2025-036_Price_Schedule.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 2000015988
- Issued by
- Koochiching County, Minnesota
About this file
This document contains a Price Schedule for a state and local contract opportunity issued by the Minnesota Department of Natural Resources (DNR) for multiple pass road grading within the Pine Island State Forest of Koochiching County. The scope of work includes labor, equipment, mobilization, fuel, lubrication, transportation, materials, tools, final clean-up, and all else necessary to provide approximately 78.3 miles of grading in the Littlefork DNR Area and 39.6 miles of grading in the Baudette area, with an estimated 8 total rounds over the life of the contract. No quantities are guaranteed. Responses must be submitted electronically through the Swift Portal, with a completed Price Schedule attached in Microsoft Excel or PDF format. The award will be made to the lowest responsible vendor meeting the specifications and all terms and conditions, and the State reserves the right to award items separately, by grouping, or by total.
The Price Schedule requires bidders to provide unit prices for mileage and hourly rates for each of the two bid groups. All costs such as labor, materials, tools, transportation, equipment, taxes, and incidentals must be included in the unit prices. Direct Pay Permit 1114 does not apply to this project. Responses that do not comply with the solicitation requirements may be considered non-responsive and rejected.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Event Price Schedule
CONTRACTOR NAME: <BIDDERS: INSERT VENDOR NAME HERE> *NOTE: PROTECT SHEET after preparing price schedule/before uploading (delete this prompt)
| PROJECT: | Littlefork-Baudette Multiple Pass Road Grading |
| SOLICITATION NO.: | 2025-036 |
| The completed Price Schedule should be uploaded in either a Microsoft Excel 97-2003 Worksheet (.xls) or Microsoft |
Excel 2010 Worksheet (.xlsx). The Price Schedule document may also be downloaded, completed and uploaded in a .pdf format. Other Excel file extensions that MAY be compatible are: .xlsm , .xlt, .xltm , and .xlw .
The State reserves the right to reject Price Schedules submitted in any other format.
Responders must submit a unit price for each Item number contained within each bid group bid on. Bids not containing a unit price for both Mile and Hourly rate for each bid group may be rejected.
| ITEM NO | DESCRIPTION | PAY UNIT | EST. QUANTITY per ROUND | ESTIMATED TOTAL ROUNDS | ESTIMATED TOTAL MILES PER LIFE OF CONTRACT | UNIT PRICE | AMOUNT BID | |
| BID GROUP 1: Littlefork Area grading | ||||||||
| 1 | Bid Group 1: Littlefork Area | Mile | 78.3 | 8.0 | 626.4 | $0.00 | ||
| 2 | Bid Group 1: Hourly rate for additional misc/as-needed grader work | Hour | 5.0 | 1.0 | 5.0 | $0.00 | ||
| BID GROUP 1: Littlefork Area Grading Subtotal (Sum of items 1-2 above) | $0.00 | |||||||
| BID GROUP 2: Birchdale (Baudette) Area grading | ||||||||
| 3 | Bid Group 2: Birchdale (Baudette Area) | Mile | 39.6 | 8.0 | 316.8 | $0.00 | ||
| 4 | Bid Group 2: Hourly rate for additional misc/as-needed grader work | Hour | 5.0 | 1.0 | 5.0 | $0.00 | ||
| BID GROUP 2: Birchdale (Baudetthe) Area Grading Subtotal (Sum of items 3-4 above) | Job | 1.0 | $0.00 | |||||
| TOTAL BID RESPONSE | $0.00 | |||||||
| Responders MUST Complete all lines associated with the Bid Group(s) bid on and Upload this attachment back into this Event. |
Call the Helpline with questions (651-201-8100 Option 1)
File details come from the government source that posted it. Updated .