This is a Request for Quotation (RFQ) issued by the City of Hayward, California for sewer manhole rehabilitation services. The project encompasses the rehabilitation of 21 aging manhole structures within the City's 325-mile sewer collection system serving approximately 160,000 residents. The scope of work includes two primary categories: channelizing existing manhole bottoms with concrete to facilitate smooth wastewater flow and rehabilitating manholes through application of mortar and epoxy composite corrosion barrier lining systems. Contractors must submit pricing for five line items: mobilization/demobilization, traffic control, sewer bypassing and flow control, rehabilitation of 10 existing sewers, and channelization of 12 existing sewers. Questions regarding the RFQ must be submitted by May 1, 2026, with proposal submissions due electronically by May 11, 2026, at 4:00 p.m. The City intends to notify the selected contractor on May 22, 2026. All work must be completed within 90 calendar days from the Notice to Proceed date. A pre-construction meeting will be held, and on-site interviews may be conducted at the City's discretion.
Award will be made to the lowest-cost proposal from a qualified contractor meeting all specified experience and technical requirements. No set-asides or disadvantaged enterprise preferences are designated for this procurement. Qualified contractors must hold a current California state contractor's license, demonstrate a minimum of five years of direct experience in sewer manhole rehabilitation, and provide proof of successful completion of at least five similar projects within the past two years. All work is subject to prevailing wage requirements under California Labor Code Section 1770 et seq., and contractors must register with the Department of Industrial Relations prior to award. The successful contractor must furnish Labor and Materials Bonds and Performance Bonds equal to 110 percent of the contract price and maintain Workers' Compensation and public liability insurance with minimum single limits of $1,000,000. Liquidated damages are assessed at $300 per calendar day for delays beyond the 90-day completion deadline. The City will reimburse permit fees at cost, and no specific contract award value or budget is disclosed in the procurement documents.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
26-049
2025-2026 SEWER MANHOLE REHABILITATION PROJECT
City of Hayward
777 B Street
Hayward, CA 94541
RELEASE DATE: April 22, 2026
DEADLINE FOR QUESTIONS: May 1, 2026
RESPONSE DEADLINE: May 11, 2026, 4:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/hayward-ca https://secure.procurenow.com/portal/%7bproject.government.code%7d
City of Hayward
REQUEST FOR QUOTATION
2025-2026 Sewer Manhole Rehabilitation Project
I. Introduction II. Project Details
III. Scope of Work IV. Submission Format V. Cost Evaluation
VI. Pricing Proposal VII. Vendor Questionnaire
Attachments:
A - Construction Contract Template
B - Manhole Rehabilitation Project Map
C - Manhole Rehabilitation Table
D - SD-304 Standard Manhole
E - Detail A- Manhole Rehabilitation
F - 02145 - Sewer Bypassing and Dewatering
G - 02731 - Manhole Lining
H - 03300 - Cast-in-Place Structural Concrete
I - Contract Bonds
J - General Provisions
K - Non-nuclear
L - Non-Collusion Affidavit
M - Nondiscriminatory Affirmative Action Cert Statement
Request For Quotation #26-049 Title: 2025-2026 Sewer Manhole Rehabilitation Project
1. Introduction
1.1. Summary
The City of Hayward is seeking an experienced and qualified contractor who is specially trained, experienced, and competent to perform sewer manhole rehabilitation services in accordance with the terms, conditions, and specifications contained in this Request for Quote (RFQ).
The City of Hayward is accepting electronic bid submissions. Bidders shall create a FREE account with
OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.
https://procurement.opengov.com/portal/hayward-ca
1.2. Background
The City of Hayward has a population of approximately 160,000 residents and is serviced by approximately 325 miles of sewer mains and nine sewage lift stations. The collection system conveys the wastewater flow to the City’s Water Resource Recovery Facility (WRRF). The WRRF treats an average of
11.3 million gallons per day of wastewater generated by the City's residents and businesses. To maintain the performance of the sewer system, the City plans to improve 21 aging manhole structures.
1.3. Contact Information
Derek Pham
Senior Utilities Engineer
777 B St
Hayward, CA 94541
Email: derek.pham@hayward-ca.gov
Phone: (510) 583-5379
Department:
Utilities
Department Head:
Alex Ameri
Director of Public Works
1.4. Timeline
Release Project Date April 22, 2026
Question Submission Deadline May 1, 2026, 4:00pm
Question Response Deadline May 4, 2026, 4:00pm https://procurement.opengov.com/signup https://procurement.opengov.com/portal/hayward-ca mailto:derek.pham@hayward-ca.gov tel:(510)583-5379
Proposal Submission Deadline May 11, 2026, 4:00pm
Selection of Firm or Individual (Tentative) May 22, 2026
2. Project Details
2.1. Important Instructions for Electronic Submittal
The City of Hayward is accepting electronic bid submissions. Bidders shall create a FREE account with
OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.
2.2. Communication Regarding this RFQ
All communication from prospective proposers regarding this RFQ must be submitted in the Question &
Answer portal within the City's project posting. Please submit each question SEPARATELY. Questions not submitted separately will be rejected. Communication by telephone or in person will not be accepted. Attempts by or on behalf of a prospective or existing vendor to contact or to influence any member of the selection committee, any member of the City Council, or any employee of the City of
Hayward with regard to the acceptance of a proposal may lead to elimination of that vendor from further consideration.
2.3. Award of City Contract and City Rights
The City reserves the right to reject any and all proposals, to contract work with whomever and in whatever manner the City decides, to abandon the work entirely and to waive any informality or non-substantive irregularity as the interest of the City may require and to be the sole judge of selection process.
The City further reserves the following rights:
• The City reserves the right to select the proposal which in its sole judgment best meets the needs of the City. Selection will be based on the lowest proposed cost proposal that also meets the specified experience and who has the capacity to perform the work as specified in this RFQ.
• Award to the Contractor is also subject to review and approval by the City Council.
• The City reserves the right, in its sole discretion, to reject any or all proposals and to waive technicalities and minor informalities in any proposals received when such waiver is determined by the
City to be in the City’s best interest.
• The City reserves the right to retain all accepted proposals, including proprietary documentation, regardless of which proposal is selected. No proposals will be returned to vendors.
• The City reserves the right to request any supplementary information it deems necessary to evaluate proposer’s experience or qualifications.
• The City reserves the right to reconsider any proposal submitted at any stage of the procurement.
Furthermore, the City reserves the right to delete or add functionality (i.e., modules and components) until the final contract signing.
• The City reserves the right to cancel, in part or in its entirety, this RFQ. If the City cancels or revises this RFQ, all proposers will be notified in writing by the City.
• The City reserves the right to revise the RFQ prior to the date that proposals are due. The City will communicate changes through addenda to this RFQ. All registered proposers will be notified of revisions to the RFQ. The City reserves the right to extend the date by which the proposals are due.
https://procurement.opengov.com/signup https://procurement.opengov.com/portal/hayward-ca/projects/258684
• The City reserves the right, in its sole discretion, to reject any and all proposals and to waive informalities and minor irregularities in any proposals received. Failure to furnish all information requested or to follow the format requested herein may disqualify the proposer, in the sole discretion of the City. False, incomplete, misleading or unresponsive statements in a proposal may also be sufficient cause for a proposal’s rejection.
• This RFQ does not commit the City to award a contract. All proposals submitted in response to this
RFQ become the property of the City and public records, and as such, may be subject to public review.
• The City shall not be liable for any pre-contractual expenses incurred by prospective vendors or selected contractors, including but not limited to costs incurred in the preparation or submission of proposals. The City shall be held harmless and free from any and all liability, claims, or expenses whatsoever incurred by, or on behalf of, any person or organization responding to this RFQ.
• If the successful proposer defaults, the City may award this RFQ to the next best proposal and may recover the loss occasioned by the successful proposer against a surety bond, if any, or by suit against the successful proposer.
• The City reserves the right to cancel, in part or in its entirety, this RFQ including, but not limited to: submittal date, and submittal requirements. If the City cancels or revises the RFQ, all interested firms will be notified.
2.4. Protest
Should any proposer question or protest the award of the contract, such question or protest must be furnished in writing to the Purchasing Manager within three calendar days after the City notifies all proposers of its Intent to Award. Such protests must fully explain the basis of the objection supported by all relevant information facts and details. Letter must be signed by an authorized representative stating specific reason(s) for the protest including all relevant facts (law, rule, regulation, and criteria). Protests not furnished in writing as prescribed will not be accepted.
2.5. Bonds
The successful Proposer, simultaneously with the execution of the contract, shall furnish a Labor and
Materials bond and a Performance bond in the amount of 110% of the contract price. The bonds shall be secured from a surety company issued by a corporation duly and legally licensed to transact business in the State of California and approved by the City.
The contract shall be in the form of the Contract Template in Attachment I.
2.6. Prevailing Wage
Prevailing wages must be paid to all workers employed on a public works project when the public works project is over $1,000. Prevailing Wages: The Work is subject to the payment of not less than prevailing wages under Labor Code Section 1770 et seq. Bidders are hereby notified that the Director of Industrial
Relations (DIR) has ascertained the general prevailing rate of per diem wages and the rates for overtime and holiday work in the locality in which the work is to be performed for each craft, classification or type of worker needed to perform the Work under the contract which will be awarded to the successful bidder. Copies are on file with and available upon request from the City Engineer or at http://www.dir.ca.gov/dlsr/DPreWageDetermination.htm.
http://www.dir.ca.gov/dlsr/DPreWageDetermination.htm
Bidders are further notified that this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Further information on Compliance Monitoring Unit requirements can be found at https://www.dir.ca.gov/dlse/cmu/cmu.html.
No contractor or subcontractor may be listed on a bid proposal for a public works project submitted on or after March 1, 2015 unless registered with the Department of Industrial Relations pursuant to Labor
Code section 1725.5, with limited exceptions from this requirement for bid purposes only under Labor
Code section 1771.1(a).
No contractor or subcontractor may be awarded a contract for public work on a public works project awarded on or after April 1, 2015 unless registered with the Department of Industrial relations pursuant to Labor Code section 1725.5.
Contractor agrees to comply with all related provisions of the Labor Code, including but not limited to, the provisions of Labor Code Section 1775 relating to the payment of prevailing wages, Section 1777.5 relating to the employment of apprentices and Section 1811-1813 relating to the payment of Overtime.
2.7. Special Conditions
Manufacturer's Recommendations
If the manufacturer of any material or equipment, which is to be incorporated into the work, recommends installation, methods and procedures, the Contractor shall submit this information along with the technical data, and observe strictly all such recommendations, which are not in conflict with the other requirements of these specifications. If a conflict is found with this specification, the
Contractor shall immediately notify the Engineer in writing.
Warranty
The warranty is to be clearly stated. Warranty information is to be included in the Bidder's submittal.
Specification Section
The data shall clearly demonstrate compliance with the Contract Plans and Specifications and shall relate to the specific material, equipment to be furnished, or process to be followed. Where manufacturer’s standard drawings are employed, they shall be clearly marked to show what portions of the data are applicable to this project.
Submittal coordination is the responsibility of the Contractor. The responsibility shall not be delegated in whole or in part to subcontractors or suppliers.
All submittals (shop drawings and supporting data, catalogs, schedules, etc.), shall be submitted as the instruments of the Contractor, who shall be responsible for their accuracy and completeness. These submittals may be prepared by the Contractor, subcontractors, or suppliers, but the Contractor shall ascertain that submittals meet all of the requirements of the Contract Documents, while conforming to structural, space, and access conditions at the point of installation. The Contractor shall check all submittals before submitting them to the Engineer.
Specified or "Approved Equal" Items
Whenever catalog numbers and specific brands of trade names followed by the designation or
"approved equal” are used in conjunction with a designated material, product, item, or service mentioned in these specifications, they are used to establish the standards of quality and utility required. Or "approved equal” proposals will be subject to acceptance by the Engineer.
https://www.dir.ca.gov/dlse/cmu/cmu.html
Permits
City permits are required as applicable. All permit fees paid by the Contractor will be reimbursed by the
City at cost.
License
Bidder must include Contractor's license number and date of expiration on the bid. Contractor shall also provide DIR number and date of expiration on the bid.
Business License
A City of Hayward Business License is required before starting work.
Engineer's Review
Allow fifteen (15) days, unless otherwise specified for the Engineer’s review of submittals and re-submittals. Note that there are some different requirements for Construction Schedule submittals. No extension of time will be allowed through failure of the Contractor to either transmit submittals sufficiently in advance of the work or on account of re-submittals. Incomplete submittals will not be accepted and will be returned to the Contractor.
3. Scope of Work
3.1. Scope of Work
The project includes, but is not limited to, the improvement of 21 manholes as shown in the Manhole
Rehabilitation Table in Attachment C and a detail for a typical manhole is shown on SD-304 – Standard
Manhole in Attachment D. Manhole improvement is divided into two categories: channelize and rehabilitate. Channelizing is defined as shaping or reconstructing the bottom of the manhole so that wastewater can flow smoothly through it. Channelizing can be done by reconstructing the bottom of manhole with concrete according to Specification Section 03300 Cast-in-Place Structural Concrete in
Attachment H to make the smooth transition. The Contractor shall submit their proposal for channelizing work as part of the bid package. Rehabilitating work involves adding a mortar and epoxy composite corrosion barrier system (lining) to the sanitary sewer manholes. The work shall be done according to Specification Section 02731 Manhole Lining in Attachment G and Detail A- Manhole
Rehabilitation in Attachment E.
Some of the access manholes are in the street, while others are in landscaped or unimproved easements across private property (owners are required to allow crews to access public facilities within easements).
All work shall be done without interruption or disruption of service to the Hayward residents unless otherwise expressly approved by the City in writing. If temporary bypassing of flows in gravity sewers around Contractor’s work is required to prevent interruption or disruption of service, perform this work according to Section 02145 – Sewer Bypassing and Dewatering in Attachment F.
All work is subject to inspection by the City inspector and is to be done in accordance with the General
Conditions, Special Conditions, and Specifications, and the City’s Standard Details and Specifications
(available on the City’s website at https://www.hayward-ca.gov/your-government/departments/engineering-division).
Site Investigation
The Contractor acknowledges that it has investigated and satisfied itself as to:
1. The conditions affecting the work, including but not limited to physical conditions of the site which may bear upon site access; handling and storage of tools and materials; and access to water, electric, or other utilities or otherwise affect performance of required activities.
2. The character and quantity of all surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site.
Any failure by the Contractor to acquaint itself with available information will not relieve him or her from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The City is not responsible for any conclusions or interpretations made by the Contractor on the basis of the information made available by the City. The contractor will not be given extra payments above the accepted prices for conditions that can be determined by examining the site and all Contract
Documents.
Project Tasks
Specific tasks include, but are not limited to the following:
A. Coordinate with property owners/tenants on easement entry and provide written advance notice to https://www.hayward-ca.gov/your-government/departments/engineering-division) https://www.hayward-ca.gov/your-government/departments/engineering-division) property owners/tenants.
B. Provide appropriate traffic control devices during the sewer manhole rehabilitation. Contractor shall maintain at least one travel lane for both directions accessible to vehicular traffic.
C. Complete the sewer manhole rehabilitation at locations shown on Attachment B and Attachment C.
Contractor must comply with all applicable confined space entry requirements.
D. Provide as-builts information for each manhole location worked on.
E. Furnish product and service guarantee documentation to the City.
This scope of work represents the City’s best summary of the work needed to accomplish the objectives of this project. The bidder is encouraged to read this RFQ in its entirety for all the required tasks.
Working Hours
Job to start at a time designated by the City and the Contractor Regular working hours, Monday through
Friday except during legal holidays if approved by the Purchasing Department in writing. The Contractor shall give a minimum of three (3) day notice to the Project Manager for any work scheduled outside of the regular working hours. The Contractor is responsible to schedule and coordinate its work accordingly to allow for inspections by the Project Manager or its designee as required by these specifications.
Cleanup
The contractor shall be responsible for necessary cleanup during progress of work and shall take necessary safety precautions to prevent injury to the workers or the public. Upon the completion, the contractor shall remove all of the contractor's equipment and debris, leaving the entire area clean and ready to use, all as approved by the City.
Traffic Control and Traffic Control Plans
Traffic shall be maintained at all times in all directions on the streets affected by the work, although partial obstruction with effective two-way traffic control is allowed.
The Contractor shall maintain pedestrian and vehicle access to all properties fronting the project. In the event a driveway must be closed four (4) hours or more, the Contractor shall notify the property owner or tenant, in writing, five (5) days prior to the closure specifying the date and time of closure, including the time of start and finish. No driveway shall be closed for more than one (1) hour without prior written approval from the City’s Representative.
Contractor furnished labor, materials, equipment, tools, and services necessary to provide access to the motoring and pedestrian public; and adequately safeguard the workers and public from construction hazards with a minimum of inconvenience. Full compensation for controlling traffic and maintaining access, including costs related to flaggers if needed, shall be considered paid under various items of work, and no additional compensation shall be allowed therefor.
Work includes but is not limited to the following:
A. Preparation of Traffic Control Plans (TCPs) and obtaining approval of Traffic Control Plans from the
City of Hayward. The traffic control plan shall address lane shifts or closures, flagging, material and equipment storage, maintaining vehicle and pedestrian access, and haul routes. It must be based on the appropriate standard layouts from the California Manual of Uniform Traffic Control Devices. Submitted
TCPs must be designed specifically for the particular conditions to be encountered in this project. Up to ten (10) working days must be allowed for the City’s review. Rejected TCP’s must be revised and resubmitted, allowing five working days for each resubmittal.
B. Installation and removal of temporary traffic control devices, including barriers and barricades, lane closures and detour implementation.
C. Coordinating work with all agencies having jurisdiction.
Comply with guidelines excluding payment sections of the latest editions of the following reference standards:
A. California Manual on Uniform Traffic Control Devices (CA MUTCD).
B. CAL/OSHA, State of California Construction Safety Orders. Submit typical Traffic Control Plan drawings which conform to all requirements of these specifications.
General Requirements
A. All work shall be completed within ninety (90) working days from the contract Notice to Proceed date.
B. Perform all work in conformance with the provisions and specifications.
C. The contractor must comply with all General Standards of Commercial Applicators set by the
California Department of Pesticide Regulation.
3.2. Specifications
The Contractor shall provide 48-hour notices to the City’s Sanitary Sewer Collection Maintenance
Division prior to starting work on any portion of the contract. In the event that a problem arises with the rehabilitation operations, or there is a problem with any of the existing manholes, the Contractor shall notify the Sewer Collection Maintenance Division immediately and report the problem.
Public Notification
The Contractor shall be responsible, during all phases of the work to provide for public safety and convenience. Manhole rehabilitation operations shall be conducted in such a manner as to cause as little inconvenience as possible to the abutting property owners. Convenient access to driveways, houses, and buildings along the line of work shall be maintained.
Work at the proposed locations shall be performed in coordination with the property owners affected by said operations. Work shall be conducted between 8:00 a.m. and 5:00 p.m., Monday through Friday.
Prior to the manhole rehabilitation, the Contractor will have mailed or delivered in person advance notices to residents/tenants who will be directly impacted by the work. The notice will also request that the residents/tenants notify the Contractor whether or not work can be done without the resident/tenant being home or if special arrangements must be made regarding safety to children, handling of pets, scheduling of work, etc. It is the contractor's responsibility to accommodate reasonable requests from the residents/tenants.
At least 72 hours in advance of starting work at a location, the Contractor shall mail or hand deliver a notice to all the residents who will be impacted from the manhole rehabilitation operation. The notification shall include a description of the work to be performed, expected dates and duration of work at that location affecting traffic and/or parking, Contractor's name and telephone number (for the purpose of taking emergency and complaint calls). A draft copy of this notice shall be submitted by
Contractor at the pre-construction meeting. Final format and wording shall be subject to approval by
City.
At least one week in advance of starting work at an easement location, the Contractor shall deliver a notice to all residents who will be impacted from the manhole rehabilitation operation where work will take place within the easement. The notification shall include a description of the work to be performed, expected dates and duration of work at the easement location, Contractor's name and telephone number (for the purpose of taking emergency and complaint calls). A draft copy of this notice shall be submitted by Contractor at the pre-construction meeting. Final format and wording shall be subject to approval by City.
All costs to Contractor for providing notification to residents shall be included in the various cost proposal items and no additional compensation shall be made.
When entering private property to do the work, the Contractor’s personnel shall first attempt to contact the residents to let them know who they are and why they are there.
All personnel entering private property shall have the Contractor’s company name clearly visible on clothing, equipment, and vehicles.
All personnel are to be courteous and polite to the residents they have contact with (whether on private property or on the street).
Any hostile contact with a resident is to be reported to the City’s Project Manager immediately afterwards.
Contractor Responsibilities
Execute all work in a manner such that injury or damage to any person, animal, structure, service, property, crop or vegetation shall be avoided. The Contractor is responsible for all property damage and for all cleanup and restoration associated with any chemical spill.
Provide all necessary equipment and barricades to prevent pets, children, and unauthorized persons from gaining access to the site of the work. Provide adequate protection for Contractor’s employees engaged in the handling, mixing, and distribution of the chemicals and ensure all the employees correctly wear such protection.
Respect the rights of property owners and inform the private property owner before entering the property.
Place proper traffic warning devices to protect the specific job site, and to prevent accidents or personal injury to the public. The Contractor shall take safe traffic control measures as conditions dictate or when so directed by the Engineer. Some manholes may be located in heavy traffic areas.
Record Keeping
The contractor shall compile records for each rehabilitated manhole. Such records shall:
A. Be accurate, complete and legible.
B. Include the date of work.
C. Street name for each given manhole.
D. A description (manhole numbers, house numbers, cross streets, etc.) which will enable the Engineer to accurately identify the exact location of each manhole.
E. Note special field conditions, access problems or unusual conditions.
F. Record weather conditions and temperatures.
G. The date for each manhole when the guarantee expires.
Guarantee
For each manhole, the Contractor shall guarantee the work for a minimum of two years, starting on the date of rehabilitation completion.
3.3. Payment
Provide a proposed cost breakdown for each bid item listed in the Pricing Proposal. Payments will be made in accordance with the Contract and Technical Specifications.
3.4. Completion and Liquidated Damages
Time shall be of the essence of the agreement. It is understood that the scope of this project shall be completed in its entirety and ready for acceptance within ninety (90) calendar days from the contract
Notice to Proceed date.
Should the Contractor fail to complete this contract, and the work provided herein within the times fixed for such completion, due allowance being made for contingencies provided for herein, the
Contractor shall become liable to the City for all loss and damage which the latter may suffer of account thereof.
As it is difficult to ascertain and determine the actual damage which the City will sustain in the event of any, by reason of such delay; and it is therefore agreed that said Contractor will pay to the City the sum of three hundred dollars ($300.00) per day for each and every calendar days delay beyond the time herein prescribed in furnishing the said work as liquidated damages; the said Contractor agrees to pay said liquidated damages as herein provided, and in case the same is not paid, agrees that said City may deduct the amount thereof from any money due or that may become due said Contractor under this
Contract, and should such money be insufficient to cover such damages, the City shall have the right to recover the balance from the Contractor or his/her Surety. In addition to the above stipulated liquidated damages, the Contractor shall pay the cost of the Inspector's salary for the time the Inspector is required on the project beyond the allotted contract time. Payment for Inspector's salary to be made directly to the City. The City shall determine the time the Inspector is required on the Project.
The Contractor shall not be charged with liquidated damages because of any delays in the completion of the work due to unforeseeable causes beyond his/her control and without default or negligence of the
Contractor, including, but not restricted to acts of the public enemy, acts of the government, acts of another prime contractor in the performance of the contract with the City, fire, flood, epidemics, delays of subcontractors due to such causes. The Contractor shall within ten (10) days from the beginning of any such delay notify the City in writing, of the causes of the delay, who shall, after ascertaining the facts and the extent of the delay extend the time for completion of the work, when in its judgment the finding of the facts and determination thereon shall be final and conclusive on the parties thereto.
The Contractor shall not be assessed for liquidated damages for delay in completion of the project, when such delay was caused by the failure of the awarding authority of this contract or the City of the utility to provide for removal or relocation of the existing utility facility; however, when the Contractor is aware that removal or relocation of an existing utility has not been provided, the Contractor shall promptly notify the awarding authority, so that provision for such removal or relocation may be made to avoid and minimize any delay which might be caused by the failure to remove or relocate the utility or to provide its removal or relocation.
3.5. Desired Qualifications of Consultant/Contractor
The Contractor must be a licensed Contractor with the State of California with experience in sewer manhole rehabilitation prior to submitting a bid proposal. Contractors who do not meet the experience and other qualifications specified herein shall not be considered for award of the contract. The
Contractor must demonstrate a minimum level of five (5) years direct experience in sewer manhole rehabilitation. The Contractor must provide proof of successful completion of at least five (5) other projects similar in size and scope to the work specified herein within the last two (2) years. The
Contractor may be disqualified if they cannot provide this proof of experience. Any work performed by subcontractors for the Contractor will not be considered. Each contractor is required to submit with the proposal a list of their qualifications applicable to manhole rehabilitation projects. Experience with other local California governments should be included. See Attachment A for additional requirements.
4. Submission Format
To ensure the fair and accurate consideration of all submissions, proposals must contain the following information.
4.1. Cover Letter
The cover letter should be on company letterhead and include the following:
A. Company name, address, phone and fax numbers.
B. Designation of primary contact within the company who is authorized to answer questions regarding the assigned work, including their name, contact phone number and e-mail.
C. Signature of an officer of the prime contractor. In case of joint venture or other joint-prime relationship, an officer of each venture partner shall sign.
4.2. Contact & Customer Service
Please describe all support services available from your company/business, specifically addressing the following issues:
A. Normal hours of availability
B. Quality assurance program(s)
C. Guaranteed response time
D. Other support services
4.3. Reference and Experience
A Iist of three (3) references of current or past contracts for which the Contractor has performed or is performing work of similar type, scope, and complexity within the past five years. This list shall include the names, addresses, email addresses, and phone numbers of the contracting party as well as a description of services performed and the dollar amount of the contract. Upon further consideration of the Proposal, the City may request additional vendors.
4.4. Capacity to Perform the Work
Describe other major work commitments and/or capacity to perform the requested services. Projects completed within the past three years, particularly in Alameda, Contra Costa, Santa Clara or San Mateo
Counties, are of particular interest.
4.5. Project Scope & Approach
Provide a detailed plan for providing the services as described in Scope of Work
4.6. Prices
Prices for provision of services that are "all-inclusive" of all costs, including but not limited to supervision, equipment, overhead-profit and all required insurances as specified in this document.
https://procurement.opengov.com/portal/hayward-ca/projects/258684/document?section=2477041
4.7. Insurance
The proposal will include confirmation that the consultant has insurance for:
A. Commercial General Liability, B. Automobile Liability, C. Workers' Compensation and Employer's Liability, and
D. Professional Liability, and provide the policy limits where applicable. Selected vendor will be required to sign a Professional
Services Agreement.
4.8. Current City Business License
The contractor selected for this project shall obtain or provide proof of having a valid City of Hayward business license.
4.9. Required Forms
Attach the following required forms:
A. Cover Letter
B. Proposal
C. Contactor Agreement
1. Exhibit A. Scope of Work
2. Exhibit B. Insurance
3. Exhibit C. Certifications
5. Cost Evaluation
Selection Process
A review committee will evaluate all responses to the RFQ that meet the submittal requirements and deadline. Submittals that do not meet the requirement or deadline will not be considered. The review committee will rank the proposals and then may arrange for on-site interviews with staff if necessary.
The City reserves the right to request additional information or materials from bidding parties if necessary to determine the winning proposal.
Likewise, the City reserves the right to accept or reject any or all proposals, or to alter the selection process in any way, to postpone the selection process for its own convenience at any time, and to waive any informality in the proposals. The City of Hayward retains the right at its sole discretion to select a contractor.
All proposals submitted in response to this RFQ become the property of the City and public records and, as such, may be subject to public review.
The City reserves the right to cancel or revise any section of this RFQ prior to the date proposals are due including, but not limited to: selection procedures, submittal date, and submittal requirements. If the
City cancels or revises the RFQ, all interested firms will be notified. The City also reserves the right to extend the date by which proposals are due.
NOTE: The City will not pay costs incurred by the proposer during this process. All costs shall be borne by the proposer.
No. Evaluation Criteria Scoring Method Weight (Points)
1. Cost & budget proposal
Pursuant and in compliance with your
Instructions and Conditions and all other documents relating thereto, the undersigned offer or, having familiarized oneself with the terms of the contract, the local conditions affecting the performance of the contract, the cost of the work at the place where the work is being done, and with the specifications and other contract documents, hereby proposed and agrees to perform within the time stipulated, in contract, including all of its component parts, and everything required to be performed, and to provide and furnish any and all of the labor, materials, tools, expandable equipment, and all utility and transportation services necessary to perform all of the work required in connection with RFQ
26-025, all in strict conformity with the specifications and other contract documents, including any addenda issued.
The undersigned declares, by their signature to this Proposal, that quantities and related work checked carefully and understands that the
City shall not be responsible for any errors or omissions on the part of the undersigned in making up this bid.
Directions to Bidders:
The following are directions to bidders by the
City of Hayward and this proposal is made with reference to them:
Bids are required for the entire work. Award (if any) will be based on the total lump sum amount listed on the Pricing Proposal for the
Base Bid. However, depending on the amount of funding available, the City reserves the right to (1) award the Base Bid only, (2) increase or decrease quantities of manholes to be improved, (3) reject any or all bid proposals.
The bidder shall set forth for each item of work, in clearly legible figures, an item price, and a total for the item in the respective spaces provided for this purpose.
In case of discrepancy between an item price in words and the price in figures, the price in words shall prevail. As to lump sum items, the amount set forth in the "Total" column shall be the item price.
Pass / Fail 100 (100% of Total)
Bid Items:
Bid Item No. 1- Mobilization/Demobilization
The contract lump sum price paid for
Mobilization/Demobilization shall include full compensation for furnishing all transportation, labor, materials, equipment, and incidentals necessary to prepare the site for the work.
Work shall consist of preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; obtaining bonds and insurance;
preparation, submission, and re-submission of submittals; schedule preparation, public notifications, cleaning, and site maintenance.
The bid price for mobilization and demobilization shall not exceed five percent
(5%) of the total bid amount.
Bid Item No. 2- Traffic Control
The contract lump sum price paid for Traffic
Control during construction shall include full compensation for furnishing all materials, equipment, labor, permits, and incidentals required to provide traffic control for worker and public safety including all flagging, signing, Portable Changeable Message Signs, temporary signing, delineation, maintenance, pedestrian safety, and other incidentals. Payment for traffic control during construction shall only be made for work in traffic areas.
Bid Item No. 3- Sewer Bypassing and Flow
Control
The contract lump sum price paid for Sewer
Bypassing and Flow control shall include full compensation for designing and providing pumps and piping, operations, and incidentals needed to bypass flow around the work area and maintain operation of the sewer system as specified in Section 02145.
Bid Item No. 4 – Rehabilitate Existing Sewer
Manhole
The contract bid price for all manholes with designation “rehabilitate” shall include all materials, equipment, labor, and incidentals to rehabilitate existing manholes by applying a manhole lining as specified in Specification
Section 02731. This bid item shall include surface preparation, lining application, curing, testing, and all incidentals.
Bid Item No. 5 – Channelize Existing Sewer
Manhole
The contract bid price for all manholes with designation “channelize” shall include all materials, equipment, labor, and incidentals to channelize existing manholes as proposed by the Contractor and agreed upon by the City.
6. Pricing Proposal
Please insert the pre-tax price.
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Mobilization/Demobilization 1 LS
2 Traffic Control 1 LS
3 Sewer Bypassing and Flow Control 1 LS
4 Rehabilitate Existing Manhole 10 EA
5 Channelize Existing Manhole 12 EA
TOTAL
7. Vendor Questionnaire
7.1. Submission Requirements*
Did you read through and confirm that you met all of the RFQ requirements including the sections:
A. Scope of Work
B. Attachments, if applicable
C. Submission Format
D. Cost Proposal (Pricing Table, if applicable)
E. Automated Addenda & Vendor Acknowledgement, if applicable
☐ Yes
☐ No
*Response required
7.2. Discretion & Liability Waiver*
The City reserves the right to exercise discretion and apply its judgment with respect to any qualifications submitted.
The City reserves the right to reject any or all submittals, either in part or in their entirety, or to request and obtain, from one or more of the businesses submitting, supplementary information as may be necessary for City staff to analyze the qualifications pursuant to the contractor/consultant selection criteria contained herein.
The City may require contractors/consultants to participate in additional rounds of discussions, negotiations, or more refined submittals before the ultimate selection of a contractor/consultant is made. These rounds could encompass revisions of the submittal criteria in response to the nature and scope of the initial qualifications.
☐ Please confirm
*Response required
7.3. Proof of Insurance*
The proposal will include confirmation that the consultant has insurance for:
A. Commercial General Liability, B. Automobile Liability, C. Workers' Compensation and Employer's Liability, and
D. Professional Liability, and provide the policy limits where applicable. Selected vendor will be required to sign a Professional
Services Agreement.
*Response required
7.4. Certifications*
The contractor selected for this project shall obtain or provide proof of having a valid City of Hayward business license.
*Response required
| 1. Introduction |
| 1.1. Summary |
| 1.2. Background |
| 1.3. Contact Information |
| 1.4. Timeline |
| 2. Project Details |
| 2.1. Important Instructions for Electronic Submittal |
| 2.2. Communication Regarding this RFQ |
| 2.3. Award of City Contract and City Rights |
| 2.4. Protest |
| 2.5. Bonds |
| 2.6. Prevailing Wage |
| 2.7. Special Conditions |
| 3. Scope of Work |
| 3.1. Scope of Work |
| 3.2. Specifications |
| 3.3. Payment |
| 3.4. Completion and Liquidated Damages |
| 3.5. Desired Qualifications of Consultant/Contractor |
| 4. Submission Format |
| 4.1. Cover Letter |
| 4.2. Contact & Customer Service |
| 4.3. Reference and Experience |
| 4.4. Capacity to Perform the Work |
| 4.5. Project Scope & Approach |
| 4.6. Prices |
| 4.7. Insurance |
| 4.8. Current City Business License |
| 4.9. Required Forms |
| 5. Cost Evaluation |
| 6. Pricing Proposal |
| 7. Vendor Questionnaire |
| 7.1. Submission Requirements* |
| 7.2. Discretion & Liability Waiver* |
| 7.3. Proof of Insurance* |
| 7.4. Certifications* |