2025-CHECProposalPages.xlsx

XLSX spreadsheet 244 KB Posted

Attached to
CHEC BID # 25-6 SPECIFICATIONS FOR 115kV Transmission Line Canadian Hole Relocation and Buxton Line Harden
Solicitation number
25-6
Issued by
Cumberland County, North Carolina

About this file

The document is an Excel-based proposal spreadsheet for Cape Hatteras Electric Cooperative (CHEC) Bid #25-6, covering a 115kV transmission line infrastructure project for Canadian Hole Relocation and Buxton Line Harden in North Carolina. The project encompasses two work orders (#108469 and #107253) involving comprehensive transmission construction assembly units, including pole installations, removals, conductor construction, and infrastructure modifications. Proposals will be received by Booth & Associates, LLC until 2:00 p.m. on Wednesday, July 16, 2025, with bid specifications available through the VendorLink system. The project involves detailed unit pricing for concrete and wood poles with embedment depths ranging from 9' to 21', steel caisson installations, and specialized site access methodologies.

The total project budget is $513,613.02, divided into $320,106.02 for Schedule No. 1 (Work Order #108469) and $193,507.00 for Schedule No. 2 (Work Order #107253). The procurement follows FEMA's Procurement Guidance for Recipients and Subrecipients Under 2 C.F.R. Part 200 (Uniform Rules), with an emphasis on competitive bidding and transparency. Contractors will be responsible for owner-furnished materials installation, pole disposal, and implementing site-specific requirements including excavation stability and backfill procedures. The project may require specialized access techniques such as project matting and temporary bridge systems, indicating a complex construction environment that demands precise pricing accuracy and detailed installation methodologies.

View the file

Other files

File Type Posted
2025-CHECProposalPages.xlsx XLSX spreadsheet
5744_RUS830Contract_IssuedForBid_2025-06-17.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Trans-Pt 1-Sch 1 (Pg.1)

TRANSMISSION CONSTRUCTION ASSEMBLY UNITS

Part 1 - POLE UNITS
SCHEDULE NO. 1 - W.O. #108469
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.1 - Transmission Install - Schedule No. 1
Concrete Poles - Embedded in Prestressed Concrete Cylinder Pile
692*95/C-06.521,90014'-0"1$ - 0$ - 0$ - 0$ - 0
693*90/C-06.520,0009'-0"1$ - 0$ - 0$ - 0$ - 0
694*90/C-06.520,0009'-0"1$ - 0$ - 0$ - 0$ - 0
695*90/C-06.520,0009'-0"1$ - 0$ - 0$ - 0$ - 0
696*90/C-06.520,0009'-0"1$ - 0$ - 0$ - 0$ - 0
Concrete Poles - Direct Embedded in Permanent Steel Caisson - Native Soil Backfill
697*105/C-07.429,04920'-0"1$ - 0$ - 0$ - 0$ - 0
698*105/C-08.029,10021'-0"1$ - 0$ - 0$ - 0$ - 0
699*100/C-07.426,80019'-0"1$ - 0$ - 0$ - 0$ - 0
Note: The Contractor shall provide all materials required to maintain the stability of an excavated pole hole. Material shall be designed and built to withstand all loads caused by earth movement or pressure and shall maintain shape of the excavated hole under all circumstances. The Bidder shall include cost of all materials, equipment, and time associated with the above variables in Construction Assembly Unit prices. The Bidder must provide a written pole installation method with their bid.
**Prestressed Concrete Cylinder Piles With Permanent Steel Caisson (Contractor Supplied)
692*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
693*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
694*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
695*TMF-PCP-PC

(5'-6" x 24'-0")

(7'-0" x 25'-0")29,28020'-0"1$ - 0$ - 0$ - 0$ - 0
696*TMF-PCP-PC

(5'-6" x 24'-0") (7'-0" x 25'-0") 29,280 20'-0" 1 $ - 0 $ - 0 $ - 0 $ - 0

* Note: Owner will supply concrete cylinder pile and concrete pole. Contractor to supply all other materials.

** Note: Pile and Steel Can units are indicated as (Minimum Required Diameter x Length). For TMF-PCP-PC Line 1 is for Pile, Line 2 is for Caisson.

SUB TOTAL Part 1 Page 1- Pole Units $ - 0

18-8888-9009/111 Copyrighted September 2018 41 &G

P.0675744-9009/111 ©Feburary 2025 34 &G

Trans-Pt 1-Sch 1 (Pg.1) (2) TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 1 - POLE UNITS (Continued)
SCHEDULE NO. 1 - W.O. #108469
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.1 - Transmission Install - Schedule No. 1 (Continued)
**Permanent Steel Cans - Direct Embedded - Contractor Supplied
697TMF-EMB-PC (4'-0" x 25'-0")-25'-0"1$ - 0$ - 0$ - 0$ - 0
698TMF-EMB-PC (4'-0" x 26'-0")-26'-0"1$ - 0$ - 0$ - 0$ - 0
699TMF-EMB-PC (4'-0" x 24'-0")-24'-0"1$ - 0$ - 0$ - 0$ - 0

** Note: Pile and Steel Can units are indicated as (Minimum Required Diameter x Length)

1.2 - Transmission Removal - Schedule No. 1
Wood Poles
69285/2n/a-1$ - 0$ - 0$ - 0$ - 0
69385/H2n/a-1$ - 0$ - 0$ - 0$ - 0
69485/H2n/a-1$ - 0$ - 0$ - 0$ - 0
69585/H2n/a-1$ - 0$ - 0$ - 0$ - 0
69685/2n/a-1$ - 0$ - 0$ - 0$ - 0
69785/H2n/a-1$ - 0$ - 0$ - 0$ - 0
69885/2n/a-1$ - 0$ - 0$ - 0$ - 0
Concrete Poles - Dispose
69990/H417,05017'-6"1$ - 0$ - 0$ - 0$ - 0

Note: Old poles must be removed promptly (saw pole to place in dumpster). Contractor to supply the dumpster for pole disposal and disposal of old poles are the responsibility of the Contractor. The bidder shall include the cost of poles disposal in the Construction Assembly Unit Prices.

Note: Dispose of existing concrete structure 699. Owner will communicate to Contractor if removal plan changes.

SUB TOTAL Part 1 Page 2 - Pole Units$ - 0
TOTAL Part 1 - Pole Units$ - 0

18-8888-9009/111 Copyrighted September 2018 35 &G

©Feburary 2025 35 &G

Trans-Pt 2-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 2 - POLE TOP CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1 - W.O. #108469
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
2.1 - Transmission Install - Schedule No. 1
TP-115B2-A3$ - 0$ - 0$ - 0$ - 0
TP-115B2-T5$ - 0$ - 0$ - 0$ - 0
2.2 - Transmission Removal - Schedule No. 1$ - 0$ - 0
TP-115M8$ - 0$ - 0$ - 0$ - 0

TOTAL Part 2 - Pole Top Construction Assembly Units $ - 0

©Feburary 2025 36 &G

Trans-Pt 3-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 3 - CONDUCTOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1 - W.O. #108469
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITS (mft)Labor/mftMaterials/mftLabor & MaterialsLabor & Materials
3.1 - Transmission Install - Schedule No. 1
*Conductor, 954 kcmil 37 Strand AAC "Magnolia" (mft.)4.533$ - 0$ - 0$ - 0$ - 0
Shield Wire, 7 No. 9 Alumoweld (mft.)1.527$ - 0$ - 0$ - 0$ - 0
3.2 - Transmission Removal - Schedule No. 1
*Conductor, 954 kcmil 37 Strand AAC "Magnolia" (mft.)4.533$ - 0$ - 0$ - 0$ - 0
Shield Wire, 7 No. 9 Alumoweld (mft.)1.527$ - 0$ - 0$ - 0$ - 0

*Estimated

TOTAL Part 3 - Conductor Construction Assembly Units $ - 0

©Feburary 2025 37 &G

Trans-Pt 4-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 4 - GUY CONSTRUCTION ASSEMBLY UNITS (TG UNITS)
SCHEDULE NO. 1 - W.O. #108469
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
4.1 - Transmission Install - Schedule No. 1
TG-27C(SS)2$ - 0$ - 0$ - 0$ - 0
TG-27D(SS)2$ - 0$ - 0$ - 0$ - 0
TG-21A2$ - 0$ - 0$ - 0$ - 0
TG-GM2$ - 0$ - 0$ - 0$ - 0
4.2 - Transmission Removal - Schedule No. 1
TG-25D3$ - 0$ - 0$ - 0$ - 0
TG-11ASS6$ - 0$ - 0$ - 0$ - 0
TG-GM6$ - 0$ - 0$ - 0$ - 0

TOTAL Part 4 - Guy Construction Assembly Units (TG Units) $ - 0

©Feburary 2025 38 &G

Trans-Pt 5-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 5 - ANCHOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1 - W.O. #108469
UNITNO. OF UNITSUnit PriceEXTENDED PRICE
NO.LaborMaterialsLabor & MaterialsLabor & Materials
5.1 - Transmission Install - Schedule No. 1
TA-2H1$ - 0$ - 0$ - 0$ - 0
TA-3.5E*1$ - 0$ - 0$ - 0$ - 0
TA-7E*1$ - 0$ - 0$ - 0$ - 0

*Estimated

5.2 - Transmission Removal - Schedule No. 1
TA-1S(M)6$ - 0$ - 0$ - 0$ - 0
TA-2H1$ - 0$ - 0$ - 0$ - 0

TOTAL Part 5 - Anchor Construction Assembly Units $ - 0

©Feburary 2025 39 &G

Trans-Pt 6-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 6 - MISCELLANEOUS CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 1 - W.O. #108469
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
6.1 - Transmission Install - Schedule No. 1
TM-2B2$ - 0$ - 0$ - 0$ - 0
TM-4GM4$ - 0$ - 0$ - 0$ - 0
TM-81$ - 0$ - 0$ - 0$ - 0
TM-8-DDE2$ - 0$ - 0$ - 0$ - 0
TM-9D8$ - 0$ - 0$ - 0$ - 0
TM-9X6$ - 0$ - 0$ - 0$ - 0
TM-9R*8$ - 0$ - 0$ - 0$ - 0
TM-D24$ - 0$ - 0$ - 0$ - 0
TMS-18$ - 0$ - 0$ - 0$ - 0

*Estimated

6.2 - Transmission Removal - Schedule No. 1
TM-9B**8$ - 0$ - 0$ - 0$ - 0

**Ground wire is removed with pole, so no labor price for ground wire. Removal for accounting purposes only.

TOTAL Part 6 - Miscellaneous Construction Assembly Units $ - 0

©Feburary 2025 40 &G

Trans-Pt 7-Sch 1 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 7 - RIGHT-OF-WAY CLEARING UNITS
SCHEDULE NO. 1 - W.O. #108469
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
Not Applicable - N/A

TOTAL Part 7 - Right-of-Way Clearing Units $ - 0

©Feburary 2025 41 &G

Trans-Pt 1-Sch 2 (Pg.1) TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 1 - POLE UNITS
SCHEDULE NO. 2 - W.O. #107253
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.1 - Transmission Install - Schedule No. 2
Concrete Poles - Embedded in Steel Caisson with Select Stone Backfill
735*95/C-09.024,43420'-0"1$ - 0$ - 0$ - 0$ - 0
736*95/C-09.024,43420'-0"1$ - 0$ - 0$ - 0$ - 0
737*95/C-09.024,43019'-0"1$ - 0$ - 0$ - 0$ - 0
738*95/C-09.024,43019'-0"1$ - 0$ - 0$ - 0$ - 0
739*100/C-10.026,68520'-0"1$ - 0$ - 0$ - 0$ - 0
740*105/C-09.028,89920'-0"1$ - 0$ - 0$ - 0$ - 0
741*105/C-11.030,64520'-6"1$ - 0$ - 0$ - 0$ - 0
742*105/C-11.030,64520'-0"1$ - 0$ - 0$ - 0$ - 0
743*100/C-09.026,61019'-0"1$ - 0$ - 0$ - 0$ - 0
**Permanent Steel Cans - Direct Embedded - Contractor Supplied
735TMF-EMB-M (4'-0" x 25'-0")--25'-0"1$ - 0$ - 0$ - 0$ - 0
736TMF-EMB-M (4'-0" x 25'-0")--25'-0"1$ - 0$ - 0$ - 0$ - 0
737TMF-EMB-M (4'-0" x 24'-0")--24'-0"1$ - 0$ - 0$ - 0$ - 0
738TMF-EMB-M (4'-0" x 24'-0")--24'-0"1$ - 0$ - 0$ - 0$ - 0
739TMF-EMB-M (4'-0" x 25'-0")--25'-0"1$ - 0$ - 0$ - 0$ - 0
740TMF-EMB-M (4'-0" x 25'-0")--25'-0"1$ - 0$ - 0$ - 0$ - 0
741TMF-EMB-M (4'-0" x 25'-6")--25'-6"1$ - 0$ - 0$ - 0$ - 0
742TMF-EMB-M (4'-0" x 25'-0")--25'-0"1$ - 0$ - 0$ - 0$ - 0
743TMF-EMB-M (4'-0" x 24'-0")--24'-0"1$ - 0$ - 0$ - 0$ - 0

* Note: Owner will supply concrete poles. Contractor to supply all other materials.

** Note: Steel Can units are indicated as (Minimum Required Diameter x Length)

Note: The Contractor shall provide all materials required to maintain the stability of an excavated pole hole. Material shall be designed and built to withstand all loads caused by earth movement or pressure and shall maintain shape of the excavated hole under all circumstances. The Bidder shall include cost of all materials, equipment, and time associated with the above variables in Construction Assembly Unit prices. The Bidder must provide a written pole installation method with their bid.
SUB TOTAL Part 1 Page 1 - Pole Units$ - 0

18-8888-9009/111 Copyrighted September 2018 43 &G

©June 2025 43 &G

Trans-Pt 1-Sch 2 (Pg.2) TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 1 - POLE UNITS
SCHEDULE NO. 2 - W.O. #107253
StructureUnitWeightEmbedmentNO. OFUnit PriceEXTENDED PRICE
NumberNumber(lbs)DepthUNITSLaborMaterialsLabor & MaterialsLabor & Materials
1.2 - Transmission Removal - Schedule No. 2
Wood Poles
73565/H1N/A-1$ - 0$ - 0$ - 0$ - 0
73660/H2N/A-1$ - 0$ - 0$ - 0$ - 0
73760/H2N/A-1$ - 0$ - 0$ - 0$ - 0
73865/H4N/A-1$ - 0$ - 0$ - 0$ - 0
73960/H2N/A-1$ - 0$ - 0$ - 0$ - 0
74060/H2N/A-1$ - 0$ - 0$ - 0$ - 0
74155/1N/A-1$ - 0$ - 0$ - 0$ - 0
74265/3N/A-1$ - 0$ - 0$ - 0$ - 0
74375/H6N/A-1$ - 0$ - 0$ - 0$ - 0
Note: Old poles must be removed promptly (saw pole to place in dumpter). Disposal of old poles are the responsibility of the Contractor. The bidder shall include the cost of old poles disposal in the Construction Assembly Unit Prices.
SUB TOTAL Part 1 Page 2 - Pole Units$ - 0
TOTAL Part 1 - Pole Units$ - 0

18-8888-9009/111 Copyrighted September 2018 41 &G

©June 2025 44 &G

Trans-Pt 2-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 2 - POLE TOP CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2 - W.O. #107253
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
2.1 - Transmission Install - Schedule No. 2
TP-115(M)(C)SS7$ - 0$ - 0$ - 0$ - 0
TP-115B2-A(C)2$ - 0$ - 0$ - 0$ - 0
2.2 - Transmission Removal - Schedule No. 2
TP-115M7$ - 0$ - 0$ - 0$ - 0
TPS1-1152$ - 0$ - 0$ - 0$ - 0

TOTAL Part 2 - Pole Top Construction Assembly Units $ - 0

©June 2025 45 &G

Trans-Pt 3-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 3 - CONDUCTOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2 - W.O. #107253
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITS (mft)Labor/mftMaterials/mftLabor & MaterialsLabor & Materials
3.1 - Transmission Install - Schedule No. 2
Shield Wire, 7 No. 9 Alumoweld (mft.)3.819$ - 0$ - 0$ - 0$ - 0
3.2 - Transmission Removal - Schedule No. 2
Shield Wire, 7 No. 9 Alumoweld (mft.)3.819$ - 0$ - 0$ - 0$ - 0

TOTAL Part 3 - Conductor Construction Assembly Units $ - 0

©June 2025 46 &G

Trans-Pt 4-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 4 - GUY CONSTRUCTION ASSEMBLY UNITS (TG UNITS)
SCHEDULE NO. 2 - W.O. #107253
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
4.1 - Transmission Install - Schedule No. 2 - N/A
Not Applicable - N/A
4.2 - Transmission Removal - Schedule No. 2
TG-25C8$ - 0$ - 0$ - 0$ - 0
TG-25D1$ - 0$ - 0$ - 0$ - 0
TG-11ASS9$ - 0$ - 0$ - 0$ - 0
TG-21A2$ - 0$ - 0$ - 0$ - 0
TG-GM11$ - 0$ - 0$ - 0$ - 0

TOTAL Part 4 - Guy Construction Assembly Units (TG Units) $ - 0

©June 2025 47 &G

Trans-Pt 5-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 5 - ANCHOR CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2 - W.O. #107253
UNITNO. OF UNITSUnit PriceEXTENDED PRICE
NO.LaborMaterialsLabor & MaterialsLabor & Materials
5.1 - Transmission Install - Schedule No. 2 - NA
Not Applicable - N/A
5.2 - Transmission Removal - Schedule No. 2
TA-1S(M)9$ - 0$ - 0$ - 0$ - 0
TA-2H1$ - 0$ - 0$ - 0$ - 0

TOTAL Part 5 - Anchor Construction Assembly Units $ - 0

©June 2025 48 &G

Trans-Pt 6-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 6 - MISCELLANEOUS CONSTRUCTION ASSEMBLY UNITS
SCHEDULE NO. 2 - W.O. #107253
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
6.1 - Transmission Install - Schedule No. 2
TM-2B2$ - 0$ - 0$ - 0$ - 0
TM-4A1$ - 0$ - 0$ - 0$ - 0
TM-4GM2$ - 0$ - 0$ - 0$ - 0
TM-6A1$ - 0$ - 0$ - 0$ - 0
TM-9X10$ - 0$ - 0$ - 0$ - 0
TM-9D9$ - 0$ - 0$ - 0$ - 0
TM-9R*9$ - 0$ - 0$ - 0$ - 0
TM-D25$ - 0$ - 0$ - 0$ - 0
TM-AFS(PHASE)213$ - 0$ - 0$ - 0$ - 0
**TM-PROJECT MATTING$ - 0$ - 0$ - 0$ - 0
**TM-BRIDGE (TEMP) (15' x 36')1$ - 0$ - 0$ - 0$ - 0
**TM-BRIDGE (TEMP) (20' x 48')1$ - 0$ - 0$ - 0$ - 0
* Estimated Quanitity
** Note: Access methods, including project matting and temporary bridge installations over canal crossings, must be performed by a qualified professional contractor specializing in matting and temporary bridge systems. These services may require subcontracting. Bidders shall include all associated costs as lump sum amounts in the respective bid items TM-PROJECT MATTING and TM-BRIDGE (TEMP). Temporary bridge dimensions are provided in Unit No. above.
6.2 - Transmission Removal - Schedule No. 2
TM-4A1$ - 0$ - 0$ - 0$ - 0
TM-4GM2$ - 0$ - 0$ - 0$ - 0
TM-61$ - 0$ - 0$ - 0$ - 0
TM-D22$ - 0$ - 0$ - 0$ - 0
TM-9B**9$ - 0$ - 0$ - 0$ - 0

**Ground wire is removed with pole, so no labor price for ground wire. Removal for accounting purposes only.

TOTAL Part 6 - Miscellaneous Construction Assembly Units $ - 0

©June 2025 49 &G

Trans-Pt 7-Sch 2 TRANSMISSION CONSTRUCTION ASSEMBLY UNITS (Continued)

Part 7 - RIGHT-OF-WAY CLEARING UNITS
SCHEDULE NO. 2 - W.O. #107253
UNITNO. OFUnit PriceEXTENDED PRICE
NO.UNITSLaborMaterialsLabor & MaterialsLabor & Materials
TM-12(mft.)1.000$ - 0$ - 0$ - 0$ - 0

TOTAL Part 7 - Right-of-Way Clearing Units $ - 0

©June 2025 50 &G

Summary

PROPOSAL SUMMARY

TRANSMISSION CONSTRUCTION ASSEMBLY UNITS, SCHEDULE NO. 1 (W.O. #108469)

Part – 1. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 2. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 3. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 4. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 5. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 6. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 7. . . . . . . . . . . . . . . . . . . . . . . . . .N/A

TOTAL TRANSMISSION CONSTRUCTION ASSEMBLY UNITS - SCHEDULE NO. 1 (W.O. #108469) $ - 0

TOTAL TRANSMISSION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST - SCHEDULE NO. 1 (W.O. #108469) $ 320,106.02

TOTAL SCHEDULE NO. 1 (W.O. #108469) $ 320,106.02

TRANSMISSION CONSTRUCTION ASSEMBLY UNITS, SCHEDULE NO. 2 (W.O. #107253)

Part – 1. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 2. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 3. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 4. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 5. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 6. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0
Part – 7. . . . . . . . . . . . . . . . . . . . . . . . . .$ - 0

TOTAL TRANSMISSION CONSTRUCTION ASSEMBLY UNITS - SCHEDULE NO. 2 (W.O. #107253) $ - 0

TOTAL TRANSMISSION CONSTRUCTION - OWNER FURNISHED MATERIALS - LUMP SUM COST - SCHEDULE NO. 2 (W.O. #107253) $ 193,507.00

TOTAL SCHEDULE NO. 2 (W.O. #107253) $ 193,507.00

TOTAL SCHEDULES NO. 1 AND 2 $ 513,613.02