2025_08_15 T9510_26_1 RFP Figure 2.pdf
PDF 3 MB Posted
- Solicitation number
- PE-66098-NONST-2026-000000130
- Issued by
- Cobb County, Georgia
About this file
This is a right-of-way record drawing limits sketch for the City of Sandy Springs, Georgia's Intelligent Transportation System (ITS) Ring B Fiber Extension project, identified as T9510-26-1. The document is a GIS-based map illustrating the proposed 12,750-foot fiber optic communication line route spanning Northridge Road, Roberts Drive, Spalding Drive, and Pitts Road within Sandy Springs. The map identifies specific project segments labeled as RingB-3, RingB-6, RingB-7, RingB-8, and RingB-12, with pull boxes noted at both sides of the Pitts Road bridge. The sketch depicts both aerial and underground fiber routing options, existing fiber infrastructure, traffic signal locations, and right-of-way record drawing limits. The document references multiple associated GDOT and city records dating from 2015 to 2023, including projects for Northridge-Colquitt signal, Northridge lighting, Pitts-Spalding infrastructure, and the Pitts Bridge project. The sketch was prepared on March 21, 2025, with final updates dated August 15, 2025.
No pricing terms, set-asides, incumbent information, funding sources, or contract award details are contained within this technical mapping document. The sketch serves as a technical reference document for the design and project management consultant selected to deliver surveying, concept and final design, utility coordination, permitting, bid support, and construction engineering and inspection services for integrating traffic signals, cameras, and Fire Station 51 into Sandy Springs' municipal fiber network.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RO
SW
EL
L
RD
0N
B
0S
B
DUNWOODY
CLUB DR
SPALD
IN
G
SPRINGS
CTCO
LQ
U
IT
T
RD
TAHOMA DR
MAD
ER
A
CT
DUNWOODY
PL
CO
LQ
U
IT
T R D R O
BE
RT
S D
R
BE
NW
EL
L D
R
PITTS
RD
W
EL
D
ST
O
NE
TE
R
SO
M
ER
SE
T
CT
SPINDLEWICK DR
NORTHRIDGE
RD
NORTHRIDGE RD
GRANITE R
ID
GE
PL
EASTCOTE DR
SPIN
D
LE CT
STRATFORD
LN
RO
BERTS D
R
NO
RT
HR
ID
GE CROSSING DR
SPALDING
SPRINGS LN
SP
AL
DI
NG
DR
IS
O
N R D
PITTS RD
ZE
PH
YR CT
SMITHDUNLN
SUNNYBROOK FARM
RD
BAKERS
GL
EN
DR
NORTHWOLD DR
AM
ST
ER
GREEN
DR
CALAVERAS DR
RingB-6 RingB-8
Ring B-12
RingB-7 R in gB -3
S ou rc es
: E sr i, To m To m , G ar m in , F
A O
, N O
A A
, U S
G S
O pe nS tr ee tM ap c on tr ib ut or s, a nd th e G
IS
U se r
C om m un ity
FY26 Ring B Fiber
Ring B Aerial
Underground
Traffic Signal
Existing Fiber
Sandy Springs
Na nc y C ree k
Dunwoody
Roswell
0 500 1,000250
Feet
GIS\PublicWorks\Projects\Transportation\20221206_ITSRingBFiber\20221206_ITSRingBFiber.aprx 3/21/2025
RingB-12
Pull boxes are installed at both sides of the Pitts Road bridge bill.lotz Text Box T9510-26-1 Ring B Fiber Extension ROW Record Drawing Limits Sketch 8/15/2025 bill.lotz Cloud+ bill.lotz Cloud+ 2015 GDOT 0013356 North- ridge - Colquitt Signal bill.lotz Cloud+ bill.lotz Cloud+ 2016 COSS T0033-06 Northridge Lighting bill.lotz Cloud+ bill.lotz Cloud+ 2022 TS111 Pitts - Spalding bill.lotz Cloud+ bill.lotz Cloud+ 2023 GDOT 0001757 Pitts Bridge bill.lotz Text Box Figure 2: ROW Record Drawing Limits Sketch
File details come from the government source that posted it. Updated .