Attachment 1 - Statement of Work.pdf

PDF 1 MB Posted

Attached to
Library of Congress - Still Imaging Consultant
Solicitation number
2024-LGD-0123
Issued by

About this file

This document is a Statement of Work (SOW) for a contract to provide a Professional Still Image Consultant to the Library of Congress (LC) to support their digitization programs. The consultant will be required to:

Participate in the Federal Agencies Digital Guidelines Initiative (FADGI) by attending meetings, presenting on technical topics, and providing reports. Provide technical support and training for the LC's digitization programs. Enhance the LC's Device Image Conformance Evaluation (DICE) conformance process. Create new and expanded content for the FADGI Technical Guidelines for Digitizing Cultural Heritage materials. The contract has a base period and four option periods, with the consultant providing services over a five-year period from August 2024 to August 2029. The consultant must have 10+ years of experience in senior roles related to imaging science and technical development, participation in ISO and other standards bodies, and expertise with FADGI and government-based still digital imagery standards.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Still Image Consultant Statement of Work

C.1. OVERVIEW / BACKGROUND

The Library supports multiple still image digitization programs converting books, manuscripts, maps, photographs, and film to digital form. These efforts are a component of the Library’s digital strategy, producing millions of digital images per year.

Essential to this effort are the Library’s ongoing digitization monitoring and standards development programs. All Library digitization units and contractors rely on these to assure consistent, high quality imaging, both within a project and spanning multiple projects. In addition to the Library’s efforts to digitize our vast holdings, the Library leads the Federal Agencies Digital Guideline Initiative (FADGl). FADGI establishes the imaging standards and metrics for all Federal agencies and as such serves an essential role for digitization efforts for the entire cultural heritage community. FADGl also publishes documents providing guidance for the cultural heritage imaging community. These documents are used worldwide, establishing a common framework for digitization which conforms to various International Standards Organization (ISO) standards. Principal among these is the "Technical Guidelines for Digitizing Cultural Heritage Materials”.

The digitization staff at The Library of Congress have worked in close coordination with expert still image consultants as part of continually occurring efforts to provide the best possible information in the FADGI Still Image guidelines and the best possible deliverables from digitization work.

Prior work performed under this contract has previously supported the creation of the FADGI Still Image program, specialized color targets used in digitization processes and software used to analyze the color targets.

C.2. SCOPE

Contractor shall provide consultation on the current state of the art and future developments in imaging science, digitization standards and best practices related to cultural heritage imaging.

C.3. REQUIREMENTS.

The contractor must provide guidance which must be aligned with ongoing standards developments in the national and international communities, including the International Standards Organization (ISO) and other standards bodies and international organizations, with special attention to the work underway within ISO IT10/TC42.

The contractor shall:

C.3.1 Participate in the Federal Agencies Digital Guidelines Initiative The contractor shall attend two (2) FADGI still image group meetings each year and provide authoritative review of selected technical topics (to be determined in advance by the Library) at each meeting. Each presentation shall be 20 minutes in length, and it must include a technical paper on the topic suitable for inclusion on the FADGI website and in the FADGI guidelines document. The contractor shall answer wide ranging questions from the group and provide expert guidance as needed. (Events 1 and 7 in section C.4.1) Contractor shall submit to the

Attachment J-1 - Statement of Work

Contracting Officer Representative two reports per contract year which shall discuss the topics for FADGI meeting, to be determined in advance by the Library. The reports shall be delivered in Microsoft Word format.

This work will require two (2) separate days of onsite participation in FADGI activity at LC for a total of four days over the course of two (2) two (2) day events.

C.3.2 Technical Support for LOC digitization programs The contractor shall provide technical support for the Library’s digitization programs. This support consists of two (2) scheduled on-site sessions per year, each of which consists of two

(2) full days of attendance at LC and advance preparation for each session. Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request.

Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.3 Training The contractor shall provide digitization training on a variety of topics related to the digitization program at the Library of Congress. This shall include the FADGI conformance program and other topics related to digitization efforts at LC and imaging science. These training sessions will take the form of four (4) training events, which shall cover topics to be mutually agreed upon between the Library and the contractor, over two (2) days, each year. The contractor must provide personnel who possess expertise on the topics and provide training appropriate for the skill level of the participants.

C.3.4 Enhance the Device Image Conformance Evaluation (DICE) conformance process Contractor shall provide continuous enhancements and improvements to the DICE conformance process at the Library of Congress to include evolving technology and best practices. The Library will provide materials and instructions to the contractor, typically transmitted via email or ftp (sample files). The contractor shall analyze the materials received from the Library and perform necessary research needed for this analysis. As appropriate, the contractor shall confer with other professionals in the field in order to receive suggestions and guidance. The contractor shall draft a written response for the Library. The contractor shall transmit the written material to the Library and must consult with Library staff about the timing of on-site work sessions. If the Library and the contractor agree that a virtual meeting will be productive, the contractor shall participate in a meeting to explain and clarify aspects of the advice that the contractor will provide.

Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request. Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.5 Perform development work for the FADGI Still Imaging Guidelines The contractor shall provide consultation and content creation for the FADGI Technical Guidelines for Digitizing Cultural Heritage materials. This work shall involve creation of new and expanded content across the spectrum of subjects which relate to cultural heritage digitization.

The contractor’s personnel must possess expertise on the subjects and provide training appropriate for the skill level of the participants. The trainings will occur on dates that are mutually agreed upon by both the COR and the contractor.

This task shall support the next revision of the FADGI guidelines.

C.3.6 The Library will work with the contractor to schedule the events at mutually agreeable times.

C.3.7 Contractor shall submit all deliverables to the COR according to the timeframes established in the schedule of deliverables. The COR will review the deliverables and provide feedback to the contractor within 5 business days of completing the review. The contractor must submit the revised deliverable to the COR within 5 business days. The COR must determine that deliverables are acceptable prior to approving invoices.

Option Period 1:

C.3.8.1 Participate in the Federal Agencies Digital Guidelines Initiative The contractor shall attend two (2) FADGI still image group meetings each year and provide authoritative review of selected technical topics (to be determined in advance by the Library) at each meeting. Each presentation shall be 20 minutes in length, and it must include a technical paper on the topic suitable for inclusion on the FADGI website and in the FADGI guidelines document. The contractor shall answer wide ranging questions from the group and provide expert guidance as needed. (Events 1 and 7 in section C.4.1) Contractor shall submit to the Contracting Officer Representative two reports per contract year which shall discuss the topics for FADGI meeting, to be determined in advance by the Library. The reports shall be delivered in Microsoft Word format.

This work will require two (2) separate days of onsite participation in FADGI activity at LC for a total of four days over the course of two (2) two (2) day events.

C.3.9 Technical Support for LOC digitization programs The contractor shall provide technical support for the Library’s digitization programs. This support consists of two (2) scheduled on-site sessions per year, each of which consists of two

(2) full days of attendance at LC and advance preparation for each session. Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request.

Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.10 Training The contractor shall provide digitization training on a variety of topics related to the digitization program at the Library of Congress. This shall include the FADGI conformance program and other topics related to digitization efforts at LC and imaging science. These training sessions will take the form of four (4) training events, which shall cover topics to be mutually agreed upon between the Library and the contractor, over two (2) days, each year. The contractor must provide personnel who possess expertise on the topics and provide training appropriate for the skill level of the participants.

C.3.11 Enhance the Device Image Conformance Evaluation (DICE) conformance process Contractor shall provide continuous enhancements and improvements to the DICE conformance process at the Library of Congress to include evolving technology and best practices. The Library will provide materials and instructions to the contractor, typically transmitted via email or ftp (sample files). The contractor shall analyze the materials received from the Library and perform necessary research needed for this analysis. As appropriate, the contractor shall confer with other professionals in the field in order to receive suggestions and guidance. The contractor shall draft a written response for the Library. The contractor shall transmit the written material to the Library and must consult with Library staff about the timing of on-site work sessions. If the Library and the contractor agree that a virtual meeting will be productive, the contractor shall participate in a meeting to explain and clarify aspects of the advice that the contractor will provide.

Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request. Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.12 Perform development work for the FADGI Still Imaging Guidelines The contractor shall provide consultation and content creation for the FADGI Technical Guidelines for Digitizing Cultural Heritage materials. This work shall involve creation of new and expanded content across the spectrum of subjects which relate to cultural heritage digitization.

The contractor’s personnel must possess expertise on the subjects and provide training appropriate for the skill level of the participants. The trainings will occur on dates that are mutually agreed upon by both the COR and the contractor.

This task shall support the next revision of the FADGI guidelines.

C.3.13 The Library will work with the contractor to schedule the events at mutually agreeable times.

C.3.14 Contractor shall submit all deliverables to the COR according to the timeframes established in the schedule of deliverables. The COR will review the deliverables and provide feedback to the contractor within 5 business days of completing the review. The contractor must submit the revised deliverable to the COR within 5 business days. The COR must determine that deliverables are acceptable prior to approving invoices.

Option Period 2:

C.3.15 Participate in the Federal Agencies Digital Guidelines Initiative The contractor shall attend two (2) FADGI still image group meetings each year and provide authoritative review of selected technical topics (to be determined in advance by the Library) at each meeting. Each presentation shall be 20 minutes in length, and it must include a technical paper on the topic suitable for inclusion on the FADGI website and in the FADGI guidelines document. The contractor shall answer wide ranging questions from the group and provide expert guidance as needed. (Events 1 and 7 in section C.4.1) Contractor shall submit to the Contracting Officer Representative two reports per contract year which shall discuss the topics for FADGI meeting, to be determined in advance by the Library. The reports shall be delivered in Microsoft Word format.

This work will require two (2) separate days of onsite participation in FADGI activity at LC for a total of four days over the course of two (2) two (2) day events.

C.3.16 Technical Support for LOC digitization programs The contractor shall provide technical support for the Library’s digitization programs. This support consists of two (2) scheduled on-site sessions per year, each of which consists of two

(2) full days of attendance at LC and advance preparation for each session. Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request.

Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.17 Training The contractor shall provide digitization training on a variety of topics related to the digitization program at the Library of Congress. This shall include the FADGI conformance program and other topics related to digitization efforts at LC and imaging science. These training sessions will take the form of four (4) training events, which shall cover topics to be mutually agreed upon between the Library and the contractor, over two (2) days, each year. The contractor must provide personnel who possess expertise on the topics and provide training appropriate for the skill level of the participants.

C.3.18 Enhance the Device Image Conformance Evaluation (DICE) conformance process Contractor shall provide continuous enhancements and improvements to the DICE conformance process at the Library of Congress to include evolving technology and best practices. The Library will provide materials and instructions to the contractor, typically transmitted via email or ftp (sample files). The contractor shall analyze the materials received from the Library and perform necessary research needed for this analysis. As appropriate, the contractor shall confer with other professionals in the field in order to receive suggestions and guidance. The contractor shall draft a written response for the Library. The contractor shall transmit the written material to the Library and must consult with Library staff about the timing of on-site work sessions. If the Library and the contractor agree that a virtual meeting will be productive, the contractor shall participate in a meeting to explain and clarify aspects of the advice that the contractor will provide.

Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request. Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.19 Perform development work for the FADGI Still Imaging Guidelines The contractor shall provide consultation and content creation for the FADGI Technical Guidelines for Digitizing Cultural Heritage materials. This work shall involve creation of new and expanded content across the spectrum of subjects which relate to cultural heritage digitization.

The contractor’s personnel must possess expertise on the subjects and provide training appropriate for the skill level of the participants. The trainings will occur on dates that are mutually agreed upon by both the COR and the contractor.

This task shall support the next revision of the FADGI guidelines.

C.3.20 The Library will work with the contractor to schedule the events at mutually agreeable times.

C.3.21 Contractor shall submit all deliverables to the COR according to the timeframes established in the schedule of deliverables. The COR will review the deliverables and provide feedback to the contractor within 5 business days of completing the review. The contractor must submit the revised deliverable to the COR within 5 business days. The COR must determine that deliverables are acceptable prior to approving invoices.

Option Period 3:

C.3.22 Participate in the Federal Agencies Digital Guidelines Initiative The contractor shall attend two (2) FADGI still image group meetings each year and provide authoritative review of selected technical topics (to be determined in advance by the Library) at each meeting. Each presentation shall be 20 minutes in length, and it must include a technical paper on the topic suitable for inclusion on the FADGI website and in the FADGI guidelines document. The contractor shall answer wide ranging questions from the group and provide expert guidance as needed. (Events 1 and 7 in section C.4.1) Contractor shall submit to the Contracting Officer Representative two reports per contract year which shall discuss the topics for FADGI meeting, to be determined in advance by the Library. The reports shall be delivered in Microsoft Word format.

This work will require two (2) separate days of onsite participation in FADGI activity at LC for a total of four days over the course of two (2) two (2) day events.

C.3.23 Technical Support for LOC digitization programs The contractor shall provide technical support for the Library’s digitization programs. This support consists of two (2) scheduled on-site sessions per year, each of which consists of two

(2) full days of attendance at LC and advance preparation for each session. Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request.

Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.24 Training The contractor shall provide digitization training on a variety of topics related to the digitization program at the Library of Congress. This shall include the FADGI conformance program and other topics related to digitization efforts at LC and imaging science. These training sessions will take the form of four (4) training events, which shall cover topics to be mutually agreed upon between the Library and the contractor, over two (2) days, each year. The contractor must provide personnel who possess expertise on the topics and provide training appropriate for the skill level of the participants.

C.3.25 Enhance the Device Image Conformance Evaluation (DICE) conformance process Contractor shall provide continuous enhancements and improvements to the DICE conformance process at the Library of Congress to include evolving technology and best practices. The Library will provide materials and instructions to the contractor, typically transmitted via email or ftp (sample files). The contractor shall analyze the materials received from the Library and perform necessary research needed for this analysis. As appropriate, the contractor shall confer with other professionals in the field in order to receive suggestions and guidance. The contractor shall draft a written response for the Library. The contractor shall transmit the written material to the Library and must consult with Library staff about the timing of on-site work sessions. If the Library and the contractor agree that a virtual meeting will be productive, the contractor shall participate in a meeting to explain and clarify aspects of the advice that the contractor will provide.

Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request. Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.26 Perform development work for the FADGI Still Imaging Guidelines

The contractor shall provide consultation and content creation for the FADGI Technical Guidelines for Digitizing Cultural Heritage materials. This work shall involve creation of new and expanded content across the spectrum of subjects which relate to cultural heritage digitization.

The contractor’s personnel must possess expertise on the subjects and provide training appropriate for the skill level of the participants. The trainings will occur on dates that are mutually agreed upon by both the COR and the contractor.

This task shall support the next revision of the FADGI guidelines.

C.3.27 The Library will work with the contractor to schedule the events at mutually agreeable times.

C.3.28 Contractor shall submit all deliverables to the COR according to the timeframes established in the schedule of deliverables. The COR will review the deliverables and provide feedback to the contractor within 5 business days of completing the review. The contractor must submit the revised deliverable to the COR within 5 business days. The COR must determine that deliverables are acceptable prior to approving invoices.

Option Period 4:

C.3.29 Participate in the Federal Agencies Digital Guidelines Initiative The contractor shall attend two (2) FADGI still image group meetings each year and provide authoritative review of selected technical topics (to be determined in advance by the Library) at each meeting. Each presentation shall be 20 minutes in length, and it must include a technical paper on the topic suitable for inclusion on the FADGI website and in the FADGI guidelines document. The contractor shall answer wide ranging questions from the group and provide expert guidance as needed. (Events 1 and 7 in section C.4.1) Contractor shall submit to the Contracting Officer Representative two reports per contract year which shall discuss the topics for FADGI meeting, to be determined in advance by the Library. The reports shall be delivered in Microsoft Word format.

This work will require two (2) separate days of onsite participation in FADGI activity at LC for a total of four days over the course of two (2) two (2) day events.

C.3.30 Technical Support for LOC digitization programs The contractor shall provide technical support for the Library’s digitization programs. This support consists of two (2) scheduled on-site sessions per year, each of which consists of two

(2) full days of attendance at LC and advance preparation for each session. Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request.

Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.31 Training The contractor shall provide digitization training on a variety of topics related to the digitization program at the Library of Congress. This shall include the FADGI conformance program and other topics related to digitization efforts at LC and imaging science. These training sessions will take the form of four (4) training events, which shall cover topics to be mutually agreed upon between the Library and the contractor, over two (2) days, each year. The contractor must provide personnel who possess expertise on the topics and provide training appropriate for the skill level of the participants.

C.3.32 Enhance the Device Image Conformance Evaluation (DICE) conformance process Contractor shall provide continuous enhancements and improvements to the DICE conformance process at the Library of Congress to include evolving technology and best practices. The Library will provide materials and instructions to the contractor, typically transmitted via email or ftp (sample files). The contractor shall analyze the materials received from the Library and perform necessary research needed for this analysis. As appropriate, the contractor shall confer with other professionals in the field in order to receive suggestions and guidance. The contractor shall draft a written response for the Library. The contractor shall transmit the written material to the Library and must consult with Library staff about the timing of on-site work sessions. If the Library and the contractor agree that a virtual meeting will be productive, the contractor shall participate in a meeting to explain and clarify aspects of the advice that the contractor will provide.

Contractor shall acknowledge the Library’s request for consultation within 30 days of the initial request. Contractor shall provide the support within 60 days of the Library’s request, unless otherwise agreed upon.

C.3.33 Perform development work for the FADGI Still Imaging Guidelines The contractor shall provide consultation and content creation for the FADGI Technical Guidelines for Digitizing Cultural Heritage materials. This work shall involve creation of new and expanded content across the spectrum of subjects which relate to cultural heritage digitization.

The contractor’s personnel must possess expertise on the subjects and provide training appropriate for the skill level of the participants. The trainings will occur on dates that are mutually agreed upon by both the COR and the contractor.

This task shall support the next revision of the FADGI guidelines.

C.3.34 The Library will work with the contractor to schedule the events at mutually agreeable times.

C.3.35 Contractor shall submit all deliverables to the COR according to the timeframes established in the schedule of deliverables. The COR will review the deliverables and provide feedback to the contractor within 5 business days of completing the review. The contractor must submit the revised deliverable to the COR within 5 business days. The COR must determine that deliverables are acceptable prior to approving invoices.

C.3.362 Contractor shall provide the deliverable for the content that will be included in the revision of the FADGI Still Image guidelines document.

C.4. CONTRACT PERFORMANCE

C.4.1. SCHEDULE OF EVENTS/DELIVERABLES

Section Reference

Deliverable Description Due Date Payment Amount/Invoice date

BASE

PERIOD

C.3.1 Attendance at FADGI Still Image meeting(s), presentation(s), and report(s).

Reports due within 30 days of each meeting. Price TBD / Contractor shall submit one invoice. COR shall approve invoice after acceptance of final deliverable.

C.3.2 Consultation shall be provided throughout the period of performance of the contract.

Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.3 Training for LOC digitization staff on four topics that will be mutually agreed upon in advance over a two day period.

Two times per year as requested by the

COR.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.4 Implementation of enhancements to the DICE digitization process management system.

Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.5 Participation in meetings either on-site or in online virtual environment related to FADGI Still Image Guidelines

Written documentation requested in meetings required within 30 calendar days of meeting’s completion.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

Section Reference

Deliverable Description Due Date Payment Amount/Invoice date

OPTION

YEAR 1

PERIOD

C.3.1 Attendance at FADGI Still Image meeting(s), presentation(s), and report(s).

Reports due within 30 days of each meeting. Price TBD / Contractor shall submit one invoice. COR shall approve invoice after acceptance of final deliverable.

C.3.2 Consultation Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.3 Training for LOC digitization staff

Two times per year as requested by the

COR.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.4 Implementation of enhancements to the DICE digitization process management system.

Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.5 Participation in meetings either on-site or in online virtual environment related to FADGI Still Image Guidelines

Written documentation requested in meetings required within 30 calendar days of meeting’s completion.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

Deliverable Description Due Date Payment Amount/Invoice date

OPTION

YEAR 2

PERIOD

C.3.1 Attendance at FADGI Still Image meeting(s), presentation(s), and report(s).

Reports due within 30 days of each meeting. Price TBD / Contractor shall submit one invoice. COR shall approve invoice after acceptance of final deliverable.

C.3.2 Consultation shall be provided throughout the period of performance of the contract.

Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.3 Training for LOC digitization staff on four topics that will be mutually agreed upon in advance over a two day period.

Two times per year as requested by the

COR.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.4 Implementation of enhancements to the DICE digitization process management system.

Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable virtual environment related to FADGI Still Image Guidelines

Written documentation requested in meetings required within 30 calendar days of meeting’s completion.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

Deliverable Description Due Date Payment Amount/Invoice date

OPTION

YEAR 3

PERIOD

C.3.1 Attendance at FADGI Still Image meeting(s), presentation(s), and report(s).

Reports due within 30 days of each meeting. Price TBD / Contractor shall submit one invoice. COR shall approve invoice after acceptance of final deliverable.

C.3.2 Consultation shall be provided throughout the period of performance of the contract.

Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.3 Training for LOC digitization staff on four topics that will be mutually agreed upon in advance over a two day period.

Two times per year as requested by the

COR.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.4 Implementation of enhancements to the DICE digitization process management system.

Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable virtual environment related to FADGI Still Image Guidelines

Written documentation requested in meetings required within 30 calendar days of meeting’s completion.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

Deliverable Description Due Date Payment Amount/Invoice date

OPTION

YEAR 4

PERIOD

C.3.1 Attendance at FADGI Still Image meeting(s), presentation(s), and report(s).

Reports due within 30 days of each meeting. Price TBD / Contractor shall submit one invoice. COR shall approve invoice after acceptance of final deliverable.

C.3.2 Consultation shall be provided throughout the period of performance of the contract.

Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.3 Training for LOC digitization staff on four topics that will be mutually agreed upon in advance over a two day period.

Two times per year as requested by the

COR.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.4 Implementation of enhancements to the DICE digitization process management system.

Consultation must be provided within an agreed timeframe between COR and contractor.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.3.5 & C.3.12 Participation in meetings virtual environment related to FADGI Still Image Guidelines and final draft of the deliverable.

Written documentation requested in meetings required within 30 calendar days of meeting’s completion.

The deliverable of the content that will be included in the revision of the FADGI Still Image guidelines document.

Price TBD / Contractor shall submit one invoice.

COR shall approve invoice after acceptance of final deliverable

C.4.2. QUALITY CONTROL

The contractor shall develop and maintain an effective quality control program (QCP) to ensure services are performed in accordance with this contract. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

The contractor’s quality control program is the means by which it assures itself that its work complies with the requirement of the contract. The quality control plan is to be delivered within 30 days of contract award. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to its QC system.

C.5. ADDITIONAL INFORMATION

C.5.1 PLACE OF PERFORMANCE

The work to be performed under this contract will be performed at the contractor’s facilities, with meetings and other activities as detailed in Section C.3 to be held at the Library of Congress.

C.5.2 GOVERNMENT FURNISHED PROPERTY

The government may furnish intellectual and physical property to the contractor for the exclusive use in this contract. This may include imaging information data sets, digital images, digital image color profiles, digital camera setup information, lighting information for digitization and other similar items. In the event of an online meeting, the Library will furnish the needed connection using a collaborative-meeting application software.

C.6. KEY PERSONNEL - The following position is considered as key personnel:

Senior Digitization Consultant - The Senior Digitization Consultant must:

• Possess ten (10) or more years' industry experience in senior roles pertaining to imaging science and technical development, in one or more corporations with significant roles in digital imaging.

• Have actively participated in digital imaging standards bodies and other professional digital imaging organizations, one of which must be the International Standards Organization.

Participation in the ISO technical committee TC-42 is required.

• Possess broad and deep familiarity with the FADGI Still Image Workgroup standard and must have written standards documents, color and image analysis specifications, and relevant technical papers or books.

• Possess familiarity with government-based still digital imagery standards activities in agencies other than the Library of Congress.

• Possess specialized tools or systems, and experience with their use, for the analysis of still digital image files.

C.7. OTHER DIRECT COSTS

C.7.1 CONTRACTOR TRAVEL

All travel, lodging, meals, and other expenses are the responsibility of the contractor. Travel, lodging, meals and other expenses are not reimbursable.

(End of Performance Work Statement / Statement of Work)

File details come from the government source that posted it. Updated .