BROUGHT TO
THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING
WITH THE WORK IN QUESTION.
6. CONFLICTING STANDARDS: IN CASE OF CONFLICT BETWEEN
THE CONTRACT DOCUMENTS AND A GOVERNING CODE OR
ORDINANCE, THE MORE STRINGENT STANDARD SHALL APPLY.
CODE COMPLIANCE
1. CONCEALED, INTERIOR INSTALLATIONS: CONCEALED FROM
VIEW AND PROTECTED FROM PHYSICAL CONTACT BY BUILDING
OCCUPANTS. EXAMPLES INCLUDE ABOVE CEILINGS AND IN
DUCT SHAFTS.
2. EXPOSED, INTERIOR INSTALLATIONS: EXPOSED TO VIEW
INDOORS. EXAMPLES INCLUDE FINISHED OCCUPIED SPACES
AND FIRE PROTECTION EQUIPMENT ROOMS.
3. FINISHED SPACES: SPACES OTHER THAN FIRE PROTECTION,
FIRE PROTECTION AND ELECTRICAL EQUIPMENT ROOMS,
FURRED SPACES, PIPE AND DUCT SHAFTS, UNHEATED SPACES
IMMEDIATELY BELOW ROOF, SPACE ABOVE CEILINGS,
UNEXCAVATED SPACES, CRAWL SPACES, AND TUNNELS.
4. FURNISH: CONTRACTOR SHALL SUPPLY (PURCHASE) ITEM AND
TURN OVER TO OTHERS FOR INSTALLATION
5. INSTALL: OTHERS SHALL PURCHASE ITEM AND THE
CONTRACTOR SHALL PLACE ITEM IN POSITION FOR SERVICE
AND OR USE
6. PROVIDE: CONTRACTOR SHALL FURNISH (PURCHASE) AND
COMPLETELY INSTALL ITEM
7. OWNER: TIOGA COUNTY DEPARTMENT OF PUBLIC WORKS.
8. STORAGE: TO PROVIDE A SAFE WAREHOUSING LOCATION TO
PROTECT EQUIPMENT AND COMPONENTS THAT ARE TO BE
IMPLEMENTED AS PART OF THE PROJECT. THIS INCLUDES BUT
NOT LIMITED TO EXISTING ITEMS TO BE RELOCATED BY THE
OWNER/CONTRACTOR AND ITEMS PURCHASED BY THE
OWNER/CONTRACTOR.
GENERAL DEFINITIONS
1. DELIVERY, STORAGE, AND PROTECTION
A. ACCEPT PRODUCTS ON SITE IN FACTORY-FABRICATED
PROTECTIVE CONTAINERS, WITH FACTORY-INSTALLED
SHIPPING SKIDS AND LIFTING LUGS. INSPECT FOR
DAMAGE.
B. STORE IN CLEAN DRY PLACE AND PROTECT FROM
WEATHER AND CONSTRUCTION TRAFFIC. HANDLE
CAREFULLY TO AVOID DAMAGE TO COMPONENTS,
ENCLOSURES, AND FINISH.
C. STORAGE OF EQUIPMENT: STORAGE OF EQUIPMENT
FOR THE JOB IS THE RESPONSIBILITY OF THE
CONTRACTOR AND SHALL BE SCHEDULED FOR
DELIVERY TO THE SITE AS THE EQUIPMENT IS
REQUIRED. DAMAGE TO THE EQUIPMENT DELIVERED
TO THE SITE OR IN TRANSPORT TO THE JOB SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR.
D. DELIVER PIPES AND TUBES WITH FACTORY-APPLIED
END CAPS. MAINTAIN END CAPS THROUGH SHIPPING,
STORAGE, AND HANDLING TO PREVENT PIPE END
DAMAGE AND TO PREVENT ENTRANCE OF DIRT,
DEBRIS, AND MOISTURE.
E. STORE PLASTIC PIPES PROTECTED FROM DIRECT
SUNLIGHT. SUPPORT TO PREVENT SAGGING AND
BENDING.
2. PERFORMANCE
A. ALL WORK SHALL BE PERFORMED IN COOPERATION
WITH THE OWNER, ARCHITECT AND OTHER SEPARATE
CONTRACTORS.
B. THE CONTRACTOR SHALL COORDINATE WORK WITH
THE CONSTRUCTION SCHEDULE ESTABLISHED BY THE
OWNER AND ARCHITECT, AND SHALL IMMEDIATELY
REPORT ANY DELAYS IN MATERIALS RECEIPT
INCLUDING CIRCUMSTANCES CAUSING THE DELAYS.
3. INSPECTIONS
A. THE CONTRACTOR SHALL HAVE THE REQUIRED LOCAL
OR MUNICIPAL INSPECTION PROCESSED AND PRESENT
OWNER WITH CERTIFICATE INDICATING APPROVAL OF
SUCH GOVERNING BODIES.
B. NEW YORK BOARD OF FIRE UNDERWRITERS INSPECT
COMPLETED INSTALLATION AND PRESENT OWNER
WITH CERTIFICATE OF INSPECTION SHOWING
APPROVAL.
GENERAL REQUIREMENT NOTES
1. THE INTENT OF THESE CONTRACT DOCUMENTS IS FOR THE
CONTRACTOR TO FURNISH AND INSTALL COMPLETE SYSTEMS.
ALL SYSTEMS SHALL BE COMPLETE IN ALL RESPECTS,
OPERATING, TESTED, ADJUSTED, APPROVED BY THE
AUTHORITIES HAVING JURISDICTION AND READY FOR
BENEFICIAL USE BY THE OWNER.
2. THE CONTRACTOR SHALL OBTAIN AND REVIEW ALL CONTRACT
DOCUMENTS, INCLUDING PROJECT MANUAL, PLANS AND
SPECIFICATIONS OF ALL TRADES BEFORE SUBMITTING BID.
REFER TO SPECIFICATIONS, PROJECT MANUAL AND PLANS,
INCLUDING ALL EQUIPMENT SCHEDULES FOR MECHANICAL AND
ELECTRICAL INFORMATION. CONTRACTOR SHALL WALK
THROUGH BUILDING PRIOR TO SUBMITTING BID.
3. ALL OF THE CONTRACT DRAWINGS AND SPECIFICATIONS ARE
COMPLIMENTARY TO FORM A TOTAL DESIGN PACKAGE. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE
WHICH TRADE CONTRACTOR IS RESPONSIBLE FOR VARIOUS
PORTIONS OF THE WORK.
4. ALL WORK AND ACTION DEPICTED AND DESCRIBED SHALL BE
PERFORMED BY THE CONTRACTOR UNLESS SPECIFICALLY
NOTED OTHERWISE.
5. DRAWINGS ARE BASED ON FIELD OBSERVATION AND EXISTING
BUILDING DRAWINGS.
6. COORDINATION
A. THE CONTRACTOR SHALL COORDINATE LOCATIONS OF
EQUIPMENT WITH ALL TRADES BEFORE STARTING
CONSTRUCTION. ANY MODIFICATIONS TO THE
EQUIPMENT LAYOUT REQUIRED FOR INSTALLATION
ARE TO BE PERFORMED AT NO ADDITIONAL COST TO
THE OWNER.
B. WHEN CONFLICTS OCCUR BETWEEN THE DRAWINGS
AND/OR SPECIFICATIONS IT SHALL BE BROUGHT TO
THE ATTENTION OF THE ENGINEER. THE CONTRACTOR
SHALL CARRY AS PART OF THE BID THE LARGER
QUANTITY AND/OR MORE EXPENSIVE ITEM(S).
C. DURING CONSTRUCTION/INSTALLATION OF SYSTEMS
IN THE WORK PHASE THE CONTRACTORS SHALL
COORDINATE BETWEEN TRADE DRAWINGS FOR
INSTALLATION OF SYSTEM. THIS SHALL BE
REPRESENTED ON THE COORDINATION DRAWINGS TO
BE DEVELOPED BY THE CONTRACTOR.
7. BASE BID AMOUNT SHALL INCLUDE ALL ADDITIONAL WORK
REQUIRED BY THE AUTHORITIES HAVING JURISDICTION
PERTAINING TO THE COMPLETION OF THIS PROJECT.
8. PROJECT CONDITIONS
A. VERIFY LOCATION OF EXISTING UTILITIES BEFORE
PROCEEDING WITH THE WORK.
B. VERIFY SCOPE OF WORK: CONTRACTOR SHALL VISIT
THE JOB SITE PRIOR TO SUBMITTING A BID TO
ASCERTAIN EXISTING FIELD CONDITIONS AND TO
DETERMINE THE SCOPE OF THE WORK, AND TO
BECOME FAMILIAR WITH THE EXISTING CONDITIONS
THAT WILL AFFECT HIS WORK AND, THEREFORE, THE
BID. ADDITIONAL COST RESULTING FROM THE
CONTRACTOR’S FAILURE TO VERIFY THE SCOPE OF
THE WORK SHALL BE THE CONTRACTOR’S
RESPONSIBILITY AND SHALL BE PAID BY THE
CONTRACTOR.
C. THE WORK SPECIFIED HEREIN AND INDICATED ON
DRAWINGS SHALL BE COMPLETED, TESTED AND MADE
READY FOR OPERATION PRIOR TO TURN OVER TO THE
OWNER. UNLESS SPECIFICALLY INDICATED,
MATERIALS AND EQUIPMENT SHALL BE NEW AND FIRST
CLASS QUALITY.
D. THE OWNER SHALL DIRECT THE CONTRACTOR WHERE
CONSTRUCTION MATERIALS TO BE INSTALLED SHALL
BE STAGED AND STOCKPILED DURING CONSTRUCTION.
E. THE WORK SPECIFIED HEREIN AND INDICATED ON
DRAWINGS SHALL BE COMPLETED, TESTED AND MADE
READY FOR OPERATION PRIOR TO TURN OVER TO THE
OWNER. UNLESS SPECIFICALLY INDICATED, MATERIALS
AND EQUIPMENT SHALL BE NEW AND FIRST CLASS
QUALITY.
9. FOLLOW FIGURED DIMENSIONS AND DO NOT SCALE CONTRACT
DOCUMENTS. DIMENSIONS ARE NOT ADJUSTABLE WITHOUT THE
APPROVAL OF THE ARCHITECT UNLESS NOTED OTHERWISE.
10. ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE
APPLICABLE CODES IN THE ORDINANCES AND THE
REGULATORY AGENCIES HAVING JURISDICTION.
11. INITIATING WORK CONSTITUTES CONTRACTOR ACCEPTANCE OF
THE EXISTING CONDITIONS ASSOCIATED WITH THE WORK IN
QUESTION.
12. REPORT DISCREPANCIES TO ENGINEER BEFORE DISTURBING
EXISTING INSTALLATION.
13. FILE REQUIRED CERTIFICATES OF INSURANCE.
14. OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND
INSPECTIONS.
15. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL
DIMENSIONS.
16. SAFETY
A. THE CONTRACTOR IS RESPONSIBLE FOR OVERSEEING
THE SAFE OPERATION OF ALL EQUIPMENT IN HIS USE.
B. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
ALL OF THE EQUIPMENT IN HIS USE IN A SAFE
CONDITION.
C. KEEP DEAD FRONT EQUIPMENT IN PLACE WHEN
EQUIPMENT IS ENERGIZED.
D. CONDUCT ALL CONSTRUCTION OPERATIONS IN A SAFE
MANNER FOR EMPLOYEES, AS WELL AS OTHER WORK-
PERSONS OR ANYONE VISITING THE JOG SITE.
PROVIDE BARRIERS, FLAGS, TAPE, ETC. AS REQUIRED
FOR SAFETY.
E. CONTRACTORS SHALL FOLLOW OWNER’S SAFETY
REQUIREMENTS DURING CONSTRUCTION.
F. CONFORM TO OWNER’S SAFETY PROCEDURES IF
HAZARDOUS OR CONTAMINATED MATERIALS ARE
DISCOVERED
GENERAL PLAN NOTES
1. MATERIALS
A. ALL MATERIALS AND EQUIPMENT SHALL BE IN STRICT
ACCORDANCE WITH THE PARAMETERS HEREINAFTER
SPECIFIED AND AS SHOWN ON THE DRAWINGS.
B. MATERIALS AND EQUIPMENT FURNISHED/PROVIDED
SHALL BE NEW UNLESS NOTED OTHERWISE.
C. FLANGES SHALL BE OF U.S. OR CANADIAN
MANUFACTURER ONLY. NO FLANGES FROM CHINA
2. ACCESSORIES
A. IT IS THE INTENT OF THIS SPECIFICATION THAT
SYSTEMS AND EQUIPMENT SHALL BE COMPLETE WITH
ALL ACCESSORIES REQUIRED TO INSURE A COMPLETE
SYSTEM.
3. MANUFACTURERS
A. ACCEPTABLE MANUFACTURERS: SUBJECT TO
COMPLIANCE WITH REQUIREMENTS, MANUFACTURERS
OFFERING PRODUCTS THAT MAY BE INCORPORATED
INTO THE WORK INCLUDE, BUT ARE NOT LIMITED TO,
THE MANUFACTURERS SPECIFIED.
B. BASIS OF DESIGN: SUBJECT TO COMPLIANCE WITH
REQUIREMENTS, PROVIDE PRODUCTS BY THE
MANUFACTURERS SPECIFIED.
4. BASIS OF DESIGN EQUIPMENT
A. MANUFACTURER AND MODEL NUMBER OF EQUIPMENT
INCLUDED IN SCHEDULE IS THE BASIS OF DESIGN FOR
PROJECT.
B. ADJUSTMENT SHALL BE MADE BY THE CONTRACTOR
FOR EQUIPMENT OTHER THAN THE BASES OF DESIGN
TO COMPLY THE INSTALLED EQUIPMENT
MANUFACTURER’S REQUIREMENTS.
PRODUCT GENERAL NOTES
GENERAL PLAN NOTES (CONT.)
15. PROFESSIONALISM AND APPEARANCE OF WORK:
A. WORKMANSHIP OF ALL INSTALLATIONS SHALL BE IN
ACCORDANCE WITH ACCEPTED PRACTICES OF THIS
TRADE. INSTALLATION METHODS SHALL CONFORM TO
MANUFACTURERS’ SPECIFICATIONS.
B. THE CONTRACTOR SHALL PROVIDE THE JOB WITH
QUALIFIED JOURNEYMEN AND HELPERS IN THIS TRADE
FOR THE DURATION OF THE JOB. IT IS THE
CONTRACTOR’S RESPONSIBILITY TO COMMUNICATE
WITH AND KEEP THE JOB SUPERINTENDENT
APPRAISED OF CHANGES OR CLARIFICATIONS.
16. CONFORM TO BUILDING STRUCTURE: THE CONTRACTOR SHALL
INSTALL THE SYSTEM IN SUCH A MANNER AS TO CONFORM TO
THE BUILDING(S) STRUCTURE, AVOID OBSTRUCTIONS,
PRESERVE HEADROOM, KEEP OPENINGS AND PASSAGES
CLEAR, AND CONFORM TO THE BUILDING CODE.
17. THE CONTRACTOR IS TO USE MATERIALS THAT ARE
COMPATIBLE WITH THE EXISTING IN PLACE MATERIALS.
18. METHODS OF CONSTRUCTION: UNLESS OTHERWISE NOTED OR
SHOWN, THESE DRAWINGS AND SPECIFICATIONS DO NOT
INDICATE METHODS OF CONSTRUCTION. THE CONTRACTOR
SHALL SUPERVISE AND DIRECT THE WORK, AND BE SOLELY
RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS,
TECHNIQUES, SEQUENCES, PROCEDURES AND SAFE WORK
PRACTICES
19. INCIDENTAL ITEMS: INCIDENTAL ITEMS NOT INDICATED ON
DRAWINGS, NOT MENTIONED IN THE SPECIFICATIONS THAT CAN
BE LEGITIMATELY AND REASONABLY INFERRED TO BELONG TO
THE WORK DESCRIBED OR NECESSARY IN GOOD PRACTICE TO
PROVIDE A COMPLETE SYSTEM, SHALL BE FURNISHED AND
INSTALLED AS THOUGH ITEMIZED HERE IN EVERY DETAIL.
20. PROTECTION
A. ALL MATERIALS, EQUIPMENT AND ACCESSORIES SHALL
BE SUITABLY PROTECTED AND COVERED DURING
CONSTRUCTION.
B. DAMAGE RESPONSIBILITY: THE CONTRACTOR SHALL
BE RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED
BY HIM OR HIS WORKMEN TO THE FACILITY, BUILDING
SURFACES OR EQUIPMENT DURING THE COURSE OF
CONSTRUCTION, AND SHALL BE FULLY RESPONSIBLE
FOR REPAIRING OR REPLACING AS REQUIRED TO
INSURE RESTORATION TO ORIGINAL CONDITION.
C. DAMAGED ITEMS: WHERE ITEMS SCHEDULED FOR
REUSE ARE FOUND TO BE IN DAMAGED CONDITION,
THE CONTRACTOR SHALL CALL THE ATTENTION OF
THE OWNER TO SUCH ITEMS AND RECEIVE FURTHER
INSTRUCTIONS PRIOR TO REMOVAL. ITEMS DAMAGED
DURING REMOVAL SHALL BE REPAIRED OR REPLACED
BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
OWNER.
D. REPAIR DAMAGES: PROMPTLY REPAIR DAMAGE TO
ADJACENT FACILITIES BY DEMOLITION OPERATIONS AT
NO COST TO THE OWNER.
21. THE WORK SPECIFIED HEREIN AND INDICATED ON DRAWINGS
SHALL BE COMPLETED, TESTED AND MADE READY FOR
OPERATION PRIOR TO TURN OVER TO THE OWNER. UNLESS
SPECIFICALLY INDICATED, ALL MATERIALS AND EQUIPMENT
SHALL BE NEW AND FIRST CLASS QUALITY. EQUIPMENT MAY BE
RE-USED ONLY AS SPECIFIED HEREIN OR SHOWN ON THE
DRAWINGS.
22. SYSTEMS: THE CONTRACTOR SHALL BE RESPONSIBLE TO
PROVIDE COMPLETE AND OPERABLE SYSTEMS, INCLUDING
OPERATIONAL PROPERTIES TO THE EXTENT NECESSARY TO
LINK MULTIPLE COMPONENTS OF A SYSTEM TOGETHER AND TO
INTERFACE WITH OTHER SYSTEMS.
23. GUARANTEE: CONTRACTOR SHALL UNCONDITIONALLY
GUARANTEE ALL LABOR AND MATERIALS ON ALL WORK AGAINST
DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF
ONE YEAR.
GENERAL SUBMITTAL NOTES
1. PRODUCT DATA:
A. SUBMIT TO ARCHITECT/ENGINEER FOR REVIEW FOR
THE LIMITED PURPOSE OF CHECKING FOR
CONFORMANCE WITH INFORMATION GIVEN AND THE
DESIGN CONCEPT EXPRESSED IN THE CONTRACT
DOCUMENTS.
B. MARK EACH COPY TO IDENTIFY APPLICABLE
PRODUCTS, MODELS, OPTIONS, AND OTHER DATA.
SUPPLEMENT MANUFACTURERS’ STANDARD DATA TO
PROVIDE INFORMATION SPECIFIC TO THIS PROJECT.
C. SUBMITTALS THAT ARE NOT PROPERLY MARKED WITH
ALL PERTINENT INFORMATION IDENTIFIED WILL BE
RETURNED.
D. IN ADDITION, THE SUBMITTAL SHALL BEAR THE
PROJECT NAME, THE CONTRACTOR'S NAME, THE DATE
REVIEWED BY THE CONTRACTOR, THE CONTRACTOR'S
CONTROL NUMBER (IF APPLICABLE), AND A STAMP
WITH THE CONTRACTOR'S SIGNATURE CERTIFYING
THAT THE ITEM HAS BEEN REVIEWED AND IT COMPLIES
WITH THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS.
2. MANUFACTURER’S INSTRUCTIONS
A. SUBMIT PRINTED INSTRUCTIONS FOR DELIVERY,
STORAGE, ASSEMBLY, INSTALLATION, START-UP,
ADJUSTING, AND FINISHING, TO THE
ARCHITECT/ENGINEER FOR PRODUCT DATA.
3. SUBMITTALS FOR REVIEW
A. PRODUCT DATA: PUBLISHED LITERATURE: INDICATE
DIMENSIONS, WEIGHTS, CAPACITIES, RATINGS, GAGES
AND FINISHES OF MATERIALS, ELECTRICAL
CHARACTERISTICS AND CONNECTION REQUIREMENTS.
B. SHOP DRAWINGS: INDICATE ASSEMBLY, DIMENSIONS,
WEIGHT LOADING, REQUIRED CLEARANCES,
CONSTRUCTION DETAILS, FIELD CONNECTION DETAILS,
ELECTRICAL CHARACTERISTICS AND CONNECTION
REQUIREMENTS.
C. ANY SUBMITTALS NOT CLEARLY MARKED AS
INDICATED ABOVE WILL BE RETURNED TO THE
CONTRACTOR FOR RESUBMISSION.
D. THE CONTRACTOR SHALL SUBMIT A CONTRACTOR’S
SAFETY PROGRAM, INCLUDING BUT NOT LIMITED TO:
E. CONFINED SPACE ACCESS
F. HOT WORK & FIRE WATCH PROCEDURES
G. LOTO PROCEDURES. (LOCK OUT / TAG OUT)
4. CLOSEOUT SUBMITTALS
A. PROVIDE 3-RING BINDER WITH THE FOLLOWING ITEMS
TO BE USED AS FACILITY OPERATION AND
MAINTENANCE MANUAL
B. PRODUCT DATE: PROVIDE ONE COPY OF FINAL
APPROVED PRODUCT DATA SUBMITTALS FOR
PRODUCTS LISTED UNDER PART 2 OF DIVISION 21
TECHNICAL SPECIFICATIONS
C. MANUFACTURER’S INSTRUCTIONS: INCLUDE
INSTALLATION INSTRUCTIONS
D. MANUFACTURER’S DATA: INCLUDE INSTRUCTIONS FOR
LUBRICATION, REPLACE PARTS, MOTOR AND DRIVE
REPLACEMENT, SPARE PARTS LIST, AND WIRING
DIAGRAMS.
5. SUBSTITUTIONS
A. SUBMITTAL OF SUBSTITUTE EQUIPMENT SHALL BE
MADE TEN (10) WORKING DAYS PRIOR TO BID FOR
CONSIDERATION AND PLACEMENT IN AN ADDENDUM
TO ALL BIDDERS IF ACCEPTABLE.
B. SUBMITTAL SHALL INCLUDE
a. PERFORMANCE DATA
b. PHYSICAL DATA
c. NARRATIVE OF DEFICIENCIES COMPARED TO
BASIS OF DESIGN
d. NARRATIVE OF BENEFITS COMPARED TO
BASIS OF DESIGN
C. BIDDER SHALL CERTIFIES:
a. PROPOSED SUBSTITUTION HAS BEEN FULLY
INVESTIGATED AND DETERMINED TO BE
EQUAL OR SUPERIOR IN ALL RESPECTS TO
SPECIFIED PRODUCT.
b. SAME WARRANTY WILL BE FURNISHED FOR
PROPOSED SUBSTITUTION AS FOR SPECIFIED
PRODUCT.
c. SAME MAINTENANCE SERVICE AND SOURCE
OF REPLACEMENT PARTS, AS APPLICABLE, IS
AVAILABLE.
d. PROPOSED SUBSTITUTION WILL HAVE NO
ADVERSE EFFECT ON OTHER TRADES AND
WILL NOT AFFECT OR DELAY PROGRESS
SCHEDULE.
e. PROPOSED SUBSTITUTION DOES NOT AFFECT
DIMENSIONS AND FUNCTIONAL CLEARANCES.
f. PAYMENT WILL BE MADE BY GENERAL
CONTRACTOR FOR CHANGES TO BUILDING
DESIGN, INCLUDING A/E DESIGN, DETAILING,
AND CONSTRUCTION COSTS CAUSED BY THE
SUBSTITUTION.
CLOSEOUT NOTES
1. TESTING, ADJUSTING AND BALANCING
A. CONTRACTOR SHALL TEST, ADJUST AND BALANCE
EQUIPMENT AND SYSTEMS TO ACHIEVE THE SPECIFIED
PERFORMANCE. CONTRACTOR SHALL EMPLOY AND
PAY FOR SERVICES OF MANUFACTURER’S
REPRESENTATIVE OR AN INDEPENDENT FIRM TO
PROVIDE TESTING, ADJUSTING AND BALANCING.
FACTORY BALANCED MOTORS SHALL BE REBALANCED
AFTER INSTALLATION TO CONFIRM BALANCE WITHIN
FACTORY TOLERANCES.
B. CONTRACTOR SHALL PROVIDE, AT CONTRACTOR’S
EXPENSE, SUCH ADDITIONAL SERVICES AS ARE
NEEDED TO ASSURE PROPER TESTING, ADJUSTING
AND BALANCING.
C. ALL TESTING, ADJUSTING AND BALANCING SHALL BE
SCHEDULED WITH OWNER AT LEAST 7 DAYS IN
ADVANCE.
D. REPORTS SHALL BE SUBMITTED TO OWNER
INDICATING OBSERVATIONS AND RESULTS OF TESTS
AND PERFORMANCE, BOTH BEFORE AND AFTER
ADJUSTMENT AND BALANCING, AND SHALL
SPECIFICALLY INDICATE COMPLIANCE OR NON-
COMPLIANCE WITH THE REQUIREMENTS OF THE
CONTRACT DOCUMENTS.
E. CONTRACTOR SHALL:
a. TEST ALL SYSTEMS AND EQUIPMENT TO
ASSURE PROPER OPERATION, AND TO
COMPLY WITH APPLICABLE CODES AND
STANDARDS.
b. PRETEST ALL SYSTEMS BEFORE
NOTIFICATION TO THE OWNER OR THE
OWNER’S REPRESENTATIVE FOR
OBSERVATION OF FINAL TESTING.
c. NOTIFICATION SHALL BE IN WRITING TO
ALLOW SUFFICIENT TIME FOR WITNESSING BY
OWNER OR THE OWNER’S REPRESENTATIVE.
d. PROVIDE REQUIRED TESTING APPARATUS TO
PROPERLY TEST ALL SYSTEMS.
e. SCHEDULE TESTING TO AVOID DELAYS AND
TO EXPEDITE PROGRESS OF THE WORK.
f. CORRECT ALL DAMAGE CAUSED BY OR
DURING THE TESTING AT NO ADDITIONAL
COST.
2. DEMONSTRATION AND TRAINING
A. DEMONSTRATE OPERATION AND MAINTENANCE OF
EQUIPMENT AND SYSTEMS TO OWNER PERSONNEL
AND PROVIDE ALL REQUIRED TRAINING PRIOR TO DATE
OF PARTIAL UTILIZATION OR SUBSTANTIAL
COMPLETION.
B. TRAINING SHALL BE SCHEDULED AT LEAST FOURTEEN
DAYS IN ADVANCE. CONTRACTOR SHALL PROVIDE ON-
SITE TRAINING CLASSES FOR OWNER PERSONNEL ON
THE PROPER OPERATION AND MAINTENANCE OF ALL
NEW EQUIPMENT PROVIDED AS A PART OF THIS
CONTRACT.
C. DEMONSTRATE ALL EQUIPMENT AND SYSTEMS AND
TRAIN OWNER PERSONNEL IN A ROOM LOCATED AT
THE SITE ALONG WITH HANDS-ON TRAINING IN THE
FIELD. DEMONSTRATION AND TRAINING IS TO BE
PROVIDED BY REPRESENTATIVES OF THE
CONTRACTOR AND/OR MANUFACTURERS WHO ARE
QUALIFIED AND KNOWLEDGEABLE ABOUT THE
EQUIPMENT AND SYSTEMS AND THEIR OPERATION AND
MAINTENANCE SPECIFICALLY FOR THIS PROJECT.
WHEN SPECIFICALLY REQUIRED IN THE INDIVIDUAL
SPECIFICATION SECTIONS, MANUFACTURER’S
REPRESENTATIVES MUST BE USED FOR THIS
DEMONSTRATION AND TRAINING..
D. FOR EQUIPMENT OR SYSTEMS REQUIRING SEASONAL
CHANGES IN OPERATION, PERFORM
DEMONSTRATIONS FOR OTHER SEASONS AS SOON AS
APPROPRIATE CONDITIONS FOR SUCH
DEMONSTRATIONS EXIST, IN THE OPINION OF THE
ENGINEER/ARCHITECT.
E. DEMONSTRATE START-UP, OPERATION, CONTROL,
ADJUSTMENT, TROUBLE-SHOOTING, SERVICING,
MAINTENANCE AND SHUTDOWN OF EACH ITEM OF
EQUIPMENT AND EACH SYSTEM.
F. UTILIZE OPERATION AND MAINTENANCE DATA AS
BASIS FOR TRAINING. REVIEW DATA WITH OWNER
PERSONNEL IN DETAIL TO EXPLAIN ALL ASPECTS OF
OPERATION AND MAINTENANCE.
G. PREPARE AND INSERT ADDITIONAL DATA IN
OPERATIONS AND MAINTENANCE MANUALS WHEN
NEED BECOMES APPARENT DURING DEMONSTRATION
AND TRAINING.
H. THE AMOUNT OF TIME FOR DEMONSTRATION AND
TRAINING ON EACH ITEM OF EQUIPMENT AND SYSTEM
SHALL BE THAT REQUIRED TO FULLY DEMONSTRATE
THE ITEM OR SYSTEM, TO COVER ALL TOPICS IN THE
APPROVED TRAINING OUTLINE OR LESSON PLAN AND
TO ANSWER QUESTIONS RAISED BY OWNER
PERSONNEL. WHEN SPECIFIC DURATIONS ARE
IDENTIFIED IN THE INDIVIDUAL SECTIONS, THOSE
DURATIONS SHALL BE CONSIDERED MINIMUMS.
I. THE OWNER STAFF MAY VIDEO TAPE ALL
DEMONSTRATIONS AND TRAINING SESSIONS, TO BE
UTILIZED AS FUTURE TRAINING TAPES.
3. ORIENTATION INSTRUCTION
A. CONTRACTOR SHALL PROVIDE THE SERVICES OF
QUALIFIED PERSONS TO DEMONSTRATE THE
OPERATION OF INSTALLED EQUIPMENT AND
APPARATUS.
B. ADVANCE NOTICE OF NOT LESS THAN 48 HOURS
SHOULD BE GIVEN TO THE OWNER OR THE OWNER’S
REPRESENTATIVE PRIOR TO SCHEDULING THE
DEMONSTRATION. NO EQUIPMENT OR APPARATUS
WILL BE ACCEPTED UNTIL DEMONSTRATION HAS BEEN
PERFORMED AND ACCEPTED.
CLOSEOUT NOTES (CONT.)
4. PROJECT CLOSE OUT INSPECTIONS
A. GENERAL: IN ORDER TO ENSURE THAT ALL CONTRACT
REQUIREMENTS ARE MET AND THAT THE WORK IS
COMPLETE AND ACCEPTABLE, THE FOLLOWING
INSPECTIONS WILL BE MADE IN ADDITION TO THE
NORMAL DAILY INSPECTIONS. THE PURPOSE OF THESE
INSPECTIONS IS TO FURNISH CONTRACTOR, IN
WRITING, LISTS OF CONTRACT EXCEPTIONS, OMIS-
SIONS AND INCOMPLETION IN ORDER TO REACH
CONTRACT COMPLETION IN AN EXPEDITIOUS AND
SATISFACTORY MANNER AND TO ESTABLISH A
PHYSICAL COMPLETION DATE.
B. PUNCH LIST INSPECTION: WILL BE MADE WHEN THE
WORK IS REASONABLY COMPLETE AS DETERMINED BY
THE ENGINEER AND/OR THE DESIGNED
REPRESENTATIVE. A COPY OF THE DETAILED
INSPECTION LIST WILL BE FURNISHED TO THE
CONTRACTOR AND WHEN THIS INSPECTION
PROGRESSES OVER ANY LENGTH OF TIME, COPIES OF
THE LIST WILL BE FURNISHED AS THE INSPECTION
PROGRESSES SO THAT THE CONTRACTOR MAY
PROCEED WITH THE REQUIRED WORK WITHOUT
DELAY.
C. PHYSICAL COMPLETION INSPECTION: WHEN
CONTRACTOR CONSIDERS THAT THE WORK OR A
DESIGNATED PORTION IS ACCEPTABLE TO THE OWNER
AS SUBSTANTIALLY COMPLETE, THE CONTRACTOR
SHALL SUBMIT TO THE ARCHITECT, ENGINEER AND
OWNER OR THE OWNER’S REPRESENTATIVE A LIST OF
ITEMS TO BE COMPLETED OR CORRECTED. THE
FAILURE TO INCLUDE ANY ITEMS ON SUCH LIST DOES
NOT ALTER THE RESPONSIBILITY OF THE
CONTRACTOR TO COMPLETE ALL WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS.
D. FINAL COMPLETION INSPECTION:
a. THE CONTRACTOR SHALL ADVISE THE
ARCHITECT, ENGINEER AND THE OWNER OR
THE OWNER’S REPRESENTATIVE IN WRITING
WHEN ALL WORK DESIGNATED AS
INCOMPLETE DURING THE PHYSICAL COM-
PLETION INSPECTION HAS BEEN COMPLETED.
b. ALL CHANGE ORDER WORK MUST BE
IDENTIFIED AND COMPLETED 2 WEEKS
BEFORE THE FINAL INSPECTION.
. INSPECTIONS BY CONTRACTOR
A. NEW YORK BOARD OF FIRE UNDERWRITERS INSPECT
COMPLETED INSTALLATION AND PRESENT OWNER
WITH CERTIFICATE OF INSPECTION SHOWING
APPROVAL.
B. REQUIRED LOCAL OR MUNICIPAL INSPECTION
PROCESSED AND PRESENT OWNER WITH CERTIFICATE
INDICATING APPROVAL OF SUCH GOVERNING BODIES.
1. UNLESS OTHERWISE INDICATED, THE CONTRACTOR SHALL
PROVIDE CUTTING AND PATCHING OF THE EXISTING FACILITY
FOR THEIR RESPECTIVE WORK. PATCHING SHALL MATCH
EXISTING MATERIALS, FINISHES, AND METHODS OF
CONSTRUCTION UNLESS NOTED OTHERWISE.
2. CUTTING AND PATCHING SHALL BE PERFORMED BY THE
QUALIFIED TRADE CONTRACTOR.
3. ANY DAMAGE CASED BY DEMOLITION SHALL BE PATCHED AND
PAINTED TO MATCH EXISTING.
4. THE CONTRACTOR SHALL PATCH AND REPAIR DAMAGED
SURFACES AND PENETRATIONS LEFT AFTER REMOVALS WITHIN
THE WORK AREA. THE CONTRACTOR IS TO USE MATERIALS
THAT ARE COMPATIBLE WITH THE EXISTING IN PLACE
MATERIALS. REFER TO ARCHITECTURAL
DRAWINGS/SPECIFICATIONS FOR PROPER PATCHING AND
REPAIR. FIRESTOP IF LOCATED IN/ON A FIRE RATED SURFACE.
5. ANY EXISTING UNUSED FLOOR/WALL OPENINGS LEFT BY
DEMOLITION OF EXISTING SYSTEMS SHALL BE PATCHED TO
MATCH EXISTING. IF WALL IS A FIRE RATED WALL, PATCH SHALL
MAINTAIN WALL FIRE RATING.
6. CONNECTION OF NEW SERVICES TO EXISTING SHALL BE IN A
NEAT AND APPROVED MANNER WITH DISTURBED SERVICES
RESTORED TO ORIGINAL CONDITION.
7. PERFORM CUTTING AND PATCHING WORK AS NOTED AND AS
NECESSARY FOR THE INSTALLATION OF THE WORK.
8. CUT, CHANNEL, CHASE, AND DRILL CEILINGS, AND OTHER
SURFACES NECESSARY FOR SYSTEM INSTALLATIONS.
PERFORM CUTTING BY SKILLED MECHANICS OF TRADE
INVOLVED.
9. REPAIR AND/OR REPLACE AT NO COST TO OWNER ALL
EQUIPMENT AND MATERIALS DAMAGED DURING
CONSTRUCTION.
10. THE CONTRACTOR IS RESPONSIBLE FOR CUTTING AND
PATCHING OF EXISTING BUILDING STRUCTURE TO FACILITATE
AND TO CONCEAL THE WORK DESCRIBED WITHIN THESE
DOCUMENTS. SURFACES TO BE PATCHED SHALL BE FINISHED
TO MATCH THE EXISTING SURFACE. OWNER HAS FINAL SAY AS
TO THE ACCEPTABILITY OF THE FINISHED PATCHED WORK.
11. PIPES AND CONDUITS FOR THE BUILDING SYSTEMS SHALL BE
CONCEALED WITHIN FINISHED SPACES UNLESS SPECIFICALLY
NOTED OTHERWISE.
CUTTING AND PATCHING GENERAL NOTES
1. COORDINATE INSTALLATION OF WORK WITH OTHER TRADES.
2. PROVIDE SUPPORT/BRACING OF EQUIPMENT AND BUILDING
SERVICES FOR SEISMIC RESTRAINT AS REQUIRED BY CODE.
3. ALL EQUIPMENT, MATERIALS AND RELATED SYSTEMS
COMPONENTS SHALL BE NEW UNLESS SPECIFICALLY NOTED
OTHERWISE.
4. ALL EQUIPMENT SHALL BE LOCATED IN ACCESSIBLE
LOCATIONS. WHEN A PIECE OF EQUIPMENT MUST BE LOCATED
ABOVE AN INACCESSIBLE CEILING OR WALL THEN THE
APPROPRIATE ACCESS DOOR SHALL BE PROVIDED. THESE
SHALL BE COORDINATED WITH THE ARCHITECT.
5. MAINTAIN MANUFACTURERS RECOMMENDED SERVICE
CLEARANCES.
6. LOCATION AND SIZES OF ALL FLOOR, WALL AND ROOF
PENETRATIONS SHALL BE COORDINATED WITH ALL OTHER
TRADES INVOLVED.
7. EQUIPMENT INSTALLATION - COMMON REQUIREMENTS
A. INSTALL EQUIPMENT TO ALLOW MAXIMUM POSSIBLE
HEADROOM UNLESS SPECIFIC MOUNTING HEIGHTS
ARE NOT INDICATED.
B. INSTALL EQUIPMENT LEVEL AND PLUMB, PARALLEL
AND PERPENDICULAR TO OTHER BUILDING SYSTEMS
AND COMPONENTS IN EXPOSED INTERIOR SPACES,
UNLESS OTHERWISE INDICATED.
8. ERECTION OF METAL SUPPORTS AND ANCHORAGES
A. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL
STEEL.
B. CUT, FIT, AND PLACE MISCELLANEOUS METAL
SUPPORTS ACCURATELY IN LOCATION, ALIGNMENT,
AND ELEVATION TO SUPPORT AND ANCHOR FIRE
PROTECTION MATERIALS AND EQUIPMENT.
C. FIELD WELDING: COMPLY WITH AWS D1.1.
9. GROUTING
A. CLEAN SURFACES THAT WILL COME INTO CONTACT
WITH GROUT.
B. PROVIDE FORMS AS REQUIRED FOR PLACEMENT OF
GROUT.
C. AVOID AIR ENTRAPMENT DURING PLACEMENT OF
GROUT.
D. PLACE GROUT, COMPLETELY FILLING EQUIPMENT
BASES.
E. PLACE GROUT ON CONCRETE BASES AND PROVIDE
SMOOTH BEARING SURFACE FOR EQUIPMENT.
F. PLACE GROUT AROUND ANCHORS.
G. CURE PLACED GROUT.
EQUIPMENT GENERAL NOTES
1. THIS PROJECT HAS BEEN SPECIFIED TO BE AN ASBESTOS FREE
CONSTRUCTION. ALL CONTRACTORS AND SUB-CONTRACTORS
ARE CAUTIONED THAT ANY PRODUCT CONTAINING EVEN A
TRACE OF ASBESTOS ARE PROHIBITED FROM USE ON THIS
PROJECT. ALL SUPPLIERS AND CONTRACTORS SHALL ENSURE
THAT ANY PROPOSED PRODUCTS HAVE BEEN ANALYZED AND
CERTIFIED ASBESTOS FREE BY THE MANUFACTURE. THE
ENGINEER AND OWNER RESERVES THE RIGHT TO REQUEST A
FLAT STATEMENT GUARANTEE OF ASBESTOS FREE MATERIALS
PRIOR TO FINAL PAYMENT OF WORK
2. THE ENGINEER OR OWNER HAVE THE RIGHT TO HAVE ANY
MATERIAL TESTED BY A TESTING LABORATORY OF THEIR
CHOICE TO DETERMINE THE PRESENCE OF ASBESTOS IN
MATERIALS/PRODUCTS DELIVERED TO THE SITE. IF A POSITIVE
RESULT FOR ASBESTOS IS DETERMINED, THE CONTRACTOR
SHALL BE REQUIRED TO REMOVE ALL SUCH
MATERIAL/PRODUCTS AND REPLACE WITH ACCEPTABLE
ASBESTOS FREE MATERIALS AND/OR PRODUCTS.
3. IF ASBESTOS IS FOUND IN ANY MATERIAL OR PRODUCT BY THE
CONTRACTOR, ALL REMOVAL, TESTING, MONITORING OF
REMOVALS AND ASBESTOS ABATEMENT COST SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
ASBESTOS FREE PROJECT NOTES
1. PROVIDE FULL HEIGHT TEMPORARY CONSTRUCTION BARRIERS
WHERE REQUIRED TO PREVENT DUST POLLUTION OF
SURROUNDING OCCUPIED AREAS. SEAL AIR-TIGHT. PARTITIONS
MUST BE INSTALLED IN ACCORDANCE WITH FIRE PROTECTION
AND EGRESS REQUIREMENTS. MAINTAIN MEANS OF EGRESS
ACCESS TO EXITS DURING CONSTRUCTION.
2. WORK AREAS ARE TO BE KEPT FREE OF DEBRIS AT ALL TIMES
AND ARE TO BE LEFT BROOM CLEAN AT THE END OF EACH
WORKING DAY.
3. TAKE PROPER MEASURES TO PREVENT DUST MIGRATION TO
AREAS OUTSIDE THE CONSTRUCTION AREA BY CLOSING ALL
OPENINGS IN DUCTS, WALLS, FLOORS AND CEILINGS. PROVIDE
CONTINUOUS EXHAUST TO EXTERIOR TO MAINTAIN NEGATIVE
PRESSURE IN CONSTRUCTION AREA.
5. DO NOT CLOSE OR OBSTRUCT EGRESS WIDTH TO ANY BUILDING
OR SITE EXIT.
6. REMOVE IN ORDERLY AND CAREFUL MANNER.
7. REMOVE MATERIALS AS WORK PROGRESSES.
8. REMOVE DEMOLISHED MATERIALS FROM SITE EXCEPT WHERE
SPECIFICALLY NOTED OTHERWISE
9. DO NOT BURN OR BURY MATERIALS ON SITE.
10. THE OWNER SHALL TO DIRECT THE CONTRACTOR WHERE
CONSTRUCTION MATERIALS, FURNITURE AND EQUIPMENT TO
BE INSTALLED SHALL BE STAGED AND STOCKPILED DURING
CONSTRUCTION.
11. ITEMS DESIGNATED ON PLAN BY DASHED LINE ARE EXISTING
ELEMENTS TO BE REMOVED. REFER TO OTHER TRADE
DRAWINGS FOR OTHER REMOVALS, INCLUDING MODIFICATIONS
THAT MAY EXTEND BEYOND AREAS SHOWN.
GENERAL REMOVAL NOTES
12. FOR DURATION OF PROJECT, EXISTING CONSTRUCTION AND/OR
EQUIPMENT TO REMAIN FROM DAMAGE OR CONSTRUCTION
ACTIVITIES. WHERE CONSTRUCTION ACTIVITIES RESULT IN
DAMAGE TO EXISTING CONSTRUCTION TO BE RETAINED,
REPLACE/REPAIR EXISTING CONSTRUCTION TO RETURN IT TO
ITS ORIGINAL CONDITION. WHERE REMOVAL OF EXISTING
CONSTRUCTION, PIPING, DUCTWORK, AND OTHER ITEMS
CREATES OPENINGS IN WALLS, FLOORS OR CEILINGS, PATCH
OPENINGS IMMEDIATELY WITH SAME MATERIALS AS ADJACENT
CONSTRUCTION AND/OR TO MAINTAIN REQUIRED FIRE RATING.
13. COORDINATE WITH OWNER FOR EQUIPMENT TO BE SALVAGED
AND RETURNED TO OWNER. THE OWNER WILL RETAIN ALL
SALVAGE THAT IS OF VALUE AS DESIGNATED BY THE USER OR
BUILDING ENGINEER. REMOVE FROM THE BUILDING AND
DISPOSE OF IN A LAWFUL MANNER ALL DEBRIS AND/OR ITEMS
NOT RETAINED BY OWNER.
14. INSTALL ADHESIVE MATS INSIDE AND OUTSIDE EACH ACCESS
DOOR TO CONSTRUCTION AREA.
GENERAL REMOVAL NOTES (CONT.)
1. THIS PROJECT IS A RENOVATION OF OF AN EXISTING FACILITY.
IT IS THE INTENT OF THE DEMOLITION DRAWING TO LEAVE ALL
MATERIALS OUTSIDE THE LIMITS OF THIS CONTRACT IN
EXISTING OPERATING CONDITION.
2. BEFORE SUBMITTING HIS BID THE CONTRACTOR SHALL VISIT
THE SITE AND BECOME THOROUGHLY FAMILIAR WITH THE
EXISTING CONDITIONS UNDER WHICH THE PROJECT IS TO BE
COMPLETED.
3. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY
ASSUMPTIONS, OMISSIONS OR ERRORS HE MAKES AS A RESULT
OF HIS FAILURE TO BECOME FULLY FAMILIAR WITH THE
EXISTING CONDITIONS.
4. PROPERLY DISPOSE OF ALL DEMOLISHED EQUIPMENT AND
MATERIALS IN COMPLIANCE WITH CODES AND REGULATIONS.
5. RELOCATE EXISTING EQUIPMENT, PIPING, WIRING AND RELATED
SYSTEMS TO REMAIN AS REQUIRED FOR CONSTRUCTION.
EXTEND FEEDER/CONDUIT AND PROVIDE RECONNECTIONS FOR
SYSTEM TO BE FULLY OPERATIONAL. ALL RELOCATED
EQUIPMENT SHALL BE PROTECTED DURING CONSTRUCTION.
6. INCLUDE ALL WORK REQUIRED TO ALLOW PHASED
CONSTRUCTION WHERE NECESSARY. COORDINATE WITH
GENERAL CONTRACTOR/CONSTRUCTION MANAGER FOR
PHASING REQUIREMENTS.
7. GENERAL CONTRACTOR IS RESPONSIBLE OF PATCHING,
REPAIRING, CAPPING, ETC. PER DEMOLITION AND
CONSTRUCTION.
8. WORK NOT INDICATED ON A PART OF THE DRAWING BUT
REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN AT
CORRESPONDING PLACES TO BE PROVIDED AT NO ADDITIONAL
COST.
9. COORDINATE OPERATIONS WITH THE OWNER SUCH AS BUT NOT
LIMITED TO, WORK AREAS USED FOR STORAGE, ACCESS TO
AND FROM WORK AREAS, TIMING OF WORK, SPECIAL
CONSIDERATIONS OF NOISY OPERATIONS, INTERRUPTIONS FOR
MECHANICAL, PLUMBING, AND ELECTRICAL SERVICES.
FLAMMABLE OR TOXIC MATERIALS ARE NOT PERMITTED TO BE
STORED INSIDE THE BUILDING.
GENERAL RENOVATION NOTES
1. UNLESS NOTED OTHERWISE, BASIS OF DESIGN IS SHERWIN-
WILLIAMS.
2. COLOR(S) AS SELECTED BY OWNER UNLESS NOTED
OTHERWISE.
3. REFER TO SPECIFIC NOTES AND DETALS FOR PRODUCT TYPES
AND LOCATIONS.
4. INSTALL PRODUCTS IN ACCORDANCE WITH MANUFACTURERS
PRINTED INSTRUCTIONS.
GENERAL PAINTING NOTES
Drawing Title
Drawing No.
Project Name
Email: mail@delta-eas.com www.delta-eas.com
Seal
Project No.
Date
Phase
UNAUTHORIZED ALTERATION OF
THIS DRAWING IS A VIOLATION OF THE NEW
YORK STATE EDUCATION LAW, SECTION
7209, SUBDIVISION 2.
860 Hooper Road Endwell, New York 13760
Tel: 607.231.6600 Fax: 607.231.6650
(I T
IS
A
V
IO
L A
T
IO
N O
F T
H E
L A
W F
O R
A N
Y P
E R
S O
N U
N L
E S
S H
E O
R S
H E
IS
A
C T
IN
G
U N
D E
R T
H E
D
IR
E C
T
IO
N O
F A
L
IC
E N
S E
D P
R O
F E
S S
IO
N
A L
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R T
O A
L T
E R
A N
IT
E
M
IN
A N
Y W
A Y
IF
A N
IT
E
M B
E A
R
IN
G T
H E
S E
A L
O F
A N
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R
IS
A L
T E
R E
D T
H E
A L
T E
R
IN
G E
N G
IN
E
E R
O R
L
A N
D S
U R
V E
Y O
R S
H A
L L
A F
F
IX
T O
T H
E
IT
E M
H
IS
O R
H E
R S
E A
L A
N D
T H
E N
O T
A T
IO
N
A
L T
E R
E D
B Y
F
O L
L O
W E
D B
Y H
IS
O
R H
E R
S
IG
N A
T U
R E
A N
D T
H E
D A
T E
O F
S U
C H
A L
T E
R A
T
IO
N A
N D
A S
P E
C
IF
IC
D
E S
C R
IP
T
IO
N
O F
T H
E A
L T
E R
A T
IO
N
CERTIFICATE OF AUTHORIZATION #: 019598
Dsg By Ckd By
/1
/2
:0
:5
P
M
A-001
GENERAL NOTES AND
SPECIFICATIONS
TIOGA COUNTY O.H. DOOR
103 CORPORATE DRIVE, OWEGO, NY 13827
2025.416.001
2026.03.18
KEM CSL
GENERAL ARCHITECTURAL NOTES
A. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. NOTIFY THE
ARCHITECT OF DISCREPANCIES PRIOR TO COMMENCING WORK.
EXISTING CONDITIONS THAT WOULD AFFECT THE EXECUTION OF THE
WORK MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
PRIOR TO COMMENCING THE WORK.
B. DIMENSIONS GIVEN ON PLANS ARE FROM FINISHED FACE TO FINISHED
FACE UNLESS OTHERWISE NOTED. DIMENSIONS ARE NOT ADJUSTABLE
WITHOUT THE APPROVAL OF THE ARCHITECT UNLESS OTHERWISE
NOTED.
C. PROVIDE BLOCKING IN WALLS AS REQUIRED TO SUPPORT WALL
MOUNTED ITEMS. LOCATE EQUIPMENT AND COORDINATE BLOCKING
LOCATIONS IN FIELD.
D. DIMENSIONS LOCATING DOORS OR INTERIOR WINDOWS ARE TO
OUTSIDE EDGE OF FRAME UNLESS NOTED OTHERWISE. REFER TO
DOOR & WINDOW SHEETS FOR FRAME TYPE, SIZE AND DETAILS.
E. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
No. Revision Date
1 DRAWING UPDATES 2026.03.06
2 ISSUE FOR CONSTRUCTION 2026.03.18
ISSUE FOR CONSTRUCTION
R1
V .I .F
E X
IS
T
IN
G
W A
L L K
N O
C K
O U
T
EXISTING JOINT FOR WALL KNOCKOUT
EXISTING JOINT FOR WALL KNOCKOUT
EXISTING DUCT TO REMAIN
A-201
WALL MOUNTED CONTROL PANEL
MECHANICAL EXTERIOR
EXISTING DUCT OVERHEAD
1' - 10 3/4"
WALL MOUNTED CONTROL PANEL
A-201
M A
S O
N R
Y O
P E
N
IN
G
V .I .F
MECHANICAL EXTERIOR
A-301
MTL ANGLE AT HEAD, JAMB
AND SILL MECHANICALLY
FASTENED. REFER TO
STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
TYP.
EXISTING BRICK VENEER, TYP.
EXISTING CMU WALL, TYP.
EXISTING DUCT OVERHEAD
EXISTING DUCT TO REMAIN
Drawing Title
Drawing No.
Project Name
Email: mail@delta-eas.com www.delta-eas.com
Key Plan
Seal
Project No.
Date
Phase
UNAUTHORIZED ALTERATION OF
THIS DRAWING IS A VIOLATION OF THE NEW
YORK STATE EDUCATION LAW, SECTION
7209, SUBDIVISION 2.
860 Hooper Road Endwell, New York 13760
Tel: 607.231.6600 Fax: 607.231.6650
(I T
IS
A
V
IO
L A
T
IO
N O
F T
H E
L A
W F
O R
A N
Y P
E R
S O
N U
N L
E S
S H
E O
R S
H E
IS
A
C T
IN
G
U N
D E
R T
H E
D
IR
E C
T
IO
N O
F A
L
IC
E N
S E
D P
R O
F E
S S
IO
N
A L
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R T
O A
L T
E R
A N
IT
E
M
IN
A N
Y W
A Y
IF
A N
IT
E
M B
E A
R
IN
G T
H E
S E
A L
O F
A N
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R
IS
A L
T E
R E
D T
H E
A L
T E
R
IN
G E
N G
IN
E
E R
N
D S
U R
V E
Y O
R S
H A
L L
A F
F
IX
T O
T H
E
IT
E M
H
IS
O R
H E
R S
E A
L A
N D
T H
E N
O T
A T
IO
N
A
L T
E R
E D
B Y
F
O L
L O
W E
D B
Y H
IS
O
R H
E R
S
IG
N A
T U
R E
A N
D T
H E
D A
T E
O F
S U
C H
A L
T E
R A
T
IO
N A
N D
A S
P E
C
IF
IC
D
E S
C R
IP
T
IO
N
O F
T H
E A
L T
E R
A T
IO
N
CERTIFICATE OF AUTHORIZATION #: 019598
Dsg By Ckd By
SCALE: N.T.S.
/1
/2
:0
:5
P
M
A-100
REMOVAL AND RENOVATION
PLANS
TIOGA COUNTY O.H. DOOR
103 CORPORATE DRIVE, OWEGO, NY 13827
2025.416.001
2026.03.18
KEM CSL
SCALE: 1/2" = 1'-0"A-100
1 FIRST FLOOR REMOVAL PLAN
SCALE: 1/2" = 1'-0"A-100
2 FIRST FLOOR RENOVATION PLAN
NORTH
0'
SCALE: 1/2" = 1'-0"
6" 1' 4'2'
A-100 REMOVAL KEY NOTES
R1 REMOVE 8'-0" X 7'-4" PORTION OF EXISTING CMU EXTERIOR WALL SYSTEM.
A-100 RENOVATION KEY NOTES
1 PROVIDE 8'-0" X 7'-4" INSULATED COILING DOOR SYSTEM WITH MANUAL PULL
CHAIN IN CMU WALL OPENING. BASIS OF DESIGN: CORNELL IRON MODEL: ESD20CR
2 REPAIR/REPOINT MASONARY AS REQUIRED TO FACILITATE THE INSTALLATION OF
O.H. DOOR.
3 PRIME AND PAINT BENT METAL AROUND PERIMETER OF CMU OPENING. COLOR
SELECTED BY OWNER.
OVERHEAD COILING DOOR
BASIS OF DESIGN
MANUFACTURER: CORNELL IRON
MODEL: ESD20CR
OPERATION: MANUAL CHAIN
CURTAIN: 316 STAINLESS OR CLEAR ANODIZED ALUMINUM
HOOD: TO MATCH CURTAIN MATERIAL
R-VALUE: 8
WIND LOAD: UP TO 40 PSF
MOUNTING: FACE OF WALL
OVERHEAD DOOR OPERATOR:
BASIS OF DESIGN
MANUFACTURER: CORNELL IRON
MODEL: MANUAL OPERATOR - CONTROLGARD - MODEL CG
OPERATION: MANUAL CHAIN
PAINT
BASIS OF DESIGN
MANUFACTURER: SHERWIN-WILLIAMS
APPLICATION:
1ST COAT PRIMER: SHERWIN-WILLIAMS KEM KROMIK UNIVERSAL METAL PRIMER
B50-Z100.
2ND & 3RD COATS: SHERWIN-WILLIAMS PRO INDUSTRIAL ACRYLIC SEMI-GLOSS
B66-650. 6-12 MILS WET, 2-4 MILS DRY PER COAT.
No. Revision Date
1 DRAWING UPDATES 2026.03.06
MEZZANINE LEVEL PLAN
100' - 0"
8' - 0"
E X
IS
T
IN
G
W A
L L K
N O
C K
O U
T
2' - 0"
EXISTING WALL KNOCKOUT
6' - 0" 6' - 0"
R1
WALL MOUNTED CONTROL PANEL
EXISTING LINTEL
107' - 4"
LINE OF DUCT BEYOND
A-301
MEZZANINE LEVEL PLAN
100' - 0"
LINE OF DUCT BEYOND
WALL MOUNTED CONTROL PANEL
EXISTING LINTEL
107' - 4"
MASONRY OPENING
8' - 0"
V.I.F.
+/- 6' - 0"
M A
S O
N R
Y O
P E
N
IN
G
A-301
Drawing Title
Drawing No.
Project Name
Email: mail@delta-eas.com www.delta-eas.com
Key Plan
Seal
Project No.
Date
Phase
UNAUTHORIZED ALTERATION OF
THIS DRAWING IS A VIOLATION OF THE NEW
YORK STATE EDUCATION LAW, SECTION
7209, SUBDIVISION 2.
860 Hooper Road Endwell, New York 13760
Tel: 607.231.6600 Fax: 607.231.6650
(I T
IS
A
V
IO
L A
T
IO
N O
F T
H E
L A
W F
O R
A N
Y P
E R
S O
N U
N L
E S
S H
E O
R S
H E
IS
A
C T
IN
G
U N
D E
R T
H E
D
IR
E C
T
IO
N O
F A
L
IC
E N
S E
D P
R O
F E
S S
IO
N
A L
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R T
O A
L T
E R
A N
IT
E
M
IN
A N
Y W
A Y
IF
A N
IT
E
M B
E A
R
IN
G T
H E
S E
A L
O F
A N
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R
IS
A L
T E
R E
D T
H E
A L
T E
R
IN
G E
N G
IN
E
E R
N
D S
U R
V E
Y O
R S
H A
L L
A F
F
IX
T O
T H
E
IT
E M
H
IS
O R
H E
R S
E A
L A
N D
T H
E N
O T
A T
IO
N
A
L T
E R
E D
B Y
F
O L
L O
W E
D B
Y H
IS
O
R H
E R
S
IG
N A
T U
R E
A N
D T
H E
D A
T E
O F
S U
C H
A L
T E
R A
T
IO
N A
N D
A S
P E
C
IF
IC
D
E S
C R
IP
T
IO
N
O F
T H
E A
L T
E R
A T
IO
N
CERTIFICATE OF AUTHORIZATION #: 019598
Dsg By Ckd By
SCALE: N.T.S.
/1
/2
:0
:5
P
M
A-201
INTERIOR ELEVATIONS
TIOGA COUNTY O.H. DOOR
103 CORPORATE DRIVE, OWEGO, NY 13827
2025.416.001
2026.03.18
KEM CSL
SCALE: 1/2" = 1'-0"A-201
1 INTERIOR ELEVATION REMOVAL
SCALE: 1/2" = 1'-0"A-201
2 INTERIOR ELEVATION RENOVATION
A-201 REMOVAL KEY NOTES
R1 REMOVE 8'-0" X 7'-4" PORTION OF EXISTING CMU EXTERIOR WALL SYSTEM.
A-201 RENOVATION KEY NOTES
1 PROVIDE 8'-0" X 7'-4" INSULATED COILING DOOR SYSTEM WITH MANUAL PULL
CHAIN IN CMU WALL OPENING. BASIS OF DESIGN: CORNELL IRON MODEL: ESD20CR
2 REPAIR/REPOINT MASONARY AS REQUIRED TO FACILITATE INSTALLATION OF O.H.
DOOR.
0'
SCALE: 1/2" = 1'-0"
6" 1' 4'2'
No. Revision Date
1 DRAWING UPDATES 2026.03.06
MEZZANINE LEVEL PLAN
100' - 0"
EXISTING LINTEL
107' - 4"
MTL ANGLE AT HEAD, JAMB
AND SILL MECHANICALLY
FASTENED. REFER TO
STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION.
TYP.
EXISTING BRICK VENEER
EXISTING 8" CMU WALL
Drawing Title
Drawing No.
Project Name
Email: mail@delta-eas.com www.delta-eas.com
Key Plan
Seal
Project No.
Date
Phase
UNAUTHORIZED ALTERATION OF
THIS DRAWING IS A VIOLATION OF THE NEW
YORK STATE EDUCATION LAW, SECTION
7209, SUBDIVISION 2.
860 Hooper Road Endwell, New York 13760
Tel: 607.231.6600 Fax: 607.231.6650
(I T
IS
A
V
IO
L A
T
IO
N O
F T
H E
L A
W F
O R
A N
Y P
E R
S O
N U
N L
E S
S H
E O
R S
H E
IS
A
C T
IN
G
U N
D E
R T
H E
D
IR
E C
T
IO
N O
F A
L
IC
E N
S E
D P
R O
F E
S S
IO
N
A L
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R T
O A
L T
E R
A N
IT
E
M
IN
A N
Y W
A Y
IF
A N
IT
E
M B
E A
R
IN
G T
H E
S E
A L
O F
A N
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R
IS
A L
T E
R E
D T
H E
A L
T E
R
IN
G E
N G
IN
E
E R
N
D S
U R
V E
Y O
R S
H A
L L
A F
F
IX
T O
T H
E
IT
E M
H
IS
O R
H E
R S
E A
L A
N D
T H
E N
O T
A T
IO
N
A
L T
E R
E D
B Y
F
O L
L O
W E
D B
Y H
IS
O
R H
E R
S
IG
N A
T U
R E
A N
D T
H E
D A
T E
O F
S U
C H
A L
T E
R A
T
IO
N A
N D
A S
P E
C
IF
IC
D
E S
C R
IP
T
IO
N
O F
T H
E A
L T
E R
A T
IO
N
CERTIFICATE OF AUTHORIZATION #: 019598
Dsg By Ckd By
SCALE: N.T.S.
/1
/2
:0
:5
P
M
A-301
WALL SECTION - OVERHEAD
DOOR
TIOGA COUNTY O.H. DOOR
103 CORPORATE DRIVE, OWEGO, NY 13827
2025.416.001
2026.03.18
KEM CMWSCALE: 1" = 1'-0"A-301
1 WALL SECTION - OVERHEAD DOOR
0'
SCALE: 1" = 1'-0"
3" 6" 2'1'
A-301 RENOVATION KEY NOTES
1 PROVIDE 8'-0" X 7'-4" INSULATED COILING DOOR SYSTEM WITH MANUAL PULL
CHAIN IN CMU WALL OPENING. BASIS OF DESIGN: CORNELL IRON MODEL: ESD20CR
2 REPAIR/REPOINT MASONARY AS REQUIRED TO FACILITATE THE INSTALLATION OF
O.H. DOOR.
3 PRIME AND PAINT BENT METAL AROUND PERIMETER OF CMU OPENING. COLOR
SELECTED BY OWNER.
No. Revision Date
1 DRAWING UPDATES 2026.03.06
EXISTING 8" CMU WALL
FULLY GROUTED REINFORCED
WITH #4's AT 8"
8' - 0"
EXISTING BOND BEAM
REINFORCED WITH (2)# 5
MEZZ
(SEE PLAN)
S-101
S-101 8
EXISTING
CMU WALL
PROPOSED
OPENING
MATERIAL OPTIONS
VENEER MORTAR: QUIKRETE, FAST SET REPAIR MORTAR MIX.PREMIXED WHITE ADHESIVE
MORTAR, RAPID SET HIGH-PERFORMANCE, FAST-SETTING MORTAR MIX OR EQUIVALENT
ANCHOR BOLT EPOXY: HIT-HY 200-R EPOXY ADHESIVE. SET-XP® HIGH-STRENGTH EPOXY
ADHESIVE. SIKA- ANCHOR FIX-1 HIGH STRENGTH FAST CURING ANCHORING ADHESIVE.
ANCHOR RODS: 3/4 in AND ½” HAS-E Carbon Steel, ASTM F1554 Grade 55. Zinc-Plated Threaded Anchor Rod. SIMPSON 3/4 in AND ½” Hot-Dip Galvanized Retrofit Bolt
6'-0" 7'-4" MASONRY
KNOCK OUT PANEL
WITH CONTROL JOINT
EACH SIDES
EXISTING BOND BEAM
CONNECTION TO CMU WALL
UNTIL ALL DEAD LOAD HAS
BEEN APPLIED TO THE ROOF
TOP/DECK ELEV. = 902'-8"
TOP OF PLANK ELEV. = 890'-8"
GROUT, TYP.
1 COURSE 2" CMU
OFFSET VERT. REINF. AS
REQ'D TO CLEAR PRECAST
PLANKS - MINIMUM 3"
GROUT SPACE REQ'D
BETWEEN CMU AND END OF
PLANK (TYP.)
CONT. BOND BM.
W/2 #5 BARS (TYP.)
8" PRECAST PRESTRESSED CONCRETE PLANK
2" STRUCTURAL TOPPING
#4 BAR - 1'-4" X 1'-4"
GROUTED INTO EA.
PLANK JOINT (TYP.)
CMU W/#4 BARS
VERTICAL IN FILLED
CORE @ 8" O.C. (TYP.)
CONT. BOND BM.
W/2 #5 BARS (TYP.)
CONT. BOND BM
W/2 #5 BARS
1 1/2" X 22 GA. PAINTED WIDE
RIB STEEL ROOF DECK
L3"X3"X1/4" CONT. W/
1/2" DIA X3" HILTI
SLEEVE ANCHORS
1. CAREFULLY REMOVE THE DESIGNATED CONCRETE MASONRY UNIT (CMU) FROM THE EXISTING KNOCK OUT IN THE WALL AND EXTEND THE OPENING TO THE SPECIFIED DIMENSIONS ON THE SOUTH SIDE.
2. THE EXISTING CONTINUOUS REINFORCED BOND BEAM (WITH TWO #5 REBARS) IS SUFFICIENT TO SERVE
AS THE LINTEL FOR THE NEW OPENING.
3. INSTALL TEMPORARY SHORING AND SUPPORT SYSTEMS FOR THE EXTERIOR BRICK VENEER TO ENSURE
STABILITY DURING CONSTRUCTION.
4. BENT PLATE INSTALLATION (UPPER):
a. PROVIDE THE PREFABRICATED BENT PLATE AS DETAILED IN THE DRAWINGS.
b. DRILL HOLES THROUGH THE VENEER AT THE FOUR DESIGNATED BOLT LOCATIONS.
c. SECURE THE BENT PLATE BY DRILLING PILOT HOLES INTO THE EXISTING BOND BEAM AND
INSTALLING EPOXY- ANCHORED BOLTS.
d. RESTORE THE BRICK VENEER AT THE BOLT LOCATIONS FOLLOWING INSTALLATION.
5. PROVIDE AND INSTALL THE LOWER BENT PLATE AT THE BOTTOM OF THE OPENING AS INDICATED IN THE
PLANS.
6. FURNISH AND INSTALL THE OVERHEAD DOOR ACCORDING TO THE ARCHITECTURAL DRAWINGS.
7. THE INSTALLATION PROCEDURE IS BASED ON THE AVAILABLE INFORMATION PROVIDED IN THE EXISTING
DRAWING. SHOULD THE ACTUAL, EXISTING CONDITIONS DIFFER FROM THOSE SPECIFIED, THE
CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD.
INSTALLATION PROCEDURE
EXISTING CONT BOND
BEAM W/ #5's
EXISTING 8" CMU WALL
WITH #4's AT 8"
EXISTING 8"
PRESTRESSED
CONCRETE
PLANKS
MEZZL
(SEE PLAN)
EXISTING ROOF
JOISTS
1' - 2 1/2"
EXISTING BRICK
VENEER
1/4" THICK BENT PALE
7 1/8" 1
/2
7 3/32"
/2
2 1/2"
3/16 2
EA
(4) 1/4" STIFFENERS
EQUALLY SPACED
AT THE SPAN
(4) 3/4" DIA POST INSTALL
ANCHOR BOLT
EQUALLY SPACED,
EPOXY AND EMBED 5" MIN
MEZZL
(SEE PLAN)
(4)1/2" DIA BOLT
EQUALLY SPACED,
EMBED 5" MIN
EXISTING 2"
TOPPING
EXISTING 1 COURSE 2" CMU
EXISTING GROUT
FILL THE GAPE W/
QUIKRET-5000 FAST
SETTING CONCRETE
MIX OR EQUIVALENT
Drawing Title
Drawing No.
Project Name
Email: mail@delta-eas.com www.delta-eas.com
Key Plan
Seal
Project No.
Date
Phase
UNAUTHORIZED ALTERATION OF
THIS DRAWING IS A VIOLATION OF THE NEW
YORK STATE EDUCATION LAW, SECTION
7209, SUBDIVISION 2.
860 Hooper Road Endwell, New York 13760
Tel: 607.231.6600 Fax: 607.231.6650
(I T
IS
A
V
IO
L A
T
IO
N O
F T
H E
L A
W F
O R
A N
Y P
E R
S O
N U
N L
E S
S H
E O
R S
H E
IS
A
C T
IN
G
U N
D E
R T
H E
D
IR
E C
T
IO
N O
F A
L
IC
E N
S E
D P
R O
F E
S S
IO
N
A L
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R T
O A
L T
E R
A N
IT
E
M
IN
A N
Y W
A Y
IF
A N
IT
E
M B
E A
R
IN
G T
H E
S E
A L
O F
A N
E N
G
IN
E E
R O
R L
A N
D S
U R
V E
Y O
R
IS
A L
T E
R E
D T
H E
A L
T E
R
IN
G E
N G
IN
E
E R
N
D S
U R
V E
Y O
R S
H A
L L
A F
F
IX
T O
T H
E
IT
E M
H
IS
O R
H E
R S
E A
L A
N D
T H
E N
O T
A T
IO
N
A
L T
E R
E D
B Y
F
O L
L O
W E
D B
Y H
IS
O
R H
E R
S
IG
N A
T U
R E
A N
D T
H E
D A
T E
O F
S U
C H
A L
T E
R A
T
IO
N A
N D
A S
P E
C
IF
IC
D
E S
C R
IP
T
IO
N
O F
T H
E A
L T
E R
A T
IO
N
CERTIFICATE OF AUTHORIZATION #: 019598
Dsg By Ckd By
/1
/2
:0
:4
P
M
S-101
LINTEL PLAN AND DETAILS
TIOGA COUNTY O.H. DOOR
103 COORPORATE DRIVE , OWEGO, NY 13827
2025.416.001
2025.12.04
NRN RS
SCALE: 1/4" = 1'-0"S-101
5 LINTEL ELEVATION
SCALE: 1/4" = 1'-0"S-101
4 OPENING PLAN
SCALE: 3/4" = 1'-0"S-101
2 EXISTING KNOCKOUT
SCALE: 3/4" = 1'-0"S-101
1 EXISTING KNOCK OUT PLAN
SCALE: 3/4" = 1'-0"S-101
3 EXISTING WALL SECTION
No. Revision Date
SCALE: 3/4" = 1'-0"S-101
6 LINTEL BEAM SECTION
kmaby Text Box
| 01 G-001-R001 IFC COVER SHEET |
| 02 A-001-R001 IFC GENERAL NOTES AND SPECIFICATIONS |
| 03 A-100-R001 IFC REMOVAL AND RENOVATION PLANS |
| 04 A-201-R001 IFC INTERIOR ELEVATIONS |
| 05 A-301-R001 IFC WALL SECTION - OVERHEAD DOOR |
| 06 S-101-R001 IFC LINTEL PLAN AND DETAILS |
File details come from the government source that posted it. Updated .