2025 Contractor Prequalification SOQ Final.pdf
PDF 9 MB Posted
- Attached to
- Wastewater Treatment Plant Upgrade
- Solicitation number
- 2025-01
- Issued by
- Larimer County, Colorado
About this file
This document is a Request for Qualifications (RFQ) issued by the Boxelder Sanitation District in Colorado for a Wastewater Treatment Plant Upgrade project. The district is seeking Letters of Interest and Statements of Qualifications from General Contracting firms with demonstrated experience in constructing wastewater treatment plants. The project involves upgrading the existing wastewater treatment plant, specifically focusing on two main components: 1) demolishing and replacing existing collection manhole structures with prebuilt pump stations, routing effluent through the existing gravity system via pressurized line, and 2) installing a recuperative thickener with upgrades to polymer feed, potable water lines, and non-potable water lines. The RFQ timeline indicates that responses are due on May 16, 2025 at 2:00 p.m., with notification of pre-qualified firms expected by May 28, 2025. The district plans to use the Construction Manager at Risk (CM@R) delivery method, with the selected General Contractor participating in a collaborative team-based approach.
The project will be implemented in phases, including a design and construction phase, start-up phase, and post-construction phase. The district will select a General Contractor no later than the completion of the 60% design phase, and the contractor will provide pre-construction services such as cost estimating, scheduling, constructability reviews, and value engineering. The goal is to contract with the selected General Contractor using a Guaranteed Maximum Price (GMP) for the project. The anticipated project schedule includes issuing a Notice to Proceed and GMP Contract in February 2026, with construction expected to start in March 2026. Contractors must meet specific eligibility criteria, including demonstrated wastewater treatment plant construction experience, a verifiable performance record, a significant regional business office in the area, Colorado business registration, and sufficient performance and payment bonding capacity.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOXELDER SANITATION DISTRICT
WASTEWATER TREATMENT PLANT UPGRADE
CONTRACTOR REQUEST FOR LETTER OF INTEREST AND STATEMENT OF
QUALIFICATIONS
INTRODUCTION
Boxelder Sanitation District (District) through this Request for Qualifications (RFQ) is seeking Letters of Interest and Statements of Qualifications (SOQs) from General Contracting firms with demonstrated experience and success in the construction of wastewater treatment plants, who are willing to work as a team member with District staff and its Design Engineer to design and construct an upgrade to its existing wastewater treatment plant (Project).
The District intends to prequalify a selected group of General Contractors who will be invited to submit proposals to provide design assistance (e.g., constructability consultation) and construction of the Project as further described herein.
Notwithstanding anything to the contrary herein, the District has no obligation to make a selection of prequalified contractors based on this RFQ and may terminate the selection process at any time. The District retains the discretion to modify, expand or delete any portion of the Project outlined in this RFQ. The District reserves the right to reject any or all of the responses to this RFQ without cause and accept any response that, in the District’s sole judgment, will be in the best interest of the District. The District assumes no responsibility for payment of any expenses incurred by a respondent to this RFQ.
PROJECT OVERVIEW:
The Project consists of upgrading the existing District WWTP scum collection system and the installation of a recuperative thickening system. The Project will occur at the existing District plant site located approximately one mile south and west of the intersection of Interstate 25 and Prospect Road near Ft. Collins, Colorado.
The District hired Carollo Engineers as the Design Engineer for the project and has currently completed the preliminary design phase.
PROJECT DESCRIPTION:
The general and conceptual description of the major facilities required for the Project include:
1. Scum Collection System: Demo and replace existing collection manhole structures with prebuilt pump stations. Effluent from prebuilt structures will be routed through existing gravity system via pressurized line.
2. Recuperative Thickening: Installation of recuperative thickener. Includes upgrades to polymer feed, potable water lines, and non-potable water lines.
Included in the documents are conceptual drawings showing the proposed improvements. The drawings are found in the Appendix and include Predesign Drawings. These drawings are of conceptual nature and are only intended to provide the proposers with general information about the scope of the project.
Wastewater Treatment Plant Upgrade Contractor Statement of Qualifications
April 21, 2025
OWNER INFORMATION:
The Boxelder Sanitation District is a statutory special district and political subdivision of the State of Colorado. Its sole function is to provide sanitary sewer service to customers within lands included in the District. It currently serves approximately 19,500 residents in Ft. Collins, Timnath and surrounding properties within Larimer County.
PROJECT APPROACH:
The District plans to implement the Project using the Construction Manager at Risk (CM@R) method of delivery. The selected General Contractor will participate in this collaborative, team-based delivery of the Project. The team will include the Owner, the Design Engineer, the General Contractor and major equipment suppliers, regulators, and specialty consultants as needed.
The phases of the Project as envisioned are:
A. Design & Construction Phase
1. Preliminary Design Engineering (30% design)
2. Select General Contractor
3. Final Design (with Owner, Design Engineer, Contractor and Consultant(s) working collaboratively to complete design)
a. Construction Guaranteed Maximum Price (GMP) contracting anticipated to be used installation of all work on the project B. Start-Up Phase
C. Post-Construction Phase The General Contractor will be selected as soon as possible and no later than at the completion of the 60% design phase. The selected General Contractor shall provide design phase pre-construction services, including but not limited to: cost estimating, scheduling, constructability reviews, and value engineering. The District will negotiate compensation for these services with the General Contractor.
The goal of the District is to contract with the selected General Contractor for the construction of the designed Project, using a Guaranteed Maximum Price (GMP) for the project, sometime prior to final completion of the design. Should the selected General Contractor and the District not achieve agreement on a GMP construction contract the District may then seek other General Contractors or revise the construction-phase scope of work at that time.
PROJECT (MILESTONE) SCHEDULE:
The Project schedule has been completed for the preliminary design phase (up through 30% design) at this time. Selection of the Contractor and start of construction dates will be finalized as the design progresses. Listed below are anticipated Project milestone dates which should aid Respondents in planning their efforts accordingly.
Issue Public Announcement for Contractor RFQ: April 21, 2025
RFQ Responses Due: May 16, 2025 2:00 p.m.
Notification of Pre-Qualified Firms: May 28, 2025
April 21, 2025
Anticipated Issue Request for Proposals to Pre-Qualified Contractors: May 29, 2025
Anticipated RFP Responses Due: June 25, 2025
Anticipated Evaluate Proposals and Interview Firms (At Discretion of District): June 25 – July 2, 2025
Anticipated Finalize Selection and Issue Notice of Award July 11, 2025
Design Assist Phase July 11, 2025 – January 17, 2026
Anticipated Issue Notice to Proceed, GMP Contract February 15, 2026
Anticipated Start of Construction, GMP Contract March 15, 2026
SCOPE OF SERVICES:
The anticipated scope of services to be provided by the selected General Contractor is outlined as follows.
Design Phase Services by the General Contractor may include:
• Work as a member of the team with the District and Design Engineer;
• Provide detailed independent cost estimating and knowledge of market conditions;
• System constructability recommendations;
• Provide project construction planning and scheduling;
• Provide alternate systems constructability evaluation and studies;
• Advise the District of ways to gain efficiency in project delivery;
• Provide long-lead procurement studies and possibly initiate procurement of long-lead items;
• Assist in the permitting process; and
• Protect the District with input including sensitivity to quality, safety, and environmental factors.
Construction Phase Services by the General Contractor may include:
• Construct the designed improvements;
• Coordinate with various regulatory agencies, utility companies and similar entities;
• Arrange for procurement and/or acceptance of procured materials and equipment;
• Schedule and manage site operations;
• Provide quality controls;
• Bond and insure the construction in accordance with Contract requirements;
• Address all federal, state and local permitting requirements;
April 21, 2025
• Deal with Owner’s issues including public information, safety and traffic issues; and
• Maintain a safe work site for all project participants Post Construction Phase Services by the General Contractor may include:
• Startup of facility;
• Plant operator training;
• Warranty work follow up and completion; and
• Completion of project to regulatory permit requirement
QUALIFICATIONS FOR ELIGIBILITY
To be considered eligible for prequalification, General Contractors responding to this RFQ (Respondents) must meet the following minimum criteria:
1. Demonstrated wastewater treatment plant construction experience including construction of activated sludge treatment processes;
2. A verifiable record of successful past performance in both the alternate project delivery approach as well as the design-bid-build approach.
3. Demonstrate a significant regional business office located in the region;
4. Registered to do business in the State of Colorado; and
5. Sufficient performance and payment bonding capacity.
RFQ SUBMITTALS REQUIREMENTS
Each Respondent must provide the information outlined below. Respondent must clearly demonstrate in their information that they meet the criteria referred in the preceding section, “QUALIFICATIONS FOR ELIGIBILITY”.
Statement of Qualifications:
Submit a formal letter and SOQ signed by an officer/principal of the firm. The letter and SOQ should be limited to no more than 20 pages (excluding resumes, supplemental marketing pieces and answers to general questions listed below). The letter and SOQ shall be printed double-sided using 8-1/2” x 11” format and minimum 11 point font. Clearly tab individual sections for reference following the format described below:
1. Letter of Interest: Provide a letter of interest notifying the District of the Respondent’s intent to be considered for the Project.
a. State reasons why the firm should be invited to submit a Proposal.
b. Provide a commitment from an officer of the firm, stating that if pre-qualified, the firm intends to aggressively pursue the project.
2. General Information: Provide a brief firm overview. Please be sure to include number of years in business and total staff. (If firm has more than one office, please provide information ONLY for the local office that will be responsible for performing the work).
Identify key staff that would be available to lead the team’s services throughout the project. Include at a minimum the principal-in-charge, lead estimator, day-to-day project manager and on-site superintendent.
April 21, 2025
a. State proposed roles and responsibilities of key project staff. Do not include department heads unless they will actually be directly involved in the day-to-day activities. Please include current office location of each key staff member.
b. Provide proof of Liability Insurance and Bonding for this project.
3. Project Experience: Provide list of WWTP projects completed using CMAR delivery methodology and firm’s understanding of the process and experiences.
a. Demonstrate firm’s understanding and experience working in an Open Book, collaborative GMP delivery method and process.
b. Provide a list of all WWTP project experience for projects completed within the last 5 years in the Rocky Mountain region (i.e., Colorado, Wyoming, New Mexico, Nebraska) using alternate project delivery and traditional project delivery. Include the name of the project, location, general description, year completed, construction cost (if available) and the roles of any of the proposed staff members had on the project.
Include owner/engineer contact information for completed projects as well as the engineer of record. Please include contact information for the owner’s and engineer’s assigned resident project representatives (or assigned construction representatives).
4. Safety Record
a. Provide a description of the firm’s safety program.
b. Provide three year history of workers compensation experience modifier and insurance carrier documentation supporting ratings.
5. References and Resumes
a. Provide a list of general references.
b. Resumes (outside the 20 page limit): Include resumes of key staff that will be committed to the project, if short-listed. Include references for each staff proposed.
SUBMITTALS:
Submittal Due Date and Time: All SOQ responses are due to the District on May 16, 2025, 2:00 p.m. Submit, in a sealed envelope labeled “Boxelder Sanitation District Wastewater Treatment Plant Upgrade Contractor Statement of Qualifications”, five (5) hard copies and one
(1) electronic version on compact disc (CD) or flash drive in Adobe format (.pdf), of SOQ response to:
Dan Richardson, District Engineer Boxelder Sanitation District 3201 E. Mulberry, Unit Q P.O. Box 1518 Ft. Collins, Colorado 80522
Information and Questions: Direct all questions in writing to Dan Richardson, District Engineer: drichardson@boxeldersanitation.org. Answers to all questions will be distributed to all Respondents via email. Deadline for submitting questions is 4:00 PM, May 7, 2025. The District will issue a final response to questions no later than the end of business day, May 9, 2025.
April 21, 2025
Right of Refusal: The Owner reserves the right to reject any and all submittals. Late submittals will not be accepted. The Owner may also waive any and all formalities during the selection process.
April 21, 2025
Appendix
PROJECT NO.
LA
ST
S
AV
ED
B
Y:
FILE NAME: 203515_00G01.dwg rli ns en m an n
203515
203515
DRAWING NO.
JOB NO.
SHEET NO.
00G01
BOXELDER SANITATION DISTRICT
JANUARY 2025
VOLUME 1 OF 1
LOCATION MAPVICINITY MAP
THICKENING AND SCUM PUMPING PREDESIGN
10 11 12 135 6 7 8 91 2 3 4
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
PROJECT NO. 203515
PROJECT ADDRESS:
2705 SW I-25 FRONTAGE RD
FORT COLLINS, CO 80525
PROJECT
LOCATION
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
203515
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
PROJECT NO.
LA
ST
S
AV
ED
B
Y:
FILE NAME:
00G02GENERAL
DRAWING INDEX
203515_00G02.dwg rli ns en m an n
X - INDICATES DRAWINGS NOT CONTAINED IN THIS SUBMITTAL
SHEET
NO.
DRAWING
NO. DESCRIPTION
PROJECT NO. 203515
SHEET
NO
DWG
NO
00G01 00G02 00G03 00G04 00G05 40G01 80G01 80G02 80G03
00GD01
00D01 00D02
80DM01
80DM02
00GC01
00C20
00GS01
00GM01
00GM02
40M01 40M02 80M01 80M02 80M03 80M04
00GE01
00GE02
03E02 04E01
00GN01
00GN02
00GN03
00GN04
00GN05
00GN06
00GN07
03N01 46N01 47N01 80N01 80N02 80N03 80N04
DESCRIPTION
(G) - GENERAL
COVER SHEET
DRAWING INDEX
GENERAL NOTES, LEGENDS AND SYMBOLS
ABBREVIATIONS
DESIGN CRITERIA
SCUM PUMPING PROCESS FLOW DIAGRAM
THICKENING PROCESS FLOW DIAGRAM
DILUTION WATER PROCESS FLOW DIAGRAM
POLYMER WATER PROCESS FLOW DIAGRAM
(D) - DEMOLITION
DEMOLITION GENERAL NOTES
SITE DEMO PLAN
SITE DEMO SECTIONS AND DETAILS
SOLIDS HANDLING BUILDING DEMOLITION LOWER PLAN
SOLIDS HANDLING BUILDING DEMOLITION DETAILS
(C) - CIVIL
CIVIL GENERAL NOTES, LEGENDS, AND SYMBOLS
YARD PIPING PLAN 1
(S) - STRUCTURAL
STRUCTURAL GENERAL NOTES, LEGEND, AND SYMBOLS
(M) - MECHANICAL
MECHANICAL GENERAL NOTES, LEGENDS AND SYMBOLS
PIPE AND PUMP SCHEDULE
SCUM VAULT PLAN
SCUM VAULT SECTIONS AND DETAILS
SOLIDS HANDLING BUILDING LOWER PLAN
SOLIDS HANDLING BUILDING UPPER PLAN
SOLIDS HANDLING BUILDING SECTIONS AND DETAILS 1
SOLIDS HANDLING BUILDING PHOTOS
(E) - ELECTRICAL
ELECTRICAL GENERAL NOTES, LEGENDS, AND SYMBOLS
ABBREVIATIONS
SH-MCC1 ONE-LINE DIAGRAM
PANELBOARD SCHEDULES
(N) - INSTRUMENTATION
SYMBOLS AND ABBREVIATIONS 1
SYMBOLS AND ABBREVIATIONS 2
SYMBOLS AND ABBREVIATIONS 3
SYMBOLS AND ABBREVIATIONS 4
SCHEMATIC SYMBOLS
SAMPLE LOOP DRAWING
EQUIPMENT TAGGING SYSTEM
NETWORK BLOCK DIAGRAM
SCUM VAULT P&ID 1
SCUM VAULT P&ID 2
DIGESTED SLUDGE PUMPING P&ID
SLUDGE THICKENER POLYMER P&ID
SLUDGE THICKENING P&ID 1
DILUTION WATER P&ID
CHECKED
DRAWN
DESIGNED
203515
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
PROJECT NO.
LA
ST
S
AV
ED
B
Y:
FILE NAME:
CE
CE
00G03GENERAL
NOTES, LEGEND, AND SYMBOLS
203515_00G03.dwg rli ns en m an n
203515
X X
REVISION DELTA
SCALE
FENCE
CENTER LINE
REMOVE AND/OR ABANDON
GATE
EXISTINGNEW
DETAIL REFERENCES HATCH PATTERNS
100'0 50' 200'
(EXIST)
KEY NOTE
EQUIPMENT/DEVICE
TAG AND NUMBER
PIPE TAG
BREAK LINE
TR
UE
N O
R
TH
PL
AN
T
NO
RT
H
30°
NORTH ARROW/PLANT NORTH
UNDERGROUND/
OVERHEAD
WARNING
(STATE/REGION
SPECIFIC)
SYMBOLS
GENERAL NOTES
MATCH LINE
HIDDEN LINE
MATCH LINE SEE DWG ##X##
ELEVATION TOC XXXX.XX
EXISTING ELEVATION
PIPE BREAK
PLAN VIEW
PIPE BREAK
CROSS SECTION
CONSTRUCTION
FUTURE CONSTRUCTION
PIPE CONTINUATION
(SINGLE LINE)
BRACKET
EQUIPMENT
(E) = EXISTING EQUIPMENT
(F) = FUTURE EQUIPMENT
SIZE FLOW STREAM
(E) = EXISTING FLOW STREAM
(F) = FUTURE FLOW STREAM
LINE WORK
T.O.W. XXXX.X±
PIPE SIZE FLOW STREAM
XXX-XX-XXXX
X" XXX
1. FOLLOWING NOTES ARE GENERAL AND APPLY TO ALL SHEETS OF THESE CONTRACT DOCUMENTS AS IF
THEY WERE WRITTEN IN THEIR ENTIRETY ON EACH SHEET.
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS INCLUDING LOCATION AND DIMENSIONS OF ALL EXISTING CONSTRUCTION AND UTILITIES. CONTRACTOR SHALL NOTIFY ENGINEER IF THERE IS A CONFLICT BETWEEN THE CONTRACT
DOCUMENTS AND EXISTING CONSTRUCTION BEFORE PROCEEDING WITH WORK.
3. UNLESS DETAILED, SPECIFIED, OR OTHERWISE INDICATED ON THE DRAWINGS, CONSTRUCTION SHALL BE AS INDICATED IN THE APPLICABLE TYPICAL DETAILS AND GENERAL NOTES. TYPICAL DETAILS SHALL APPLY
EVEN THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS ON DRAWINGS.
4. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART OF WORK. DETAILS SHALL BE
IN THE SAME AS FOR OTHER SIMILAR WORK.
5. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORM WATER DISCHARGE REGULATIONS
AND REQUIREMENTS.
6. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW PIPING AND/OR OTHER PROPOSED UTILITIES, CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING PIPING AND UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR SHALL TEMPORARILY RELOCATE CONFLICTING EXISTING UTILITIES AT TIE-IN/CONNECTION LOCATIONS AND REINSTALL THEM AS REQUIRED TO ELIMINATE THE CONFLICT AT NO ADDITIONAL COST TO THE
OWNER.
7. ALL PIPELINES 12" AND LARGER SHALL HAVE A MINIMUM COVER OF 36" UNLESS THE COVER DEPTH IS SPECIFICALLY INDICATED ON THE DRAWINGS. PIPE SMALLER THAN 12" SHALL HAVE A MINIMUM COVER OF 30" UNLESS NOTED OTHERWISE. PIPES SHALL BE ROUTED AS SHOWN UNLESS MINOR REVISIONS ARE NECESSARY TO MISS EXISTING PIPES, STRUCTURES, ETC. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL FITTINGS AND ADAPTERS REQUIRED TO MAKE THE ROUTING CHANGES AT NO
ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL INCLUDE COST FOR THIS IN THE BID.
8. EXISTING FACILITY AND UTILITY INFORMATION SHOWN ON THE DRAWINGS WAS OBTAINED FROM AVAILABLE RECORDS OR ELECTRONIC FILES. NEITHER THE OWNER NOR ENGINEER ASSUMES ANY RESPONSIBILITY FOR FACILITIES AND UTILITIES NOT SHOWN OR NOT IN THE LOCATION SHOWN.
THE CONTRACTOR SHALL FIELD VERIFY ALL LOCATIONS, SIZES, MATERIAL TYPES, AND ELEVATIONS
SHOWN AROUND OR NEAR AREAS OF NEW CONSTRUCTION PRIOR TO START OF CONSTRUCTION.
9. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT FROM DAMAGE EXISTING FACILITIES AND UTILITIES SHOWN OR NOT SHOWN THAT ARE TO REMAIN IN PLACE.
ALL FACILITIES DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE EXPEDITIOUSLY REPAIRED
OR RECONSTRUCTED TO THE ORIGINAL OR BETTER CONDITION AT THE CONTRACTOR'S EXPENSE
WITHOUT ADDITIONAL COMPENSATION.
10. CONTRACTOR SHALL MAKE CONNECTIONS TO EXISTING PIPE, EQUIPMENT, ETC. AS REQUIRED AND SHALL PROVIDE ALL FITTINGS, ADAPTERS, AND APPURTENANCES REQUIRED TO MAKE THE CONNECTIONS.
PROVIDE ALL SUPPORTS REQUIRED FOR A RIGIDLY SUPPORTED COMPLETE AND WORKING SYSTEM.
11. ADJUST ALL VALVE BOXES, VAULTS, PULL BOXES, AND MANHOLES TO FINISHED GRADE UNLESS OTHER- WISE SHOWN OR DIRECTED. MANHOLES IN OPEN FIELDS SHALL BE SET TWELVE INCHES ABOVE FINISHED
GRADE AND VAULTS SHALL BE SIX INCHES ABOVE FINISHED GRADE.
12. THE CONTRACTOR SHALL CONTACT THE PROPER UTILITY REPRESENTATIVE AS FOLLOWS FOR
QUESTIONS OR COORDINATION OF CONSTRUCTION RELATED TO EXISTING UTILITIES.
STATE/REGION/MUNICIPALITY SPECIFIC: COLORADO
13. CONTRACTOR SHALL VERIFY THAT PIPING SHOWN TO BE ABANDONED OR AS ABANDONED PREVIOUSLY IS NO LONGER IN SERVICE. LINES IN SERVICE SHALL BE MAINTAINED UNTIL NO LONGER REQUIRED BY
THE PLANT.
14. ALL EXISTING PIPES THAT ARE TO BE ABANDONED IN PLACE OR REMOVED MAY NOT BE SHOWN.
WHERE PIPING IS TO BE ABANDONED AND MUST REMAIN IN SERVICE UNTIL COMPLETION OF OTHER PHASES OF WORK, AND IT CONFLICTS WITH NEW PIPING, TEMPORARILY RELOCATE PIPING AS REQUIRED
TO MAINTAIN SERVICE BY THE PLANT.
15. CONTRACTOR SHALL REROUTE THE EXISTING PIPING IF REQUIRED TO MISS THE PROPOSED STRUCTURES.
THE EXISTING PIPE SHALL REMAIN IN SERVICE UNTIL NEW PIPING IS READY TO BE PLACED INTO SERVICE.
DOWNTIME SHALL BE A MAXIMUM OF 2 HOURS, UNLESS SPECIFIED OR SHOWN OTHERWISE.
16. ALL SIDEWALKS TO BE 3'-0" WIDE UNLESS SHOWN OTHERWISE.
17. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS IN THE VICINITY OF ANY OVERHEAD ELECTRIC LINES. CONTRACTOR SHALL ABIDE BY THE NATIONAL ELECTRIC CODE AND ANY REQUIREMENT BY THE
OWNER OF THE ELECTRIC LINES.
18. PROVIDE ALL SHEETING/SHORING REQUIRED TO PROTECT EXISTING STRUCTURES, PIPES AND FACILITIES.
19. CONTRACTOR SHALL VERIFY LOCATION OF ALL ARCHITECTURAL, MECHANICAL, AND ELECTRICAL ITEMS
BEFORE PLACING ANY STRUCTURAL STEEL OR CONCRETE. ALSO, STRUCTURAL DIMENSIONS AND
OPENINGS CONTROLLED BY ARCHITECTURAL, MECHANICAL, OR ELECTRICAL EQUIPMENT SHALL BE
VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.
20. MECHANICAL AND ELECTRICAL EQUIPMENT SUPPORTS, ANCHORAGES, OPENINGS, RECESSES, AND REVEALS NOT SHOWN ON THE STRUCTURAL DRAWINGS, THAT ARE REQUIRED BY OTHER CONTRACT
DRAWINGS, SHALL BE PROVIDED PRIOR TO CASTING CONCRETE.
RUBBER
TREAD PLATE
LANDSCAPING
GRATING
STEEL
ALUMINUM
BRONZE, BRASS,
OR COPPER
BRICK OR BLOCK
MISCELLANEOUS
AGGREGATE BASE
COURSE (ABC)
BEDROCK
CAST IRON OR
FIBERGLASS
CLSM
CONCRETE
(ALL CLASSES)
DRAIN ROCK
STRUCTURAL FILL
OR BACKFILL
WOOD
SPAN
ASPHALT PAVING
GRAVEL
EXISTING/
UNDISTURBED SOIL
SAND OR GROUT
KEY TAG X
VIEW
VIEW
DRAWING CUT ORIGINATION
TYPICAL DETAIL #
FILE:
SCALE:
FILE:
SECTION CUT
TYPICAL DETAIL
REFERENCE
EXTERIOR ELEVATION
VIEWS
PHOTO LOCATION
AGRID BUBBLE
ARROW INDICATES
POINT OF VIEW
- = SHOWN ON SAME DRAWING
##X## = SEE INDICATED DRAWING
DRAWING REFERENCE ##X##
DISCIPLINE DESIGNATOR
SEE INDICATED
DRAWING
SHEETS IN
DETAIL
TYPICAL DETAIL NUMBER
TYPICAL DETAIL TITLE
AREA DESIGNATOR
(WHEN APPLICABLE)
DATE CREATED
(REVISED)
PLAN NOT REFERENCED
MODIFICATION NOTE
S = STANDARD
J = JOB SPECIFIC
R = REVISED
N = NOTE TO TYPICAL DETAIL USER
##X##
SHT # OF #MOD
LINE 2
LINE 1
LINE 3
VER DATE
TYP
C/1 ##X##
FILE
SCALE
C
A FILE
INDICATES LOCATED ON
TYPICAL DETAIL SHEETS
(TYP)
(TYP) - INDICATES THE
TYPICAL DETAIL IS USED IN
MULTIPLE LOCATIONS WITHIN
THE DRAWING
DESCRIPTION
SECTION/DETAIL
PLAN
VIEW DESCRIPTION, AS NECESSARY
SHEET NUMBER
DESCRIPTION
VIEW DESCRIPTION, AS NECESSARY
PLAN/VIEW TITLE
SECTION OR DETAIL
VIEW TITLE W/
REFERENCE
DETAIL OR
ENLARGED PLAN
CALL OUT
ALPHA = SECTION
NUMERIC = DETAIL
ALPHA = ENLARGED PLAN
NUMERIC = DETAIL
TYP
A ##X##
##X##
SEE INDICATED
DRAWING
SEE INDICATED
DRAWING
Know what's below.
Call before you dig.
(E)or (F)
(E)or (F)
GUARDRAIL
CHECKED
DRAWN
DESIGNED
203515
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
PROJECT NO.
LA
ST
S
AV
ED
B
Y:
FILE NAME:
CE
CE
00G04GENERAL
ABBREVIATIONS
203515_00G04.dwg rli ns en m an n
203515
K
W
N
Y
I
Q
A
B
C
J
H
P
S
V
U
R
M
D
F
T
L
E
O
G
GV
GSP
H1E H
GRV
GPM
GPD
GRTG
GR
H2E
HP
HORIZ
HPU
HPA
HGT
HDW
HB
HEF
HDWL
GND
FX
FW
G
FXC
FV
FT or '
FSTN
FUP
FTG
GA
GL
GEN
GM
GLV
GEL
GALV
GAL
GB
GAV
LAV
LAB
LDF
LB(S)
L
JST
ISR
KGV
JT
LDFR
LP
LLV
LPG
LPA
LLH
LG
LF
LL
LHRA
IP
HWR
HWL
HxW
HWS
HW
HSF
HR
HV
HTX
HYD
INSTR
INJ
INV
INSUL
INF
ID
IA
INCL
IN or "
EJ
EIFS
EMBED
EJR
EG
ED
ECU
EFF
EF
EMH
ESEW
ES
EUH
ET
ER
EPS
EP
EQ
EPV
ECC RED
DR
DPV
DRV
DRT
DO
DMS
DMP
do
DN
DS
E
DWL(S)
EC
EA
DWD
DUC
DSW
DW
DUH
FLD
FLA
FLEX
FLE
FL
FILT
FH
FIN FL
FIN
FLG
FRPP
FPP
FS
FRS
FPM
FM
FLR
FO
FND
FG
EXPO
EXP
FAD
EXT
EWH
EW
EVR
EWEF
EWC
FB
FDL
FD
FEFF
FDR
FCU
FC
FBW
FCO
FCA
REG
REF
REJ
REINF
RED
RDL
RD
RECIRC
RDOF
REQD
RHRB
RH
RM
RLS
RG
RES
RF
REV
RCP
PSI
PSG
PT
PSIG
PSF
PRR
PROJ
PS
PRV
PV
QTY
PLW
RAS
R/W or R.O.W.
PVT
PVDF
PVC
PVMT
PVI
SEC
SE
SED
SECT
SDO
SCR
SCR
SDL
SD
SEP
SHT
SHR
SK
SIM
SHDR
SFW
SF
SHD
SG
SCO
RT
RR
RUD
RTF
RPMP
ROT
RO
RPM
RP
RW
SCB
SC
SCFM
SCD
SA
RWW
RWR
S S/W
MOD
MO
MON
MOIST
ML
MIX
MISC
MK
MJ
MOS
NG
NEV
NO., #
NIC
NA
MS
MPM
N
MTD
MIN
MAN
MAINT
MAU
MATL
M
LS
LR
LWL
LT
MAX
MG/L
MFR
MH
MGD
MET
MC
MB
MECH
MD
PLAS
PIV
PMP
PLWD
PI
PERP
PE
PH
PG
PNL(S)
PRC
PPMV
PRI
PRG
PP
POLY
POL
POW
POS
PDP
OD
OC
OPP
OPNG
OBD
NPT
NOM
O
NTS
OPP HND
PCP
PCCP
PD, PLD
PD
PCC
P
OZ
PC
PBL
DLV
TOP OF
INSIDE FACE
WTP WATER TREATMENT PLANT
OFL WEATHERPROOF, WATERPROOF
NUMBER (REBAR Ø)
OUTSIDE FACE
WORKING POINT
SANITARY WASTE
RAD
TOP OF STEEL
WPT
TAS THREADED ANCHOR STUD
ELL
EXHAUST FAN, EACH FACE
DEFLECTION ANGLE, CENTRAL ANGLE
EL
FRP
INTERIOR
FIBERGLASS REINFORCED PLASTIC
INT
CLEANOUT
O.F.
CTJ
I.F.
T.O.
CONTROL JOINT
HOOK ONE END
HOOK TWO ENDS
HEAT PUMP, HORSEPOWER, HIGH PRESSURE
GALVANIZE(D)
ADDL ADDITIONAL
CIRC
ADJACENT, ADJUST, ADJUSTABLE
ABOVE FINISHED FLOOR
CONSTRUCTION JOINT
COL(S)
AL
APPROXIMATE, APPROXIMATELY
POLYMER SOLUTION
UHMW ULTRA HIGH MOLECULAR WEIGHT
UHMWPE ULTRA HIGH MOLECULAR WEIGHT POLYETHYLENE
WRS
HIGH DENSITY POLYETHYLENE
PLS
BELT FILTER PRESS
HDPE
COLUMN(S)
LEFT HAND
LOW PRESSURE
HOLLOW STRUCTURAL SECTION (STEEL)
LH
LPT
NEAR SIDE
NOT IN CONTRACT
LOW POINT
NS
HIGH POINT
ELBOW
ELEVATION
DEMO DEMOLISH, DEMOLITION
EQUIP
FIBERGLASS REINFORCED PLASTIC PIPE
HPT
EX
FINISHED GRADE
CHLORIDE
TIME DELAY RELAY, TOWEL DISPENSER/RECEPTACLE
RIGHT HAND REVERSE ACTIVE
RIGHT HAND REVERSE
TOP OF GRATING
VEC VINYL ESTER COATING
THICKENER SUPERNATANT OR SUBNATANT
TRIAD (THREE CONDUCTOR SHIELDED CABLE), TIMING RELAY
RHRA
REGULATION VALVE, PRESSURE RELIEF VALVE
PREFAB
MASONRYMASY
PREFABRICATED
STORE FRONT GLAZING SYSTEM
RHR
DRAIN
SGS WATER SURFACE
STATIC PRESSURE, SET POINT
SLUDGE TRANSFER
POINT, POINT OF TANGENCY
REVISION, REVERSE
TOP OF CURB
SERVICE VALVE, SHUTOFF VALVE, SOLENOID VALVE
WATER METER
VALVE
WEST, WIDTH
PROGRESSIVE CAVITY PUMP
ASPHALTIC CONCRETE
CATCH BASIN
WSTP WATERSTOP
CONTROL POINT
BFG BELOW FINISHED GRADE
CARPET
END OF CURVE WTF
WWTF
TUR TURBINE
WATER TREATMENT FACILITY
BTWN BETWEEN
WASTEWATER TREATMENT FACILITY
FIN GR
TANGENT LENGTH, THERMOSTAT, TIMER, TREAD
OPEN EQUIPMENT DRAIN
NPW
OED
NON-POTABLE WATER
RTU ROOF TOP UNIT
SCH
RADIUS, RADIAL
CIRCUMFERENTIAL/CIRCUMFERENCE
GENERAL, GENERATOR
GYPSUM
FXE FIRE EXTINGUISHER - ELECTRICAL
GYP
LHR LEFT HAND REVERSE
LEFT HAND REVERSE BEVELLHRB
FACTORY
CURRENT TRANSFORMER, CERAMIC TILE
CIRCLE
CLK
CORRUGATE(D), CORROSION
BCKR
EXIST
FACT
BACKER BOARD
EXISTING
CKF
CKB
CKS
CKA
CI
CHKD PL
CJ
CIP
CLD
CMLC
CML
CMU
CMP
CLV
CLP
CLL
CLS
CLR
CHF
C
BV
CAUSTIC
CA
BTU
BPV
BOTTS
BSP
BRG
CB
CFM
CF
CHEMD
CFS
CEF
CD
CC
CDT
CDL
DEG or °
DDR
DFL
DET
DBL
CY
CWV
D/W D
DG
DISCH
DIP
DL
DIW
DIM
DIAG
DIA or Ø
DIG
DIF
CW
CORR
CONT
CPT
CP
CONST
CO
CNV
CONN
CONC
CPVC
CU
CTSK
CV
CUP
CTR
CSP
CS
CTL
CT
MASONRY CONTROL JOINT
CLOSE, CONDUIT CHANNEL (STRUCTURAL)
HEADED ANCHOR STUD
MCJ
CCB
COUPLING
CLSM
CHLORINE CONTACT BASIN
CPLG
HAS
ACI
ACB
ACU
ACP
AC
AB
ABS
ABC
CONTROLLED LOW STRENGTH MATERIAL
HSS
INSIDE DIAMETER, INSIDE DIMENSION, IDENTIFICATION
GC
GRAVITY BELT THICKENER
NC
SPECIFICATION(S)
TOG
NORMALLY CLOSED
SPEC(S)
GROOVED COUPLING
DWG(S)
DOWEL(S)
CONNECT, CONNECTION
DRAWING(S)
ELEC
FIRE DEPARTMENT CONNECTION
GBT
ELECTRICAL
FDC
BD
BCM
BDR
BDD
BC
AVG
AV
AW
AVV
BF
BLR
BLKHD
BOTT
BM
BLK
BFV
BFP
BLDG
BKW
ASTM
AFC
AER
AFM
AFF
AED
ADJ
AD
ADR
ADMIN
AHU
ARCH
APPROX
ASSY
ARV
ANV
AIL
AIC
ANCH
ALT
SL
POLYMER BLENDER
POLE
PLANT CONTROL CENTER
POINT OF CURVATURE
OUNCE
OPENING
OVERFLOW
OPPOSITE HAND
OPPOSITE
PRESTRESSED CONCRETE CYLINDER PIPE
PHASE, PHYSICALLY HANDICAPPED
PRESSURE GAUGE
POST INDICATOR VALVE
POINT OF INTERSECTION
PERPENDICULAR
PULSATION DAMPENER
POSITIVE DISPLACEMENT, PLANT DRAIN
PLAIN END
POSITIVE DISPLACEMENT PUMP
OUTSIDE DIAMETER, OUTSIDE DIMENSION
MOP SINK
METERING PUMP
NORTH, NEUTRAL
MOUNTED
MOISTURE SEPARATOR
MODIFIED
MASONRY OPENING
MONUMENT
MOISTURE
NOT APPLICABLE
OPEN
NOT TO SCALE
ON CENTER
OPPOSED BLADE DAMPER
NATIONAL PIPE THREAD
NATURAL GRADE, NATURAL OR LP GAS
VALVE, NEEDLE
NOMINAL
NUMBER
PAVEMENT
POINT OF VERTICAL INTERSECTION
PLANT WATER
POINT OF VERTICAL TANGENCY
POLYVINYLIDENE FLUORIDE
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCH
POINT OF VERTICAL CURVATURE, POLYVINYL
PLUG VALVE
QUANTITY
RECIRCULATING
ROOF DRAIN OVERFLOW
REFERENCE
REDUCER, ROOF EQUIPMENT DRAIN
ROOF DRAIN LINE
RETURN ACTIVATED SLUDGE
RIGHT OF WAY
ROOF DRAIN
REINFORCED CONCRETE PIPE
PRESSURE GAUGE
POLYETHYLENE
POLYMER
POTABLE WATER
POSITION
PANEL(S)
PLASTIC
PLATE, PROPERTY LINE
PUMP
PLYWOOD
POWER POLE
PRESSURE REDUCING VALVE, PRESSURE
PRESSURE OR VACUUM RELIEF VALVE
POUNDS PER SQUARE FOOT
PUMP STATION, PIPE SUPPORT
PROJECTION
POINT OF REVERSE CURVATURE
PARTS PER MILLION (VOLUME)
PRIMARY
PRESSURE REGULATOR
INSTRUMENT AIR
HYDRANT
INCLUDE, INCLUDING
INCHES
HEIGHT BY WIDTH
HIGH WATER LEVEL
HOT WATER
HOT WATER SUPPLY
HOT WATER RETURN
INFLUENT
JOIST
INTRINSICALLY SAFE RELAY
KNIFE GATE VALVE
JOINT
IRON PIPE
INSTRUMENTATION
INJECTOR
INVERT
INSULAT(E)(ED)(ING)(ION)
HOSE VALVE
GATE VALVE
GALVANIZED STEEL PIPE
HOSE BIBB
EXPLOSION-PROOF, HIGH, HORIZONTAL
GRAVITY VENTILATOR
GALLONS PER MINUTE
GALLONS PER DAY
GRATING
GRADE
HARDWARE
HANDRAIL, HOSE REEL, HOUR
HEAT PUMP UNIT AIR
HEAT EXCHANGER
HOOD SUPPLY FAN
HIGH PRESSURE AIR
HOOD EXHAUST FAN
HEADWALL
HORIZONTAL
HEIGHT
MOTORIZED DAMPER
MECHANICAL COUPLING
METAL
MECHANICAL
MACHINE BOLT
MATERIAL
MANUAL
MAXIMUM
MAKE-UP AIR UNIT
MANUFACTURER
MECHANICAL JOINT
MIXER
MIXED LIQUOR
MARK
MISCELLANEOUS
MILLION GALLONS PER DAY
MILLIGRAMS PER LITER
MINIMUM
MANHOLE
MAINTENANCE
LINEAL FEET
LIQUID DIESEL FUEL RETURN
LEFT HAND REVERSE ACTIVE
LONG
LIQUID DIESEL FUEL
LABORATORY
ANGLE (STRUCTURAL), LENGTH, LOUVER
POUND(S)
LAVATORY
LIVE LOAD
LEFT
LAB SINK
MOTOR
LOW WATER LEVEL
LONG RADIUS
LONG LEG VERTICAL
LONG LEG HORIZONTAL
LIQUIFIED PROPANE GAS
LOW PRESSURE AIR
TURBIDIMETER SAMPLE
THICKENED SLUDGE DECANT
TELEPHONE TERMINAL BOARD
THERMOSTAT
TANK
TEMPERATURE
TOP OF MASONRY
TOP OF CONCRETE
TURNING VANES
VARIES
UTILITY SINK
VITRIFIED CLAY PIPE
VALVE BOX
UNLESS NOTED OTHERWISE
TYPICAL
THREE-WAY VALVE
UNDERGROUND
UNDERCUT
TELEPHONE MANHOLE
PIPE SUPPORT, SUPPORT
SLUICE GATE
SYMMETRICAL
SEAL WATER
STRUCTURAL
STEAM
STEEL
STRAINER
STEEL PIPE
SYNTHETIC
THICKENER, THICKNESS, THICK
TEST HOLE
TELESCOPING VALVE
THICKENED SLUDGE
TELEPHONE
TEMPORARY BENCHMARK
TOP AND BOTTOM
TOTAL DYNAMIC HEAD
TEMPERATURE CONTROL VALVE
YARD HYDRANT
YARD CLEANOUT
SECONDARY SLUDGESSL
WYE
WASTEWATER
WATER CONTROL VALVE
WASTEWATER TREATMENT PLANT
WELDED WIRE FABRIC
PLCS
EMERGENCY HAND SWITCH
DEEP (OR DEPTH)DP
ESS
SW
PLACES
BREAK GLASS HAND SWITCHBG
WATER
WITH
VENT THROUGH ROOF
WASTE ACTIVATED SLUDGE
WITHOUT
VACUUM REGULATING VALVE
VOLUMETRIC FEEDER
VERTICAL
VOLUME
VACUUM GAUGE, VALLEY GUTTER
WALL CLEANOUT
WEIR GATE
WASTE OIL DRAIN
WALK THROUGH, WEIGHT
WATER SOFTENER
WALL LOUVER, WATER LEVEL
WALL FITTING, WASH FOUNTAIN
WALL EXHAUST FAN
WEIGHT INDICATOR
WATER HEATER
SAMPLE
SCRUBBER
SECONDARY CLARIFIER
SIDEWALK
RECLAIMED WATER, REUSE WATER
RUPTURE DISK
RAW WASTEWATER
RECLAIMED WATER RETURN
SMOKE CONTROL DAMPER
SUMP DISCHARGE DRAIN LINE
SMOKE DETECTOR, SPLITTER DAMPER, STORM
SECONDARY EFFLUENT
SLUDGE DRAWOFF
SILICON CONTROL RECTIFIER
SCHEDULE
STANDARD CUBIC FEET PER MINUTE
BAR SCREEN
SURFACE CLEANOUT
ROTARY FEEDER
RETURN FAN
RESERVOIR
RIGHT HAND
RETURN GRILLE RUBBER GASKET
REINFORCE(D)(ING)(MENT)
REGULATOR, REGULATING
REQUIRED
RUBBER EXPANSION JOINT
RIGHT HAND REVERSE BEVEL
REINFORCED PLASTIC MORTAR PIPE
REVOLUTIONS PER MINUTE
RIGHT
RETURN REGISTER
RADIUS POINT
ROOM
REGISTERED LAND SURVEYOR
ROTAMETER
ROUGH OPENING
SQUARE
SAMPLE WATER
SQUARE INCH(ES)
SQUARE FEET
SAMPLE SINK
SINGLE POLE DOUBLE THROW
SUMP PUMP DRAIN
SPARE
SPLITTER BOX
SHORT RADIUS, SUPPLY REGISTER
STANDARDS(S)
STABILIZER
STIRRUPS
STIFFENER
STATION
SANITARY SEWER, SELECTOR SWITCH
SCRUBBER RECIRCULATION LIQUID (CAUSTIC)
STAINLESS STEEL
SERVICE SINK
SOLUTION
SUPPLY GRILLE
SOFTENED WATER
SOLIDS HANDLING-RECYCLE
SHOWER DRAIN
SUPPLY FAN
SECTION
SECONDARY, SECOND
SEPTAGE
SEDIMENTATION
SHOWER
SLEEVE VALVE
SLIDE GATE
SUPERNATANT OR SUBNATANT
SAMPLER, SUMP PUMP
SLUDGE COLLECTOR DRIVE
SIMILAR
SHEET
SLOPE, SLUDGE
SKIMMINGS
GROUND
AT (MEASUREMENT)
YH
AGGREGATE BASE COURSE
ANCHOR BOLT
YCO
WWF
WW
Y
WWTP
ACRYLONITRILE BUTADIENE STYRENE
ACCESS DOOR
ADMINISTRATION
AERAT(ION)(OR)
AREA EQUIPMENT DRAIN
AREA DRAIN
AMERICAN CONCRETE INSTITUTE
AIR CIRCUIT BREAKER
AIR CONDITIONING UNIT
ASBESTOS CEMENT PIPE
WV
WCO
WAS
WF
WEF
W/O
VTR
VRV
W/ W
WH
WS
WRG
WTR
WT
WP
WL
WI
WOD
WM
BLOCK
BUILDING
PROCESS BLOWER
BULKHEAD
BACKWASH
BASIN DRAIN LINE
BACKDRAFT DAMPER
BUTTERFLY VALVE
BLIND FLANGE
BEAM, BENCH MARK
BALL VALVE
BRITISH THERMAL UNITS
CAUSTIC SOLUTION (CONCENTRATED OR DILUTE)
CONCRETE ANCHOR
BLACK STEEL PIPE
BOTTOM SLUDGE
BOTTOM
BEARING
BACK PRESSURE VALVE
BOARD
ALUMINUM
ALTERNATE
ANGLE VALVE
ANCHOR
AIR INTAKE LOUVER
AIR FLOW MONITOR
AFTERCOOLER
AIR COMPRESSOR
AIR HANDLING UNIT
ARCHITECTURAL
ACID WASTE
AIR AND VACUUM VALVE
BATCHMETER
BEGIN CURVE, BRASS CAP, BACK OF CURB, BOLT
AVERAGE
ASSEMBLY
AIR RELEASE VALVE
ACID VENT
AMERICAN SOCIETY FOR TESTING AND MATERIALS
STIR
STIFF
STM
STL
STD(S)
ST
STB
STA
STP
SYM
SWR
T
SYN
SV
STRUCT
STR
SUPT
SUG
SSK
SP
SOL
SPDT
SPD
SN
SLG
SLC
SMP
SLV
SPL
SR
SQ IN(S)
SS
SRL
SQ FT
SPS
SPR
SQ
SPW
TYP
TWV
UG
UC
TV
TSPL
TSD
TTB
TSTAT
UNO
VFR
VERT
VOL
VG
VCP
V
US
VB
VAR
TS
TEL
TDR
THK
TH
TDH
TBM
T&B
TCV
TC
TKS
TOS
TOM
TR
TOC
TMH
TLV
TNK
TMP
ELECTRIC WATER HEATER, EXHAUST
EACH WAY EACH FACE
EXPANSION, EXPANSION TANK
EXISTING
ELECTRIC WATER COOLER
ELECTRIC UNIT HEATER
ELECTRICALLY HEAT TRACED
EACH WAY
EVAPORATOR
EXPOSED
FLOOR CLEANOUT
FLANGE COUPLING ADAPTER
FIRE DAMPER, FLOOR DRAIN, FOUND
FAN COIL UNIT
FACE OF CURB, FLEXIBLE COUPLING
FOUL AIR DUCT
EXTERIOR
FILTER BACKWASH
FLAT BAR
EMERGENCY SHOWER AND EYE WASH
EXHAUST GRILLE
EFFLUENT
EXPANSION JOINT
EXTERIOR INSULATION AND FINISH SYSTEM
EQUIPMENT DRAIN
EACH
EAST
EVAPORATOR COOLING UNIT
ECCENTRIC REDUCER
INJECTOR/EDUCTOR
EQUIPMENT
EQUAL
EACH SIDE
EXHAUST REGISTER
ECCENTRIC PLUG VALVE
ELECTRICAL MANHOLE
EMBEDMENT
EXPANDED POLYSTYRENE
EDGE OF PAVEMENT
FLAP VALVE
FUEL DISPENSER
FIRE EXTINGUISHER
FOOTING
FAR SIDE
FROTH SPRAY
FOOT, FEET
FASTEN(ED)
FIRE EXTINGUISHER CABINET
GLASS
GRAVITY EXHAUST LOUVER
GAS METER
GLOBE VALVE
GRADE BREAK
GAUGE or GAGE
GAS, GROUND, GUTTER
GRAVITY VENTILATOR
GALLONS
FLEXIBLE PLASTIC PIPE
FINISH
FILTRATE
FINISHED FLOOR
FIRE HYDRANT
FEEDER
FLOOR DRAIN LINE
FLAP GATE
FINAL EFFLUENT
FOUL AIR
FOUNDATION
FORCE MAIN
FEET PER MINUTE
FUEL OIL
FILTER
FILTER EFFLUENT
FILTER DRAIN
FLANGE, OR FLANGED
FLEXIBLE
CEMENT MORTAR LINED AND COATED
CEMENT MORTAR LINED
CONCRETE MASONRY UNIT
CORRUGATED METAL PIPE
CHLORINE GAS (VACUUM)
CHLORINE GAS (PRESSURE)
CHLORINE LIQUID
CHLORINE SOLUTION
CLEAR
CONVEYOR
CONTROL
CHEMICAL SUMP PUMP, CORRUGATED STEEL PIPE
COUNTERSUNK
CENTER, CENTERED
CARBON STEEL, CIRCULATING SLUDGE
CONSTRUCTION
CONCRETE
CHLORINATED POLYVINYL CHLORIDE
CONTINUOUS OR CONTINUATION OR (D) (OUS)
CHLORINE LEAK DETECTOR
CUBIC FEET PER MINUTE
CUBIC FEET
CHEMICAL DRAIN
CUBIC FEET PER SECOND
CEILING EXHAUST FAN
CEILING DIFFUSER, CONDENSATE DRAIN
CENTER OF CURVATURE, CENTER TO CENTER
CONDUIT
CHEMICAL DRAIN LINE
CHEMICAL FEEDER
CHECK VALVE, SWING
CHECK VALVE, FLAP
CHAIN LINK
CENTER LINE
CHECK VALVE, BALL
CAST IRON
CHECKERED PLATE
CHECK VALVE, ANGLE
CAST IRON PIPE
DOWN
DIAPHRAGM SEAL
DOOR OPENING
DITTO
DAMPER
DEIONIZED WATER
DISCHARGE
DOOR LOUVER
DEAD LOAD, DRAIN LINE
DIAPHRAGM VALVE
DUCT HEATER UNIT
DUST COLLECTOR
DEWATERING DRAIN
DISTILLED WATER
DISTILLED WATER, DOOR SWITCH
DRIP TRAP
DOOR, DRAIN
DIGESTED SLUDGE, DOWN SPOUT
DRAIN VALVE
DUCTILE IRON PIPE
DEPTH, DIGITAL OR DISCRETE, DRAIN
CUBIC YARD
DOUBLE
DRIVEWAY
COMBINATION WASTE AND VENT
COPPER PIPE
CUBIC
COLD WATER
CHECK VALVE
DESICCANT DRYER
DIFFUSER
DIAGONAL
DIMENSION
DIGESTER
DIAMETER
DETAIL
DEGREE
DOOR GRILLE
DECANT/FILTRATE
SOUTH, SWITCH, SLOPE
CL
PL
FLOOR, FLOW LINE
SST
FOB
FOT
FLAT ON BOTTOM
FLAT ON TOP
BWCCP BAR-WRAPPED CONCRETE CYLINDER PIPE
RCCP REINFORCED CONCRETE CYLINDER PIPE
FLUSHING WATER, FINISHED WATER
BOTTOM OFBO
ESMT EASEMENT
TOP OF WALLT.O.W.RER REACTOR
R RISER
CHECKED
DRAWN
DESIGNED
203515
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
PROJECT NO.
LA
ST
S
AV
ED
B
Y:
FILE NAME:
00G05GENERAL
DESIGN CRITERIA
203515_00G05.dwg rli ns en m an n
203515-100000PROJECT NO. 203515
FROM ML
SPLITTER BOX 1
TO PROCESS BUILDING
SECONDARY
CLARIFIER 4
SECONDARY
CLARIFIER 3
SECONDARY
CLARIFIER 2
SECONDARY
CLARIFIER 1
R A S
SC
R A S
R A S
R A S
S E
FF
SCUM PUMP
SCUM VAULT 1
SC
SC
S C
SC
SC 1 & 2 SCUM
MANHOLE 2
NPW
FROM PROCESS
BUILDING
NPW
FROM NPW
PUMPS
SCUM PUMP
SCUM VAULT 2
SC
FROM ML
SPLITTER BOX 1
FROM ML
SPLITTER BOX 2
FROM ML
SPLITTER BOX 2
S E
FF
FROM NPW
PUMPS
SE
FF
SE
FF
N P
W
TO SOLIDS
HANDLING
BUILDING
TO SOLIDS
HANDLING
BUILDING
COMBINED
WAS AND SC
COMBINED SCUM
MANHOLE 1
TO UV
BUILDING
GENERAL NOTES:
1. NOT ALL PIPING CONNECTIONS AND ACCESSORIES ARE SHOWN.
REFER TO MECHANICAL AND CIVIL DRAWINGS FOR PIPING DETAILS.
SEE P&IDS FOR INSTRUMENTATION REQUIREMENTS.
KEY NOTES:
1. A PORTION OF SCUM DISCHARGE PIPING FROM SCUM VAULT 1 IS
ROUTED THROUGH EX 8" SC GRAVITY LINE. SEE MECHANICAL AND
CIVIL DRAWINGS FOR DETAILS.
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED JOB NO.
DRAWING NO.
SHEET NO.
VERIFY SCALES
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
OF
FILE NAME:
XX
P L O
T D
A T
E
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
203515
/1
/2
:4 :5
P
M
Autodesk Docs://Boxelder SD 203515-100000 Predesign/203515_40M0801.rvt
40G01
SCUM PUMPING
PROCESS FLOW DIAGRAM
GENERAL
Checker
RDL
PKN
M
M
M
TO DIGESTERS 1
PR
TDS
VOLUTE
THICKENER 1
FLOC
TANKDS
P R
DS
DIGESTED SLUDGE
PUMP 1
FROM DIGESTER 1
DIGESTED SLUDGE
PUMP 2
FROM DIGESTER 2
DIGESTED SLUDGE
PUMP 3
VOLUTE DEWATERING PRESS 1
VOLUTE DEWATERING PRESS 2
D S
POLYMER SKID FOR
RECUPERATIVE
THICKENING
THICKENED SLUDGE PUMP
TDS
TO DIGESTERS 2
FROM SCUM
VAULTS 1 & 2
FROM WAS PUMPS
GENERAL NOTES:
1. NOT ALL PIPING CONNECTIONS AND ACCESSORIES ARE SHOWN.
REFER TO MECHANICAL AND CIVIL DRAWINGS FOR PIPING DETAILS.
SEE P&IDS FOR INSTRUMENTATION REQUIREMENTS.
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED JOB NO.
DRAWING NO.
SHEET NO.
VERIFY SCALES
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
OF
FILE NAME:
XX
P L O
T D
A T
E
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
203515
/4
/2
:4
:4
P
M
Autodesk Docs://Boxelder SD 203515-100000 Predesign/203515_80M0801.rvt
80G01
THICKENING
PROCESS FLOW DIAGRAM
GENERAL
Checker
Designer
HOT WATER
HEATER
HOT WATER
HEATER
E Y
E W
A S
H S
T A
T
IO
N
DILUTION WATER
TANK 1
DILUTION WATER
TANK 2
DILUTION WATER
PUMP 1
DILUTION WATER
PUMP 2
TO POLYMER SKID
PW BOOSTER PUMP
SECOND FLOOR
FIRST FLOOR
NPW
PW
PW
HW
HOSE BIBB
BFP
DRAIN TO FLOOR DRAIN
HW
TO POLYMER SKID FOR
RECUPERATIVE THICKENING
TO POLYMER SKID
FOR DEWATERING 1
TO POLYMER SKID
FOR DEWATERING 2
PW
PW
PW
P W
P W
HOSE BIBB
HOSE BIBB
H
W
H W
PW
NPW
BFP
TO POLYMER SKID
GENERAL NOTES:
1. NOT ALL PIPING CONNECTIONS AND ACCESSORIES ARE SHOWN.
REFER TO MECHANICAL AND CIVIL DRAWINGS FOR PIPING DETAILS.
SEE P&IDS FOR INSTRUMENTATION REQUIREMENTS.
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED JOB NO.
DRAWING NO.
SHEET NO.
VERIFY SCALES
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
OF
FILE NAME:
XX
P L O
T D
A T
E
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
203515
/1
/2
:3
:3
A
M
Autodesk Docs://Boxelder SD 203515-100000 Predesign/203515_80M0801.rvt
80G02
DILUTION WATER
PROCESS FLOW DIAGRAM
GENERAL
Checker
Author
POLYMER SKID FOR
DEWATERING 1
POLYMER SKID FOR
DEWATERING 2
POLYMER SKID FOR
RECUPERATIVE
THICKENING
NEAT
POLYMER
TOTE
NEAT
POLYMER
TOTE
TO VOLUTE SCREW PRESS 1
POS
POS
POS
POS
NP
P O
S
TO VOLUTE SCREW PRESS 2TO VOLUTE THICKENER 1
POS
PW PW PW
FROM DILUTION WATER PUMP 1
FROM DILUTION WATER PUMP 2
GENERAL NOTES:
1. NOT ALL PIPING CONNECTIONS AND ACCESSORIES ARE SHOWN.
REFER TO MECHANICAL AND CIVIL DRAWINGS FOR PIPING DETAILS.
SEE P&IDS FOR INSTRUMENTATION REQUIREMENTS.
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED JOB NO.
DRAWING NO.
SHEET NO.
VERIFY SCALES
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
OF
FILE NAME:
XX
P L O
T D
A T
E
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
203515
/1
/2
:3
:5
A
M
Autodesk Docs://Boxelder SD 203515-100000 Predesign/203515_80M0801.rvt
80G03
POLYMER WATER
PROCESS FLOW DIAGRAM
GENERAL
Checker
CHECKED
DRAWN
DESIGNED
203515
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
PROJECT NO.
LA
ST
S
AV
ED
B
Y:
FILE NAME:
RDL
00GD01DEMOLITION
GENERAL NOTES
203515_00GD01.dwg rli ns en m an n
203515-100000
GENERAL:
1. GENERAL DEMOLITION NOTES APPLY TO ALL DEMOLITION DRAWINGS.
2. NOT ALL PENETRATIONS ARE SHOWN. GENERALLY, ONLY PENETRATIONS 12” AND
GREATER IN DIAMETER ARE SHOWN ON THE DEMOLITION DRAWINGS. NUMEROUS SMALL
DIAMETER (<12ӯ) PIPE AND CONDUITS PENETRATE THE CONCRETE BUT ARE NOT
SPECIFICALLY DETAILED ON THE DEMOLITION OR STRUCTURAL DRAWINGS. COORDINATE
REQUIRED OPENINGS WITH CIVIL, ELECTRICAL, MECHANICAL AND INSTRUMENTATION AND
CONTROL DRAWINGS.
3. NOT ALL DISCIPLINE RELATED DEMOLITION MAY BE SHOWN ON AREA DEMOLITION
DRAWINGS. SEE ARCHITECTURAL, HVAC/PLUMBING, AND ELECTRICAL DEMOLITION
DRAWINGS FOR ADDITIONAL DEMOLITION DETAILS, IF APPLICABLE.
EXISTING CONDITIONS:
1. DIMENSIONS, WALL THICKNESSES, FOUNDATIONS, PIPING, AND OTHER DETAILS SHOWN
ON THESE PLANS WERE TAKEN FROM RECORD DRAWINGS PROVIDED BY THE OWNER.
ACTUAL DIMENSIONS AND CONDITIONS MAY VARY.
2. FIELD VERIFY ALL EXISTING DIMENSIONS, ELEVATIONS, PIPING AND CONDITIONS RELATED
TO WORK PRIOR TO DEMOLITION, SHOP DRAWING PREPARATION AND FABRICATION.
3. NOTIFY ENGINEER IMMEDIATELY IF ANY OF THE FOLLOWING ARE EXPOSED:
3.a. SIZES OR DIMENSIONS DIFFERING FROM THE CONTRACT DOCUMENTS.
3.b. DAMAGE OR DETERIORATION TO MATERIALS AND COMPONENTS.
3.c. CONDITIONS OR DETAILS DIFFERENT FROM THOSE SHOWN ON THE DRAWINGS.
PROCEDURES:
1. PERFORM DEMOLITION PER SPECIFICATION SECTION 01_35_21 - SELECTIVE ALTERATION
AND DEMOLITION.
2. DEMOLITION WILL BE COMPLETED IN PHASES. SEE SPECIFICATION SECTION 01_14_00 –
WORK RESTRICTIONS.
3. MAINTAIN FACILITIES IN SERVICE AS DIRECTED BY THE ENGINEER AND AS STIPULATED IN
SPECIFICATION SECTION 01_14_00 – WORK RESTRICTIONS.
4. PRIOR TO ANY WORK, COORDINATE DEMOLITION WITH THE OWNER AND ENGINEER AND
SUBMIT METHOD OF PROCEDURES AS REQUIRED IN SPECIFICATION SECTION 01_14_00 –
WORK RESTRICTIONS.
5. BEFORE STARTING DEMOLITION AND CONSTRUCTION, FIELD VERIFY DEMOLITION LIMITS.
6. PROTECT IN PLACE ITEMS THAT ARE NOT DESIGNATED TO BE DEMOLISHED OR MODIFIED.
SHOULD SUCH ITEMS BECOME DAMAGED DURING THE WORK, REPLACE IN KIND AT NO
COST TO THE OWNER.
7. PROVIDE TEMPORARY SUPPORT FOR PARTIALLY DEMOLISHED AND CONSTRUCTED
STRUCTURES AS REQUIRED TO RESIST TEMPORARY LOADS DURING CONSTRUCTION.
DEMOLITION SCHEDULE SHALL CONSIDER THE STABILITY OF THE STRUCTURE BEING
DEMOLISHED.
8. REROUTE PIPING AND UTILITIES AS REQUIRED ON DRAWINGS AND IN SPECIFICATIONS.
9. IMPLOSION, UNCONTROLLED COLLAPSE, OR RAPID DECONSTRUCTION FACILITATED BY
GRAVITY IS NOT PERMITTED. DEMOLITION SHALL BE ACCOMPLISHED IN A CONTROLLED
MANNER WITH CONVENTIONAL MECHANICAL DEMOLITION EQUIPMENT UNLESS
OTHERWISE AUTHORIZED IN WRITING BY THE ENGINEER.
10. WHEN USING CUTTING EQUIPMENT, DO NOT OVER CUT CORNERS BEYOND THE AREA
DESIGNATED TO BE DEMOLISHED. STOP CUTTING EQUIPMENT SHORT OF CORNERS AND
CORE DRILL AND/OR HAND DEMOLISH.
11. COORDINATE THE SHUTDOWN OF POWER AND ELECTRICAL EQUIPMENT WITH THE OWNER
AND ENGINEER. SEE DIVISION 26 FOR ADDITIONAL ELECTRICAL DEMOLITION
REQUIREMENTS.
12. PRIOR TO DEMOLITION, PROPERLY DISCONNECT PIPING, CONDUIT, WIRING, AND OTHER
ITEMS ASSOCIATED WITH THE DEMOLITION.
13. WHERE DEMOLITION EXPOSES EXISTING MECHANICAL, ELECTRICAL, HVAC, INTERIOR
BUILDING FINISHES OR OTHER ELEMENTS TO THE WEATHER THAT WOULD POTENTIALLY
CAUSE LOSS OF OPERATION, REDUCE EQUIPMENT LIFE, IMPAIR FUNCTIONALITY, OR
OTHERWISE DEGRADE ELEMENTS THAT ARE TO REMAIN, PROVIDE PROTECTION FROM
THE ELEMENTS.
14. WHERE EQUIPMENT AND ASSOCIATED ELECTRICAL APPURTENANCES SCHEDULED FOR
REMOVAL ARE NOT INDICATED FOR REUSE, DEMOLISH JUNCTION BOXES, CONTROL
STATIONS, INSTRUMENTATION, DISCONNECTS, ECT. DEMOLISH CONDUIT BACK TO THE
JUNCTION BOX OR DUCTBANK. DISCONNECT AND REMOVE WIRING FROM SOURCE TO
LOAD. PROVIDE NEW CONDUIT, WEIR, BOXES, DISCONNECTS, INSTRUMENTS,
RECEPTACLES, AND LIGHTING AS SHOWN ON THE ELECTRICAL DRAWINGS.
REPAIR:
1. WHERE DEMOLISHING PIPES OR EQUIPMENT, REMOVE ASSOCIATED SUPPORTS AND
ANCHORS THAT WILL NOT BE REUSED. FOR CARBON STEEL, GALVANIZED, OR CORRODED
STAINLESS STEEL ANCHORS, GRIND BACK 1” FROM SURFACE OF CONCRETE AND FILL
CAVITY WITH EPOXY GROUT. FOR CLEAN STAINLESS STEEL ANCHORS NOT SHOWING
SIGNS OF CORROSION, CUT/GRIND ANCHOR BOLT FLUSH.
2. WHERE DEMOLISHING MECHANICAL OR ELECTRICAL EQUIPMENT, REMOVE ASSOCIATED
CONCRETE PADS AND SUPPORTS UNLESS OTHERWISE INDICATED. GRIND BACK DOWELS
AND REPAIR PER DETAIL S209/TYP.
3. WHERE DEMOLITION EXPOSES REINFORCING BARS THAT WILL NOT BE COVERED BY NEW
CONCRETE, GRIND BARS BACK 1” AND FILL WITH EPOXY GROUT.
4. CAP OR PERMANENTLY SEAL PIPES THAT ARE ABANDONED IN PLACE, USING MATERIALS
ACCEPTABLE TO THE ENGINEER.
5. WHERE DEMOLISHING 12” DIAMETER OR SMALLER PIPES, FILL CMU WALL PENETRATIONS
THAT WILL NOT BE REUSED WITH GROUT UNLESS OTHERWISE NOTED.
6. FOR EQUIPMENT NOTED FOR DEMOLITION, DEMOLISH ASSOCIATED WIRE, EXPOSED
CONDUIT, DISCONNECTS, CONTROL STATIONS AND CONTROL PANELS. CUT ASSOCIATED
EMBEDDED CONDUITS FLUSH WITH FLOOR/WALL AND CAP PER DETAIL EM105/TYP.
7. WHERE DEMOLITION REQUIRES THE REMOVAL OF CONCRETE AND/OR MISCELLANEOUS
MATERIALS BELOW THE PROPOSED FINISHED GRADE, BACKFILL WITH SELECT FILL TO
PROPOSED GRADE UNLESS NOTED OTHERWISE. IN AREAS WHERE NO STRUCTURE IS
PROPOSED, BACKFILL WITH NATIVE FILL TO WITHIN ONE FOOT OF FINAL GRADE AND
FINISH PER CIVIL DRAWINGS.
DISPOSAL:
1. PAY FEES ASSOCIATED WITH PROPER DISPOSAL OF THE DEMOLISHED STRUCTURES AND
FACILITIES.
2. REMOVE BROKEN CONCRETE AND BUILDING MATERIALS FROM THE PLANT SITE AND DO
NOT USE AS BACKFILL.
3. DEMOLITION PLAN SHALL INCLUDE SEQUENCING AND DESIGN OF SECTIONING OR SIZING
DOWN OF DEMOLISHED ITEMS INTO SMALLER ELEMENTS FOR PROPER AND SAFE
REMOVAL.
4. OWNER HAS FIRST RIGHT OF REFUSAL ON DEMOLISHED MATERIALS AND EQUIPMENT.
5. DISPOSE OF UNWANTED ITEMS IN ACCORDANCE WITH LOCAL LAWS AND REGULATIONS.
PROJECT NO. 203515
ST
S
AV
ED
B
Y:
FILE NAME:
Pl ot
D at e:
DES
DWN
CHK
00D01
X
DEMO
SITE DEMO PLAN
203515_00D01.DWG
C H
U
ST
ED
202594
/9
/2
9:
:2
AM
SCALE
KEY PLAN
KEY PLAN
NORTH
GENERAL NOTES:
1. CONTRACTOR SHALL FIELD VERIFY LOCATION,
SIZE, AND MATERIALS FOR EXISTING PIPING AND
EQUIPMENT AS NECESSARY PRIOR TO BEGINNING
WORK.
2. CONTRACTOR SHALL COORDINATE ALL
CONSTRUCTION ACTIVITIES WITH OWNER IN
ACCORDANCE WITH THE CONSTRUCTION
SEQUENCE PROVIDED IN SPECIFICATION
SECTION XX_XX_XX - WORK RESTRICTIONS.
40'20'0 10'
SCALE: 1" = 20'
usanorth811.org
KEY NOTES:
1. DEMO EXISTING MANHOLE. SEE DWGS 00D02 FOR
DETAILS.
2. DEMO EX 8" SC FROM SECONDARY CLARIFIER TO
NEW SCUM VAULT. PROTECT STUB OUT FROM
SECONDARY CLARIFIER FOR NEW CONNECTION.
SEE DWG 00C20 FOR NEW YARD PIPING.
3. DEMO PORTION OF EX 8" SC AS NECESSARY FOR
CONNECTION TO NEW SCUM VAULT.
4. DEMO PORTION OF 4" NPW AS NECESSARY FOR
CONNECTION TO NEW 4" NPW.
5. DEMO PORTION OF 8" WAS AS NECESSARY FOR
CONNECTION TO NEW SCUM LINES.
6. DEMO EXISTING MANHOLE AND PORTION OF EX-8"
SC FROM SECONDARY CLARIFIERS AS
NECESSARY. SEE DWGS 00D02 FOR DETAILS.
7. SUPPORT AND PROTECT EXISTING SECONDARY
EFFLUENT LINE AND ELECTRICAL DUCT BANK
DURING EXCAVATION.
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
203515
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
EX. 8" SC
EX. 8" SC
EX. 8" SC
EX. 24" SEFF
EX. 24" SEFF
EX. 4" NPW
EX. 8" WAS
EX. 4" NPW
EX. ELEC
EX. 10" SNT
EX. 4" SNT
B 00D02
SECONDARY
CLARIFIER NO. 4
OXIDATION DITCH
SECONDARY
CLARIFIER NO. 3
SECONDARY
CLARIFIER NO. 2
SECONDARY
CLARIFIER NO. 1
A 00D02
SOLIDS HANDLING
BUILDING
DIGESTER NO. 2
DIGESTER NO. 1
OXIDATION DITCH
ST
S
AV
ED
B
Y:
FILE NAME:
Pl ot
D at e:
DES
DWN
CHK
00D02
X
DEMO
SITE DEMO SECTION AND DETAILS
203515_00D02.DWG
C H
U
ST
ED
202594
/2
/2
9:
:2
AM
SCALE
KEY PLAN
GENERAL NOTES:
1. CONTRACTOR SHALL FIELD VERIFY LOCATION,
SIZE, AND MATERIALS FOR EXISTING PIPING AND
EQUIPMENT AS NECESSARY PRIOR TO BEGINNING
WORK.
2. CONTRACTOR SHALL COORDINATE ALL
CONSTRUCTION ACTIVITIES WITH OWNER IN
ACCORDANCE WITH THE CONSTRUCTION
SEQUENCE PROVIDED IN SPECIFICATION
SECTION XX_XX_XX - WORK RESTRICTIONS.
3. EXTENT OF EXISTING MANHOLE AND SCUM LINE
DEMO WILL BE BASED ON THE DIMENSIONS OF
NEW SCUM VAULT WHICH WILL BE INSTALLED IN
THE SAME LOCATION (TYP 2). REFER TO 40M02
FOR NEW SCUM VAULT DIMENSIONS.
usanorth811.org
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
203515
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
JANUARY 2025
BOXELDER SANITATION DISTRICT
THICKENING AND SCUM PUMPING PREDESIGN
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
INTERMEDIATE DESIGN
SUBMITTAL
NOT FOR CONSTRUCTION
SCALE:
FILE:
PLAN
FILE
1/2" = 1'A
EXISTING CLARIFIER 1 & 2
SCUM MANHOLE
SCALE:
FILE:
PLAN
FILE
1/2" = 1'B
EXISTING CLARIFIER 3 & 4
SCUM MANHOLE
PHOTO
FILE:
FILE
PHOTO
FILE:
FILE
RIM ELE 4876.93 ±
7' -0
EX. 8" SC
EX. 8" SC, INV EL 4869.89 ±
EX. 8" SC, INV
EL 4869.79 ±
EX. 8" SC, INV EL 4870.36 ±
EX. 8" SC, INV EL 4870.20 ±
4' -0
FROM CLARIFIER 4
FROM CLARIFIER 3
TO COMBINED
SCUM MANHOLE 1
TO CLARIFIER 1 & 2
SCUM MANHOLE 2
FROM CLARIFIER 1
FROM CLARIFIER 2
4'-0"
4'-0"
SCALE:
FILE:
SECTIONC
SCALE
FILE
EXISTING CLARIFIER 1 & 2
AND 3 & 4 SCUM MANHOLES
B
80DM02
D
80DM02
C
80DM02
SCUM PUMP
8" WAS
8" PR
4" DS
DIGESTED SOLIDS PUMP 1
DIGESTED SOLIDS PUMP 2
SOLIDS HANDLING BUILDING
LOWER LEVEL
GENERAL NOTES:
1. CONTRACTOR SHALL FIELD VERIFY LOCATION, SIZE AND MATERIALS
FOR EXISTING PIPING AND EQUIPMENT AS NECESSARY PRIOR TO
BEGINNING WORK.
2. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES
WITH OWNER IN ACCORDANCE WITH THE CONSTRUCTION
SEQUENCE PROVIDED IN SPECIFICATION SECTION XX_XX_XX - WORK
RESTRICTIONS.
KEY NOTES:
1. REMOVE AND SALVAGE EXISTING SCUM PUMP. DEMO ALL PIPING
DOWNSTREAM OF THE SCUM PUMP CONNECTING TO WAS LINE.
2. REMOVE REDUCER AND BLIND FLANGE THE EXISTING 4" SCUM PIPE.
INSTALL PIPE TAP WITH FLUSHING CONNECTION ON BLIND FLANGE.
3. REMOVE SECTION OF PIPE AS SHOWN.
4. REMOVE 8" ELBOW.
5. REMOVE 3" TEE
1 2 3 4 5…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .