2025-40_Street_Rehab_S._Pine_Lake_Rd_Technical_Specifications_IFB.pdf
PDF 20 MB Posted
- Attached to
- Street Rehabilitation - South Pine Lake Road
- Solicitation number
- 2025-40
- Issued by
- Harris County, Corpus Christi City, Texas
About this file
This is a Technical Specifications document for an Invitation for Bids (IFB) issued by the State of Texas for Street Rehabilitation on South Pine Lake Road. The project involves the rehabilitation of approximately 1.1 miles of roadway, including the removal and replacement of existing asphalt pavement, excavation and replacement of base materials, installation of new curb and gutter, sidewalk improvements, and drainage modifications. The scope encompasses pavement milling, full-depth asphalt replacement, concrete work, and traffic control measures. Specific bid submission requirements, material specifications, and construction standards are detailed throughout the document to ensure quality and compliance with local engineering standards.
The engineering estimated budget for this project is $1,300,000.00. The technical specifications document outlines detailed requirements for materials, workmanship, testing procedures, and quality assurance measures that all bidders must follow in their proposals. Contractors must comply with Texas Department of Transportation standards and local municipal requirements. The project is funded through municipal or state transportation budgets, with specific details regarding payment terms, schedule requirements, and performance standards incorporated into the overall procurement framework.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .