2025-937_Price_Schedule.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- DNR RFB Boyd Sartell WMA Wetland Restoration
- Solicitation number
- 2000017130
- Issued by
- Sherburne County, Minnesota
About this file
This document is a Price Schedule Excel spreadsheet for a wetland restoration project at Boyd Sartell Wildlife Management Area (WMA), associated with solicitation number 2025-937. The project involves multiple construction and environmental restoration tasks, including breaking and capping tile, earthwork, sediment removal, rock weir installation, tile daylighting and outlet installation, riprap placement, mulching, and seeding. The schedule outlines 11 specific line items with estimated quantities, including 200 linear feet of tile breaking and capping, 450 cubic yards of embankment, 300 cubic yards of sediment removal, and installation of rock weirs, tile outlets, and erosion control measures across approximately 0.75 acres.
The price schedule requires bidders to provide unit prices for each line item, with all entries currently showing $0.00. The document specifies that bids must include unit prices for all items, and incomplete submissions may be rejected. Contractors are instructed to upload the completed spreadsheet in specific Excel formats (.xls, .xlsx, .xlsm, .xlt, .xltm, .xlw) or PDF, with a helpline (651-201-8100 Option 1) available for questions. The total project value will be determined by multiplying the estimated quantities by the unit prices submitted by the bidder, with a current placeholder total of $0.00.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Event Price Schedule
CONTRACTOR NAME:
| PROJECT: Boyd Sartell WMA - Wetland Restoration |
| SOLICITATION NO.: 2025-937 |
| The completed Price Schedule should be uploaded in either a Microsoft Excel 97-2003 Worksheet (.xls) or Microsoft |
Excel 2010 Worksheet (.xlsx). The Price Schedule document may also be downloaded, completed and uploaded in a .pdf format. Other Excel file extensions that MAY be compatible are: .xlsm , .xlt, .xltm , and .xlw .
The State reserves the right to reject Price Schedules submitted in any other format.
Responders must submit a unit price for each Item number one (1) through eleven (11). Bids not containing a unit price for each item may be rejected.
| ITEM NO | DESCRIPTION | PAY UNIT | EST. QUANTITY | UNIT PRICE | AMOUNT BID |
| 1 | Break Tile and Cap (BWSR Type A, B, C) | L.F. | 200 | $0.00 | $0.00 |
| 2 | Tile Exploration (additional to #1 if tile cannot be found - Not to Exceed 100 L.F.) | L.F. | 100 | $0.00 | $0.00 |
| 3 | Earthwork: Embankment | C.Y. | 450 | $0.00 | $0.00 |
| 4 | Earthwork: Sediment Removal (Not to Exceed 300 C.Y.) | C.Y. | 300 | $0.00 | $0.00 |
| 5 | Rock Weir: Furnish & Install 40 tons Class I & II Mixed Riprap & 600 sq. ft. Geotextile | EA | 1 | $0.00 | $0.00 |
| 6 | Daylight Tile: Furnish & Install 150' 6-inch non perforated tile with junction | EA | 1 | $0.00 | $0.00 |
| 7 | Tile Outlet: Furnish & Install 10' x 8" CMP with coupler and rodent guard | EA | 1 | $0.00 | $0.00 |
| 8 | Tile Outlet Basin: Furnish & Install 2 CY Class II Riprap & 12 sq. yd. Geotextile | EA | 1 | $0.00 | $0.00 |
| 9 | Mulching and Crimping Bare Soils in Upland Areas | Acre | 0.75 | $0.00 | $0.00 |
| 10 | Seed Oat Cover Crop | Acre | 0.75 | $0.00 | $0.00 |
| 11 | Mobilization | EA | 1 | $0.00 | $0.00 |
| TOTAL | $0.00 | ||||
| Responders MUST Complete all lines and Upload this attachment back into this Event. |
Call the Helpline with questions (651-201-8100 Option 1)
Sheet2
Sheet3
File details come from the government source that posted it. Updated .