2025 Contractor Prequalification SOQ Final.pdf

PDF 9 MB Posted

Attached to
Wastewater Treatment Plant Upgrade
Solicitation number
2025-01
Issued by
Larimer County, Colorado

About this file

This document is a Request for Qualifications (RFQ) issued by the Boxelder Sanitation District in Colorado for a Wastewater Treatment Plant Upgrade project. The district is seeking Letters of Interest and Statements of Qualifications from General Contracting firms with demonstrated experience in constructing wastewater treatment plants. The project involves upgrading the existing wastewater treatment plant, specifically focusing on two main components: 1) demolishing and replacing existing collection manhole structures with prebuilt pump stations, routing effluent through the existing gravity system via pressurized line, and 2) installing a recuperative thickener with upgrades to polymer feed, potable water lines, and non-potable water lines. The RFQ timeline indicates that responses are due on May 16, 2025 at 2:00 p.m., with notification of pre-qualified firms expected by May 28, 2025. The district plans to use the Construction Manager at Risk (CM@R) delivery method, with the selected General Contractor participating in a collaborative team-based approach.

The project will be implemented in phases, including a design and construction phase, start-up phase, and post-construction phase. The district will select a General Contractor no later than the completion of the 60% design phase, and the contractor will provide pre-construction services such as cost estimating, scheduling, constructability reviews, and value engineering. The goal is to contract with the selected General Contractor using a Guaranteed Maximum Price (GMP) for the project. The anticipated project schedule includes issuing a Notice to Proceed and GMP Contract in February 2026, with construction expected to start in March 2026. Contractors must meet specific eligibility criteria, including demonstrated wastewater treatment plant construction experience, a verifiable performance record, a significant regional business office in the area, Colorado business registration, and sufficient performance and payment bonding capacity.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOXELDER SANITATION DISTRICT

WASTEWATER TREATMENT PLANT UPGRADE

CONTRACTOR REQUEST FOR LETTER OF INTEREST AND STATEMENT OF

QUALIFICATIONS

INTRODUCTION

Boxelder Sanitation District (District) through this Request for Qualifications (RFQ) is seeking Letters of Interest and Statements of Qualifications (SOQs) from General Contracting firms with demonstrated experience and success in the construction of wastewater treatment plants, who are willing to work as a team member with District staff and its Design Engineer to design and construct an upgrade to its existing wastewater treatment plant (Project).

The District intends to prequalify a selected group of General Contractors who will be invited to submit proposals to provide design assistance (e.g., constructability consultation) and construction of the Project as further described herein.

Notwithstanding anything to the contrary herein, the District has no obligation to make a selection of prequalified contractors based on this RFQ and may terminate the selection process at any time. The District retains the discretion to modify, expand or delete any portion of the Project outlined in this RFQ. The District reserves the right to reject any or all of the responses to this RFQ without cause and accept any response that, in the District’s sole judgment, will be in the best interest of the District. The District assumes no responsibility for payment of any expenses incurred by a respondent to this RFQ.

PROJECT OVERVIEW:

The Project consists of upgrading the existing District WWTP scum collection system and the installation of a recuperative thickening system. The Project will occur at the existing District plant site located approximately one mile south and west of the intersection of Interstate 25 and Prospect Road near Ft. Collins, Colorado.

The District hired Carollo Engineers as the Design Engineer for the project and has currently completed the preliminary design phase.

PROJECT DESCRIPTION:

The general and conceptual description of the major facilities required for the Project include:

1. Scum Collection System: Demo and replace existing collection manhole structures with prebuilt pump stations. Effluent from prebuilt structures will be routed through existing gravity system via pressurized line.

2. Recuperative Thickening: Installation of recuperative thickener. Includes upgrades to polymer feed, potable water lines, and non-potable water lines.

Included in the documents are conceptual drawings showing the proposed improvements. The drawings are found in the Appendix and include Predesign Drawings. These drawings are of conceptual nature and are only intended to provide the proposers with general information about the scope of the project.

Wastewater Treatment Plant Upgrade Contractor Statement of Qualifications

April 21, 2025

OWNER INFORMATION:

The Boxelder Sanitation District is a statutory special district and political subdivision of the State of Colorado. Its sole function is to provide sanitary sewer service to customers within lands included in the District. It currently serves approximately 19,500 residents in Ft. Collins, Timnath and surrounding properties within Larimer County.

PROJECT APPROACH:

The District plans to implement the Project using the Construction Manager at Risk (CM@R) method of delivery. The selected General Contractor will participate in this collaborative, team-based delivery of the Project. The team will include the Owner, the Design Engineer, the General Contractor and major equipment suppliers, regulators, and specialty consultants as needed.

The phases of the Project as envisioned are:

A. Design & Construction Phase

1. Preliminary Design Engineering (30% design)

2. Select General Contractor

3. Final Design (with Owner, Design Engineer, Contractor and Consultant(s) working collaboratively to complete design)

a. Construction Guaranteed Maximum Price (GMP) contracting anticipated to be used installation of all work on the project B. Start-Up Phase

C. Post-Construction Phase The General Contractor will be selected as soon as possible and no later than at the completion of the 60% design phase. The selected General Contractor shall provide design phase pre-construction services, including but not limited to: cost estimating, scheduling, constructability reviews, and value engineering. The District will negotiate compensation for these services with the General Contractor.

The goal of the District is to contract with the selected General Contractor for the construction of the designed Project, using a Guaranteed Maximum Price (GMP) for the project, sometime prior to final completion of the design. Should the selected General Contractor and the District not achieve agreement on a GMP construction contract the District may then seek other General Contractors or revise the construction-phase scope of work at that time.

PROJECT (MILESTONE) SCHEDULE:

The Project schedule has been completed for the preliminary design phase (up through 30% design) at this time. Selection of the Contractor and start of construction dates will be finalized as the design progresses. Listed below are anticipated Project milestone dates which should aid Respondents in planning their efforts accordingly.

Issue Public Announcement for Contractor RFQ: April 21, 2025

RFQ Responses Due: May 16, 2025 2:00 p.m.

Notification of Pre-Qualified Firms: May 28, 2025

April 21, 2025

Anticipated Issue Request for Proposals to Pre-Qualified Contractors: May 29, 2025

Anticipated RFP Responses Due: June 25, 2025

Anticipated Evaluate Proposals and Interview Firms (At Discretion of District): June 25 – July 2, 2025

Anticipated Finalize Selection and Issue Notice of Award July 11, 2025

Design Assist Phase July 11, 2025 – January 17, 2026

Anticipated Issue Notice to Proceed, GMP Contract February 15, 2026

Anticipated Start of Construction, GMP Contract March 15, 2026

SCOPE OF SERVICES:

The anticipated scope of services to be provided by the selected General Contractor is outlined as follows.

Design Phase Services by the General Contractor may include:

• Work as a member of the team with the District and Design Engineer;

• Provide detailed independent cost estimating and knowledge of market conditions;

• System constructability recommendations;

• Provide project construction planning and scheduling;

• Provide alternate systems constructability evaluation and studies;

• Advise the District of ways to gain efficiency in project delivery;

• Provide long-lead procurement studies and possibly initiate procurement of long-lead items;

• Assist in the permitting process; and

• Protect the District with input including sensitivity to quality, safety, and environmental factors.

Construction Phase Services by the General Contractor may include:

• Construct the designed improvements;

• Coordinate with various regulatory agencies, utility companies and similar entities;

• Arrange for procurement and/or acceptance of procured materials and equipment;

• Schedule and manage site operations;

• Provide quality controls;

• Bond and insure the construction in accordance with Contract requirements;

• Address all federal, state and local permitting requirements;

April 21, 2025

• Deal with Owner’s issues including public information, safety and traffic issues; and

• Maintain a safe work site for all project participants Post Construction Phase Services by the General Contractor may include:

• Startup of facility;

• Plant operator training;

• Warranty work follow up and completion; and

• Completion of project to regulatory permit requirement

QUALIFICATIONS FOR ELIGIBILITY

To be considered eligible for prequalification, General Contractors responding to this RFQ (Respondents) must meet the following minimum criteria:

1. Demonstrated wastewater treatment plant construction experience including construction of activated sludge treatment processes;

2. A verifiable record of successful past performance in both the alternate project delivery approach as well as the design-bid-build approach.

3. Demonstrate a significant regional business office located in the region;

4. Registered to do business in the State of Colorado; and

5. Sufficient performance and payment bonding capacity.

RFQ SUBMITTALS REQUIREMENTS

Each Respondent must provide the information outlined below. Respondent must clearly demonstrate in their information that they meet the criteria referred in the preceding section, “QUALIFICATIONS FOR ELIGIBILITY”.

Statement of Qualifications:

Submit a formal letter and SOQ signed by an officer/principal of the firm. The letter and SOQ should be limited to no more than 20 pages (excluding resumes, supplemental marketing pieces and answers to general questions listed below). The letter and SOQ shall be printed double-sided using 8-1/2” x 11” format and minimum 11 point font. Clearly tab individual sections for reference following the format described below:

1. Letter of Interest: Provide a letter of interest notifying the District of the Respondent’s intent to be considered for the Project.

a. State reasons why the firm should be invited to submit a Proposal.

b. Provide a commitment from an officer of the firm, stating that if pre-qualified, the firm intends to aggressively pursue the project.

2. General Information: Provide a brief firm overview. Please be sure to include number of years in business and total staff. (If firm has more than one office, please provide information ONLY for the local office that will be responsible for performing the work).

Identify key staff that would be available to lead the team’s services throughout the project. Include at a minimum the principal-in-charge, lead estimator, day-to-day project manager and on-site superintendent.

April 21, 2025

a. State proposed roles and responsibilities of key project staff. Do not include department heads unless they will actually be directly involved in the day-to-day activities. Please include current office location of each key staff member.

b. Provide proof of Liability Insurance and Bonding for this project.

3. Project Experience: Provide list of WWTP projects completed using CMAR delivery methodology and firm’s understanding of the process and experiences.

a. Demonstrate firm’s understanding and experience working in an Open Book, collaborative GMP delivery method and process.

b. Provide a list of all WWTP project experience for projects completed within the last 5 years in the Rocky Mountain region (i.e., Colorado, Wyoming, New Mexico, Nebraska) using alternate project delivery and traditional project delivery. Include the name of the project, location, general description, year completed, construction cost (if available) and the roles of any of the proposed staff members had on the project.

Include owner/engineer contact information for completed projects as well as the engineer of record. Please include contact information for the owner’s and engineer’s assigned resident project representatives (or assigned construction representatives).

4. Safety Record

a. Provide a description of the firm’s safety program.

b. Provide three year history of workers compensation experience modifier and insurance carrier documentation supporting ratings.

5. References and Resumes

a. Provide a list of general references.

b. Resumes (outside the 20 page limit): Include resumes of key staff that will be committed to the project, if short-listed. Include references for each staff proposed.

SUBMITTALS:

Submittal Due Date and Time: All SOQ responses are due to the District on May 16, 2025, 2:00 p.m. Submit, in a sealed envelope labeled “Boxelder Sanitation District Wastewater Treatment Plant Upgrade Contractor Statement of Qualifications”, five (5) hard copies and one

(1) electronic version on compact disc (CD) or flash drive in Adobe format (.pdf), of SOQ response to:

Dan Richardson, District Engineer Boxelder Sanitation District 3201 E. Mulberry, Unit Q P.O. Box 1518 Ft. Collins, Colorado 80522

Information and Questions: Direct all questions in writing to Dan Richardson, District Engineer: drichardson@boxeldersanitation.org. Answers to all questions will be distributed to all Respondents via email. Deadline for submitting questions is 4:00 PM, May 7, 2025. The District will issue a final response to questions no later than the end of business day, May 9, 2025.

April 21, 2025

Right of Refusal: The Owner reserves the right to reject any and all submittals. Late submittals will not be accepted. The Owner may also waive any and all formalities during the selection process.

April 21, 2025

Appendix

PROJECT NO.

LA

ST

S

AV

ED

B

Y:

FILE NAME: 203515_00G01.dwg rli ns en m an n

203515

203515

DRAWING NO.

JOB NO.

SHEET NO.

00G01

BOXELDER SANITATION DISTRICT

JANUARY 2025

VOLUME 1 OF 1

LOCATION MAPVICINITY MAP

THICKENING AND SCUM PUMPING PREDESIGN

10 11 12 135 6 7 8 91 2 3 4

A

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G

PROJECT NO. 203515

PROJECT ADDRESS:

2705 SW I-25 FRONTAGE RD

FORT COLLINS, CO 80525

PROJECT

LOCATION

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

DATEREV BY DESCRIPTION

DATE

CHECKED

DRAWN

DESIGNED

203515

JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

PROJECT NO.

LA

ST

S

AV

ED

B

Y:

FILE NAME:

00G02GENERAL

DRAWING INDEX

203515_00G02.dwg rli ns en m an n

X - INDICATES DRAWINGS NOT CONTAINED IN THIS SUBMITTAL

SHEET

NO.

DRAWING

NO. DESCRIPTION

PROJECT NO. 203515

SHEET

NO

DWG

NO

00G01 00G02 00G03 00G04 00G05 40G01 80G01 80G02 80G03

00GD01

00D01 00D02

80DM01

80DM02

00GC01

00C20

00GS01

00GM01

00GM02

40M01 40M02 80M01 80M02 80M03 80M04

00GE01

00GE02

03E02 04E01

00GN01

00GN02

00GN03

00GN04

00GN05

00GN06

00GN07

03N01 46N01 47N01 80N01 80N02 80N03 80N04

DESCRIPTION

(G) - GENERAL

COVER SHEET

DRAWING INDEX

GENERAL NOTES, LEGENDS AND SYMBOLS

ABBREVIATIONS

DESIGN CRITERIA

SCUM PUMPING PROCESS FLOW DIAGRAM

THICKENING PROCESS FLOW DIAGRAM

DILUTION WATER PROCESS FLOW DIAGRAM

POLYMER WATER PROCESS FLOW DIAGRAM

(D) - DEMOLITION

DEMOLITION GENERAL NOTES

SITE DEMO PLAN

SITE DEMO SECTIONS AND DETAILS

SOLIDS HANDLING BUILDING DEMOLITION LOWER PLAN

SOLIDS HANDLING BUILDING DEMOLITION DETAILS

(C) - CIVIL

CIVIL GENERAL NOTES, LEGENDS, AND SYMBOLS

YARD PIPING PLAN 1

(S) - STRUCTURAL

STRUCTURAL GENERAL NOTES, LEGEND, AND SYMBOLS

(M) - MECHANICAL

MECHANICAL GENERAL NOTES, LEGENDS AND SYMBOLS

PIPE AND PUMP SCHEDULE

SCUM VAULT PLAN

SCUM VAULT SECTIONS AND DETAILS

SOLIDS HANDLING BUILDING LOWER PLAN

SOLIDS HANDLING BUILDING UPPER PLAN

SOLIDS HANDLING BUILDING SECTIONS AND DETAILS 1

SOLIDS HANDLING BUILDING PHOTOS

(E) - ELECTRICAL

ELECTRICAL GENERAL NOTES, LEGENDS, AND SYMBOLS

ABBREVIATIONS

SH-MCC1 ONE-LINE DIAGRAM

PANELBOARD SCHEDULES

(N) - INSTRUMENTATION

SYMBOLS AND ABBREVIATIONS 1

SYMBOLS AND ABBREVIATIONS 2

SYMBOLS AND ABBREVIATIONS 3

SYMBOLS AND ABBREVIATIONS 4

SCHEMATIC SYMBOLS

SAMPLE LOOP DRAWING

EQUIPMENT TAGGING SYSTEM

NETWORK BLOCK DIAGRAM

SCUM VAULT P&ID 1

SCUM VAULT P&ID 2

DIGESTED SLUDGE PUMPING P&ID

SLUDGE THICKENER POLYMER P&ID

SLUDGE THICKENING P&ID 1

DILUTION WATER P&ID

CHECKED

DRAWN

DESIGNED

203515

JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

PROJECT NO.

LA

ST

S

AV

ED

B

Y:

FILE NAME:

CE

CE

00G03GENERAL

NOTES, LEGEND, AND SYMBOLS

203515_00G03.dwg rli ns en m an n

203515

X X

REVISION DELTA

SCALE

FENCE

CENTER LINE

REMOVE AND/OR ABANDON

GATE

EXISTINGNEW

DETAIL REFERENCES HATCH PATTERNS

100'0 50' 200'

(EXIST)

KEY NOTE

EQUIPMENT/DEVICE

TAG AND NUMBER

PIPE TAG

BREAK LINE

TR

UE

N O

R

TH

PL

AN

T

NO

RT

H

30°

NORTH ARROW/PLANT NORTH

UNDERGROUND/

OVERHEAD

WARNING

(STATE/REGION

SPECIFIC)

SYMBOLS

GENERAL NOTES

MATCH LINE

HIDDEN LINE

MATCH LINE SEE DWG ##X##

ELEVATION TOC XXXX.XX

EXISTING ELEVATION

PIPE BREAK

PLAN VIEW

PIPE BREAK

CROSS SECTION

CONSTRUCTION

FUTURE CONSTRUCTION

PIPE CONTINUATION

(SINGLE LINE)

BRACKET

EQUIPMENT

(E) = EXISTING EQUIPMENT

(F) = FUTURE EQUIPMENT

SIZE FLOW STREAM

(E) = EXISTING FLOW STREAM

(F) = FUTURE FLOW STREAM

LINE WORK

T.O.W. XXXX.X±

PIPE SIZE FLOW STREAM

XXX-XX-XXXX

X" XXX

1. FOLLOWING NOTES ARE GENERAL AND APPLY TO ALL SHEETS OF THESE CONTRACT DOCUMENTS AS IF

THEY WERE WRITTEN IN THEIR ENTIRETY ON EACH SHEET.

2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS INCLUDING LOCATION AND DIMENSIONS OF ALL EXISTING CONSTRUCTION AND UTILITIES. CONTRACTOR SHALL NOTIFY ENGINEER IF THERE IS A CONFLICT BETWEEN THE CONTRACT

DOCUMENTS AND EXISTING CONSTRUCTION BEFORE PROCEEDING WITH WORK.

3. UNLESS DETAILED, SPECIFIED, OR OTHERWISE INDICATED ON THE DRAWINGS, CONSTRUCTION SHALL BE AS INDICATED IN THE APPLICABLE TYPICAL DETAILS AND GENERAL NOTES. TYPICAL DETAILS SHALL APPLY

EVEN THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS ON DRAWINGS.

4. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART OF WORK. DETAILS SHALL BE

IN THE SAME AS FOR OTHER SIMILAR WORK.

5. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORM WATER DISCHARGE REGULATIONS

AND REQUIREMENTS.

6. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW PIPING AND/OR OTHER PROPOSED UTILITIES, CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING PIPING AND UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR SHALL TEMPORARILY RELOCATE CONFLICTING EXISTING UTILITIES AT TIE-IN/CONNECTION LOCATIONS AND REINSTALL THEM AS REQUIRED TO ELIMINATE THE CONFLICT AT NO ADDITIONAL COST TO THE

OWNER.

7. ALL PIPELINES 12" AND LARGER SHALL HAVE A MINIMUM COVER OF 36" UNLESS THE COVER DEPTH IS SPECIFICALLY INDICATED ON THE DRAWINGS. PIPE SMALLER THAN 12" SHALL HAVE A MINIMUM COVER OF 30" UNLESS NOTED OTHERWISE. PIPES SHALL BE ROUTED AS SHOWN UNLESS MINOR REVISIONS ARE NECESSARY TO MISS EXISTING PIPES, STRUCTURES, ETC. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL FITTINGS AND ADAPTERS REQUIRED TO MAKE THE ROUTING CHANGES AT NO

ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL INCLUDE COST FOR THIS IN THE BID.

8. EXISTING FACILITY AND UTILITY INFORMATION SHOWN ON THE DRAWINGS WAS OBTAINED FROM AVAILABLE RECORDS OR ELECTRONIC FILES. NEITHER THE OWNER NOR ENGINEER ASSUMES ANY RESPONSIBILITY FOR FACILITIES AND UTILITIES NOT SHOWN OR NOT IN THE LOCATION SHOWN.

THE CONTRACTOR SHALL FIELD VERIFY ALL LOCATIONS, SIZES, MATERIAL TYPES, AND ELEVATIONS

SHOWN AROUND OR NEAR AREAS OF NEW CONSTRUCTION PRIOR TO START OF CONSTRUCTION.

9. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT FROM DAMAGE EXISTING FACILITIES AND UTILITIES SHOWN OR NOT SHOWN THAT ARE TO REMAIN IN PLACE.

ALL FACILITIES DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE EXPEDITIOUSLY REPAIRED

OR RECONSTRUCTED TO THE ORIGINAL OR BETTER CONDITION AT THE CONTRACTOR'S EXPENSE

WITHOUT ADDITIONAL COMPENSATION.

10. CONTRACTOR SHALL MAKE CONNECTIONS TO EXISTING PIPE, EQUIPMENT, ETC. AS REQUIRED AND SHALL PROVIDE ALL FITTINGS, ADAPTERS, AND APPURTENANCES REQUIRED TO MAKE THE CONNECTIONS.

PROVIDE ALL SUPPORTS REQUIRED FOR A RIGIDLY SUPPORTED COMPLETE AND WORKING SYSTEM.

11. ADJUST ALL VALVE BOXES, VAULTS, PULL BOXES, AND MANHOLES TO FINISHED GRADE UNLESS OTHER- WISE SHOWN OR DIRECTED. MANHOLES IN OPEN FIELDS SHALL BE SET TWELVE INCHES ABOVE FINISHED

GRADE AND VAULTS SHALL BE SIX INCHES ABOVE FINISHED GRADE.

12. THE CONTRACTOR SHALL CONTACT THE PROPER UTILITY REPRESENTATIVE AS FOLLOWS FOR

QUESTIONS OR COORDINATION OF CONSTRUCTION RELATED TO EXISTING UTILITIES.

STATE/REGION/MUNICIPALITY SPECIFIC: COLORADO

13. CONTRACTOR SHALL VERIFY THAT PIPING SHOWN TO BE ABANDONED OR AS ABANDONED PREVIOUSLY IS NO LONGER IN SERVICE. LINES IN SERVICE SHALL BE MAINTAINED UNTIL NO LONGER REQUIRED BY

THE PLANT.

14. ALL EXISTING PIPES THAT ARE TO BE ABANDONED IN PLACE OR REMOVED MAY NOT BE SHOWN.

WHERE PIPING IS TO BE ABANDONED AND MUST REMAIN IN SERVICE UNTIL COMPLETION OF OTHER PHASES OF WORK, AND IT CONFLICTS WITH NEW PIPING, TEMPORARILY RELOCATE PIPING AS REQUIRED

TO MAINTAIN SERVICE BY THE PLANT.

15. CONTRACTOR SHALL REROUTE THE EXISTING PIPING IF REQUIRED TO MISS THE PROPOSED STRUCTURES.

THE EXISTING PIPE SHALL REMAIN IN SERVICE UNTIL NEW PIPING IS READY TO BE PLACED INTO SERVICE.

DOWNTIME SHALL BE A MAXIMUM OF 2 HOURS, UNLESS SPECIFIED OR SHOWN OTHERWISE.

16. ALL SIDEWALKS TO BE 3'-0" WIDE UNLESS SHOWN OTHERWISE.

17. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS IN THE VICINITY OF ANY OVERHEAD ELECTRIC LINES. CONTRACTOR SHALL ABIDE BY THE NATIONAL ELECTRIC CODE AND ANY REQUIREMENT BY THE

OWNER OF THE ELECTRIC LINES.

18. PROVIDE ALL SHEETING/SHORING REQUIRED TO PROTECT EXISTING STRUCTURES, PIPES AND FACILITIES.

19. CONTRACTOR SHALL VERIFY LOCATION OF ALL ARCHITECTURAL, MECHANICAL, AND ELECTRICAL ITEMS

BEFORE PLACING ANY STRUCTURAL STEEL OR CONCRETE. ALSO, STRUCTURAL DIMENSIONS AND

OPENINGS CONTROLLED BY ARCHITECTURAL, MECHANICAL, OR ELECTRICAL EQUIPMENT SHALL BE

VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.

20. MECHANICAL AND ELECTRICAL EQUIPMENT SUPPORTS, ANCHORAGES, OPENINGS, RECESSES, AND REVEALS NOT SHOWN ON THE STRUCTURAL DRAWINGS, THAT ARE REQUIRED BY OTHER CONTRACT

DRAWINGS, SHALL BE PROVIDED PRIOR TO CASTING CONCRETE.

RUBBER

TREAD PLATE

LANDSCAPING

GRATING

STEEL

ALUMINUM

BRONZE, BRASS,

OR COPPER

BRICK OR BLOCK

MISCELLANEOUS

AGGREGATE BASE

COURSE (ABC)

BEDROCK

CAST IRON OR

FIBERGLASS

CLSM

CONCRETE

(ALL CLASSES)

DRAIN ROCK

STRUCTURAL FILL

OR BACKFILL

WOOD

SPAN

ASPHALT PAVING

GRAVEL

EXISTING/

UNDISTURBED SOIL

SAND OR GROUT

KEY TAG X

VIEW

VIEW

DRAWING CUT ORIGINATION

TYPICAL DETAIL #

FILE:

SCALE:

FILE:

SECTION CUT

TYPICAL DETAIL

REFERENCE

EXTERIOR ELEVATION

VIEWS

PHOTO LOCATION

AGRID BUBBLE

ARROW INDICATES

POINT OF VIEW

- = SHOWN ON SAME DRAWING

##X## = SEE INDICATED DRAWING

DRAWING REFERENCE ##X##

DISCIPLINE DESIGNATOR

SEE INDICATED

DRAWING

SHEETS IN

DETAIL

TYPICAL DETAIL NUMBER

TYPICAL DETAIL TITLE

AREA DESIGNATOR

(WHEN APPLICABLE)

DATE CREATED

(REVISED)

PLAN NOT REFERENCED

MODIFICATION NOTE

S = STANDARD

J = JOB SPECIFIC

R = REVISED

N = NOTE TO TYPICAL DETAIL USER

##X##

SHT # OF #MOD

LINE 2

LINE 1

LINE 3

VER DATE

TYP

C/1 ##X##

FILE

SCALE

C

A FILE

INDICATES LOCATED ON

TYPICAL DETAIL SHEETS

(TYP)

(TYP) - INDICATES THE

TYPICAL DETAIL IS USED IN

MULTIPLE LOCATIONS WITHIN

THE DRAWING

DESCRIPTION

SECTION/DETAIL

PLAN

VIEW DESCRIPTION, AS NECESSARY

SHEET NUMBER

DESCRIPTION

VIEW DESCRIPTION, AS NECESSARY

PLAN/VIEW TITLE

SECTION OR DETAIL

VIEW TITLE W/

REFERENCE

DETAIL OR

ENLARGED PLAN

CALL OUT

ALPHA = SECTION

NUMERIC = DETAIL

ALPHA = ENLARGED PLAN

NUMERIC = DETAIL

TYP

A ##X##

##X##

SEE INDICATED

DRAWING

SEE INDICATED

DRAWING

Know what's below.

Call before you dig.

(E)or (F)

(E)or (F)

GUARDRAIL

CHECKED

DRAWN

DESIGNED

203515

JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

PROJECT NO.

LA

ST

S

AV

ED

B

Y:

FILE NAME:

CE

CE

00G04GENERAL

ABBREVIATIONS

203515_00G04.dwg rli ns en m an n

203515

K

W

N

Y

I

Q

A

B

C

J

H

P

S

V

U

R

M

D

F

T

L

E

O

G

GV

GSP

H1E H

GRV

GPM

GPD

GRTG

GR

H2E

HP

HORIZ

HPU

HPA

HGT

HDW

HB

HEF

HDWL

GND

FX

FW

G

FXC

FV

FT or '

FSTN

FUP

FTG

GA

GL

GEN

GM

GLV

GEL

GALV

GAL

GB

GAV

LAV

LAB

LDF

LB(S)

L

JST

ISR

KGV

JT

LDFR

LP

LLV

LPG

LPA

LLH

LG

LF

LL

LHRA

IP

HWR

HWL

HxW

HWS

HW

HSF

HR

HV

HTX

HYD

INSTR

INJ

INV

INSUL

INF

ID

IA

INCL

IN or "

EJ

EIFS

EMBED

EJR

EG

ED

ECU

EFF

EF

EMH

ESEW

ES

EUH

ET

ER

EPS

EP

EQ

EPV

ECC RED

DR

DPV

DRV

DRT

DO

DMS

DMP

do

DN

DS

E

DWL(S)

EC

EA

DWD

DUC

DSW

DW

DUH

FLD

FLA

FLEX

FLE

FL

FILT

FH

FIN FL

FIN

FLG

FRPP

FPP

FS

FRS

FPM

FM

FLR

FO

FND

FG

EXPO

EXP

FAD

EXT

EWH

EW

EVR

EWEF

EWC

FB

FDL

FD

FEFF

FDR

FCU

FC

FBW

FCO

FCA

REG

REF

REJ

REINF

RED

RDL

RD

RECIRC

RDOF

REQD

RHRB

RH

RM

RLS

RG

RES

RF

REV

RCP

PSI

PSG

PT

PSIG

PSF

PRR

PROJ

PS

PRV

PV

QTY

PLW

RAS

R/W or R.O.W.

PVT

PVDF

PVC

PVMT

PVI

SEC

SE

SED

SECT

SDO

SCR

SCR

SDL

SD

SEP

SHT

SHR

SK

SIM

SHDR

SFW

SF

SHD

SG

SCO

RT

RR

RUD

RTF

RPMP

ROT

RO

RPM

RP

RW

SCB

SC

SCFM

SCD

SA

RWW

RWR

S S/W

MOD

MO

MON

MOIST

ML

MIX

MISC

MK

MJ

MOS

NG

NEV

NO., #

NIC

NA

MS

MPM

N

MTD

MIN

MAN

MAINT

MAU

MATL

M

LS

LR

LWL

LT

MAX

MG/L

MFR

MH

MGD

MET

MC

MB

MECH

MD

PLAS

PIV

PMP

PLWD

PI

PERP

PE

PH

PG

PNL(S)

PRC

PPMV

PRI

PRG

PP

POLY

POL

POW

POS

PDP

OD

OC

OPP

OPNG

OBD

NPT

NOM

O

NTS

OPP HND

PCP

PCCP

PD, PLD

PD

PCC

P

OZ

PC

PBL

DLV

TOP OF

INSIDE FACE

WTP WATER TREATMENT PLANT

OFL WEATHERPROOF, WATERPROOF

NUMBER (REBAR Ø)

OUTSIDE FACE

WORKING POINT

SANITARY WASTE

RAD

TOP OF STEEL

WPT

TAS THREADED ANCHOR STUD

ELL

EXHAUST FAN, EACH FACE

DEFLECTION ANGLE, CENTRAL ANGLE

EL

FRP

INTERIOR

FIBERGLASS REINFORCED PLASTIC

INT

CLEANOUT

O.F.

CTJ

I.F.

T.O.

CONTROL JOINT

HOOK ONE END

HOOK TWO ENDS

HEAT PUMP, HORSEPOWER, HIGH PRESSURE

GALVANIZE(D)

ADDL ADDITIONAL

CIRC

ADJACENT, ADJUST, ADJUSTABLE

ABOVE FINISHED FLOOR

CONSTRUCTION JOINT

COL(S)

AL

APPROXIMATE, APPROXIMATELY

POLYMER SOLUTION

UHMW ULTRA HIGH MOLECULAR WEIGHT

UHMWPE ULTRA HIGH MOLECULAR WEIGHT POLYETHYLENE

WRS

HIGH DENSITY POLYETHYLENE

PLS

BELT FILTER PRESS

HDPE

COLUMN(S)

LEFT HAND

LOW PRESSURE

HOLLOW STRUCTURAL SECTION (STEEL)

LH

LPT

NEAR SIDE

NOT IN CONTRACT

LOW POINT

NS

HIGH POINT

ELBOW

ELEVATION

DEMO DEMOLISH, DEMOLITION

EQUIP

FIBERGLASS REINFORCED PLASTIC PIPE

HPT

EX

FINISHED GRADE

CHLORIDE

TIME DELAY RELAY, TOWEL DISPENSER/RECEPTACLE

RIGHT HAND REVERSE ACTIVE

RIGHT HAND REVERSE

TOP OF GRATING

VEC VINYL ESTER COATING

THICKENER SUPERNATANT OR SUBNATANT

TRIAD (THREE CONDUCTOR SHIELDED CABLE), TIMING RELAY

RHRA

REGULATION VALVE, PRESSURE RELIEF VALVE

PREFAB

MASONRYMASY

PREFABRICATED

STORE FRONT GLAZING SYSTEM

RHR

DRAIN

SGS WATER SURFACE

STATIC PRESSURE, SET POINT

SLUDGE TRANSFER

POINT, POINT OF TANGENCY

REVISION, REVERSE

TOP OF CURB

SERVICE VALVE, SHUTOFF VALVE, SOLENOID VALVE

WATER METER

VALVE

WEST, WIDTH

PROGRESSIVE CAVITY PUMP

ASPHALTIC CONCRETE

CATCH BASIN

WSTP WATERSTOP

CONTROL POINT

BFG BELOW FINISHED GRADE

CARPET

END OF CURVE WTF

WWTF

TUR TURBINE

WATER TREATMENT FACILITY

BTWN BETWEEN

WASTEWATER TREATMENT FACILITY

FIN GR

TANGENT LENGTH, THERMOSTAT, TIMER, TREAD

OPEN EQUIPMENT DRAIN

NPW

OED

NON-POTABLE WATER

RTU ROOF TOP UNIT

SCH

RADIUS, RADIAL

CIRCUMFERENTIAL/CIRCUMFERENCE

GENERAL, GENERATOR

GYPSUM

FXE FIRE EXTINGUISHER - ELECTRICAL

GYP

LHR LEFT HAND REVERSE

LEFT HAND REVERSE BEVELLHRB

FACTORY

CURRENT TRANSFORMER, CERAMIC TILE

CIRCLE

CLK

CORRUGATE(D), CORROSION

BCKR

EXIST

FACT

BACKER BOARD

EXISTING

CKF

CKB

CKS

CKA

CI

CHKD PL

CJ

CIP

CLD

CMLC

CML

CMU

CMP

CLV

CLP

CLL

CLS

CLR

CHF

C

BV

CAUSTIC

CA

BTU

BPV

BOTTS

BSP

BRG

CB

CFM

CF

CHEMD

CFS

CEF

CD

CC

CDT

CDL

DEG or °

DDR

DFL

DET

DBL

CY

CWV

D/W D

DG

DISCH

DIP

DL

DIW

DIM

DIAG

DIA or Ø

DIG

DIF

CW

CORR

CONT

CPT

CP

CONST

CO

CNV

CONN

CONC

CPVC

CU

CTSK

CV

CUP

CTR

CSP

CS

CTL

CT

MASONRY CONTROL JOINT

CLOSE, CONDUIT CHANNEL (STRUCTURAL)

HEADED ANCHOR STUD

MCJ

CCB

COUPLING

CLSM

CHLORINE CONTACT BASIN

CPLG

HAS

ACI

ACB

ACU

ACP

AC

AB

ABS

ABC

CONTROLLED LOW STRENGTH MATERIAL

HSS

INSIDE DIAMETER, INSIDE DIMENSION, IDENTIFICATION

GC

GRAVITY BELT THICKENER

NC

SPECIFICATION(S)

TOG

NORMALLY CLOSED

SPEC(S)

GROOVED COUPLING

DWG(S)

DOWEL(S)

CONNECT, CONNECTION

DRAWING(S)

ELEC

FIRE DEPARTMENT CONNECTION

GBT

ELECTRICAL

FDC

BD

BCM

BDR

BDD

BC

AVG

AV

AW

AVV

BF

BLR

BLKHD

BOTT

BM

BLK

BFV

BFP

BLDG

BKW

ASTM

AFC

AER

AFM

AFF

AED

ADJ

AD

ADR

ADMIN

AHU

ARCH

APPROX

ASSY

ARV

ANV

AIL

AIC

ANCH

ALT

SL

POLYMER BLENDER

POLE

PLANT CONTROL CENTER

POINT OF CURVATURE

OUNCE

OPENING

OVERFLOW

OPPOSITE HAND

OPPOSITE

PRESTRESSED CONCRETE CYLINDER PIPE

PHASE, PHYSICALLY HANDICAPPED

PRESSURE GAUGE

POST INDICATOR VALVE

POINT OF INTERSECTION

PERPENDICULAR

PULSATION DAMPENER

POSITIVE DISPLACEMENT, PLANT DRAIN

PLAIN END

POSITIVE DISPLACEMENT PUMP

OUTSIDE DIAMETER, OUTSIDE DIMENSION

MOP SINK

METERING PUMP

NORTH, NEUTRAL

MOUNTED

MOISTURE SEPARATOR

MODIFIED

MASONRY OPENING

MONUMENT

MOISTURE

NOT APPLICABLE

OPEN

NOT TO SCALE

ON CENTER

OPPOSED BLADE DAMPER

NATIONAL PIPE THREAD

NATURAL GRADE, NATURAL OR LP GAS

VALVE, NEEDLE

NOMINAL

NUMBER

PAVEMENT

POINT OF VERTICAL INTERSECTION

PLANT WATER

POINT OF VERTICAL TANGENCY

POLYVINYLIDENE FLUORIDE

POUNDS PER SQUARE INCH GAUGE

POUNDS PER SQUARE INCH

POINT OF VERTICAL CURVATURE, POLYVINYL

PLUG VALVE

QUANTITY

RECIRCULATING

ROOF DRAIN OVERFLOW

REFERENCE

REDUCER, ROOF EQUIPMENT DRAIN

ROOF DRAIN LINE

RETURN ACTIVATED SLUDGE

RIGHT OF WAY

ROOF DRAIN

REINFORCED CONCRETE PIPE

PRESSURE GAUGE

POLYETHYLENE

POLYMER

POTABLE WATER

POSITION

PANEL(S)

PLASTIC

PLATE, PROPERTY LINE

PUMP

PLYWOOD

POWER POLE

PRESSURE REDUCING VALVE, PRESSURE

PRESSURE OR VACUUM RELIEF VALVE

POUNDS PER SQUARE FOOT

PUMP STATION, PIPE SUPPORT

PROJECTION

POINT OF REVERSE CURVATURE

PARTS PER MILLION (VOLUME)

PRIMARY

PRESSURE REGULATOR

INSTRUMENT AIR

HYDRANT

INCLUDE, INCLUDING

INCHES

HEIGHT BY WIDTH

HIGH WATER LEVEL

HOT WATER

HOT WATER SUPPLY

HOT WATER RETURN

INFLUENT

JOIST

INTRINSICALLY SAFE RELAY

KNIFE GATE VALVE

JOINT

IRON PIPE

INSTRUMENTATION

INJECTOR

INVERT

INSULAT(E)(ED)(ING)(ION)

HOSE VALVE

GATE VALVE

GALVANIZED STEEL PIPE

HOSE BIBB

EXPLOSION-PROOF, HIGH, HORIZONTAL

GRAVITY VENTILATOR

GALLONS PER MINUTE

GALLONS PER DAY

GRATING

GRADE

HARDWARE

HANDRAIL, HOSE REEL, HOUR

HEAT PUMP UNIT AIR

HEAT EXCHANGER

HOOD SUPPLY FAN

HIGH PRESSURE AIR

HOOD EXHAUST FAN

HEADWALL

HORIZONTAL

HEIGHT

MOTORIZED DAMPER

MECHANICAL COUPLING

METAL

MECHANICAL

MACHINE BOLT

MATERIAL

MANUAL

MAXIMUM

MAKE-UP AIR UNIT

MANUFACTURER

MECHANICAL JOINT

MIXER

MIXED LIQUOR

MARK

MISCELLANEOUS

MILLION GALLONS PER DAY

MILLIGRAMS PER LITER

MINIMUM

MANHOLE

MAINTENANCE

LINEAL FEET

LIQUID DIESEL FUEL RETURN

LEFT HAND REVERSE ACTIVE

LONG

LIQUID DIESEL FUEL

LABORATORY

ANGLE (STRUCTURAL), LENGTH, LOUVER

POUND(S)

LAVATORY

LIVE LOAD

LEFT

LAB SINK

MOTOR

LOW WATER LEVEL

LONG RADIUS

LONG LEG VERTICAL

LONG LEG HORIZONTAL

LIQUIFIED PROPANE GAS

LOW PRESSURE AIR

TURBIDIMETER SAMPLE

THICKENED SLUDGE DECANT

TELEPHONE TERMINAL BOARD

THERMOSTAT

TANK

TEMPERATURE

TOP OF MASONRY

TOP OF CONCRETE

TURNING VANES

VARIES

UTILITY SINK

VITRIFIED CLAY PIPE

VALVE BOX

UNLESS NOTED OTHERWISE

TYPICAL

THREE-WAY VALVE

UNDERGROUND

UNDERCUT

TELEPHONE MANHOLE

PIPE SUPPORT, SUPPORT

SLUICE GATE

SYMMETRICAL

SEAL WATER

STRUCTURAL

STEAM

STEEL

STRAINER

STEEL PIPE

SYNTHETIC

THICKENER, THICKNESS, THICK

TEST HOLE

TELESCOPING VALVE

THICKENED SLUDGE

TELEPHONE

TEMPORARY BENCHMARK

TOP AND BOTTOM

TOTAL DYNAMIC HEAD

TEMPERATURE CONTROL VALVE

YARD HYDRANT

YARD CLEANOUT

SECONDARY SLUDGESSL

WYE

WASTEWATER

WATER CONTROL VALVE

WASTEWATER TREATMENT PLANT

WELDED WIRE FABRIC

PLCS

EMERGENCY HAND SWITCH

DEEP (OR DEPTH)DP

ESS

SW

PLACES

BREAK GLASS HAND SWITCHBG

WATER

WITH

VENT THROUGH ROOF

WASTE ACTIVATED SLUDGE

WITHOUT

VACUUM REGULATING VALVE

VOLUMETRIC FEEDER

VERTICAL

VOLUME

VACUUM GAUGE, VALLEY GUTTER

WALL CLEANOUT

WEIR GATE

WASTE OIL DRAIN

WALK THROUGH, WEIGHT

WATER SOFTENER

WALL LOUVER, WATER LEVEL

WALL FITTING, WASH FOUNTAIN

WALL EXHAUST FAN

WEIGHT INDICATOR

WATER HEATER

SAMPLE

SCRUBBER

SECONDARY CLARIFIER

SIDEWALK

RECLAIMED WATER, REUSE WATER

RUPTURE DISK

RAW WASTEWATER

RECLAIMED WATER RETURN

SMOKE CONTROL DAMPER

SUMP DISCHARGE DRAIN LINE

SMOKE DETECTOR, SPLITTER DAMPER, STORM

SECONDARY EFFLUENT

SLUDGE DRAWOFF

SILICON CONTROL RECTIFIER

SCHEDULE

STANDARD CUBIC FEET PER MINUTE

BAR SCREEN

SURFACE CLEANOUT

ROTARY FEEDER

RETURN FAN

RESERVOIR

RIGHT HAND

RETURN GRILLE RUBBER GASKET

REINFORCE(D)(ING)(MENT)

REGULATOR, REGULATING

REQUIRED

RUBBER EXPANSION JOINT

RIGHT HAND REVERSE BEVEL

REINFORCED PLASTIC MORTAR PIPE

REVOLUTIONS PER MINUTE

RIGHT

RETURN REGISTER

RADIUS POINT

ROOM

REGISTERED LAND SURVEYOR

ROTAMETER

ROUGH OPENING

SQUARE

SAMPLE WATER

SQUARE INCH(ES)

SQUARE FEET

SAMPLE SINK

SINGLE POLE DOUBLE THROW

SUMP PUMP DRAIN

SPARE

SPLITTER BOX

SHORT RADIUS, SUPPLY REGISTER

STANDARDS(S)

STABILIZER

STIRRUPS

STIFFENER

STATION

SANITARY SEWER, SELECTOR SWITCH

SCRUBBER RECIRCULATION LIQUID (CAUSTIC)

STAINLESS STEEL

SERVICE SINK

SOLUTION

SUPPLY GRILLE

SOFTENED WATER

SOLIDS HANDLING-RECYCLE

SHOWER DRAIN

SUPPLY FAN

SECTION

SECONDARY, SECOND

SEPTAGE

SEDIMENTATION

SHOWER

SLEEVE VALVE

SLIDE GATE

SUPERNATANT OR SUBNATANT

SAMPLER, SUMP PUMP

SLUDGE COLLECTOR DRIVE

SIMILAR

SHEET

SLOPE, SLUDGE

SKIMMINGS

GROUND

AT (MEASUREMENT)

YH

AGGREGATE BASE COURSE

ANCHOR BOLT

YCO

WWF

WW

Y

WWTP

ACRYLONITRILE BUTADIENE STYRENE

ACCESS DOOR

ADMINISTRATION

AERAT(ION)(OR)

AREA EQUIPMENT DRAIN

AREA DRAIN

AMERICAN CONCRETE INSTITUTE

AIR CIRCUIT BREAKER

AIR CONDITIONING UNIT

ASBESTOS CEMENT PIPE

WV

WCO

WAS

WF

WEF

W/O

VTR

VRV

W/ W

WH

WS

WRG

WTR

WT

WP

WL

WI

WOD

WM

BLOCK

BUILDING

PROCESS BLOWER

BULKHEAD

BACKWASH

BASIN DRAIN LINE

BACKDRAFT DAMPER

BUTTERFLY VALVE

BLIND FLANGE

BEAM, BENCH MARK

BALL VALVE

BRITISH THERMAL UNITS

CAUSTIC SOLUTION (CONCENTRATED OR DILUTE)

CONCRETE ANCHOR

BLACK STEEL PIPE

BOTTOM SLUDGE

BOTTOM

BEARING

BACK PRESSURE VALVE

BOARD

ALUMINUM

ALTERNATE

ANGLE VALVE

ANCHOR

AIR INTAKE LOUVER

AIR FLOW MONITOR

AFTERCOOLER

AIR COMPRESSOR

AIR HANDLING UNIT

ARCHITECTURAL

ACID WASTE

AIR AND VACUUM VALVE

BATCHMETER

BEGIN CURVE, BRASS CAP, BACK OF CURB, BOLT

AVERAGE

ASSEMBLY

AIR RELEASE VALVE

ACID VENT

AMERICAN SOCIETY FOR TESTING AND MATERIALS

STIR

STIFF

STM

STL

STD(S)

ST

STB

STA

STP

SYM

SWR

T

SYN

SV

STRUCT

STR

SUPT

SUG

SSK

SP

SOL

SPDT

SPD

SN

SLG

SLC

SMP

SLV

SPL

SR

SQ IN(S)

SS

SRL

SQ FT

SPS

SPR

SQ

SPW

TYP

TWV

UG

UC

TV

TSPL

TSD

TTB

TSTAT

UNO

VFR

VERT

VOL

VG

VCP

V

US

VB

VAR

TS

TEL

TDR

THK

TH

TDH

TBM

T&B

TCV

TC

TKS

TOS

TOM

TR

TOC

TMH

TLV

TNK

TMP

ELECTRIC WATER HEATER, EXHAUST

EACH WAY EACH FACE

EXPANSION, EXPANSION TANK

EXISTING

ELECTRIC WATER COOLER

ELECTRIC UNIT HEATER

ELECTRICALLY HEAT TRACED

EACH WAY

EVAPORATOR

EXPOSED

FLOOR CLEANOUT

FLANGE COUPLING ADAPTER

FIRE DAMPER, FLOOR DRAIN, FOUND

FAN COIL UNIT

FACE OF CURB, FLEXIBLE COUPLING

FOUL AIR DUCT

EXTERIOR

FILTER BACKWASH

FLAT BAR

EMERGENCY SHOWER AND EYE WASH

EXHAUST GRILLE

EFFLUENT

EXPANSION JOINT

EXTERIOR INSULATION AND FINISH SYSTEM

EQUIPMENT DRAIN

EACH

EAST

EVAPORATOR COOLING UNIT

ECCENTRIC REDUCER

INJECTOR/EDUCTOR

EQUIPMENT

EQUAL

EACH SIDE

EXHAUST REGISTER

ECCENTRIC PLUG VALVE

ELECTRICAL MANHOLE

EMBEDMENT

EXPANDED POLYSTYRENE

EDGE OF PAVEMENT

FLAP VALVE

FUEL DISPENSER

FIRE EXTINGUISHER

FOOTING

FAR SIDE

FROTH SPRAY

FOOT, FEET

FASTEN(ED)

FIRE EXTINGUISHER CABINET

GLASS

GRAVITY EXHAUST LOUVER

GAS METER

GLOBE VALVE

GRADE BREAK

GAUGE or GAGE

GAS, GROUND, GUTTER

GRAVITY VENTILATOR

GALLONS

FLEXIBLE PLASTIC PIPE

FINISH

FILTRATE

FINISHED FLOOR

FIRE HYDRANT

FEEDER

FLOOR DRAIN LINE

FLAP GATE

FINAL EFFLUENT

FOUL AIR

FOUNDATION

FORCE MAIN

FEET PER MINUTE

FUEL OIL

FILTER

FILTER EFFLUENT

FILTER DRAIN

FLANGE, OR FLANGED

FLEXIBLE

CEMENT MORTAR LINED AND COATED

CEMENT MORTAR LINED

CONCRETE MASONRY UNIT

CORRUGATED METAL PIPE

CHLORINE GAS (VACUUM)

CHLORINE GAS (PRESSURE)

CHLORINE LIQUID

CHLORINE SOLUTION

CLEAR

CONVEYOR

CONTROL

CHEMICAL SUMP PUMP, CORRUGATED STEEL PIPE

COUNTERSUNK

CENTER, CENTERED

CARBON STEEL, CIRCULATING SLUDGE

CONSTRUCTION

CONCRETE

CHLORINATED POLYVINYL CHLORIDE

CONTINUOUS OR CONTINUATION OR (D) (OUS)

CHLORINE LEAK DETECTOR

CUBIC FEET PER MINUTE

CUBIC FEET

CHEMICAL DRAIN

CUBIC FEET PER SECOND

CEILING EXHAUST FAN

CEILING DIFFUSER, CONDENSATE DRAIN

CENTER OF CURVATURE, CENTER TO CENTER

CONDUIT

CHEMICAL DRAIN LINE

CHEMICAL FEEDER

CHECK VALVE, SWING

CHECK VALVE, FLAP

CHAIN LINK

CENTER LINE

CHECK VALVE, BALL

CAST IRON

CHECKERED PLATE

CHECK VALVE, ANGLE

CAST IRON PIPE

DOWN

DIAPHRAGM SEAL

DOOR OPENING

DITTO

DAMPER

DEIONIZED WATER

DISCHARGE

DOOR LOUVER

DEAD LOAD, DRAIN LINE

DIAPHRAGM VALVE

DUCT HEATER UNIT

DUST COLLECTOR

DEWATERING DRAIN

DISTILLED WATER

DISTILLED WATER, DOOR SWITCH

DRIP TRAP

DOOR, DRAIN

DIGESTED SLUDGE, DOWN SPOUT

DRAIN VALVE

DUCTILE IRON PIPE

DEPTH, DIGITAL OR DISCRETE, DRAIN

CUBIC YARD

DOUBLE

DRIVEWAY

COMBINATION WASTE AND VENT

COPPER PIPE

CUBIC

COLD WATER

CHECK VALVE

DESICCANT DRYER

DIFFUSER

DIAGONAL

DIMENSION

DIGESTER

DIAMETER

DETAIL

DEGREE

DOOR GRILLE

DECANT/FILTRATE

SOUTH, SWITCH, SLOPE

CL

PL

FLOOR, FLOW LINE

SST

FOB

FOT

FLAT ON BOTTOM

FLAT ON TOP

BWCCP BAR-WRAPPED CONCRETE CYLINDER PIPE

RCCP REINFORCED CONCRETE CYLINDER PIPE

FLUSHING WATER, FINISHED WATER

BOTTOM OFBO

ESMT EASEMENT

TOP OF WALLT.O.W.RER REACTOR

R RISER

CHECKED

DRAWN

DESIGNED

203515

JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

PROJECT NO.

LA

ST

S

AV

ED

B

Y:

FILE NAME:

00G05GENERAL

DESIGN CRITERIA

203515_00G05.dwg rli ns en m an n

203515-100000PROJECT NO. 203515

FROM ML

SPLITTER BOX 1

TO PROCESS BUILDING

SECONDARY

CLARIFIER 4

SECONDARY

CLARIFIER 3

SECONDARY

CLARIFIER 2

SECONDARY

CLARIFIER 1

R A S

SC

R A S

R A S

R A S

S E

FF

SCUM PUMP

SCUM VAULT 1

SC

SC

S C

SC

SC 1 & 2 SCUM

MANHOLE 2

NPW

FROM PROCESS

BUILDING

NPW

FROM NPW

PUMPS

SCUM PUMP

SCUM VAULT 2

SC

FROM ML

SPLITTER BOX 1

FROM ML

SPLITTER BOX 2

FROM ML

SPLITTER BOX 2

S E

FF

FROM NPW

PUMPS

SE

FF

SE

FF

N P

W

TO SOLIDS

HANDLING

BUILDING

TO SOLIDS

HANDLING

BUILDING

COMBINED

WAS AND SC

COMBINED SCUM

MANHOLE 1

TO UV

BUILDING

GENERAL NOTES:

1. NOT ALL PIPING CONNECTIONS AND ACCESSORIES ARE SHOWN.

REFER TO MECHANICAL AND CIVIL DRAWINGS FOR PIPING DETAILS.

SEE P&IDS FOR INSTRUMENTATION REQUIREMENTS.

KEY NOTES:

1. A PORTION OF SCUM DISCHARGE PIPING FROM SCUM VAULT 1 IS

ROUTED THROUGH EX 8" SC GRAVITY LINE. SEE MECHANICAL AND

CIVIL DRAWINGS FOR DETAILS.

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

DATEREV BY DESCRIPTION

DATE

CHECKED

DRAWN

DESIGNED JOB NO.

DRAWING NO.

SHEET NO.

VERIFY SCALES

IF NOT ONE INCH ON

THIS SHEET, ADJUST

SCALES ACCORDINGLY

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

OF

FILE NAME:

XX

P L O

T D

A T

E

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

203515

/1

/2

:4 :5

P

M

Autodesk Docs://Boxelder SD 203515-100000 Predesign/203515_40M0801.rvt

40G01

SCUM PUMPING

PROCESS FLOW DIAGRAM

GENERAL

Checker

RDL

PKN

M

M

M

TO DIGESTERS 1

PR

TDS

VOLUTE

THICKENER 1

FLOC

TANKDS

P R

DS

DIGESTED SLUDGE

PUMP 1

FROM DIGESTER 1

DIGESTED SLUDGE

PUMP 2

FROM DIGESTER 2

DIGESTED SLUDGE

PUMP 3

VOLUTE DEWATERING PRESS 1

VOLUTE DEWATERING PRESS 2

D S

POLYMER SKID FOR

RECUPERATIVE

THICKENING

THICKENED SLUDGE PUMP

TDS

TO DIGESTERS 2

FROM SCUM

VAULTS 1 & 2

FROM WAS PUMPS

GENERAL NOTES:

1. NOT ALL PIPING CONNECTIONS AND ACCESSORIES ARE SHOWN.

REFER TO MECHANICAL AND CIVIL DRAWINGS FOR PIPING DETAILS.

SEE P&IDS FOR INSTRUMENTATION REQUIREMENTS.

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

DATEREV BY DESCRIPTION

DATE

CHECKED

DRAWN

DESIGNED JOB NO.

DRAWING NO.

SHEET NO.

VERIFY SCALES

IF NOT ONE INCH ON

THIS SHEET, ADJUST

SCALES ACCORDINGLY

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

OF

FILE NAME:

XX

P L O

T D

A T

E

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

203515

/4

/2

:4

:4

P

M

Autodesk Docs://Boxelder SD 203515-100000 Predesign/203515_80M0801.rvt

80G01

THICKENING

PROCESS FLOW DIAGRAM

GENERAL

Checker

Designer

HOT WATER

HEATER

HOT WATER

HEATER

E Y

E W

A S

H S

T A

T

IO

N

DILUTION WATER

TANK 1

DILUTION WATER

TANK 2

DILUTION WATER

PUMP 1

DILUTION WATER

PUMP 2

TO POLYMER SKID

PW BOOSTER PUMP

SECOND FLOOR

FIRST FLOOR

NPW

PW

PW

HW

HOSE BIBB

BFP

DRAIN TO FLOOR DRAIN

HW

TO POLYMER SKID FOR

RECUPERATIVE THICKENING

TO POLYMER SKID

FOR DEWATERING 1

TO POLYMER SKID

FOR DEWATERING 2

PW

PW

PW

P W

P W

HOSE BIBB

HOSE BIBB

H

W

H W

PW

NPW

BFP

TO POLYMER SKID

GENERAL NOTES:

1. NOT ALL PIPING CONNECTIONS AND ACCESSORIES ARE SHOWN.

REFER TO MECHANICAL AND CIVIL DRAWINGS FOR PIPING DETAILS.

SEE P&IDS FOR INSTRUMENTATION REQUIREMENTS.

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

DATEREV BY DESCRIPTION

DATE

CHECKED

DRAWN

DESIGNED JOB NO.

DRAWING NO.

SHEET NO.

VERIFY SCALES

IF NOT ONE INCH ON

THIS SHEET, ADJUST

SCALES ACCORDINGLY

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

OF

FILE NAME:

XX

P L O

T D

A T

E

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

203515

/1

/2

:3

:3

A

M

Autodesk Docs://Boxelder SD 203515-100000 Predesign/203515_80M0801.rvt

80G02

DILUTION WATER

PROCESS FLOW DIAGRAM

GENERAL

Checker

Author

POLYMER SKID FOR

DEWATERING 1

POLYMER SKID FOR

DEWATERING 2

POLYMER SKID FOR

RECUPERATIVE

THICKENING

NEAT

POLYMER

TOTE

NEAT

POLYMER

TOTE

TO VOLUTE SCREW PRESS 1

POS

POS

POS

POS

NP

P O

S

TO VOLUTE SCREW PRESS 2TO VOLUTE THICKENER 1

POS

PW PW PW

FROM DILUTION WATER PUMP 1

FROM DILUTION WATER PUMP 2

GENERAL NOTES:

1. NOT ALL PIPING CONNECTIONS AND ACCESSORIES ARE SHOWN.

REFER TO MECHANICAL AND CIVIL DRAWINGS FOR PIPING DETAILS.

SEE P&IDS FOR INSTRUMENTATION REQUIREMENTS.

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

DATEREV BY DESCRIPTION

DATE

CHECKED

DRAWN

DESIGNED JOB NO.

DRAWING NO.

SHEET NO.

VERIFY SCALES

IF NOT ONE INCH ON

THIS SHEET, ADJUST

SCALES ACCORDINGLY

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

OF

FILE NAME:

XX

P L O

T D

A T

E

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

203515

/1

/2

:3

:5

A

M

Autodesk Docs://Boxelder SD 203515-100000 Predesign/203515_80M0801.rvt

80G03

POLYMER WATER

PROCESS FLOW DIAGRAM

GENERAL

Checker

CHECKED

DRAWN

DESIGNED

203515

JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

PROJECT NO.

LA

ST

S

AV

ED

B

Y:

FILE NAME:

RDL

00GD01DEMOLITION

GENERAL NOTES

203515_00GD01.dwg rli ns en m an n

203515-100000

GENERAL:

1. GENERAL DEMOLITION NOTES APPLY TO ALL DEMOLITION DRAWINGS.

2. NOT ALL PENETRATIONS ARE SHOWN. GENERALLY, ONLY PENETRATIONS 12” AND

GREATER IN DIAMETER ARE SHOWN ON THE DEMOLITION DRAWINGS. NUMEROUS SMALL

DIAMETER (<12ӯ) PIPE AND CONDUITS PENETRATE THE CONCRETE BUT ARE NOT

SPECIFICALLY DETAILED ON THE DEMOLITION OR STRUCTURAL DRAWINGS. COORDINATE

REQUIRED OPENINGS WITH CIVIL, ELECTRICAL, MECHANICAL AND INSTRUMENTATION AND

CONTROL DRAWINGS.

3. NOT ALL DISCIPLINE RELATED DEMOLITION MAY BE SHOWN ON AREA DEMOLITION

DRAWINGS. SEE ARCHITECTURAL, HVAC/PLUMBING, AND ELECTRICAL DEMOLITION

DRAWINGS FOR ADDITIONAL DEMOLITION DETAILS, IF APPLICABLE.

EXISTING CONDITIONS:

1. DIMENSIONS, WALL THICKNESSES, FOUNDATIONS, PIPING, AND OTHER DETAILS SHOWN

ON THESE PLANS WERE TAKEN FROM RECORD DRAWINGS PROVIDED BY THE OWNER.

ACTUAL DIMENSIONS AND CONDITIONS MAY VARY.

2. FIELD VERIFY ALL EXISTING DIMENSIONS, ELEVATIONS, PIPING AND CONDITIONS RELATED

TO WORK PRIOR TO DEMOLITION, SHOP DRAWING PREPARATION AND FABRICATION.

3. NOTIFY ENGINEER IMMEDIATELY IF ANY OF THE FOLLOWING ARE EXPOSED:

3.a. SIZES OR DIMENSIONS DIFFERING FROM THE CONTRACT DOCUMENTS.

3.b. DAMAGE OR DETERIORATION TO MATERIALS AND COMPONENTS.

3.c. CONDITIONS OR DETAILS DIFFERENT FROM THOSE SHOWN ON THE DRAWINGS.

PROCEDURES:

1. PERFORM DEMOLITION PER SPECIFICATION SECTION 01_35_21 - SELECTIVE ALTERATION

AND DEMOLITION.

2. DEMOLITION WILL BE COMPLETED IN PHASES. SEE SPECIFICATION SECTION 01_14_00 –

WORK RESTRICTIONS.

3. MAINTAIN FACILITIES IN SERVICE AS DIRECTED BY THE ENGINEER AND AS STIPULATED IN

SPECIFICATION SECTION 01_14_00 – WORK RESTRICTIONS.

4. PRIOR TO ANY WORK, COORDINATE DEMOLITION WITH THE OWNER AND ENGINEER AND

SUBMIT METHOD OF PROCEDURES AS REQUIRED IN SPECIFICATION SECTION 01_14_00 –

WORK RESTRICTIONS.

5. BEFORE STARTING DEMOLITION AND CONSTRUCTION, FIELD VERIFY DEMOLITION LIMITS.

6. PROTECT IN PLACE ITEMS THAT ARE NOT DESIGNATED TO BE DEMOLISHED OR MODIFIED.

SHOULD SUCH ITEMS BECOME DAMAGED DURING THE WORK, REPLACE IN KIND AT NO

COST TO THE OWNER.

7. PROVIDE TEMPORARY SUPPORT FOR PARTIALLY DEMOLISHED AND CONSTRUCTED

STRUCTURES AS REQUIRED TO RESIST TEMPORARY LOADS DURING CONSTRUCTION.

DEMOLITION SCHEDULE SHALL CONSIDER THE STABILITY OF THE STRUCTURE BEING

DEMOLISHED.

8. REROUTE PIPING AND UTILITIES AS REQUIRED ON DRAWINGS AND IN SPECIFICATIONS.

9. IMPLOSION, UNCONTROLLED COLLAPSE, OR RAPID DECONSTRUCTION FACILITATED BY

GRAVITY IS NOT PERMITTED. DEMOLITION SHALL BE ACCOMPLISHED IN A CONTROLLED

MANNER WITH CONVENTIONAL MECHANICAL DEMOLITION EQUIPMENT UNLESS

OTHERWISE AUTHORIZED IN WRITING BY THE ENGINEER.

10. WHEN USING CUTTING EQUIPMENT, DO NOT OVER CUT CORNERS BEYOND THE AREA

DESIGNATED TO BE DEMOLISHED. STOP CUTTING EQUIPMENT SHORT OF CORNERS AND

CORE DRILL AND/OR HAND DEMOLISH.

11. COORDINATE THE SHUTDOWN OF POWER AND ELECTRICAL EQUIPMENT WITH THE OWNER

AND ENGINEER. SEE DIVISION 26 FOR ADDITIONAL ELECTRICAL DEMOLITION

REQUIREMENTS.

12. PRIOR TO DEMOLITION, PROPERLY DISCONNECT PIPING, CONDUIT, WIRING, AND OTHER

ITEMS ASSOCIATED WITH THE DEMOLITION.

13. WHERE DEMOLITION EXPOSES EXISTING MECHANICAL, ELECTRICAL, HVAC, INTERIOR

BUILDING FINISHES OR OTHER ELEMENTS TO THE WEATHER THAT WOULD POTENTIALLY

CAUSE LOSS OF OPERATION, REDUCE EQUIPMENT LIFE, IMPAIR FUNCTIONALITY, OR

OTHERWISE DEGRADE ELEMENTS THAT ARE TO REMAIN, PROVIDE PROTECTION FROM

THE ELEMENTS.

14. WHERE EQUIPMENT AND ASSOCIATED ELECTRICAL APPURTENANCES SCHEDULED FOR

REMOVAL ARE NOT INDICATED FOR REUSE, DEMOLISH JUNCTION BOXES, CONTROL

STATIONS, INSTRUMENTATION, DISCONNECTS, ECT. DEMOLISH CONDUIT BACK TO THE

JUNCTION BOX OR DUCTBANK. DISCONNECT AND REMOVE WIRING FROM SOURCE TO

LOAD. PROVIDE NEW CONDUIT, WEIR, BOXES, DISCONNECTS, INSTRUMENTS,

RECEPTACLES, AND LIGHTING AS SHOWN ON THE ELECTRICAL DRAWINGS.

REPAIR:

1. WHERE DEMOLISHING PIPES OR EQUIPMENT, REMOVE ASSOCIATED SUPPORTS AND

ANCHORS THAT WILL NOT BE REUSED. FOR CARBON STEEL, GALVANIZED, OR CORRODED

STAINLESS STEEL ANCHORS, GRIND BACK 1” FROM SURFACE OF CONCRETE AND FILL

CAVITY WITH EPOXY GROUT. FOR CLEAN STAINLESS STEEL ANCHORS NOT SHOWING

SIGNS OF CORROSION, CUT/GRIND ANCHOR BOLT FLUSH.

2. WHERE DEMOLISHING MECHANICAL OR ELECTRICAL EQUIPMENT, REMOVE ASSOCIATED

CONCRETE PADS AND SUPPORTS UNLESS OTHERWISE INDICATED. GRIND BACK DOWELS

AND REPAIR PER DETAIL S209/TYP.

3. WHERE DEMOLITION EXPOSES REINFORCING BARS THAT WILL NOT BE COVERED BY NEW

CONCRETE, GRIND BARS BACK 1” AND FILL WITH EPOXY GROUT.

4. CAP OR PERMANENTLY SEAL PIPES THAT ARE ABANDONED IN PLACE, USING MATERIALS

ACCEPTABLE TO THE ENGINEER.

5. WHERE DEMOLISHING 12” DIAMETER OR SMALLER PIPES, FILL CMU WALL PENETRATIONS

THAT WILL NOT BE REUSED WITH GROUT UNLESS OTHERWISE NOTED.

6. FOR EQUIPMENT NOTED FOR DEMOLITION, DEMOLISH ASSOCIATED WIRE, EXPOSED

CONDUIT, DISCONNECTS, CONTROL STATIONS AND CONTROL PANELS. CUT ASSOCIATED

EMBEDDED CONDUITS FLUSH WITH FLOOR/WALL AND CAP PER DETAIL EM105/TYP.

7. WHERE DEMOLITION REQUIRES THE REMOVAL OF CONCRETE AND/OR MISCELLANEOUS

MATERIALS BELOW THE PROPOSED FINISHED GRADE, BACKFILL WITH SELECT FILL TO

PROPOSED GRADE UNLESS NOTED OTHERWISE. IN AREAS WHERE NO STRUCTURE IS

PROPOSED, BACKFILL WITH NATIVE FILL TO WITHIN ONE FOOT OF FINAL GRADE AND

FINISH PER CIVIL DRAWINGS.

DISPOSAL:

1. PAY FEES ASSOCIATED WITH PROPER DISPOSAL OF THE DEMOLISHED STRUCTURES AND

FACILITIES.

2. REMOVE BROKEN CONCRETE AND BUILDING MATERIALS FROM THE PLANT SITE AND DO

NOT USE AS BACKFILL.

3. DEMOLITION PLAN SHALL INCLUDE SEQUENCING AND DESIGN OF SECTIONING OR SIZING

DOWN OF DEMOLISHED ITEMS INTO SMALLER ELEMENTS FOR PROPER AND SAFE

REMOVAL.

4. OWNER HAS FIRST RIGHT OF REFUSAL ON DEMOLISHED MATERIALS AND EQUIPMENT.

5. DISPOSE OF UNWANTED ITEMS IN ACCORDANCE WITH LOCAL LAWS AND REGULATIONS.

PROJECT NO. 203515

ST

S

AV

ED

B

Y:

FILE NAME:

Pl ot

D at e:

DES

DWN

CHK

00D01

X

DEMO

SITE DEMO PLAN

203515_00D01.DWG

C H

U

ST

ED

202594

/9

/2

9:

:2

AM

SCALE

KEY PLAN

KEY PLAN

NORTH

GENERAL NOTES:

1. CONTRACTOR SHALL FIELD VERIFY LOCATION,

SIZE, AND MATERIALS FOR EXISTING PIPING AND

EQUIPMENT AS NECESSARY PRIOR TO BEGINNING

WORK.

2. CONTRACTOR SHALL COORDINATE ALL

CONSTRUCTION ACTIVITIES WITH OWNER IN

ACCORDANCE WITH THE CONSTRUCTION

SEQUENCE PROVIDED IN SPECIFICATION

SECTION XX_XX_XX - WORK RESTRICTIONS.

40'20'0 10'

SCALE: 1" = 20'

usanorth811.org

KEY NOTES:

1. DEMO EXISTING MANHOLE. SEE DWGS 00D02 FOR

DETAILS.

2. DEMO EX 8" SC FROM SECONDARY CLARIFIER TO

NEW SCUM VAULT. PROTECT STUB OUT FROM

SECONDARY CLARIFIER FOR NEW CONNECTION.

SEE DWG 00C20 FOR NEW YARD PIPING.

3. DEMO PORTION OF EX 8" SC AS NECESSARY FOR

CONNECTION TO NEW SCUM VAULT.

4. DEMO PORTION OF 4" NPW AS NECESSARY FOR

CONNECTION TO NEW 4" NPW.

5. DEMO PORTION OF 8" WAS AS NECESSARY FOR

CONNECTION TO NEW SCUM LINES.

6. DEMO EXISTING MANHOLE AND PORTION OF EX-8"

SC FROM SECONDARY CLARIFIERS AS

NECESSARY. SEE DWGS 00D02 FOR DETAILS.

7. SUPPORT AND PROTECT EXISTING SECONDARY

EFFLUENT LINE AND ELECTRICAL DUCT BANK

DURING EXCAVATION.

DATEREV BY DESCRIPTION

DATE

CHECKED

DRAWN

DESIGNED

203515

JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

EX. 8" SC

EX. 8" SC

EX. 8" SC

EX. 24" SEFF

EX. 24" SEFF

EX. 4" NPW

EX. 8" WAS

EX. 4" NPW

EX. ELEC

EX. 10" SNT

EX. 4" SNT

B 00D02

SECONDARY

CLARIFIER NO. 4

OXIDATION DITCH

SECONDARY

CLARIFIER NO. 3

SECONDARY

CLARIFIER NO. 2

SECONDARY

CLARIFIER NO. 1

A 00D02

SOLIDS HANDLING

BUILDING

DIGESTER NO. 2

DIGESTER NO. 1

OXIDATION DITCH

ST

S

AV

ED

B

Y:

FILE NAME:

Pl ot

D at e:

DES

DWN

CHK

00D02

X

DEMO

SITE DEMO SECTION AND DETAILS

203515_00D02.DWG

C H

U

ST

ED

202594

/2

/2

9:

:2

AM

SCALE

KEY PLAN

GENERAL NOTES:

1. CONTRACTOR SHALL FIELD VERIFY LOCATION,

SIZE, AND MATERIALS FOR EXISTING PIPING AND

EQUIPMENT AS NECESSARY PRIOR TO BEGINNING

WORK.

2. CONTRACTOR SHALL COORDINATE ALL

CONSTRUCTION ACTIVITIES WITH OWNER IN

ACCORDANCE WITH THE CONSTRUCTION

SEQUENCE PROVIDED IN SPECIFICATION

SECTION XX_XX_XX - WORK RESTRICTIONS.

3. EXTENT OF EXISTING MANHOLE AND SCUM LINE

DEMO WILL BE BASED ON THE DIMENSIONS OF

NEW SCUM VAULT WHICH WILL BE INSTALLED IN

THE SAME LOCATION (TYP 2). REFER TO 40M02

FOR NEW SCUM VAULT DIMENSIONS.

usanorth811.org

DATEREV BY DESCRIPTION

DATE

CHECKED

DRAWN

DESIGNED

203515

JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

JANUARY 2025

BOXELDER SANITATION DISTRICT

THICKENING AND SCUM PUMPING PREDESIGN

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

INTERMEDIATE DESIGN

SUBMITTAL

NOT FOR CONSTRUCTION

SCALE:

FILE:

PLAN

FILE

1/2" = 1'A

EXISTING CLARIFIER 1 & 2

SCUM MANHOLE

SCALE:

FILE:

PLAN

FILE

1/2" = 1'B

EXISTING CLARIFIER 3 & 4

SCUM MANHOLE

PHOTO

FILE:

FILE

PHOTO

FILE:

FILE

RIM ELE 4876.93 ±

7' -0

EX. 8" SC

EX. 8" SC, INV EL 4869.89 ±

EX. 8" SC, INV

EL 4869.79 ±

EX. 8" SC, INV EL 4870.36 ±

EX. 8" SC, INV EL 4870.20 ±

4' -0

FROM CLARIFIER 4

FROM CLARIFIER 3

TO COMBINED

SCUM MANHOLE 1

TO CLARIFIER 1 & 2

SCUM MANHOLE 2

FROM CLARIFIER 1

FROM CLARIFIER 2

4'-0"

4'-0"

SCALE:

FILE:

SECTIONC

SCALE

FILE

EXISTING CLARIFIER 1 & 2

AND 3 & 4 SCUM MANHOLES

B

80DM02

D

80DM02

C

80DM02

SCUM PUMP

8" WAS

8" PR

4" DS

DIGESTED SOLIDS PUMP 1

DIGESTED SOLIDS PUMP 2

SOLIDS HANDLING BUILDING

LOWER LEVEL

GENERAL NOTES:

1. CONTRACTOR SHALL FIELD VERIFY LOCATION, SIZE AND MATERIALS

FOR EXISTING PIPING AND EQUIPMENT AS NECESSARY PRIOR TO

BEGINNING WORK.

2. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES

WITH OWNER IN ACCORDANCE WITH THE CONSTRUCTION

SEQUENCE PROVIDED IN SPECIFICATION SECTION XX_XX_XX - WORK

RESTRICTIONS.

KEY NOTES:

1. REMOVE AND SALVAGE EXISTING SCUM PUMP. DEMO ALL PIPING

DOWNSTREAM OF THE SCUM PUMP CONNECTING TO WAS LINE.

2. REMOVE REDUCER AND BLIND FLANGE THE EXISTING 4" SCUM PIPE.

INSTALL PIPE TAP WITH FLUSHING CONNECTION ON BLIND FLANGE.

3. REMOVE SECTION OF PIPE AS SHOWN.

4. REMOVE 8" ELBOW.

5. REMOVE 3" TEE

1 2 3 4 5…