This document is a Dam Inspection Report Form completed by the Connecticut Department of Energy and Environmental Protection (DEEP) for the Paper Goods Pond Dam (CT Dam ID #707) located in Berlin, Connecticut, conducted on October 17, 2025. The dam is a stone masonry arch structure approximately 73 feet long with a maximum height of 30 feet, built in the 1890s for industrial water supply and currently used for recreation. The inspection was performed by engineers from Macchi Engineers and representatives from the Town of Berlin Highway Department. The dam's overall condition is rated as Poor, with a Hazard Classification of B (Significant Hazard). The inspection identified a 61-foot-long broad-crested spillway weir, a 16-inch blowoff valve that is in good working condition, upstream concrete training walls designed to contain 100-year storm flows, and an impoundment area of 14.4 acres with a drainage area of 9.18 square miles. The report notes that the pool level was 1 to 2 inches above the spillway crest at the time of inspection, and hydraulic analysis confirms that the 100-year storm is contained between abutment training walls while the probable maximum flood (PMF) storm would overtop the abutments by 2.9 feet.
The inspection identified significant deficiencies requiring corrective action, including cracking at the crest of the 12-foot dam section serving as the operator's platform, multiple cracks and spalling in shotcrete on the downstream face with visible efflorescence, bulging on both upstream and downstream sections, damaged mortar skim coat on the upstream left abutment wall, and exposed welded wire fabric on the downstream face. Additional concerns include vegetation within 25 feet of both dam abutments, incomplete grout filling in fence post core holes causing rust and deterioration, a 1.25-inch-wide gap at the spillway crest near the right abutment, and potential seepage issues. The inspection report provides twelve specific recommendations for repairs and maintenance, including clearing vegetation, repairing cracks, grouting voids, removing damaged shotcrete and mortar, investigating underlying conditions, completely filling core holes, monitoring seepage, clearing sediment, and repairing exposed mesh. Supporting information includes 50 photographs documenting various conditions and features of the dam from multiple angles and a location plan sketch. Related procurement documents indicate that the Town of Berlin is soliciting proposals from qualified architectural and engineering firms to conduct assessment, prepare design documents, obtain permitting approvals, and provide construction administration services for the necessary repairs and improvements to the dam.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEEP-DAM-FRM-002 Page 1 of 41 Rev. 11/21/2024
79 Elm Street • Hartford, CT 06106-5127 www.ct.gov/deep/dams Affirmative Action/Equal Opportunity Employer
DAM SAFETY PROGRAM
DAM INSPECTION REPORT FORM – FOR REGULATORY
INSPECTION
Please complete this form in accordance with the instructions (DEEP-DAM-INST-002).
Part I: Summary of Dam Inspection
Dam Name: Paper Goods Pond Dam Inspection Date(s): 10/17/25
Alternate Dam Name(s): CT Dam ID #: 707
Location (Municipality): Berlin Temperature / Weather: 53⁰ Clear
Registered?: Yes 201206818 Pool Level: 1”-2” above the spillway crest
Emergency Action Plan?:
Yes or No Yes, Updated 2019 Impoundment Use: Recreation
Hydraulic and Hydrologic Analysis?: Yes or No
Yes, 100-yr storm contained between abutment training walls, ½ PMF storm overtops abutment by 2.9’
Stability Analysis?:
Yes or No
Yes, Stability of dam is sufficient during ½ PMF overtopping event.
Overall Condition of Dam: Poor
Persons present at the inspection (select the tab button in the last cell to the right to create another row) Name Title/Position Representing Jenna Bogaczyk, P.E. Engineer Macchi Engineers Herb May, P.E. Engineer Macchi Engineers Steve Karp Highway Department Town of Berlin Dan Cotto Highway Department Town of Berlin
Paper Goods Pond Dam DamID#707 October 17, 2025
DEEP-DAM-FRM-002 Page 2 of 41 Rev. 11/21/2024
Owners and Operators: If there is more than one owner or operator, copy the empty table below for each owner or operator and paste right below the previous table, then complete the information for each *By providing this e-mail address you are agreeing to receive official correspondence from DEEP, at this electronic address, concerning the subject report. Please remember to check your security settings to be sure you can receive e-mails from “ct.gov” addresses. Also, please notify DEEP if your e-mail address changes by email via deep.damsafety@ct.gov.
Indicate if Owner or Operator: Owner & Operator Name: Town of Berlin Mailing Address: 240 Kensington Road City/Town: Berlin State: CT Zip Code: 06037 Phone: 860-828-7014 ext.:
Emergency Phone:
*E-mail: mahern@berlinct.gov
DEEP-DAM-FRM-002 Page 3 of 41 Rev. 11/21/2024
Part II: General Dam Information General Description: Stone masonry arch structure approximately 73 feet long with a maximum height of approximately 30 feet and a crest width of 4 feet. Dam includes a 61-foot-long broad crested spillway weir. Dam impounds flows of the Mattabesset River in Berlin to create the Paper Goods Pond impoundment. Dam built into natural rocks for its entire length. Appurtenant structures include a 16” blowoff near the center of the dam with operator stand adjacent to the left spillway abutment. Also, upstream concrete training walls at each dam abutment.
Hazard Classification: B Dam Height (ft): 30’
Dam Length (ft): 73’ Spillway Length (ft): 61’
Spillway Type:
Broad crested free overflow stone masonry arch spillway
Normal Freeboard (ft):
6.2’ (Dam abutment walls 122.0’ – Spillway 115.8’)
Drainage Area (square miles): 9.18
Impoundment Area (at principal spillway crest, in acres):
14.4
Watercourse(s): Mattabesset River
OTHER INFORMATION:
1) Dam was constructed in 1890’s for industrial water supply.
2) Repairs initially made in 1939 included shotcrete coating on portions of dam.
3) Repairs made in 1999 included increased lengths and heights of upstream training walls to contain
100-yr storm within dam abutments. Also repairs made to shotcrete, plugged abandoned 48” diameter penstock, plugged abandoned 10” diameter mill supply pipe, replaced stem and guides for 16” diameter blow off valve and provided new concrete operator’s stand.
4) Town reports regular maintenance items including cutting of brush at abutments and exercising gate valve.
Part III: Aerial Photo/Location Map
See Page 4 for Impoundment View, Page 5 for Aerial View, and Page 6 for Location Plan
DEEP-DAM-FRM-002 Page 7 of 41 Rev. 11/21/2024
Part IV: Dam Information
Dam Name: Paper Goods Pond Dam General Description: Overall dam length is 73’ of which 61’ is spillway. 12’ section of dam is located at left abutment and is 2.6’ above the spillway. This 12’ section consists of stone masonry built up from natural rock and covered with shotcrete. A +/- 7’ wide concrete section was built atop the stone masonry to create an operator’s platform. This 12’ section also acts as an auxiliary spillway section for high flows. There are training walls at each abutment built up to elevation 122.0’ in order to contain the 100-yr storm flows. The wall at the left abutment is 31’-2” in length and +/- 2’-4” width with a 5’ wide cap for access to the operator’s platform. The wall appears to have originally been constructed of stone masonry covered in shotcrete with a newer concrete section built on top. This wall extends upstream to the bridge abutment for the Percival Avenue bridge. The wall at the right abutment is concrete, 34’-6” in length and 18” in width. It extends upstream to natural grade General Condition: Poor Concrete Condition: Crest of 12’ dam section has a ¼” to ½” wide crack towards center. Downstream face has multiple cracks in the shotcrete with visible efflorescence. Spalling on right face below spillway with welded wire fabric visible. Downstream also appears to have bulging, although this could have been the result of uneven shotcrete application over natural stone masonry. Left upstream abutment wall appears to have had a mortar skim coat applied over the original layer of shotcrete. Multiple cracks and spalls in the skim coat layer. The left wall also appears to have significant bulging although this also could have been the result of uneven shotcrete application over natural rock outcrops and stone masonry. Upper concrete cap/access platform at left wall is in good condition. Right upstream concrete abutment wall is in good condition with no visible deficiencies.
Stone Masonry: None Visible Settlement/Alignment/Movement: Bulging on upstream left abutment wall and downstream section of dam as mentioned above, unsure if movement has occurred or was part of shotcrete application.
Seepage/Foundation Drainage: None observed Riprap: N/A Erosion/Burrows: None observed Vegetative Cover: N/A Other: Woody vegetation observed within 25’ of both dam abutments Photos/Graphics/Sketches (See Parts XIII and XIV)
Part V: Principal Spillway, Training Walls, Apron Number of Principal Spillways: 1
Spillway Type: Broad crested stone masonry free overflow spillway General Description: +/-24’ high by 61’ wide stone arch with radius of approximately 55’ and batter at approximately 1:7. Appears the stone arch was capped with a +/- 8” thick by 4’ wide concrete cap. Spillway has main flow area 61’ in length for normal flows. (See above for description of additional 12’ long dam section that will accommodate high flows). At crest of right spillway abutment, small section of natural rock outcrop lies between the right upstream dam abutment wall and the stone masonry arch. The rock outcrop has a small concrete slab upstream for flow transition to the arch.
General Condition: Satisfactory Concrete Condition: Concrete cap section covered in thick coat of algae and water flows prevented thorough examination, however no deficiencies were noted.
Stone Masonry:
Settlement/Alignment/Movement: Flow over spillway and inaccessible route to toe of dam prevented thorough examination. Visible inspection from abutment sections and accessible downstream areas found no deficiencies to downstream face. Small gap was noted at crest near right abutment at interface of stone masonry and rock outcrop. Gap was 1-1/4” wide by +/- 6” in depth.
Cracks: None observed Scouring/Undermining: Toe of spillway is natural rock with mild scouring.
Seepage/Foundation Drainage: None observed Other:
Photos/Graphics/Sketches (See Parts XIII and XIV)
DEEP-DAM-FRM-002 Page 8 of 41 Rev. 11/21/2024
Part VI: Auxiliary Spillway, Training Walls, Apron Number of Auxiliary Spillways: 1
Auxiliary Spillway Type: Broad crested concrete free overflow General Description: The auxiliary spillway is the 12’ long by 7’ wide section of dam towards the left abutment used as an operator’s platform described in Part IV above.
General Condition: Fair Concrete Condition: Crest of 12’ dam section has a ¼” to ½” wide crack towards center. Downstream face has multiple cracks in the shotcrete with visible efflorescence. Downstream also appears to have bulging, although this could have been the result of uneven shotcrete application over natural stone masonry.
Stone Masonry: None visible Settlement/Alignment/Movement: Bulging as indicated above.
Cracks: Cracks in shotcrete as indicated above.
Scouring/Undermining: None observed Vegetative Cover: N/A Riprap: N/A Seepage/Foundation Drainage: None observed Other:
Photos/Graphics/Sketches (See Parts XIII and XIV)
Part VII: Downstream Channel Number of Downstream Channels: 1
Channel Name (see instructions), include Watercourse Name: Mattabesset River General Description: Deep gorge with significant flow capacity. Natural bedrock with rock outcrops near toe of dam and in stilling area. Bottom of channel width varies +/- 20 to 50 feet in width. Channel embankments very steep (+/-1:1) and heavily wooded with thick brush. At top of left channel embankment, tall retaining wall for adjacent property parking lot. Wall extends downstream approximately 850’. Riprap along base of retaining wall and sporadic riprap spread in channel where bedrock ends. Remnants of abandoned power house, and tailrace in downstream channel at left channel embankment. About 1500 feet downstream, Mattabesset River empties into Railroad Pond.
General Condition: Good Scouring: None observed.
Debris: Little debris found in normal channel flow path. Significant vegetative growth and debris on channel embankments. However, depth and width of channel gorge provides significant capacity. Channel eventually discharges into large impoundment with no bridge or culvert crossings between spillway outfall and downstream impoundment so there is no worry for debris impacting outflow.
Riprap: Sporadic coverage, however due to natural bedrock, riprap not necessary for erosion protection.
Other:
Photos/Graphics/Sketches (See Parts XIII and XIV)
Part VIII: Intake Structure(s) Number of Intake Structures: 1
Intake Structure Type: 16” diameter blowoff valve General Description: 16” diameter cast iron pipe and valve located towards the center of the spillway. Operator stand is at the left side of the spillway and operation is with a non-rising stem operator.
General Condition: Good Concrete Condition: N/A
DEEP-DAM-FRM-002 Page 9 of 41 Rev. 11/21/2024
Stone Masonry: N/A Settlement/Alignment/Movement: N/A Cracks: None observed Other: Stem and guides were replaced during 1999 repairs. Owner regularly exercises valve and demonstrated workability during inspection.
Photos/Graphics/Sketches (See Parts XIII and XIV)
Part IX: Outlet Structure(s) Number of Outlet Structures: 0
Outlet Structure Type (see instructions):
General Description:
General Condition:
Concrete Condition:
Stone Masonry:
Settlement/Alignment/Movement:
Scouring/Undermining:
Other:
Photos/Graphics/Sketches (See Parts XIII and XIV)
Part X: Miscellaneous Features
List miscellaneous features: (e.g., access roads, bridges, etc.):
1) Percival Avenue (Route 71) bridge located +/- 30’ upstream of dam. Left dam abutment wall ties into bridge abutment wall. Bottom of bridge beam flanges 4’ above spillway elevation. Would begin to impede flows to spillway above the 100-yr storm level.
2) Abandoned turbine house foundation/walls and tailrace walls located immediately downstream of spillway on left side of channel.
3) Old concrete wall located downstream on right side of channel appears to have channeled flows into turbine house.
4) Chain link fencing on upstream abutment walls and on downstream side of crest of 12’ dam section. Fencing on 12’ dam section has had lower portion of fabric trimmed to prevent blockages during overtopping events.
5) Ships ladder from left upstream abutment wall to 12’ dam section (operator’s platform) for access to operator.
Photos/Graphics/Sketches (See Parts XIII and XIV)
DEEP-DAM-FRM-002 Page 10 of 41 Rev. 11/21/2024
Part XI: Downstream Hazard Classification Reassessment
Downstream Hazard Classification:
Current hazard classification is B – Significant Hazard.
Recommend hazard classification remain at B.
Part XII: Recommendations (See instructions for identifying recommendations)
Recommendations:
1. Clear all vegetation with 25’ of dam abutments and clear any vegetation near upstream abutment walls.
2. Repair crack at crest of dam (operator’s platform).
3. Grout fill void at crest of spillway near right abutment at interface between stone masonry and rock ledge.
4. Remove damaged mortar skim coat on upstream left abutment wall and further investigate condition of underlying concrete/shotcrete/stone masonry.
5. Remove damaged shotcrete on downstream side of dam and further investigate condition of underlying concrete/shotcrete/stone masonry.
6. All chain link fence posts were grouted in cored holes. Grout was left low in all cores allowing rain water to collect in holes causing rust and deterioration at base of each fence posts. Core holes should be completely grout filled.
7. Investigate potential seepage under capstone of dam along spillway.
8. Clear all vegetation near the downstream face to avoid further damage.
9. Monitor seepage on downstream left channel.
10. Clear sediment from upstream channel
11. Repair exposed welded wire mesh on downstream right face of dam.
DEEP-DAM-FRM-002 Page 11 of 41 Rev. 11/21/2024
Part XIII: Photographs/Graphics (see instructions and Appendix C)
Photograph No. 1 – Dam Viewed from Upstream Looking Southerly
Photograph No. 2 – Dam Behind Percival Avenue Viewed from Upstream
DEEP-DAM-FRM-002 Page 12 of 41 Rev. 11/21/2024
Photograph No. 3 – Downstream Face of Dam Viewed from Downstream Looking Southwesterly
Photograph No. 4 – Downstream Face of Dam Viewed from Further Downstream Looking Southwesterly
DEEP-DAM-FRM-002 Page 13 of 41 Rev. 11/21/2024
Photograph No. 5 – Crest of Dam Viewed from Right Abutment Looking Northerly
Photograph No. 6 – 12’ Dam Section Viewed from Right Abutment Looking Northerly
DEEP-DAM-FRM-002 Page 14 of 41 Rev. 11/21/2024
Photograph No. 7 – Downstream Face of Dam Viewed from Right Abutment Looking Northerly
Photograph No. 8 – Dam Viewed from Left Abutment Looking Southerly
DEEP-DAM-FRM-002 Page 15 of 41 Rev. 11/21/2024
Photograph No. 9 – Dam Viewed from Atop Left Abutment Looking Southerly
Photograph No. 10 – Downstream Face of Dam Viewed from Left Abutment Looking Southerly
DEEP-DAM-FRM-002 Page 16 of 41 Rev. 11/21/2024
Photograph No. 11 – Left Abutment Viewed from Downstream Looking Westerly
Photograph No. 12 – Left Abutment Viewed from Above
DEEP-DAM-FRM-002 Page 17 of 41 Rev. 11/21/2024
Photograph No. 13 – Dam Viewed from Left Abutment on 12’ Dam Section Looking Southerly
Photograph No. 14 – 12’ Dam Section Connection to Percival Avenue Viewed Looking Southerly (Note: Voids in Caulking)
DEEP-DAM-FRM-002 Page 18 of 41 Rev. 11/21/2024
Photograph No. 15 – 12’ Dam Section Viewed from Upstream Looking Easterly
Photograph No. 16 – Operator Platform Viewed from Upstream Looking Easterly
DEEP-DAM-FRM-002 Page 19 of 41 Rev. 11/21/2024
Photograph No. 17 – 12’ Dam Section Viewed from Entrance Looking Southeasterly
Photograph No. 18 – Northern Side of Spillway Viewed from Downstream Looking Southwesterly
DEEP-DAM-FRM-002 Page 20 of 41 Rev. 11/21/2024
Photograph No. 19 – Southern Side of Spillway Viewed from Downstream Looking Southwesterly
Photograph No. 20 – Edge of Spillway Viewed from the Right Abutment
DEEP-DAM-FRM-002 Page 21 of 41 Rev. 11/21/2024
Photograph No. 21 – Right Toe of Dam Viewed from Above (Note: Tree within 25’)
Photograph No. 22 – Right Training Wall Viewed from the Right Side Looking Northeasterly
DEEP-DAM-FRM-002 Page 22 of 41 Rev. 11/21/2024
Photograph No. 23 – Right Training Wall Viewed from Upstream Looking Southeasterly
Photograph No. 24 – Overview of Left Training Wall Viewed from Above
DEEP-DAM-FRM-002 Page 23 of 41 Rev. 11/21/2024
Photograph No. 25 – Connection of Left Training Wall and Crest of Spillway Viewed from Above
Photograph No. 26 – Downstream Channel Viewed from Dam Looking Easterly
DEEP-DAM-FRM-002 Page 24 of 41 Rev. 11/21/2024
Photograph No. 27 – Downstream Channel Viewed from Above on the Left Bank
Photograph No. 28 – Left Bank of Downstream Channel Viewed from Dam Looking Easterly
DEEP-DAM-FRM-002 Page 25 of 41 Rev. 11/21/2024
Photograph No. 29 – Left Bank of Downstream Channel Viewed from Above
Photograph No. 30 – Downstream Channel Viewed from Bottom of Left Bank Looking Southeasterly
DEEP-DAM-FRM-002 Page 26 of 41 Rev. 11/21/2024
Photograph No. 31 – Stem and Stem Guide for 16” Blowoff Operation Viewed from Operator Stand Looking Westerly
Photograph No. 32 – Downstream Side of Dam Viewing Opened 16” Blowoff Pipe in Operation from Left Abutment Looking Southerly
DEEP-DAM-FRM-002 Page 27 of 41 Rev. 11/21/2024
Photograph No. 33 – Overview of Reservoir Area
Photograph No. 34 – Northern Side of Percival Avenue Viewed from the Dam Looking Northwesterly
DEEP-DAM-FRM-002 Page 28 of 41 Rev. 11/21/2024
Photograph No. 35 – Side of Percival Avenue Viewed from the Dam Looking Westerly
Photograph No. 36 – Southern Side of Percival Avenue Viewed from the Dam Looking Southwesterly
DEEP-DAM-FRM-002 Page 29 of 41 Rev. 11/21/2024
Photograph No. 37 – Concrete Pipe Support Located on Left Bank of Downstream Channel
Photograph No. 38 – Typical Core Holes for Fence Post Installation (Note: Grout Not Filled to Top of Core Hole and Deterioration at Base of Post)
DEEP-DAM-FRM-002 Page 30 of 41 Rev. 11/21/2024
Photograph No. 39 – Vegetation on the Side of 12’ Dam Section Looking Northeasterly
Photograph No. 40 – Vegetation along Right Abutment Looking Northerly
DEEP-DAM-FRM-002 Page 31 of 41 Rev. 11/21/2024
Photograph No. 41 – Dead Vegetation on Area Downstream of Left Abutment
Photograph No. 42 – Hairline crack Along 12’ Dam Section with Clipboard for Scale.
DEEP-DAM-FRM-002 Page 32 of 41 Rev. 11/21/2024
Photograph No. 43 – Crack Along Top of 12’ Dam Section
Photograph No. 44 – Bulging and Cracking in 12’ Dam Section Looking Northwesterly
DEEP-DAM-FRM-002 Page 33 of 41 Rev. 11/21/2024
Photograph No. 45 – Closer View of Bulging and Cracking in 12’ Dam Section Looking Northwesterly
Photograph No. 46 – Overview of Bulging and Cracking in 12’ Dam Section Looking Northerly
DEEP-DAM-FRM-002 Page 34 of 41 Rev. 11/21/2024
Photograph No. 47 – 12’ Dam Section Underneath Stairs Leading to Operator Platform Looking Northerly
Photograph No. 48 – 12’ Dam Section Underneath Stairs Leading to Operator Platform Looking Northeasterly
DEEP-DAM-FRM-002 Page 35 of 41 Rev. 11/21/2024
Photograph No. 49 – Spalling in Concrete on Right Side of Spillway (Note: Exposed Welded Wire Fabric)
Photograph No. 50 – Possible Undercutting/Erosion at Bottom of Right Side of Spillway
Part XIV: Sketches