This Statement of Work (SOW) is for the City of Sheridan, Colorado, detailing a commercial grade ceramic and carpet tile flooring installation project for the city government building. The project involves replacing existing carpet and failed LVT tile in areas occupied by the police department, general administration, and municipal court, with an estimated 5,000 square feet of ceramic tile for the police department's general operations center, 2,735 square feet of commercial grade carpet tile for government administration, and 1,908 square feet of carpet tile for the court room and chambers. The project is scheduled to begin in early to mid-October 2025, with substantial completion required by December 12, 2025, and all work, including punch lists and rework, to be finished by December 30, 2025. A mandatory pre-bid meeting is scheduled for October 3, 2025, and bid responses are due by October 14, 2025. The contract includes the option for two additional renewal projects if mutually agreed upon by the City and the Contractor.

The project requires a 5% bid bond and will necessitate performance and payment bonds if the contract value exceeds $75,000. Contractors must provide comprehensive insurance, including commercial general liability ($2,000,000 combined single limit), workers' compensation, and automobile liability ($1,000,000 combined single limit). The project mandates that all contractors and employees pass a criminal background check, as work will be performed in high-security areas. Contractors must use commercial-grade materials meeting specific specifications, such as American Olean Porcelain StepWise™ Tile or Tarkett carpet tile, and follow detailed installation guidelines. The City will provide contractor accommodations and storage areas, and reserves the right to make changes to the work scope without materially affecting the contract sum. An additional 3% of flooring materials will be required as extra stock for future repairs.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

2025 Commercial Grade Ceramic and Carpet Tile Flooring Installation - Project No. 2025-FAC-002

2025 Commercial Grade Ceramic and Carpet Tile Flooring Installation

SCOPE OF WORK (SOW)

The Contractor shall furnish all materials, equipment and labor incidental to complete all work described herein, made part of the Contract Documents. The Contractor shall complete the work with industry standard practices in a professional workmanlike manner in accordance with the provisions and specifications of the Contract. Before executing this Contract, the Contractor must fully understand the Contract Documents and Specifications regarding the work. No adjustment or modification to the Contract Documents shall be allowed for any misunderstanding of the work or the terms and provisions contained in the Contract Documents. The selection of the materials, equipment and labor for all work shall be in accordance with the Contract Documents and all City, Federal and State of Colorado laws applicable to the work being performed by Contractor. The Contractor understands and agrees that the City may modify, delete or add various portions of the work at the City’s discretion. Bid prices SHALL REMAIN FIRM. Price adjustments for fuel, inflation or raw material price increases will not be allowed.

A. WORK:

1) The majority of the work will be occupied and furnished rooms, and work must be performed during certain days and hours or non-work hours, or sequentially coordinated as necessary, in order to minimize impact and disruption to the City’s operations and other areas and facilities open to the public

2) The contractor shall provide and install commercial grade ceramic and carpet tile flooring to replace existing carpet and failed LVT tile currently at the City of Sheridan City government building occupying by the police department, general administration and municipal court

3) Work will be performed in sensitive, high security areas consisting of Police Department, City Court and general government offices.

Contractor(s) must certify by way of public notary, that they their employees pass a criminal background check with no felony convictions or sexual or violent related crimes, or crimes relating to theft, fraud and financial. The City of Sheridan is under surveillance and may require evidence to background information if suspicion or reasonable cause arises

4) The work consists of furnishing all labor, equipment and materials necessary for the removal of existing flooring in various City of Sheridan (City) occupied spaces, hallways, offices and common areas

5) The work consists of furnishing all labor, equipment and materials necessary for preparations of the flooring substrate and subsurface in various City occupied spaces, hallways, offices and common areas

6) Any moisture mitigation necessary to prepare the substrate for ceramic or carpet tile shall be conducted by the contractor and bid as its own item; if mitigation is not necessary this item shall not be used or paid for

7) The work consists of furnishing all labor, equipment and materials necessary for the installation of new ceramic tile and commercial carpet tile flooring in various City occupied spaces, hallways, offices and common areas

8) Contractor will be responsible for moving furniture and equipment in and out of spaces for all activities.

9) The contractor shall be responsible for all pre-work notification and posting for each area impacted by their work. Contractors shall work with each unit and individual office occupants to coordinate their work and sequence scheduling

10) Access and Inspection; The City and its representatives shall always have access to the work area. The Contractor shall provide proper access for inspection of the Work for the purpose of determining compliance with this Contract and Specifications. All materials, equipment and supplies used in the performance of work shall be subject to inspection and testing in accordance with generally accepted standards. If any portion of the work or materials is determined to be non-compliant and or defective, the Contractor shall bear all costs involved to bring the Work into compliance with the Contract, including without limitation the cost to replace any materials, equipment and labor

11) It shall be the Contractor’s responsibility to remove or correct all non-compliant work within forty-eight (48) hours or an agreed upon schedule from the time of the written notification

12) The City’s representative shall have the right to obtain samples of all materials to be used in the work and to use such samples for the purpose of determining specification compliance. The City reserves the right to obtain samples at any point of delivery and/or at a manufacturing point

13) Contractors Use of Premises; Contractor shall not enter or occupy with people, tools, equipment, construction materials, or materials removed from the Work, any area outside the designated construction areas or public space without written permission from the City. Contractors shall confine operations to the area designated by City and be responsible for all areas at the site used by Contractor or Sub-contractors in their performance of the Work

14) Contractors will exert full control over the actions of all employees to include conduct and communication with other people with respect to the use and preservation of a respectful, appropriate and professional environment

15) Contractor has the right to exclude from the site all people who have no purpose related to the work or its inspection and may require all people on site to observe the same regulations as required of Contractor’s employees

16) Work hours (except for emergencies), or unless otherwise agreed to in writing for sequential coordination, shall be limited to 5:30 a.m. to 4:00 p.m., Monday through Friday

17) Work will be documented for each area, to include material use and labor hours

B. INSTRUCTIONS AND GENERAL CONDITIONS

1) Mandatory Pre-Bid Meeting is required in order submit a bid and to be considered for work. Pre-bid meeting will be held Thursday October 3, 2025 @ 10:00 a.m., at 4101 S. Federal Blvd, Sheridan CO 80110. Those attending shall remain in the lobby area until 9:00 a.m..

(a) The purpose of the pre-bid meeting is to provide potential Bidders with an opportunity to ask questions and obtain clarification about any aspect of this Request for Bid. Any changes or clarifications resulting from this pre-bid meeting will be issued in a written addendum. It is important that all Bidders have a clear understanding of the scope of work and requirements of this solicitation. Attendance at the pre-bid meeting will be a pre-requisite for submitting a Bid; attendance will be evidenced by the Contractor’s sign-in and MUST HAVE A BUSINESS CARD WITH CONTACT INFORMATION

2) RFP Questions: All questions regarding this Request/or Proposal is due in writing, through Bidnet, no later than October 8, 2025 @ 2:00 p.m. Answers to all questions will be issued on October 10, 2025 @ 10:00 a.m. followed by Addendum same day no later than 4:00 p.m. All direct calls, emails or contact will not be responded to

3) Bidders shall provide unit prices as described in the Bid Form herein and must use CITY’s Bid Form in BidNet Online. City will not accept a Bidders form. Bid tabulations after closing is administered through BidNet therefore bids must be strictly submitted using the platform bid sheet. Please read and use the platform thoroughly, as all documents are provided to include important deadline dates, requirements and addendum.

4) Responses are due for the Request for Bids, and submittal acceptance will close Tuesday October 14, 2025 @ 2:00 p.m.

5) Bid Bond Required: A bid bond or certified check made payable to City of

Sheridan, in the amount of 5% of the total project price quoted on the Vendor Response and Pricing Pages. Bid Bond shall be mailed or dropped off in person, before the bid close. If bid bond is not received within 48 hours od closing, bidders proposal will not be considered. CHECKS ARE NOT CASHED. The bid bond is used as a guarantee that the bidder, if awarded the contract, will furnish a satisfactory Performance and Payment Bond as described below; will execute the contract; and proceed with the work. Upon failure to do so, the offeror shall forfeit the deposit or amount of the Bid Bond as liquidated damages. Failure to include the Bid Bond may result in finding the bid none-responsive to the City without further evaluation

6) If the contract is valued at $75,000 or greater, then the following bond requirements shall apply:

Performance Bond: Upon awarding the contract, the contractor shall furnish a Performance Bond as Surety implied as a warranty of labor, material and performance for goods, services or both, provided to the City. A Performance Bond shall be in an amount equal to the full contract price, guaranteeing faithful compliance with all requirements of all contract documents and complete fulfillment of the contract, including performance of contract tasks and materials provided. After one year, the Bond may be re-issued reducing to 50% of the original contract value if no warranty claim has been made

a) Any suit under this bond must be instituted before the expiration of two

(2) years from the date on which final payment under the Contract falls due.

Labor and Material Payment Bond: Upon award of the contract, the contractor shall furnish a Labor and Material Payment Bond equal to 50% of the contract value, as surety that the Contractor shall promptly make payments to all claimants as hereinafter defined, for all labor and material used or reasonably required for use in the performance of the Contract, then this obligation shall be void; otherwise, it shall remain in full force and effect, subject, however, to the following conditions.

a) A claimant is defined as one having a direct contract with the Contractor or with a subcontractor of the Contractor for labor or a vendor for material, or both, used or reasonably required for use in the performance of the Contract, including services, rentals, or equipment directly applicable to the Contract.

a. The above-named Contractor and Surety hereby jointly and severally agree with the City that every claimant as herein defined, who has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such claimant's work or labor was done or performed, or materials were furnished by such claimant, may sue on this bond for the use of such claimant, prosecute the suit to final judgment for such sum or sums as may be justly due to claimant, and have execution thereon. The City shall not be liable for the payment of any costs or expenses of any such suit.

7) The contractor shall not commence work under the contract until the contractor has obtained all insurance required under this paragraph and the Certificate of Insurance has been approved by the City Attorney(s), nor shall the contractor allow any subcontractor to commence work on their subcontract until all similar insurance required of subcontractor has been obtained and approved. All policies shall be in amounts, form and companies satisfactory to the City. Insurance limits indicated below may be lowered at the discretion of the City.

a) Employer's Liability and Worker's Compensation Insurance: The contractor shall take out and maintain during the life of the contract, Employers Liability and Workers Compensation Insurance for all of its employees employed at the site, and in case any work is sublet, the contractor shall require the subcontractor similarly to provide Workers Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the contractor. Workers Compensation coverage shall meet Colorado statutory limits. Employers Liability limits shall be $500,000.00 for each employee, $500,000.00 each accident, and $500,000.00 policy limit. In case any class of employees engaged in hazardous work under the contract at the site of the work is not protected under the Workers Compensation Statute, the contractor shall provide and shall cause each subcontractor to provide Employers Liability Insurance for the protection of their employees not otherwise protected.

b) Commercial General Liability Insurance: The contractor shall take out and maintain during the life of the contract, such commercial general liability insurance as shall protect it and any subcontractor performing work covered by the contract, from claims for damages for personal & advertising injury, bodily injury including accidental death, as well as from claims for property damages, which may arise from operations under the contract, whether such operations be by themselves or for any subcontractor or by anyone directly or indirectly employed by them. The amounts of insurance shall be not less than $2,000,000.00 combined single limit for any one occurrence covering both bodily injury and property damage, including accidental death. If the contract involves any underground/digging operations, the general liability certificate shall include X, C, and U (Explosion, Collapse, and Underground) coverage. If providing Commercial General Liability Insurance, then the Proof of Coverage of Insurance shall also be included.

c) Business Automobile Liability: The contractor shall maintain during the life of the contract, automobile liability insurance in the amount of not less than $1,000,000.00 combined single limit for any one occurrence, covering both bodily injury, including accidental death, and property damage, to protect themselves from any and all claims arising from the use of the contractor's own automobiles, teams and trucks; hired automobiles, teams and trucks;

non-owned and both on and off the site of work.

8) The contractor shall warrant and guarantee that all work shall be in accordance with all contract requirements and shall not be defective. All materials provided by the contractor shall be new material and of high quality. At minimum, the contractor shall provide the manufacturer's standard product warranty on all carpet, tile, cove base, and other materials/supplies used to complete the project.

a. It is highly desirable that the contractor act as a liaison between the City and the manufacturer on all product issues which may arise regarding products purchased under the contract.

b. The terms of the contract shall supersede any language to the contrary on invoices or other documents provided by the contractor, manufacturer(s), or other sources regarding any warranty terms.

c. The warranty shall commence upon delivery and acceptance of the item(s) by the City.

d. The contractor shall guarantee the products provided under contract shall be free from defects in materials and workmanship, given normal use and care.

9) All firms doing business with the City of Sheridan shall obtain a business license prior to the start of work. Business licensing can be obtained by: Business Licenses | Sheridan, CO - Official Website

C. CONTRACTOR RESPONSIBILITIES:

1) The Contractor shall cooperate with the City in selecting ceramic and carpet tiles and provide samples, before ordering and executing any work.

2) It is the responsibility of the Contractor to maintain quality control of the materials and equipment.

3) Except for deliveries, loading and unloading and other intermittent purposes, parking shall be at the designated location by the City. City will provide areas to stage and store equipment. No job site trailers will be allowed.

4) While work is in progress, new materials shall be covered or protected from dust, debris or damage.

5) The Contractor shall maintain the job site in a clean, safe, orderly working condition and shall leave the premises as such each day.

6) The Contractor shall be responsible for the repair or replacement of any roof, grass, asphalt pavement, building, or building contents damaged during the course of this Contract.

7) The Contractor shall provide all necessary manpower, barricades, safety signs and protection needed to safely perform the required work during the Contract.

8) All items (lights, pipes, fencing, etc.) that have to be removed during the course of this work shall be reinstalled or relocated as necessary to complete the project.

9) Smoke dust and any construction odors shall not be allowed to enter the occupied building. Contractors shall provide exhaust fans, ducts, seal openings into the workspaces, and if necessary, schedule work during off-hours to prevent problems during the business hours.

10) Site Clean-Up

The Contractor shall maintain the work areas free from the accumulation of burden, debris or accumulation daily. The Contractor will be responsible for all cleaning resulting from their operations as deemed necessary by the City. The City may, after providing notice to the Contractor, perform any necessary clean-up and charge the costs associated with the clean-up to the Contractor.

D. CITY RESPONSIBILITIES:

1) The City will also be responsible for providing contractor accommodations and storage areas

2) The City shall provide support to the Contractor as needed and shall be responsible for all inspections of work progress. The City will not be responsible for determining if products or portions of systems or applications proposed and bid by the Contractor, are acceptable to the conditions of the site such as vapor, moisture or suitability.

3) City’s Right to Make Changes. The City reserves the right to make such additions, deletions, or changes to the Work as may be necessary in its sole and absolute discretion to complete the Work; provided, however, that no such additions, deletions or changes shall materially affect the substance or materially change the Contract Sum to go over the Not to exceed value. This Contract shall in no way be invalidated by any such additions, deletions or changes. No claim shall be made by the Contractor for loss of anticipated profits resulting from any such addition, deletion, or change to the Work.

4) The City may, in its sole discretion, at any time propose modification or change order and without notice to the Sureties require the performance of such Extra Work as it deems necessary or desirable. Work Order or a Change Order covering extra work shall be valid only if issued in writing and signed by the City and the contractor.

E. PROJECT QUANTITIES & BRAND NAME PRODUCTS

1) The quantities given are an estimate only and are not a guarantee that the City will take any or all of the specified product. Actual quantities performed will be determined solely by City needs.

2) Estimated work areas and quantities:

Ceramic Tile:

Police Department general operations center: Approximately 5,000 sf

Commercial Grade Carpet Tile:

Government Administration: Approximately 2,735 sf Court Room & Chambers: Approximately 1,908 sf

Cove Base

All areas receiving new flooring: TBD

3) Any manufacturer's name, trade names, brand names, information and/or catalog numbers must be provided to the City and listed with a specification and/or requirement and are for informational purposes only and are not intended to limit competition. However, the vendor advised that the brand names identified in their proposal have been researched and are regarded as being particularly suited to addressing substrate conditions at the City of Sheridan municipal center.

4) The vendor may offer any brand of product that meets or exceeds the specifications. In addition to identifying the manufacturer's name and model number, the vendor must explain in detail how their product meets or exceeds the specifications, if any. Bids, which do not comply with the requirement and the specifications, are subject to rejection without clarification.

5) The vendor shall understand and agree that the assessment of equality is solely City's determination based on information the vendor provides as well as information the City obtains from secondary sources.

6) All flooring types shall include an additional three percent (3%) extra stock for the City, at Contractors cost plus (+) a maximum of five percent (5%) markup. This will provide the City with matching material should a repair be needed in the future and product is no longer available.

F. CONTRACT TIME/PERIOD

1) Anticipated start time for this project is early to mid-October.

2) All work shall be substantially complete by December 12, 2025, and all work including punch-lists, non-compliant and/or rework shall be complete no later than December 30, 2025.

3) This contract may be renewed for up to Two (2) additional projects if mutually agreed upon by the City and the Contractor. Pricing and specifications changes, if any, shall be negotiated by and agreed upon by both parties. Renewal project pricing must be submitted sixty days (60) prior to the original Contract expiration date.

4) Stop Work Order

The City Representative shall have the authority to suspend work at any time if the work is deficient or unsafe. Work may not recommence until the deficiencies have been resolved and the corrective actions submitted to the City in writing and approved by the City’s representative.

G. WORK ACCEPTANCE CRITERIA

1) City Representative shall consider all work complete upon visual inspection to verify compliance with specifications, deliverables and performance standards.

Defects shall be corrected in accordance with the contract terms. Acceptance will be provided after all requirements of final inspection are met in accordance with the terms and conditions of the contract.

H. PAYMENT/MEASUREMENT

1) The Contractor shall be paid on a unit price per unit basis, as indicated by the bid, for the actual quantities completed and accepted in place.

2) Contractors will be required to meet with the City Representative to perform measurements of the work completed prior to invoicing. Work quantities shall be verified and agreed upon by the Contractor and the City Representative at this time.

I. MATERIAL SPECIFICATIONS

1) Ceramic Tile should be of natural, earth or concrete color and no less than 3/8” in thickness

2) Ceramic Tile must meet or exceed American Olean Porcelain StepWise™ Tile, or approved equal:

3) Commercial Carpet Tile or plank, glue down, must meet or exceed Tarkett or approved equal:

4) Adhesive for direct glue-down carpets:

Provide carpet manufacturers privately labeled "premium" (highest grade) adhesive, with antimicrobial protection for both "wet state" and "dry state" protection.

a. Total solids shall not exceed 60%.

b. Filler material shall not exceed 35%.

c. Adhesives shall be solvent free

d. Flammability requirements shall be the same as for installed carpet.

5) Seaming cement: Hot melt seaming adhesive or similar product with private label by carpet manufacturer, for taping seams and butt cut edges at backing to form secure seams and prevent pile loss at seams.

6) Leveling Compound: Two- (2) component mineral filled polyamide type epoxy compound trowel applied - "Ardex" or approved equal.

7) Edge Strips: Heavy-duty vinyl or rubber carpet edge guard of appropriate size and profile, minimum width of 2" anchorage flange. Color as selected.

8) Wall Base: Provide vinyl base complying with Fed Spec SS-W-40, Type II, 4" height, thickness .080”-gauge min., standard cove style, with high gloss finish.

9) Setting and Grouting Materials: Use appropriate installation mortars according to ANSI A118-1999 series or A136.1-1999.

Use grout per ANSI A118.3, A118.5, A118.6 A118.7 or A118.8-1999.

Use waterproofing/Anti Fracture Membrane as required according to ANSI A118.10-1999.

10) Comply with current editions and applicable Specifications of the following:

a. American Society for Testing and Materials (ASTM).

b. American National Standards Institute (ANSI).

c. Tile Council of America (TCA) Handbook for Ceramic Tile Installation.

J. EXECUTION OF WORK

1) Removal and Floor Preparation:

a. All existing flooring in the designated areas shall be removed by the Contractor

b. Contractor shall be responsible for vapor testing, adhesion puck tests and other necessary substrate testing to ensure proper mitigation is addressed before new flooring is installed

c. The old flooring shall be removed from the City and properly disposed of off-site by the Contractor

d. The floor shall be cleaned, swept, minor cracks and depressions patched, and leveled using an approved underlayment product acceptable to the flooring product manufacturer. Minor patching shall be considered coincidental to the contract and at no cost to the Owner

e. Concrete sub-floors must be sealed using a latex underlayment liquid if required by the ceramic tile or carpet manufacturer's installment instructions.

f. When necessary, a vapor barrier or vapor blocking or mitigation system must be used so that installation adhesives and motors do not fail. Appropriate specialized adhesives and mortars may need to be used to conform to any substrate testing results

g. New flooring shall not be installed on surfaces that are unsuitable and will prevent a proper installation. Defects that are not correctable by procedures as described above shall be brought to the City's attention. Do not start work until all unsatisfactory conditions are corrected

2) Tile Installation:

a. Manufacturers' Instructions: Perform work in compliance with standard accepted installation guidelines and setting materials per manufacturers' instructions.

b. General Installation Standards: Install tiles in accordance with ANSI A108 standards, appropriate TCA methods, and written instructions of the specified manufacturers.

c. Install tile in grid pattern plumb and level. Align joints when adjoining tiles on floor, base, walls, and trim. Adjust to minimize tile cutting and to avoid tiles less than half size.

d. When possible, smooth cut edges of tile and/or use appropriate cutter or wet saw to produce smooth cuts. Provide straight cuts which align with adjacent materials. Extend tile into recesses and under equipment and fixtures to form a complete covering without interruption, gaps or voids.

e. Terminate tile neatly at obstructions, edges, and corners, without disruption of pattern or joint alignment.

f. Provide tile joints uniform in width, subject to variance in tolerance allowed in tile size. Make joints smooth and even, without voids, cracks, or excess mortar or grout.

g. Mix mortar in strict accordance with manufacturer's recommendations.

h. Apply setting material in accordance with manufacturer's directions and install tiles before mortar has started initial cure. For thin set mortar application, use a notch trowel that will achieve the recommended coverage of mortar after tiles have been installed. Reference standard coverage information and follow manufacturer's recommendations for trowel size when using mortar.

i. Do not spread more material than can be covered within 10 to 15 minutes. If

"skinning" occurs, remove mortar and spread fresh material. Spread mortar with notches running in one direction that shall be perpendicular to the pressing, pushing and pulling of tile during placement.

j. Place tile in fresh mortar, press, push and pull the tile slightly to achieve as near 100% coverage and contact of tile with setting material and substrate as possible. The coverage shall be no less than 85% and be sufficiently distributed to give full support of the tile. Make sure that all corners and edges are well supported with mortar. Leave no hollow corners or edges.

NOTE: 95-100% coverage is mandatory for wet or exterior areas. A skim coat (“back-butter”) of mortar can be placed onto the entire back of the tile using a trowel in order to assist in optimum adhesion and coverage of the mortar being used.

k. Ensure there is a minimum 1/8" of mortar between tile and substrate after proper bedding. Installer must periodically remove sheets or individual tiles to assure proper bond coverage consistent with industry specifications. If coverage is found to be insufficient, use a larger size notch trowel.

l. Use a beating block and hammer or rubber mallet so that faces and edges of individual tiles are flush and level with faces and edges of adjacent tiles, and to reduce lippage.

3) Tile Grouting:

a. Install grout in accordance with ANSI A108.10, A108.6, A108.8, A108.9-

1999 correlating to grout type chosen and manufacturer’s recommendations

b. Mix grout material in strict accordance with manufacturer's directions.

c. Apply grout to produce full, smooth grout joints of uniform width, and free of voids and gaps

d. Cure all setting and grouting materials in accordance with manufacturer's recommendations.

e. Grout should be pre-sealed or of modified type that does not require sealing after cure

4) Cleaning and Protection:

a. If one has been used, remove grout release and clean tile surfaces so they are free of grout residue and foreign matter, in accordance with manufacturer's instructions. If a grout haze or residue remains, use a suitable grout haze remover or cleaner and contact grout manufacturer for recommendations.

Flush surface with clean water before and after cleaning. Do not use harsh hydrochloric, muriatic or sulfuric acid or acid-based cleaners to clean glazed tiles or tiles grouted with latex modified grout.

b. When a heavy residue of Portland cement grout is present, acceptable tile cleaning acids may be used. However, the grout should be allowed to cure a minimum of 10 days before this aggressive cleaning method is employed. Tile and grout shall be soaked with water before cleaning. In the absence of a recommendation from the grout manufacturer, acid cleaning may be done with a saturated solution of phosphoric or sulfamic acid, mixed in accordance with manufacturer's recommendations.

c. Leave finished installation clean and free of cracked, chipped, broken, unbonded, and otherwise defective tile work.

5) Carpet Tile Installation:

a. Provide ventilation of area during laying of carpet /tile and for a minimum of 24 hours after if glue down method is used.

b. Install carpet only within allowable temperature range stated by the manufacturer.

c. Comply with manufacturer’s recommendations for installation and direction of carpet; maintain uniformity of carpet direction and lay of pile.

d. Extend carpet under open-bottom obstructions and under removable flanges and furnishings, and into alcoves and closets of each space.

e. Provide cutouts where required, and bind cut edges properly where not concealed by protective edge guards or overlapping flanges. Install carpet edge guard where edge of carpet is exposed, anchor guards to substrate.

f. Expansion joints - Do not bridge building expansion joints with continuous carpeting; provide for movement.

g. Install carpet by glue-down method unless stated otherwise.

h. Fit sections of carpet into each space prior to application of adhesive.

i. Trim edges and butt cuts with seaming cement in compliance with manufacturer’s instructions.

j. Apply adhesive uniformly to substrate in accordance with manufacturer's instructions. Ensure adequate ventilation during application of adhesives. Butt carpet edges tightly together to form seams without gaps. Remove any adhesive promptly from face of carpet by method, which will not damage carpet face.

k. Carpet installers shall remove and dispose of existing vinyl wall base and edge strips and replace it with new material of similar dimension upon completion of the carpet installation.

**END OF DOCUMENT**