2025.05.03 Project Manual_and Plans (1) (1).pdf
PDF 5 MB Posted
- Attached to
- KE White Tower Disinfection Project
- Solicitation number
- 498-05052025CBS
- Issued by
- Person County, North Carolina
About this file
This is a comprehensive Construction Contract and Bidding Document package for the City of Elizabeth City's KE White Water Tower Disinfection Improvements project in Pasquotank County, North Carolina. The project involves installing a Monoclor Residual Control System (RCS) within an existing elevated water tower, which includes a tank mixer, water quality sampling system, chemical feed skids, storage tanks, control panels, piping, and associated appurtenances. The bid is scheduled to be received on May 29, 2025, at 3:00 PM local time, with a non-mandatory pre-bid conference on May 19, 2025, at 3:00 PM. The contract timeframe requires substantial completion within 30 consecutive calendar days and final completion within 60 consecutive calendar days after contract commencement.
The project is funded by the City of Elizabeth City and has a 10% minority business participation goal. The bid requires a 5% bid bond, and contractors must be licensed to perform work in North Carolina. The City will provide certain equipment including the PWM250 tank mixer, control centers, chemical feed skids, and storage tanks, while the contractor is responsible for installation, interconnecting piping, electrical work, and other system components. Bidders must submit detailed documentation including minority business participation forms, bid bonds, qualification statements, and comply with local and state regulations. The total project involves precise chemical dosing and water quality monitoring to maintain consistent disinfectant residual levels in the water tower.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00 01 11 - EJCDC Advertisement for Bids_updated (2).pdf | ||
| 2025-05-20-CombinedAddenda#1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WithersRavenel Our People. Your Success.
PROJECT MANUAL
for the
City of Elizabeth City
KE White Water Tower Disinfection Improvements
May 3, 2025
WithersRavenel Project No. 23-1097-004
Cathleen Saunders, P.E.
WithersRavenel 8466 Caratoke Highway, Building 400 | Powells Point, NC 27966
Office: 252.491.8147 | Fax: 919.467.6008 | www.withersravenel.com | License No. F-1479
Asheville | Cary | Charlotte | Greensboro | Pittsboro | Raleigh | Southern Pines | Wilmington
Docusign Envelope ID: 885F5A7D-142A-43AF-9F6C-6BBE41388D6C
5/2/2025
May 3, 2025
23-1097-004 00 00 03 - Page 1 of 2 City of Elizabeth City KE White Water Tower Disinfection Improvements
Table of Contents
TABLE OF CONTENTS
SECTION SUBJECT
SECTION 00 - BIDDING AND CONTRACT DOCUMENTS
00 00 01 Cover 00 00 03 Table of Contents 00 01 11 Advertisement for Bids 00 02 00 Instructions to Bidders 00 03 00 Information Available to Bidders 00 03 40 Non-collusive Affidavit 00 03 50 Authority to Execute Contract 00 04 10 Bid Form 00 04 12 E-Verify Affidavit 00 04 20 Bidder’s Qualifications Form 00 04 30 Bid Bond 00 05 10 Notice of Award 00 05 20 Agreement 00 05 30 Certificate of Owner’s Finance Officer 00 05 40 Certificate of Owner’s Attorney 00 05 50 Notice to Proceed 00 06 10 Performance Bond 00 06 15 Payment Bond 00 06 16 Certificates of Insurance 00 06 20 Contractor’s Application for Payment 00 06 21 Sale Tax Summary 00 06 22 MWBE Monthly Pay Application 00 06 25 Certificate of Substantial Completion 00 06 30 Contractor’s Affidavit of Release of Liens 00 07 00 Standard General Conditions of the Construction Contract 00 08 00 Supplementary Conditions 00 08 10 Dispute Resolution 00 09 00 Addenda 00 09 40 Work Change Directive 00 09 41 Change Order 00 09 42 Field Order
Minority Business Participation Forms
Guidelines for Minority Business Participation Forms Identification of Minority Business Participation
Affidavit A Listing of Good Faith Efforts Affidavit B Intent to Perform Contract with Own Workforce Affidavit C Portion of the Work to be Performed by Minority Firms Affidavit D Good Faith Efforts
23-1097-004 00 00 03 - Page 2 of 2 City of Elizabeth City KE White Water Tower Disinfection Improvements
Table of Contents
TABLE OF CONTENTS
SECTION SUBJECT
SECTION 01 - GENERAL REQUIREMENTS
01 03 00 Administrative Requirements 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 60 00 Product Requirements 01 70 00 Execution and Closeout Requirements
SECTION 02 – NOT USED
SECTION 03 – NOT USED
SECTION 04 – NOT USED
SECTION 05 – NOT USED
SECTION 06 – NOT USED
SECTION 07 – THERMAL AND MOISTURE PROTECTION
07 90 00.00 Joint Protection
SECTION 08 THROUGH SECTION 31 – NOT USED
SECTION 33 – UTILITIES
33 05 05.31 Hydrostatic Testing 33 14 13.00 Public Water Utility Distribution Piping 33 14 17.00 Water Services 33 14 17.10 Monoclor® Residual Control System (Bulk)
ADVERTISEMENT FOR BIDS
Project: KE White Tower Disinfection Project Owner: City of Elizabeth City
410 Pritchard Street, Elizabeth City, NC 27909 Engineer: WithersRavenel 8466 Caratoke Highway, Building 400, Powells Point, NC 27966
The City of Elizabeth City will receive separate sealed formal bids for the KE White Tower Disinfection Project at the City of Elizabeth City’s Public Works 2nd Floor Conference Room, located at 410 Pritchard Street, Elizabeth City, NC 27909, until Thursday, May 29th, 2025, at 3 PM, local prevailing time, at which time the Bids received will be publicly opened and read. Bids received after this time will not be accepted. Bids may be submitted by UPS or hand delivery only at the Public Works building located at 410 Pritchard Street, Elizabeth City, NC 27909. While there is an option to attend the Bid Opening virtually, hardcopy bids are still required to be received. Sealed bids should be marked clearly:
City of Elizabeth City RE: KE White Tower Disinfection Project
C/O: R. Lassiter or D. Bell 410 Pritchard Street
Elizabeth City, NC 27909
The project consists of installation of a Monoclor® Residual Control System (RCS) within the KE White Elevated Water Tower. The proposed booster pump disinfection improvement system includes a submerged tank mixer, water quality sampling system, submerged pump, injector assembly, hypochlorite storage tank, liquid ammonium storage tank, individual dosing skids for each chemical, and all associated appurtenances including, but not limited to, piping, control panels, chemical and electrical conduit. The booster pump disinfection system materials are to be provided by the City as detailed on the plan. All remaining materials are to be provided by the contractor.
A non‐mandatory Pre‐Bid Conference will be held on Monday, May 19th, 2025, at 3 PM local time, virtually, and at the City of Elizabeth City’s Public Works 2nd Floor Conference Room, located at 410 Pritchard Street, Elizabeth City, NC 27909. Interested parties are encouraged to attend this conference to review the plans. Attendance is strongly encouraged.
To participate in the virtual Pre‐Bid Conference, you must email Erin Spencer at espencer@withersravenel.com by 10:00 am local time on Friday, May 16th, 2025, to be provided with the information to join the meeting.
Complete digital bidding documents are available at http://withersravenel.com/bid/ or www.questcdn.com. You may download the digital documents for $25.00 by inputting Quest project # 9656265 on the website’s search page. Please contact QuestCDN.com at (952) 233‐1632 or info@questcdn.com for assistance in membership registration, downloading, and working with this digital project information. Contract documents may also be examined by downloading them under the project notices at www.elizabethcitync.gov, or evp.nc.gov.
All questions related to this bid shall be submitted in writing to espencer@withersravenel.com and rlassiter@elizabethcitync.gov prior to 5 PM local time on Tuesday, May 20th, 2025 to receive consideration.
Questions received after that time will not be answered or accepted. A Final Addendum will be provided prior to the Bid Date.
Bidders are responsible for the review of any addenda for the project and shall acknowledge the addenda on the bid form. To qualify, all bids shall be submitted using bid forms contained in the Contract Documents.
mailto:espencer@withersravenel.com http://withersravenel.com/bid/ mailto:espencer@withersravenel.com mailto:rlassiter@elizabethcitync.gov
Incomplete or segregated bids will not be accepted. All bids must be accompanied by a certified or cashier's check or bid bond in the amount of 5% of the total amount bid made payable to the Owner. The bid deposit shall be retained by the Owner if the successful bidder fails to execute contracts or fails to provide the required bonds, as stated above, within ten (10) days after the proper notice of award of the contract. No bid shall be withdrawn for a period of 60 consecutive calendar days after bid opening except as provided in Information for Bidders. Bidders must show evidence that they are licensed to perform the work in the Bid Documents as required by the North Carolina General Statutes Chapter 87. The Owner reserves the right to reject any/all bids, to waive formalities, or to reject non‐conforming, non‐responsive, or conditional bids. The Owner reserves the right to award a contract to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance, and time.
The Owner is an Equal Opportunity Employer. The Owner encourages bidding from small, minority and female (M/WBE), disadvantaged business enterprise (DBE), historically underutilized businesses (HUB). Bidders shall be required to submit with their Bids affidavits of “Good Faith Efforts” in the recruitment of MBEs.
Dwan Bell, Public Utilities Director
EJCDC® C‐200, Instruc ons to Bidders for Construc on Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page
ARTICLE 1 – Defined Terms
ARTICLE 2 – Copies of Bidding Documents
ARTICLE 3 – Qualifica ons of Bidders
ARTICLE 4 – Site and Other Areas; Exis ng Site Condi ons; Examina on of Site; Owner’s Safety Program; Other Work at the Site
ARTICLE 5 – Bidder’s Representa ons
ARTICLE 6 – Pre‐Bid Conference
ARTICLE 7 – Interpreta ons and Addenda
ARTICLE 8 – Bid Security
ARTICLE 9 – Contract Times
ARTICLE 10 – Liquidated Damages
ARTICLE 11 – Subs tute and “Or‐Equal” Items
ARTICLE 12 – Subcontractors, Suppliers, and Others
ARTICLE 13 – Prepara on of Bid
ARTICLE 14 – Basis of Bid
ARTICLE 15 – Submi al of Bid
ARTICLE 16 – Modifica on and Withdrawal of Bid
ARTICLE 17 – Opening of Bids
ARTICLE 18 – Bids to Remain Subject to Acceptance
ARTICLE 19 – Evalua on of Bids and Award of Contract
ARTICLE 20 – Bonds and Insurance
ARTICLE 21 – Signing of Agreement
ARTICLE 22 – Sales and Use Taxes
ARTICLE 23 – Retainage
ARTICLE 24 – Contracts to be Assigned
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit, with the bid, (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. Evidence of Bidder’s authority to do business in the state where the Project is located
B. Bidder’s state or other contractor license number, if applicable
C. Subcontractor and Supplier qualification information; coordinate with provisions of Article 12 of these Instructions, “Subcontractors, Suppliers, and Others”
D. Other required information regarding qualifications
3.02 A Bidder’s failure to submit required qualification information with the bid may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights‐of‐way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the General Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site‐related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 6 – PRE‐BID CONFERENCE
6.01 A pre‐Bid conference will be held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or one day longer than the number of days to bid withdrawal as described in Article 2 of the Bid Form, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR‐EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or‐equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or‐equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6 supplemented by Addenda. Any assumptions regarding the possibility of post‐Bid approvals of “or‐equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.
12.03 All bidders shall submit to Owner with Bid a list of the Subcontractors or Suppliers proposed for the Work. If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown. The corporate seal shall be affixed and attested by the corporate secretary or an assistant corporate secretary.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7
13.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown.
13.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.
13.05 A Bid by an individual shall show the Bidder’s name and official address.
13.06 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
13.07 All names shall be printed in ink below the signatures.
13.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.09 Postal and e‐mail addresses and telephone number for communications regarding the Bid shall be shown.
13.10 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 – BASIS OF BID
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
14.02 Allowances
A. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.
ARTICLE 15 – SUBMITTAL OF BID
15.01 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8
Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation:
BID ENCLOSED
KE White Tower Disinfection Project
Bids may be submitted by UPS or hand delivery only at the Public Works building:
R. Lassiter or D. Bell
410 Pritchard Street
Elizabeth City, NC 27909
15.02 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.
16.03 If within 72 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned; all in accordance with North Carolina General Stature 143‐
129.1. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non‐responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder whose bid is in the best interests of the Owner.
19.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 10
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 22 – SALES AND USE TAXES
22.01 The Contractor shall pay all applicable sales, consumer, use and other similar taxes required by law. The Contractor is responsible for reviewing the pertinent State Statutes involving the sales tax and sales tax exemption and complying with all requirements. The Contractor shall include all Federal, State, and local taxes in his bid. The Contractor shall indemnify, defend and hold harmless, Owner, Engineer and their employees, agents and representatives from and against any and all claims, damages, losses, penalties, fines and tax liabilities whatsoever resulting from Contractor’s failure to include such taxes in his bid, pay any such tax, or comply with any applicable tax requirements or statutes.
ARTICLE 23 – RETAINAGE
23.01 Provisions concerning Contractor’s rights to deposit securities in lieu of retainage are set forth in the Agreement.
ARTICLE 24 – CONTRACTS TO BE ASSIGNED
24.01 Not Used
23-1097-004 00 03 00 - Page 1 of 1 City of Elizabeth City KE White Water Tower Disinfection Improvements
Information Available to Bidders
SECTION 00 03 00
INFORMATION AVAILABLE TO BIDDERS
The following information is available:
Prior to reviewing the information and/or Report(s), interested Bidders will be required to sign a release form stating that it is understood the information is for general information purposes only; no warranties or guarantees are implied. A copy of the report(s) is attached to the end of this section.
"CONTRACTOR" hereby acknowledges and agrees that the following information and/or report(s) are provided by OWNER solely for general information purposes and are not part of the Contract Documents;
no warranties or guarantees are implied.
CONTRACTOR:
(Name of Company)
Accepted By:
(Name of the CONTRACTOR’s Representative)
Title:
(Title of the CONTRACTOR’s Representative)
Date:
END OF SECTION
23-1097-004 00 03 40 - Page 1 of 1 City of Elizabeth City KE White Water Tower Disinfection Improvements
Non-Collusive Affidavit
SECTION 00 03 40
NON-COLLUSIVE AFFIDAVIT
being first duly sworn, deposes and says that:
1. He/She is the , (OWNER, Partner, Officer, Representative or Agent) of (the Bidder that has submitted the attached Bid);
2. He/She is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affidavit, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Work;
5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest, including this affidavit.
Dated:
(CONTRACTOR)
By:
State Of:
County Of:
Subscribed and sworn to before me this Day of
Notary Public
My commission expires:
23-1097-004 00 03 50 - Page 1 of 1 City of Elizabeth City KE White Water Tower Disinfection Improvements
Authority to Execute Contract
SECTION 00 03 50
AUTHORITY TO EXECUTE CONTRACT
If the Bidder is a Corporation, attach to this page a certified copy of corporate resolutions of the Board of Directors of the Corporation authorizing an officer of the Corporation to execute the Agreement contained within this document on behalf of the Corporation.
EJCDC® C‐410, Bid Form for Construc on Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i
BID FORM
KE White Water Tower
Disinfection Improvements
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page ii
TABLE OF CONTENTS
Page
ARTICLE 1 – Bid Recipient
ARTICLE 2 – Bidder’s Acknowledgements
ARTICLE 3 – Bidder’s Representa ons
ARTICLE 4 – Bidder’s Cer fica on
ARTICLE 5 – Basis of Bid
ARTICLE 6 – Time of Comple on
ARTICLE 7 – A achments to this Bid
ARTICLE 8 – Defined Terms
ARTICLE 9 – Bid Submi al
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
R. Lassiter or D. Bell
City of Elizabeth City
410 Pritchard Street
Elizabeth City, NC 27909
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 5 consecutive calendar days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
Addendum No. Addendum, Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site‐related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 artificial non‐competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non‐competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
See Attached Bid Form
Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete within 30 consecutive calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 60 consecutive calendar days after the date when the Contract Times commence to run.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security; in an amount of five (5) percent (%) of the total price bid in the form of a (CIRCLE ONE):
Bid Bond
Certified Check
Cashier’s Check
B. 00 03 00 ‐ Information Available to Bidder’s ‐ Acknowledgement
C. 00 03 40 ‐ Non‐collusive Affidavit
D. 00 04 10 ‐ Bid Form ‐ Addenda Acknowledgement
E. 00 04 12 ‐ E‐Verify Affidavit
F. 00 04 20 – Bidders Qualifications Forms
Copyright © 2013 National Society of Professional…