This is Addendum No. 1 to the Invitation to Bid for the ISB Parking Lot Renewal Project (FP-2024-03A) issued by Eastern Oregon University's Facilities & Planning Department on February 28, 2025. The addendum modifies the original bid documents to remove discrepancies, revise the bid schedule, clarify bid items, and update special provisions and supplemental technical specifications. The project involves site improvements including removal of existing infrastructure (pipes, curbs, walks, driveways, surfacings, inlets, and manholes), clearing and grubbing, general excavation, installation of storm sewer systems, aggregate base and asphalt paving, concrete work (curbs, walks, and stairs), pavement markings and signage, rock mulch installation, potable water pipe installation, drainage structures (9 curb-o-lets), and irrigation system modifications. Key modifications include adjusting the bid deadline to 1:00 PM Pacific Standard Time on Tuesday, March 11, 2025 for proposals and 3:00 PM for First Tier Subcontractor Disclosure forms (reduced from 4:00 PM), adding a 10-inch culvert installation bid item (20 linear feet) at the gravel access road to maintain existing drainage patterns, and clarifying three pay items related to removal of structures, clearing and grubbing, and rock mulch specifications. The revised bid schedule spans two pages with numerous line items and associated unit prices requiring bidder completion.
The addendum specifies that crushed basalt angular rock mulch measuring 2 to 3 inches in gray color must be free of fines and other non-gravel materials. Contractor submittals are limited to two reviews at no cost (initial and one resubmittal), with a maximum charge of $1,000 per resubmittal for third and subsequent reviews if deemed unresponsive by the Owner. All submittals must be made within seven days of Notice to Proceed, with resubmittals due within seven days of return. Bidders are required to obtain solicitation documents from Eastern Oregon University in La Grande, Oregon, or through ORPU.org or ORPIN. The gravel access road will remain upon project completion and must consist of 6 inches of compacted aggregate base over compacted subgrade with non-woven drainage geotextile Type II at the base. Electronic and faxed bids are not accepted and will be considered non-responsive.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISB Parking Lot Renewal EOU Project Number FP-2024-03A February 28, 2025
Invitation to Bid Addendum No. 1
Eastern Oregon University Facilities & Planning Department Page 1 of 2 EOU Fieldhouse RFQ/P #FP-2019-02 Addendum No. 1
ADDENDUM NO. 1
EASTERN OREGON UNIVERSITY
ISB Parking Lot Renewal Project FP-2024-03A
This four (4) page addendum removes discrepancies in the Contract Documents, modifies the bid schedule, requiring Bidders to use the revised Bid Schedule in Attachment 1, clarifies bid items and makes modifications to the Special Provisions and the Supplemental Technical Specifications. Addendum No. 1 to the RFP is hereby submitted for use in proposal preparation and submittal.
The following changes, additions, and/or deletions are hereby made as part of the INTEGRATED SERVICES BUILDING RFP, as fully and completely as if the same were entirely set forth in the RFP, changes and additions are noted in underlined italics, deletions are noted in strikethrough.
BID DOCUMENTS AND SPECIFICATIONS
COVER SHEET
Modify the Cover Sheet at follows:
INTEGRATED BUILDING SERVICES BUILDING PARKING LOT RENEWAL PROJECT
INVITATION TO BID
Modify page BD-1 as follows:
…Withing 3 2 working hours after the date and time designated for bid opening, the bidders shall submit to
EOU the First Tier Subcontractor Disclosure form. If a First Tier Subcontractor Disclosure form is not received by 4:00 PM 3:00 PM the bid will be considered non-responsive..
…must be electronically received by 1:00 PM Pacific Standard Time, Tuesday March 11, 2025 for
Bidder’s Proposal and 4:00 PM 3:00 PM for the First Tier Subcontractors form…
BID SCHEDULE
CURB-O-LETS DRAINAGE STRUCTURE, Page BD-11
Change as follows:
CURB-0-LETS, PRODUCT ID TCD4RD-NS DRAINAGE STRUCTURE EA 9
PRIVATE UTILITY LOCATES/POTHOLING, Page BD-11
Change as follows:
PRIVATE UTILITY LOCATES/POTHOLING LS 1
PRIVATE UTILITY LOCATIONS LS 1
EXPLORATORY UTILITY POTHOLING EA 5
Add the following:
10-IN C-900 CULVERT AT GRAVEL ACCESS RD. LF 20
The gravel access road will traverse a drainage swale, this bid item pays for the installation of a culvert along the existing drainage pattern as part of the gravel access road without disrupting the existing drainage pattern.
Bid Schedule Clarifications:
• Pay Item Number 0310-010600A REMOVAL OF STRUCTURES AND OBSTRUCTIONS refers to Sheet C-010 where there are two drainage structures (D26 and D29) at the NW corner of the site to be removed.
• Pay Item Number 0320-0100000A CLEARING AND GRUBBING refers to any area on the site that needs above ground (clearing) and below ground (grubbing) of organic materials to construct the improvements.
• Pay Item Number 1040-0196000M ROCK MULCH is further clarified on the following page under “Add the following to page
SP-7.
Contractors are required to use the revised Bid Schedule (Attachment No. 1)
ISB Parking Lot Renewal EOU Project Number FP-2024-03A February 28, 2025
Invitation to Bid Addendum No. 1
Eastern Oregon University Facilities & Planning Department Page 2 of 2 EOU Fieldhouse RFQ/P #FP-2019-02 Addendum No. 1
SPECIAL PROVISIONS
Modify page SP-1 as follows:
0120.05 Request for Plans, Special Provisions, and Bid Booklets. Modify this section as follows:
(a) Paper Bid – Bidders must obtain Solicitation Documents at Eastern Oregon University in La Grande, OR.
ORPU.org or ORPIN.
(b) Electronic Bids – Electronic and/or faxed Bids are not accepted and considered non-responsive must be submitted per the Invitation to Bid on page BD-1.
Add the following to page SP-7:
6. REVISIONS TO PART 01000 – RIGHT OF WAY DEVELOPMENT CONTROL
The Section shall be revised with the following:
01040.20 Mulch (d) Rock Mulch – Crushed basalt angular rock, 2-in to 3-in. Provide material that is free of fines and other non-gravel material. Rock color shall be gray.
Modify pages STS-4 and STS-5 as follows:
04000.10 – Submittal Limits
A. Two submittals will be permitted for each item in this section at no cost to the Contractor. The two submittals include on initial submittal and one resubmittal.
B. All sSubmittals requiring a third review by the Engineer may be shall be considered unresponsive at the sole discretion of and the Owner if the Contractor does not make a reasonable effort to timely address and resolve the submittal comments. If the Owner considers the submittal unresponsive, the Owner will charge the Contractor on a Time and Materials basis for the third and subsequent reviews and related administrative costs not to exceed $1,000.00 for each resubmittal.
C. All submittals, unless noted otherwise in the Contract Documents, shall be submitted within seven (7) days from Notice to Proceed. Those items requiring resubmittal shall be submitted within seven (7) days from date return to Contractor.
CONSTRUCTION PLANS
SHEET C-003
Modify Key Note 3 as follows:
CONTRACTOR TO INSTALL GRAVEL ACCESS AS GENERALLY SHOWN AND INSTALL A 10”
CULVERT IN A MANNER THAT ALLOWS THE EXISTING DRAINAGE PATTERN TO REMAIN
AFTER THE PLACEMENT OF THE GRAVEL ACCESS. . GRAVEL ACCESS TO REMAIN UPON
COMPLETION OF CONSTRUCTION. GRAVEL ACCESS SHALL CONSIST OF 6” OF
COMPACTED AGGREGATE BASE OVER COMPACTED SUBGRADE. PLACE NON-WOVEN
DRAINAGE GEOTEXTILE TYPE II PER THE OREGON STANDARD SPECIFICATIONS AT THE
BASE OF THE COMPACTED AGGREGATE BASE.
ATTACHMENTS
1. Attachment 1 – Revised Bid Schedule (Two Pages) BD-10 & 11.
By: John Garlitz, P.E., Director of Facilities and Planning Date: February 28, 2025
ATTACHMENT 1 – REVISED BID SCHEDULE
Eastern Oregon University J-U-B ENGINEERS, INC. Page BD-10 ISB Parking Lot Renewal Project Bid Set 30-24-034 Addendum No. 1
BID SCHEDULE
ISB Site Improvements Bid
ODOT Pay
Item
Number
Pay Item Name Unit Est.
Qty Unit Price Total Price
0210-
0100000A
MOBILIZATION LS 1 $ $
0225-
0101000A
TEMPORARY WORK ZONE TRAFFIC
CONTROL, COMPLETE
LS 1 $ $
0280-
0100000A
EROSION CONTROL LS 1 $ $
0305-
0100000A
CONSTRUCTION SURVEY WORK LS 1 $ $
0310-
0100000F
REMOVAL OF PIPES FOOT 30 $ $
0310-
0101000F
REMOVAL OF CURBS
FOOT 2,460 $ $
0310-
0102000J
REMOVAL OF WALKS AND DRIVEWAYS
SQYD 1,985 $ $
0103000J
REMOVAL OF SURFACINGS SQYD 6,556 $ $
0310-
0104000E
REMOVAL OF INLETS
EACH 2 $ $
0105000E
REMOVAL OF MANHOLES
0106000A
REMOVAL OF STRUCTURES AND
OBSTRUCTIONS
0320-
0100000A
CLEARING AND GRUBBING LS 1 $ $
0330-
0105000K
GENERAL EXCAVATION CUYD 5,091 $ $
0350-
0101000J
DRAINAGE GEOTEXTILE, TYPE 2 SQYD 6,767 $ $
0350-
0105000J
SUBGRADE GEOTEXTILE SQYD 6,556 $ $
0445-
035008AF
8 INCH STORM SEWER PIPE, 5 FT
DEPTH
FOOT 324 $ $
0445-
035010AF
10 INCH STORM SEWER PIPE, 5 FT
DEPTH
FOOT 36 $ $
0470-
0104000E
CONCRETE MANHOLES, STORM SEWER
POLLUTION CONTROL
EACH 1
0470-
0332000e
CATCH BASINS, TYPE 3 EACH 12
0640-
0100000M
AGGREGATE BASE TON 1,450
ATTACHMENT 1 – REVISED BID SCHEDULE
Eastern Oregon University J-U-B ENGINEERS, INC. Page BD-11 ISB Parking Lot Renewal Project Bid Set 30-24-034 Addendum No. 1
ISB Site Improvements Bid
ODOT Pay
Item
Number
Pay Item Name Unit Est.
Qty Unit Price Total Price
0640-
0100000M
3" MINUS PIT RUN (CLASS D BACKFILL) TON 8,300
0745-
0622000M
PG 64-28 IN LEVEL 2 ACP TON 960
0755-
0111000J
REINFORCED CONCRETE PAVEMENT 6
INCHES THICK
SQYD 6
0759-
0110000F
CONCRETE CURBS, STANDARD CURB FOOT 2,460
0759-
0128000J
CONCRETE WALKS SQFT 1,985
0759-
0150000K
CONCRETE STAIRS EACH 2
0759-
0154100E
NEW CURB RAMPS EACH 5
0759-
0510000J
TRUNCATED DOMES ON NEW
SURFACES
EACH 5
0860-
0200000F
LONGITUDINAL PAVEMENT MARKINGS
– PAINT
FOOT 3,300
0867-
0173000E
PAVEMENT LEGEND, TYPE B: DISABLED
PARKING
EACH 6
0905-
0100000A
REMOVE EXISTING SIGNS EACH 6
1040-
0196000M
ROCK MULCH
TON 95
1140-
0100000F
8 INCH POTABLE WATER PIPE, FITTINGS
AND COUPLINGS WITH CLASS A
BACKFILL
FOOT 470
PARKING LOT SIGNAGE EACH 6 $ $
IRRIGATION SYSTEMS MODIFICATIONS LS 1 $ $
CURB-O-LETS, PRODUCT ID TCD4RD-NS
DRAINAGE STRUCTURE
EACH 9
RESET BIKE RACK LS 1 $ $
PRIVATE UTILITY LOCATES/POTHOLING LS 1 $ $
EXPLORATORY UTILITY POTHOLING EA 5 $ $
TOTAL CONTRACT PRICE $