2025-074_Roosevelt_Way_Preservation_Appendix.pdf

PDF 105 MB Posted

Attached to
Roosevelt Way Preservation (FHWA)
Solicitation number
PW#2025-074
Issued by
King County, Spokane City, Washington

About this file

This appendix document supports the Roosevelt Way Preservation project, a Federal Highway Administration (FHWA)-funded initiative managed by the State of Washington. The project encompasses comprehensive roadway improvements along Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE and along Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. The scope of work includes asphalt planing and overlay, removal and replacement of select concrete panels with base repair, intersection realignment at NE 113th Street, and installation of curb bulbs at NE 114th Street and NE 115th Street. Additional project elements include ADA-compliant curb ramps, sidewalk removal and restoration, channelization, signing, concrete bike barriers, driveway modifications, traffic signal installation, landscaping, storm drainage improvements, and pedestrian safety enhancements. The project specifically identifies rebar installation and electrical work as specialty trades requiring subcontractor participation.

The engineer's estimate for the Roosevelt Way Preservation Project ranges from $12,500,000 to $12,800,000. Funding is provided through FHWA, indicating federal support for this transportation infrastructure improvement. The appendix document serves as supporting documentation for bid preparation and subcontractor identification requirements, establishing the technical specifications and project parameters necessary for contractors and subcontractors to develop accurate proposals and project schedules.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .