Portage County, Wisconsin has issued a Request for Bid (RFB #2025-11PC) for Geotechnical Soil Boring Services associated with the design and construction of a new Sheriff's Office Law Enforcement and Detention Center. The project is planned for a 42-acre vacant parcel at the southeast corner of Black Oak Drive and County Highway R in Plover, WI. The solicitation requests qualified consultants to perform geotechnical engineering services, including building borings, road borings, and test pit excavations across multiple proposed structures totaling approximately 180,000 square feet. The bid is due by 2:00 PM on July 2, 2025, with a contract term extending through December 31, 2025 or upon project completion.
The project encompasses a comprehensive facility including a 200-bed jail, Sheriff's Office, fleet garage, and potential future government buildings. Specific technical requirements include drilling building borings to 35 feet depth, road borings to 5-10 feet depths, and test pits at 5-foot depths for infiltration analysis. The bid requires unit pricing for various boring types, with alternates for optional additional borings. Bidders must provide references, maintain specific insurance requirements, and submit detailed documentation including boring logs, laboratory testing results, and a comprehensive geotechnical report. The county will award the contract based on the lowest total price and considers the timeliness of soil boring completion and report delivery as part of the evaluation criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025-11PC Addendum 1 062625.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BID (RFB)
FOR
Geotechnical
Soil Boring Services
BID #2025-11PC
Issued by:
Portage County Purchasing Department
Bids must be submitted:
No later than 2:00 PM 07/02/2025 to:
Portage County Purchasing 1462 Strongs Ave
Stevens Point WI 54481
LATE BIDS WILL BE REJECTED
There will be a public opening for this Bid
1462 Strongs Ave Stevens Point WI 54481
For further information regarding this RFB contact Chris Schultz
At (715) 346-1393 Email: schultzc@co.portage.wi.gov
Issued: 06/18/2025
PORTAGE COUNTY BID #2025-10PC
WISCONSIN PAGE 2 OF 14
TABLE OF CONTENTS
SECTION SUBJECT PAGE #
1. GENERAL INFORMATION AND SCOPE
2. CONTRACT TERM
3. QUESTIONS
4. METHOD OF BID
5. BID SUBMISSION
6. BID RESPONSE REQUIREMENTS
7. METHOD OF AWARD
8. BIDDER/CONTRACTOR QUALIFICATIONS
9. GENERAL SPECIFICATIONS FOR CONTRACTOR
10. SITE SPECIFIC SPECIFICATIONS
11. ON SITE SERVICE
12. SUBCONTRACTING OR THIRD PARTY PAYMENTS
13. FIRM PRICES
14. CONTRACT CANCELLATION
15. APPEALS PROCESS
ATTACHMENT A – SIGNATURE AND AUTHORITY AFFIDAVIT FORM
ATTACHMENT B – REFERENCES SHEET
ATTACHMENT C – BID OFFER FORM
ATTACHMENT D – STANDARD TERMS AND CONDITIONS
ATTACHMENT E – SITE LOCATION AND SOIL BORING LOCATONS FROM DEWBERRY INC
WISCONSIN PAGE 3 OF 14
1. GENERAL INFORMATION AND SCOPE
1.1 Introduction
The County of Portage Wisconsin (County), through its Purchasing Department (Purchasing), is requesting bids for qualified Consultants to perform Geotechnical Engineering Services associated with the design and construction of the new Portage County Sheriff’s Office Law Enforcement and Detention Center. The project is planned in a 42-acre vacant parcel at the southeast corner of Black Oak Drive and County Highway R in Plover, WI.
The attached Standard Terms and Conditions shall govern this bid unless specifically modified in these bid documents. Conditions of bid that include the word "must" or "shall,” describe a mandatory requirement. All specifications are defined as mandatory minimum requirements unless otherwise stated. If no bidder is able to comply with a given specification or condition of bid, purchasing reserves the right to delete that specification or condition of bid. Failure to meet specification requirements shall disqualify your bid. Vendors may not submit their own contract document as a substitute for these terms and conditions.
Retain a copy of these Bid documents for your files. Should you receive an award, these Bid documents become your contract terms and conditions.
1.2 Definitions:
The following definitions are used throughout the RFB documents:
Bidder/Vendor means a company or individual submitting a bid response to this RFB Contractor means bidder awarded the contract County means the County of Portage Wisconsin Purchasing means the County of Portage Purchasing Department RFB means Request for Bid State means the State of Wisconsin VendorNet means the State of Wisconsin’s electronic purchasing information system
1.3 Scope
1.3.1. Project Description-The project on this site will be a Law Enforcement Center (LEC) that has a 200 bed Jail, Sheriff Office, and Fleet Garage. The current projected square feet of the those buildings is around 180,000. Options for additional Government Building on site is being explored but will be projects that are much further out in terms of at least 7-10 plus years. There will be one building indicated as Building B on Attachment E that will be 2 Stories. The project's programming has not finalized if a basement will be present in the building. This may be determined by the Geotechnical Report based on Ground Water location.
1.3.2. Summary of Buildings Borings-
A summary of the proposed building borings is as follows:
• Building Code – 2015 International Building Code with Wisconsin Amendments
• Number of stories above grade – Maximum of 2 Stories in a few locations
• Below grade construction: Elevator pits for Two story building and a possible Basement below the Jail
• Maximum estimated column load: 375k Two-Story Plus Basement 225k service Two-Story, 75k Single-Story (the Geotech report shall provide recommendations based on all three scenarios)
WISCONSIN PAGE 4 OF 14
• Maximum estimated wall load: 6.5 klf
• Maximum allowable settlement and Differential Settlement: Typically sees 1” total max, 1/2” differential but defers to the geotechnical engineer for their recommendations.
• Building Borings shall be drilled to a depth of 35FT
1.3.3. Summary of Pavement Borings-
Locations are marked on Attachment E that indicate 5FT and 10FT depths for the various Road/Pavement Borings.
1.3.4. Summary of Retention Ponds Excavation-
Locations are marked on Attachment E that indicate Test Pit locations for excavation of depths of 5FT.
2. CONTRACT TERM
Date of award, through 12/31/2025 or upon job completion.
3. QUESTIONS
If a vendor discovers any significant ambiguity, error, conflict, discrepancy, omission, or other deficiency in this RFB they shall notify the Procurement Director named below of such error and request a modification or clarification.
Any communications or questions regarding the specifications, or special conditions of bid should be written and submitted to Purchasing as soon as possible, but no later than 2PM on 06/25/2025.
Purchasing will respond to questions if necessary by issuing an official addendum, posted on VendorNet and on the Portage County Website. Bidders are responsible for checking these websites for any addenda before submitting a bid. Failure to acknowledge addenda may disqualify your bid.
https://vendornet.wi.gov/ http://www.co.portage.wi.gov
Any correspondence or questions submitted must include the bid number Submit questions in writing via email to:
Chris Schultz, Procurement Director, e-mail: schultzc@co.portage.wi.gov Phone: 715-346-1393
4. METHOD OF BID
Bidder must submit a unit price for each item. All prices must be quoted in U.S. Dollars. Bidder must bid on the enclosed Bid Offer Form.
5. BID SUBMISSION
Bidders must submit their bid by email, a valid emailed bid shall be received by the Portage County Purchasing prior to the Bid due date and time shown on the Request for Bid, on or before 2:00 p.m., Wednesday, July 2, 2025, to: schultzc@co.portage.wi.gov
All documents required for a complete submission shall be included as attachments to the submission email. Those are listed in section 7 of this RFB. Prior to the bid deadline, the bidder is responsible for confirming that their emailed bid response has been successfully received. The Portage County Purchasing is not responsible for late receipt of a bid, regardless of the reason for the delay. Proof of transmission does not constitute proof of receipt. The time stamp issued to the submission email by Portage County email system shall serve as the official time stamp https://vendornet.wi.gov/ http://www.co.portage.wi.gov/
WISCONSIN PAGE 5 OF 14
determining timeliness of the bid. Bid responses shall be emailed to schultzc@co.portage.wi.gov.
Submitting a bid to any other email address does not constitute receipt of a bid by Portage County Purchasing. Emailed bids that do not meet these requirements will be rejected. Beside the attached documents the email should include:
• Bidders Name and Address somewhere in the email
• Request for Bid Number and Title in the Subject Line
6. BID RESPONSE REQUIREMENTS
In order for your bid to be considered, the following information must be provided by the due date and time listed on the bid cover page. Include:
6.1 Addendum Cover (Signature) Page(s), if applicable to this bid request
6.2 Signature and Authority Affidavit Form, Attachment A
6.3 References Sheet, Attachment B
6.4 Bid Offer Form, Attachment C
The Signature and Authority Affidavit submitted in response to this RFB must be signed by the person in the Contractor's organization who is responsible for the decision as to the prices being offered in the Bid or by a person who has been authorized in writing to act as agent for the person responsible for the decision on prices and services. Failure to provide these forms/information with your bid submittal may disqualify your bid. The County encourages all bidders to print their submission double-sided to save paper.
7. METHOD OF AWARD
An award will be made on the basis of the lowest total price listed on Line 6 of attachment C for all the requested units. Timeliness of completion of the Soil Boring with results may be considered when making this award.
8. BIDDER/CONTRACTOR QUALIFICATIONS
To be eligible for a contract award, you must be qualified and able to provide the following:
8.1 Bidder must supply references of three firms to which similar services have been provided during the past five years to a comparable-sized institution or company. If contacted, all of those references must verify that a high level of satisfaction was provided. Use Attachment B to list references.
8.2 Awarded contractor must provide Purchasing a Certificate of Insurance and maintain the minimum limits specified for the term of the contract. All policies must be issued with a 30-day cancellation notice, by an insurance company licensed to do business in the State of Wisconsin, with a minimum AM Best rating of A1, and signed by an authorized agent.
Maintain worker's compensation insurance as required by Wisconsin Statutes, for all employees engaged in the work.
Maintain commercial liability, bodily injury and property damage insurance against any claim(s) which might occur in carrying out this agreement/contract. Minimum coverage shall be one million dollars ($1,000,000) liability for bodily injury and property damage including products liability and completed operations. Provide motor vehicle insurance for all owned, non-owned and hired vehicles that are used in carrying out this contract. Minimum coverage shall be one million
WISCONSIN PAGE 6 OF 14
dollars ($1,000,000) per occurrence combined single limit for automobile liability and property damage.
9. GENERAL SPECIFICATIONS FOR CONTRACTOR
The following specifications are minimum acceptable requirements. Bid specifications may not be revised without an official written addendum issued by Purchasing.
9.1 All work shall be performed by qualified personnel under supervision of a Registered Professional Engineer. All reports shall bear the seal of a Registered Professional Engineer.
9.2 The Geotechnical Engineer shall deliver one digital copy of the logs and reports to the Owner, Architect. It is understood that the Owner, Architect, and Construction Manager may make and distribute copies of the reports, including boring logs, as necessary in connection with the proposed Project without additional compensation.
9.3 The Geotechnical Engineer shall be available to consult with the Owner, Architect, Civil Engineer, structural Engineer, and Construction Manager regarding the geotechnical aspects of the Project throughout the design of the Project. Estimated to be 12-18 months from the due date of the bid.
9.4 At a minimum, collect soil samples in general conformance with ASTM D1586 at 2.5 foot intervals to a depth of 10 feet and at 5 foot intervals thereafter. Additional samples should be collected if necessary based on the soil conditions encountered or the improvements which are planned in in vicinity of the boring location.
9.5 Backfill all soil borings in accordance with State of Wisconsin requirements. Excess auger cuttings can be thin spread in the vicinity of the boring locations.
9.6 Perform laboratory testing as determined to be necessary by the Geotechnical Consultant to provided engineering design recommendations for the planned improvements. Laboratory testing may included moisture content determination, grain size analysis, strength testing or compressibility testing.
9.7 Prepare soil boring logs presenting the results of field and laboratory testing results. The boring logs should include measurements of topsoil to the nearest ½ inch, documentation of any observed fill materials or debris, any unnatural odors or signs of environmental impacts and documentation of stratigraphy changes in the subsurface profile and the associated classification in accordance with the Unified Soil Classification System.
9.8 Prepare a geotechnical report under the direction of a Professional Engineering licensed in the State of Wisconsin experienced with geotechnical evaluations. At a minimum the report should include:
9.8.1. Boring logs with field and laboratory data
9.8.2. Stra�fica�on based on visual soil (and rock) classifica�on.
9.8.3. Groundwater levels observed during and a�er the comple�on of drilling.
9.8.4. Site Loca�on and Explora�on Loca�on Plan
9.8.5. Subsurface explora�on procedures
9.8.6. Descrip�on of subsurface condi�ons
9.8.7. Recommended founda�on op�ons and engineering design parameters
9.8.8. Es�mated setlement of founda�ons
9.8.9. Recommenda�ons for design and construc�on of interior floor slabs
WISCONSIN PAGE 7 OF 14
9.8.10. Seismic site classifica�on
9.8.11. Earthwork recommenda�ons including site/subgrade prepara�on.
9.8.12. Lateral earth pressure recommenda�ons
9.8.13. Recommended pavement op�ons and design parameters
9.8.14. Evalua�on of stormwater management facili�es including infiltra�on characteris�cs and recommenda�ons associated with geotechnical aspects of construc�on.
9.8.15. Provide an electronic (PDF) copy of the signed and sealed final report for inclusion in the project documents.
10. SITE SPECIFIC SPECIFICATIONS
10.1 Complete amount of building boring, road boring, and test pit holes as indicated on the map done by our Architect Dewberry Inc. Please see attachment E for count and general locations.
10.2 We request the vendor (Geotechnical Consultant) provide all layout and staking on site for their borings. Coordinates and elevations for the boring locations should be provided in .csv format and shall be included on the final boring logs.
10.3 The structural engineer on our project is requesting Building Boring be drilled to the depth of 35 Feet inside the footprint of the building.
10.4 The civil engineer is requesting Road Boring be drilled to either 5FT or 10 FT as indicated on Attachment E.
10.5 Test pit at depth of 5FT classified according to USDA and WDNR technical standard 1002, signed by soil scientist for infiltration.
10.6 Indicate any boring that were not completed to the specified depth and the reason for incomplete results.
11. ON SITE SERVICE
In carrying out the scope of this contract, the Contractor shall be required to perform services on County property. Bidders must include all transportation and insurance charges. Failure to include these costs may disqualify your bid.
12. SUBCONTRACTING OR THIRD PARTY PAYMENTS
All subcontracting shall be pre-approved by the County before any work begins. Subcontractors must abide by all terms and conditions of the contract. The prime contractor shall be responsible for all subcontractor(s) work and payment. The County will not pay any subcontractor or third parties directly.
13. FIRM PRICES
The awarded contractor must hold the awarded pricing for the entire first year contract period. The County will review any adjustment of costs before the beginning of a contract renewal period. Price adjustment requests must be justified with supporting documentation of industry-wide increases or decreases.
14. CONTRACT CANCELLATION
This Contract may be terminated by either party under the following conditions:
14.1 The County may terminate the contract at any time at its sole discretion by delivering 30 days written notice to the contractor.
WISCONSIN PAGE 8 OF 14
If the problem is service performance, contractor will be warned either verbally or in writing of unsatisfactory performance and intent to cancel this contract. Contractor will be given a period of time to ‘cure’ the performance. If the performance does not improve contractor will be given 30 days written notice that the contract will be cancelled.
Upon termination, the County’s liability will be limited to the pro rata cost of the services performed as of the date of termination.
14.2 If at any time the contractor’s performance threatens the health and/or safety of the County or the public, the County has the right to cancel and terminate the Contract without notice.
14.3 If the Contractor fails to maintain and keep in force the insurance as required, he County has the right to cancel and terminate the Contract without notice.
15. APPEALS PROCESS
Notices of intent to protest and protests must be made in writing. Protestors should make their protests as specific as possible and should identify Wisconsin Statutes or Portage County Ordinance provisions that are alleged to have been violated.
The written notice of intent to protest the intent to award a contract must be filed with Chris Schultz, Procurement Director, Portage County Wisconsin, 1462 Strongs Ave, Stevens Point, WI 54481, and received in his office no later than five (5) working days after the notice of intent to award is issued.
The written protest must be received in his office no later than ten (10) working days after the notice of intent to award is issued.
The decision of the Procurement Director may be appealed to the Corporation Counsel Office within (5) working days of issuance. The appeal must allege a violation of a Wisconsin Statute or a Portage County Ordinance provision.
WISCONSIN PAGE 9 OF 14
ATTACHMENT A
SIGNATURE AND AUTHORITY AFFIDAVIT FORM
BIDDING COMPANY NAME: __________________________________________________________
FEIN (Federal Employer ID Number) OR Social Security # (if Sole Proprietorship)
Address: __________________________________________________________________________
City _____________________________ State ________ Zip + 4 _______________________
Number of years in Business _______
Name the person to contact for questions concerning this bid.
Name ___________________________ Title _______________________________
Phone ( ) _______________________ Toll Free Phone ( ) __________________________
Fax ( ) _______________________ Email Address ____________________________
In signing this bid, we also certify that we have not, either directly or indirectly, entered into any agreement or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a bid; that this bid has been independently arrived at without collusion with any other bidder, competitor or potential competitor; that this bid has not been knowingly disclosed prior to the opening of bids to any other bidder or competitor; that the above statement is accurate under penalty of perjury.
The undersigned, having familiarized themselves with the conditions affecting the cost of the work, having read completely the specifications, hereby proposes to perform everything required and to provide and furnish labor, materials, equipment, tools and all other services and supplies necessary to produce in a complete and workmanlike manner all of the materials or products described in the specifications relating to this Bid.
I further certify that I have carefully examined he bid documents and all terms herein, and site where the work is to be done and have no agreements to prevent the completion of said work.
Signature Title
Name (type or print) Date
This firm herby acknowledges receipt / review of the following addendum(s) (If any)
Addendum #_____ Addendum #_____Addendum #_____Addendum #_____
WISCONSIN PAGE 10 OF 14
ATTACHMENT B
REFERENCES
Vendor: _______________________________________________________________________
Provide company name, address, contact person, telephone number, and appropriate information on the product(s) and/or service(s) provided to customers similar to those requested in this solicitation document.
Potential subcontractors cannot be references. Any subcontractor arrangement for the completion of this work shall be listed on a separate page.
Company Name: _________________________________________________________________________
Address (include Zip + 4) _____________________________________________________________________
Contact Person: _____________________________________ Phone No. __________________________
E-Mail Address: ___________________________________________________________________________
Product(s) Used and/or Service(s) Provided: _____________________________________________________
Company Name: _________________________________________________________________________
Address (include Zip + 4) _____________________________________________________________________
Contact Person: _____________________________________ Phone No. __________________________
E-Mail Address: ___________________________________________________________________________
Product(s) Used and/or Service(s) Provided: _____________________________________________________
Company Name: _________________________________________________________________________
Address (include Zip + 4) _____________________________________________________________________
Contact Person: _____________________________________ Phone No. __________________________
E-Mail Address: ___________________________________________________________________________
Product(s) Used and/or Service(s) Provided: _____________________________________________________
Company Name: _________________________________________________________________________
Address (include Zip + 4) _____________________________________________________________________
Contact Person: _____________________________________ Phone No. __________________________
E-Mail Address: ___________________________________________________________________________
Product(s) Used and/or Service(s) Provided: _____________________________________________________
WISCONSIN PAGE 11 OF 14
ATTACHMENT C BID OFFER FORM
Vendor:______________________________________________________________ Bid Pricing Form Line # Description Price per Unit 1 Cost for Test Pit at Depth of 5FT Classified According To USDA and WDNR
Technical Standard 1002, Signed By Soil Scientist for Infiltration Labeled TP 1- 12 on Attachment E
2 Cost of Building Boring Labeled BB 1-15 on Attachment E $ 3 Cost of Road Boring to Depth of 5Ft Labeled R5 1-18 on Attachment E $ 4 Cost of Road Boring to Depth of 10Ft Labeled R10 1-2 on Attachment E $ 5 Cost of Mobilization and other expenses not included in lines above $ 6 Total Cost of All Products and Services (Sum of Lines 1-5) $
Alternates / Unit Prices:
O1 Cost Per Linear Foot for Rock Cores $ /LF O2 Cost for Building Boring Labeled BA 1-9 on Attachment E $ O3 Cost for Building Boring Labeled FA 1-6 on Attachment E $ O4 Cost for Building Boring Labeled FB 1-10 on Attachment E $ O5 Cost of Road Boring to Depth of 5Ft Labeled R5 19-31 on Attachment E $ O6 Cost of Road Boring to Depth of 10Ft Labeled R10 3-4 on Attachment E $
State the lead time for scheduling the physical borings assuming Notification of Award is on July 7, 2025. ________Days
State the lead time to provide the Geotechnical report after completion of the borings.________Days
TOTAL LEAD TIME FROM SIGNED CONTRACT TO COMPLETED REPORT ________Days
Please provide a statement on the likely hood that you could have completed Soil Borings and provide results to the Portage County Procurement Director by August 6, 2025 assuming Notification of Award is on July 7, 2025.
WISCONSIN PAGE 12 OF 14
ATTACHMENT D
STANDARD TERMS AND CONDITIONS
1.0 SPECIFICATIONS: The specifications in this request are the minimum acceptable. When specific manufacturer and model numbers are used, they are to establish a design, type of construction, quality, functional capability and/or performance level desired, unless otherwise specified. When alternates are bid/proposed, they must be identified by manufacturer, stock number, and such other information necessary to establish an acceptable equivalency. The County shall be the sole and final judge of equivalency.
2.0 HOW TO AMEND A REQUEST FOR BID, PROPOSAL OR QUOTE:
2.1 Public Works Projects are subject to Wis Stats 66.0901(5): If a person submits a bid or proposal for the performance of public work under any public contract to be let by a municipality and the bidder claims that a mistake, omission or error has been made in preparing the bid, the bidder shall, before the bids are opened, make known the fact that an error, omission or mistake has been made. If the bidder makes this fact known, the bid shall be returned to the bidder unopened and the bidder may not bid upon the public contract unless it is re-advertised and relet upon the re-advertisement. If a bidder makes an error, omission or mistake and discovers it after the bids are opened, the bidder shall immediately and without delay give written notice and make known the fact of the mistake, omission or error which has been committed and submit to the municipality clear and satisfactory evidence of the mistake, omission or error and that it was not caused by any careless act or omission on the bidder's part in the exercise of ordinary care in examining the plans or specifications and in conforming with the provisions of this section. If the discovery and notice of a mistake, omission or error causes a forfeiture, the bidder may not recover the moneys or certified check forfeited as liquidated damages unless it is proven before a court of competent jurisdiction in an action brought for the recovery of the amount forfeited, that in making the mistake, error or omission the bidder was free from carelessness, negligence or inexcusable neglect.
2.2 Non-Public Work Projects: After a Request for Bid/Proposal/Quote has been filed with the Portage County Purchasing Department, the responder may submit an amended response BEFORE THE DUE DATE AND TIME set in the request. All the conditions and provisions of the original Bid/Proposal/Quote will be in effect. No submittals or amendments will be accepted after the due date and time of the request. This does not preclude the County from requesting additional information and/or clarification.
3.0 DEVIATIONS AND EXCEPTIONS: Deviations and exceptions from original text, terms, conditions, or specifications shall be described fully, on the bidder's/proposer's letterhead, signed, and attached to the request. In the absence of such statement, the bid/proposal shall be accepted as in strict compliance with all terms, conditions, and specifications and the bidders/proposers shall be held liable.
4.0 QUALITY: Unless otherwise indicated in the request, all material shall be new, newest model year, and free from defects.
Items which are used, demonstrators, obsolete, seconds, or which have been discontinued are unacceptable without prior written approval by the County.
5.0 QUANTITIES: The quantities shown on this request are based on estimated needs. The County reserves the right to increase or decrease quantities to meet actual needs.
6.0 DELIVERY: Deliveries shall be F.O.B. destination freight prepaid and included unless otherwise specified.
7.0 PRICING AND DISCOUNT: The County qualifies for governmental discounts. Unit prices shall reflect these discounts.
7.1 Unit prices shown on the bid/proposal or contract shall be the price per unit of sale (e.g., gal., cs., doz., ea.) as stated on the request or contract. For any given item, the quantity multiplied by the unit price shall establish the extended price; the unit price shall govern in the bid/proposal evaluation.
7.2 Prices established in continuing agreements and term contracts may be lowered due to general market conditions.
WISCONSIN PAGE 13 OF 14
8.0 RESPONSES TO REMAIN OPEN: Responses must remain open and will be deemed to be open and subject to acceptance until awarding of the bid/proposal is finalized, or a minimum of sixty (60) days unless otherwise specified.
9.0 ACCEPTANCE-REJECTION: The County reserves the right to accept or reject any or all bids/proposals, to waive any technicality in any bid/proposal submitted, request clarification of any bid/proposal, award a bid/proposal that is not the lowest price, and to accept any part of a bid/proposal as deemed to be in the best interests of the County.
10.0 GUARANTEED DELIVERY: Failure of the Contractor to adhere to delivery schedules as specified or to promptly replace rejected materials shall render the Contractor liable for all costs in excess of the contract price when alternate procurement is necessary. Excess costs shall include the administrative costs and other costs attributable to the delay.
11.0 CONTRACT AND EXECUTION OF CONTRACT: Unless otherwise specified in the bid/proposal, the successful responder agrees to enter into a contract, a copy of which will be on file in the office of the Portage County Purchasing Department. Contractor shall and will well and truly execute and perform this contract under the terms applicable to the satisfaction of the County, and shall promptly make payment to each and every person or party entitled thereto of all the claims for work or labor performed and materials furnished in the performance of this contract.
12.0 ENTIRE AGREEMENT: These Standard Terms and Conditions shall apply to any contract or order awarded as a result of this request except where special requirements are stated elsewhere in the request; in such cases, the special requirements shall apply. Further, the written contract and/or order with referenced parts and attachments shall constitute the entire agreement and no other terms and conditions in any document, acceptance, or acknowledgment shall be effective or binding unless expressly agreed to in writing by the County.
13.0 APPLICABLE LAW AND COMPLIANCE: This contract shall be governed under the laws of the State of Wisconsin. The Contractor shall at all times comply with and observe all federal and state laws, local laws, ordinances, and regulations which are in effect during the period of this contract and which in any manner affect the work or its conduct. The County reserves the right to cancel this contract if the contractor fails to follow the requirements of s. 77.66, Wis. Stats., and related statutes regarding certification for collection of sales and use tax. The County also reserves the right to cancel this contract with any state or federally debarred contractor or a contractor that is presently identified on the list of parties excluded from federal procurement and non-procurement contracts.
14.0 LICENSES AND PERMITS: Contractor shall have and/or provide any and all licenses and permits required to perform the work specified and furnish proof of such licensing authorization and permits with their bids if required.
15.0 ASSIGNMENT: No right or duty in whole or in part of the Contractor under this contract may be assigned or delegated without the prior written consent of the County.
16.0 NONEXCLUSIVE CONTRACT: Unless otherwise stated, the County reserves the right to purchase work or materials outside of this contract.
17.0 NONDISCRIMINATION & AFFIRMATIVE ACTION: In connection with the performance of work under this contract, the Contractor agrees not to discriminate against any employee or applicant for employment because of age, race, religion, color, handicap, sex, physical condition, developmental disability as defined in s. 51.01(5), Wis. Stats., sexual orientation, gender identity and gender expression, or national origin. This provision shall include, but not be limited to, the following:
employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
18.0 INDEPENDENT CAPACITY: The parties hereto agree that the contractor, its officers, agents, and employees, in the performance of this agreement shall act in the capacity of an independent contractor and not as an officer, employee, or agent of the County. The contractor agrees to take such steps as may be necessary to ensure that each subcontractor of the contractor will be deemed to be an independent contractor and will not be considered or permitted to be an agent, servant, joint venturer, or partner of the County.
WISCONSIN PAGE 14 OF 14
19.0 SAFETY REQUIREMENTS: All materials, equipment, and supplies provided to the County must comply fully with all safety requirements as set forth by the Wisconsin Administrative Code and all applicable OSHA Standards.
20.0 WARRANTY: Unless otherwise specifically stated, equipment purchased as a result of this request shall be warranted against defects by the Contractor for one (1) year from date of receipt. The equipment manufacturer's standard warranty shall apply as a minimum and must be honored by the Contractor.
21.0 INSURANCE RESPONSIBILITY: If insurance is required, satisfactory proof of the existence and carriage of such insurance of the kinds and limits specified will be required.
22.0 CANCELLATION: The County reserves the right to cancel any contract in whole or in part without penalty due to non-appropriation of funds or for failure of the contractor to comply with terms, conditions, and specifications of this contract.
23.0 VENDOR TAX DELINQUENCY: Vendors who have a delinquent Portage County tax liability may have their payments offset by the County.
24.0 OPEN RECORDS: Both parties understand that the County is bound by the Wisconsin Public Records Law, and as such, responses and contracts are subject to and conditioned on the provisions of the law. Contractor acknowledges that it is obligated to assist the County in retaining and producing records that are subject to Wisconsin Public Records Law, and that the failure to do so shall constitute a material breach of the contract, and that the Contractor must defend and hold the County harmless from liability under that law. Except as otherwise authorized, those records shall be maintained for a period of seven (7) years after receipt of final payment under the contract.
25.0 MATERIAL SAFETY DATA SHEET: If any item(s) on an order(s) resulting from this award(s) is a hazardous chemical, as defined under 29CFR 1910.1200, the Contractor shall provide one (1) copy of a Material Safety Data Sheet for each item with the shipped container(s) and one (1) copy with the invoice(s).
26.0 ADVERTISING AND NEWS RELEASES: Reference to or use of the County, any of its departments, officials, or employees, for commercial promotion is prohibited. News releases pertaining to this procurement shall not be made without prior approval of the County. Release of broadcast e-mails pertaining to this procurement shall not be made without prior written authorization of the County.
27.0 HOLD HARMLESS: The Contractor will indemnify, pay the cost of defense including attorney’s fees, and save harmless the County and all of its officers, agents and employees from all suits, actions, or claims of any character directly related to any injuries or damages to any persons or property resulting from the operations of the contractor, or of any of its contractors, in prosecuting work under this agreement.
28.0 FOREIGN CORPORATION: A foreign corporation (any corporation other than a Wisconsin corporation) which becomes a party to this contract is required to conform to all the requirements of Chapter 180, Wis. Stats., relating to a foreign corporation and must possess a certificate of authority from the Wisconsin Department of Financial Institutions, unless the corporation is transacting business in interstate commerce or is otherwise exempt from the requirement of obtaining a certificate of authority. Any foreign corporation which desires to apply for a certificate of authority should contact the Department of Financial Institutions, Division of Corporation, P. O. Box 7846, Madison, WI 53707-7846; telephone (608) 261- 7577.
29.0 FORCE MAJEURE: Neither party shall be in default by reason of any failure in performance of this contract in accordance with reasonable control and without fault or negligence on their part. Such causes may include, but are not restricted to, acts of nature or the public enemy, acts of the government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes and unusually severe weather, but in every case the failure to perform such must be beyond the reasonable control and without the fault or negligence of the party.
BUILDING Proposed SF A Law Enforcement Fleet
Garage
17,000 SF
B Law Enforcement Center – 2 story
36,000 SF
C Building Support – Loading Dock/Warehouse/MEP
Included in B
D Public Service Lobby Included in B E Jail 95,000 SF with approximate 80,000 SF footprint
F Alternate – Juvenile Detention
22,000 SF
G Future Jail Expansion NA H Alternate – Facilities
Management
29,000 SF
I Future Facilities Maintenance Fenced Yard
NA
J Future Building NA K Future Building NA
A
TP
TP
2 TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
10 BB
BB
BB
BB
BB
BA
BA
BA
BA
BA
BA
BA
BA
BA
FA
FA
FA
FA
FA
FA
FB
FB
FB
FB
FB
FB
FB
FB
FB
FB
R10
R5
R10
R10
R10
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
R5
B
C D
E
E
F
G
H I J
K
NOTES
TP 1-12 TEST PIT AT DEPTH OF 5 FEET CLASSIFIED
ACCORDING TO USDA AND WDNR TECHNICAL
STANDARD 1002, SIGNED BY SOIL SCIENTIST FOR
INFILTRATION
BB 1-15 BUILDING (BASE BID) BORING
BA 1-9 BUILDING (ALTERNATE) BORING OPTIONAL
FA 1-6 BUILDING (FUTURE ADDITION) OPTIONAL
FB 1-10 BUILDING (FUTURE) OPTIONAL
R5 1-18 ROAD BORINGS DEPTH 5 FEET
R5 19-31 ROAD BORINGS DEPTH 5 FEET OPTIONAL
R10 1-2 ROAD BORINGS DEPTH 10 FEET
R10 3-4 ROAD BORINGS DEPTH 10 FEET OPTIONAL
Mead and Hunt along with Pierce Engineers provided boring location information
S
E C or ne r o f t he in te rs ec tio n of
C ou nt y
R a nd Bl ac k
O ak
D riv e
Attachment E
| 2025-11PC Bid Document Draft 061625 DK Edits |
| 1. General Information and Scope |
| 1.1 Introduction |
| 1.2 Definitions: |
| 1.3 Scope |
| 1.3.1. Project Description-The project on this site will be a Law Enforcement Center (LEC) that has a 200 bed Jail, Sheriff Office, and Fleet Garage. The current projected square feet of the those buildings is around 180,000. Options for additional ... |
| 1.3.2. Summary of Buildings Borings- |
| 1.3.3. Summary of Pavement Borings- |
| 1.3.4. Summary of Retention Ponds Excavation- |
| 2. Contract term |
| 3. QUESTIONS |
| 4. METHOD OF BID |
| 5. BID SUBMISSION |
| 6. BID RESPONSE REQUIREMENTS |
| 7. METHOD OF AWARD |
| 8. bidder/contractor qualifications |
| 9. GENERAL SPECIFICATIONS FOR CONTRACTOR |
| 10. SITE SPECIFIC SPECIFICATIONS |
| 11. ON SITE SERVICE |
| 12. SUBCONTRACTING OR THIRD PARTY PAYMENTS |
| 13. Firm prices |
| 14. CONTRACT CANCELLATION |
| 15. APPEALS PROCESS |
| PCJLEC SOIL BORINGS 06132025 |
| Slide Number 1 |
File details come from the government source that posted it. Updated .