About this file

This file contains architectural and engineering drawings for the Eleventh Addition to the Nine Springs Wastewater Treatment Plant for the Madison Metropolitan Sewerage District in Madison, Wisconsin. The drawings detail the construction specifications for two acid digesters (numbered 1 and 2) and associated facilities including a recirculation pump room, transfer pump room, and sour gas room. The project drawings, dated October 2011, include detailed elevations, sections, floor plans, mechanical systems, and electrical layouts for the digester facility.

The drawings provide comprehensive technical specifications for the construction, showing the digesters as circular structures with dome covers, access platforms, sidewall hatches, and mixer shafts. The facility includes brick veneer exterior walls, insulation systems, and specialized piping for acid handling. The mechanical drawings detail extensive piping systems for both digesters, including sour gas handling equipment and pump systems. The electrical plans show Class 1, Division 1 hazardous area classifications and associated lighting and power requirements. The project is identified as Project No. 4635 and includes requirements for specialized construction methods for handling acidic materials and hazardous environments.

View the file

Other files

File Type Posted
Digester 8 Drawings.pdf PDF
MMSD 2025 Prequalification Forms.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sidewall access hatch

Rita N Rectangle

Line c

0 "

80-A-1

GENERAL NOTES:

ACID DIGESTER

NO. 2

1. CONTRACTOR /5 TO SUBMIT PROPOSED SEQUENCE OF CONCRETE

PLACEMENT TO ENGINEER FOR APPROVAL.

2. REINFORCE ALL CONCRETE CORNERS PER( 0.3205 ).

.3. FOR EQUIPMENT PADS SEE MECHANICAL DRAWINGS VERIFY

EQUIPMENT �NS/ONS W/ MANUFACTURER. ALL PU�

TO BE PER� AND ALL OTHERS PADS TO BE PER�.

4. FOR FLOOR BEAM SCHEDULE SEE SHEET 95-S-2. FOR SLAB, PIER

AND COLUMN SCHEDULE, SEE 95-S-1.

5. FOR LINTEL SCHEDULE SEE ( 04560 ) .

� 6. FOR MASONRY ANCHORAGE REQUIREMENTS SEE ( 04592 ) ,

6 ( 0459.3 ).( 04594 )4,;( 04595 ), US£ AS APPLICABLE. ALL CMU

Il! WALLS ARE TO BE ANCHORED TO INTERSECTING CONCRETE WALLS

�-gj �

W/ DOVETAIL ANCHORS.

7. JOINT REINFORCING REQUIRED FOR ALL CMU WALL PER SPEC.

�] ,c; � 8. FOR BEAM CAMBER REQUIREMENTS SEE BEAM SCHEDULE.

� 1: 9. FLOOR REINFORCING HAS BEEN DESIGNED TO ACCOMMODATE THINNER

;,:; 'a. SLABS OU£ TO FLOOR SLOPE AND DRAINS. THEREFORE SLAB

THICKNESS IS ALLOWED TO VARY.

I

16'-.3"

WAS BLEND TANKS

( 78)

MASONRY EJ, 1YP

1· 10'-8"

80-AS-8

1·-0·

8"

8"

80-AS-7

2'-8"

1· o·

CON WALL

SLAB DESIGNATION

TYP, SEE 95-5-1

. I

2·-0· 2·-0· ,3'-4"

8"

1·-0·

CONC WALL

80-A-1

9'-8" 4'-0" MO 9'-8"

16'-.3" 1"

2.3'-4"

TRUE PLAN

NORTH NORTH

.37'-4"

2.3'-4"

10·-o·

FIRST FLOOR PLAN

1/4" = 1·-0·

80-A-1 10'-8"

( 0459.3 ) .TYP AT

ALL EXTERIOR

CONCRETE WALLS

B

1·

WAS THICKENING BLDG

cm

16'-.3"

"\ SEE DETAIL ffi 1YP

80-AS-9

ACID DIGESTER

NO. 1

EXPANSION

r1-ff\

TYP

SEE DETAIL 5

80-AS-9

1· 16'-.3"

2.3'-4"

I I

I I

I I

TYPICAL £/FS FIN/SH SYSTEM ON

2" & 4" RIGID INSULATION PATTERN

AROUND ACID DIGESTER$.

G 80-A-1 sIqEWALL ACCESS HATCH AND P

TFORM COORDINATE WITH TANK

M SIM TO ffi, 1YP EACH

DI ESTER .30-M-5

I

EQUAL

KEYED NOTES:

0 8" NON LOAD BEARING WALL W/ 1" CLR BETWEEN TOP OF WALL

& BOTTOM OF CONCRETE. SEAL JOINT TO MEET FIRE WALL

REQUIREMENTS. NO ANCHOR REQUIRED AT TOP OF WALL.

REINFORCE SLAB W/ #5 @ 12" OC, EW, T&B CONTINUOUS W/

80S2 REINFORCEMENT.

REINFORCE WALL W/ #Ii O 12" OC, EW, ff W/ 2" CLR SIM TO @

,,,=,-... 80-AS-8

FOR COLUMN-IN-WALL REINFORCING. SEE DETAIL L...!.......J

80-AS-9

HORIZONTAL WALL REINFORCING TO HA VE STD 90" HOOKS @ THIS

END.

'i' o 10. ALL HVAC OPENINGS IN FLOOR SHALL HAVE A 4"Wx4"H CONCRETE @ PROVIDE .3" DIA PVC PIPE THROUGH PAD FOR FLOOR DRAINAGE. � " CURB ALL AROUND OPENING. IF OPENING IS ADJACENT TO A """' ;� BUILDING WALL, THE CURB SHOULD TERMINATE AT FACE OF WALL. 0 FOR LINTEL SEE LlQ..:i .

VERIFY SCALES

LENGTH OF BAR IS 1 "

ON ORIGINAL DRAWING

1:2

PLOT SCALE, ADJUST

SCALE(S) ACCORDINGLY

DESIGNED BY: t.1.A.H./J.T.

DRAWN BY: J.TH./P.C.G.

CHECKED BY: W.A.E.

APPROVED BY: PAT.

PROJECT NO.

DATE

OCT 2011

DRAWING NO.

m -§, SEE STANDARD DETAIL ( 0.3260) . 75-AS-11

!IL _________________________________________________________________________________________________________________________________ .._ __________ �

80-AS-2

Acid Digester 2 Location

Digester 8 Location

Digester 9 Location

Rita N Rectangle

Rita N Rectangle

Rita N Rectangle

Rita N Line

Rita N Line

Line

VOLUME 3
Group 10 - Project Reference
Group 20 - Site Work
Group 30 - Digester No 8
Group 32 - Digester No 9
Group 35 - Sludge Control Building No 3
Group 36 - Waste Gas Burner
Group 38 - Solids Tunnel No 3
Group 40 - East Digester Complex
Group 42 - Substation U1
Group 45 - Sludge Control Building No 2
Group 50 - West Digester Complex
Group 52 - Sludge Control Building No. 1
Group 55 - Tunnel No. 2
Group 60 - Thickener Modifications
Group 65 - GBT Building
Group 70 - Struvite Harvesting Building
Group 74 - Substation U3 ans Was Gallery
Group 75 - Was Thickening Building
Group 76 - Filtrate Wells
Group 78 - Was Pretreatment Tanks
Group 80 - Acid Digester Facility
Group 88 - Miscellaneous Site Modifications
Group 90 - Instrumentation & Control