2025_694_Equipment_Requirement_Form.pdf
PDF 195 KB Posted
- Attached to
- DNR-RFB Tangnes Road Graveling
- Solicitation number
- 2000016879
- Issued by
- Scott County, Minnesota
About this file
This document is an Equipment Requirement Specifications Response Form for the Tangnes Forest Road Graveling project, solicitation number 2025-694. The form outlines specific equipment requirements for contractors bidding on the road graveling project, with a focus on truck and trailer specifications. Contractors must provide belly dump trailer trucks with a minimum volumetric capacity of 16 cubic yards, and a minimum of 3 truck/trailer combinations must be listed on the contract, with at least 2 operating simultaneously during the project.
The response form requires contractors to detail their proposed equipment, including make and model, truck type, quantity, capacity, and whether the trucks are rented or owned. The document provides a structured table for contractors to complete, enabling a standardized submission of equipment information. No specific pricing, funding sources, or contract duration details are provided in this equipment specification form, which appears to be a preliminary qualification document for potential bidders to demonstrate their equipment capabilities for the forest road graveling project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQUIPMENT REQUIREMENT SPECIFICATIONS
RESPONSE FORM
Tangnes Forest Road Graveling Solicitation # 2025-694
CONTRACTOR NAME:
Truck(s)
• The truck trailer combination must be of the belly dump trailer type having a volumetric capacity of not less than 16 cubic yards.
• The truck/trailer will be indicated in the Proposal by the capacity of the belly dump box capacity in cubic yards.
o Belly dump trailer required method of haul and spread.
• A minimum of 3 truck/trailers must be listed on the contract and a minimum of 2 must be operating at one time.
REQUIRED EQUIPMENT INFORMATION (list items you will provide for project)
Trucks Make and Model Type (belly) Quantity of trucks Capacity
(cu. yds)
Rent or Own?
Contractor Signature Date
File details come from the government source that posted it. Updated .