2025-010 CR 9-15 Chip Seal - Scope of Work.pdf

PDF 2 MB Posted

Attached to
2025-010 CR 9/15 Chip Seal
Solicitation number
2025-010
Issued by
El Paso County, Colorado

About this file

The document is a Project Special Provisions document for a Road Surface Treatment Project (Chip Seal) for Elbert County, Colorado, specifically for County Road 194 covering approximately 3.3 miles. The project involves applying a chip seal treatment using latex modified cationic rapid set emulsion (CRS-2R) and a 3/8" aggregate cover coat material. The contractor will be responsible for furnishing all labor, equipment, materials, environmental protection, traffic control, and incidental items necessary to complete the surface treatment.

The project specifications detail precise requirements for bituminous materials, aggregate composition, application rates, and construction methods. The polymerized asphalt shall be applied at 0.38 to 0.42 net gallons per square yard, with a fog seal solution applied at 0.12 gallons per square yard. The project has specific weather limitations, requiring pavement and air temperatures between 50°F and rising, and mandates precise rolling, sweeping, and maintenance procedures. The contract includes provisions for traffic control, measurement, and payment, with cover coat material to be paid by square yard of road surface properly chip sealed and accepted by Elbert County.

View the file

Other files

File Type Posted
2025-010 CR 9-15 Chip Seal - IFB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .