2025-251_Price_Schedule.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- DNR_RFB_Lac Qui Parle WMA Shelstad Unit Wetland
- Solicitation number
- 2000016266
- Issued by
- Lac Qui Parle County, Minnesota
About this file
This document is a Price Schedule for the Lac Qui Parle WMA Shelstad Unit Wetland Restoration project, Solicitation #2025-251, issued by the Minnesota Department of Natural Resources (DNR). The Price Schedule includes 11 bid items such as mobilization, tile removal, site preparation, excavation, erosion control, and sowing/mulching. Contractors must bid on all line items, and the bid will be rejected if any lines are left blank. The project scope includes activities such as stripping, excavation, removal, backfilling, cultivation, and sowing/mulching over approximately 20 acres. Payment will be based on unit prices provided by the contractor for each bid item.
The Price Schedule provides detailed bid notes describing the requirements and scope of work for each bid item. It also specifies that machine control will be required for sediment removal areas and the project plug. The contractor will be responsible for obtaining the stormwater permit prior to construction. The DNR will seed the native plants, and the contractor will be responsible for installing the cover crop, erosion control blanket, and mulch.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
Event Price Schedule
| PROJECT: | Lac Qui Parle WMA Shelstad Unit Wetland Restoration |
| SOLICITATION #: | 2025-251 |
| CONTRACTOR NAME: | (VENDOR: PLEASE INSERT YOUR BUSINESS NAME) |
The completed Price Schedule should be uploaded in either a Microsoft Excel 97-2003 Worksheet (.xls) or Microsoft Excel 2010 Worksheet (.xlsx). The Price Schedule document may also be downloaded, completed and uploaded in a .pdf format. Other Excel file extensions that MAY be compatible are: .xlsm , .xlt, .xltm , and .xlw .
The State reserves the right to reject Price Schedules submitted in any other format.
| Item | |||
| No | Bid Notes Sheet C-002 | Description | Pay |
| Unit | Est. | ||
| Qty | Unit | ||
| Price | Amount |
Bid
| 1 | A | MOBILIZATION | LS | 1 | $ - 0 | $ - 0 |
| 2 | B | TILE REMOVAL | LF | 3100 | $ - 0 | $ - 0 |
| 3 | C | TILE INVESTIGATION | LF | 800 | $ - 0 | $ - 0 |
| 4 | D | SITE PREPARATION | LS | 1 | $ - 0 | $ - 0 |
| 5 | E | CULTIVATION | ACRE | 20 | $ - 0 | $ - 0 |
| 6 | F | EXCAVATION - SEDIMENT REMOVAL AREAS (SRA'S) | CY-P | 9172 | $ - 0 | $ - 0 |
| 7 | EROSION CONTROL BLANKET CAT.20 - NATURAL NETTING | SY | 2600 | $ - 0 | $ - 0 | |
| 8 | 9"Ø STRAW WATTLES -NATURAL NETTING | LF | 1200 | $ - 0 | $ - 0 | |
| 9 | CONSTRUCTION EXIT | EA | 1 | $ - 0 | $ - 0 | |
| 10 | G | STORM WATER PERMIT FOR CONSTRUCTION | LS | 1 | $ - 0 | $ - 0 |
| 11 | H | SOWING AND MULCHING | ACRE | 20 | $ - 0 | $ - 0 |
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| TOTAL | $ - 0 | |||||
| Responders MUST bid on all lines and Upload this attachment back into this Event. Call the Helpline with questions (651-201-8100 Option 1). Failure to respond all line items may result in bid rejection. | ||||||
| Bid Notes | ||||||
| A | BID ITEM FOR MOBILIZATION SHALL INCLUDE THE SUPPLY OF ALL LABOR, MATERIAL, AND EQUIPMENT TO TRANSPORT ALL NEEDED LABOR, MATERIAL, AND EQUIPMENT TO AND FROM A PROJECT SITE TO SUCCESSFULLY COMPLETE THE PROJECT AS SHOWN ON THE PLANS OR DESCRIBED BY THE DNRFIELD REPRESENTATIVE. | |||||
| B | BID ITEM FOR TILE REMOVAL SHALL INCLUDE STRIPPING, EXCAVATION, REMOVAL, AND BACKFILLING OPERATIONS. CONTRACTOR WILL ONLY BE PAID FOR THE ACTUAL LINEAR FEET OF TILE REMOVED IN THE FIELD. | |||||
| C | BID ITEM FOR TILE INVESTIGATION SHALL INCLUDE STRIPPING, EXCAVATION, AND BACKFILLING OPERATIONS. CONTRACTOR WILL ONLY BE PAID FOR THE ACTUAL LINEAR FEET INVESTIGATED. | |||||
| D | BID ITEM FOR SITE PREPARATION SHALL INCLUDE STRIPPING BENEATH PLUG AND DESIGNATED SPOIL AREAS. BID ITEM SHALL ALSO INCLUDE |
LEVELING/DRAGGING TOPSOIL SUITABLE ENOUGH TO BE CONSIDERED "SEED BED READY."
E BID ITEM FOR CULTIVATION SHALL INCLUDE EQUIPMENT, LABOR, AND ALL ASSOCIATED COST REQUIRED TO CULTIVATE DISTURBED AREAS INCLUDING: SEDIMENT REMOVAL AREAS, PLUG, SPOIL AREAS, AND TILE INVESTIGATION/REMOVAL AREAS. CONTRACTOR SHALL USE FIELD CULTIVATOR WITH DRAG/ROLLER SECTION OR OTHER IMPLEMENT WITH MINIMUM 4" DEPTH. FINISHED SURFACE SHALL BE SMOOTH FIRM SEED BED, FREE OF ROCK AND DEBRIS SUITABLE FOR NATIVE SEED PLANTING. CULTIVATION LINE ITEM WILL BE PAID FOR BASED ON ACRES.
F BID ITEM FOR EXCAVATION- SEDIMENT REMOVAL AREAS SHALL INCLUDE EXCAVATING THE VARIOUS SRA'S AS IDENTIFIED IN THE PLANS.
ALL SPOIL MATERIAL SHALL BE REMOVED FROM WETLAND AREAS AND MOVED TO DESIGNATED AREAS AS SHOWN IN THESE PLANS. PAYMENT IS BASED ON CUBIC YARD PLAN, THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE OR DECREASE TO QUANTITY. ALL PLUG'S WILL BE CONSIDERED INCIDENTAL TO THIS LINE ITEM. MACHINE CONTROL WILL BE REQUIRED FOR SRA'S AND PLUG.
G BID ITEM FOR STORM WATER PERMIT FOR CONSTRUCTION SHALL INCLUDE THE CONTRACTOR OBTAINING THE STORM WATER PERMIT FOR
CONSTRUCTION ACTIVITIES PRIOR TO THE START OF CONSTRUCTION.
H BID ITEM FOR SOWING AND MULCHING SHALL INCLUDE THE EQUIPMENT AND LABOR REQUIRED TO SOW AND MULCH ALL DISTURBED AREAS. MnDOT TYPE 1 MULCH SHALL BE USED AND CONTRACTOR WILL BE REQUIRED TO DISC ANCHOR IN THE FIELD. THE CONTRACTOR WILL COORDINATE WITH THE MN DNR AS HE/SHE WILL ONLY BE INSTALLING A COVER CROP AND MN DNR WILL BE SEEDING NATIVES PRIOR TO EROSION BLANKET AND MULCH.
File details come from the government source that posted it. Updated .