This document is a Justification and Approval (J&A) for Other Than Full and Open Competition for a federal contract opportunity.

The Library of Congress requires professional classification support services to complete approximately 10 new position descriptions and/or redescriptions each month, as well as 66 reviews of existing position descriptions. The Library is issuing a sole source modification to the incumbent contractor, AEIO, LLC, under contract GS-37F-002GA, to provide these services for a 1-year period from 09/01/2024 to 08/31/2025 at an estimated value of $390,000. This is justified as a logical follow-on in the interest of economy and efficiency, as using an alternate contractor would result in a brief period of duplicative contracts that is not in the government's best interest. The Library plans to issue a competitively awarded IDIQ contract in FY25 to fulfill future classification support requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification and Approval For Other than Full and Open Competition

Plan ID Number: 2024-HRS-0050

Form Updated 4/14/2023

Justification & Approval

As a legislative branch agency, the Library is subject to the competition and advertising requirements of 41 U.S.C. § 6101. Like the Competition in

Contracting Act and the FAR, 41 U.S.C. § 6101 does not require competition when a contracting officer certifies that only one source or brand-name item is available, when dictated by public exigency, or when otherwise authorized by law.

This document sets forth the justification and approval for award of a contract or order by means providing for other than full and open competition per 41 U.S.C. § 6101, LCR 7-210, and, as applicable, FAR 6.302, FAR 13.106-1, FAR 8.405, and FAR 16.505. Contracting without competition shall not be justified on the basis of a lack of advance planning or concerns related to availability of funds.

This form shall be used to support instances where competition will be limited to a single source, a limited number of sources, including where a brand name product is required.

Part 1 – Identification

1. Contracting Agency and Activity: Library of Congress, Human Capital Division (HCD)

2. Nature of Action Being Approved Contract (or modification)

LoC or Leg Branch Order (or modification)

GSA Schedule or GWAC: GS-37F-002GA, LCHRS23F0008

Other: Identify

Plan ID Number: 2024-HRS-0050

Contractor (or Brand Name): AEIO, LLC

Estimated Value (Base and all options): $390,000.00

Period of Performance: 09/01/2024 – 08/31/2025

3. Description of Supplies or Services Required to Meet Library Needs

The Library requires the following supplies or services: The contractor shall provide professional Classification support services in the areas of position classification and re-description, as well as quality control of existing Position Descriptions (PDs) in support of the Library’s Trusted Workforce Implementation Strategy, per requirements from https://www.performance.gov/trusted-workforce/ and in accordance with LCR 9-220 (see section 8) Position Sensitivity and Risk Designations.

This entails completion of approximately 10 new position descriptions and/or redescriptions each month as well as approximately 66 reviews of position descriptions with data entry completion.

https://www.performance.gov/trusted-workforce/

Part 2 – Program Office Justification & Approval

4. Authority for Contracting Without Competition

Over $250,000 For this requirement over $250,000, under FAR part 6, the basis for contracting without providing for full and open competition is:

There is only one responsible source and no other supplies or services will satisfy Library requirements.

41 U.S.C. § 6101(b)(2)(C); FAR 6.302-1.

Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. FAR 6.302-1(b)(1).

Source controls copyrights, patents, raw materials, or secret processes cannot be acquired otherwise, or similar circumstances. FAR 6.302-

1(b)(2).

Other exception identified in FAR 6.302-1: Identify the exception

There is such unusual & compelling urgency that the Government would be seriously injured if competition is not limited.

41 U.S.C. § 6101(b)(2)(B); FAR 6.302-2. Option years are not permitted.

Source is expressly authorized or required by statute (e.g., AbilityOne, UNICOR, GPO, GSA Public Buildings Service, Appropriations Act, etc.) per 41 U.S.C. § 6101(b)(1) and FAR 6.302-5: Identify the authority

Other basis authorized in 41 U.S.C. § 6101(b) or FAR part 6.302: Identify the exception

Library’s needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. FAR 6.302-1(c).

The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

IT Standard Data Sheet)

Up to and including $250,000 For this requirement up to $250,000, using simplified acquisition procedures under FAR part 13, the basis for contracting without providing for full and open competition is:

Only one responsible source is reasonably available to meet Library requirements. 41 U.S.C. § 6101(b); FAR 13.106-1.

Product or service is reasonably available from only one source.

Source controls copyrights, patents or other exclusive licensing arrangements.

Urgent circumstances; only one source can reasonably deliver by required date. Option years are not permitted.

Source is expressly authorized or required by statute: Identify the authority

Library’s needs can only be satisfied by a brand-name product

The Product is listed the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

GSA Schedule Order For this GSA schedule order under FAR part 8, the basis for not competing among GSA schedule-holders and/or specifying a brand name product or item is:

An urgent and compelling need exists, and following GSA procedures would result in unacceptable delays.

FAR 8.405-6(a)(1)(i)(A).

Only one GSA source is capable of fulfilling the requirement at the level of quality required because the supplies or services are unique or highly specialized. FAR 8.405-6(a)(1)(i)(B).

In the interest of economy and efficiency, the new work is a logical follow-on to an original order that was placed competitively among GSA schedule-holders (i.e., the original order was not sole-source or limited-source.) FAR 8.405-6(a)(1)(i)(C).

Library’s needs can only be satisfied by a brand-name product

The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

Order Under Multiple Award Indefinite-Delivery Contract or GWAC For this order under FAR subpart 16.5, the basis for contracting without providing for full and open competition is:

The need is so urgent fair opportunity would result in unacceptable delays. 41 U.S.C. § 6101(b)(2)(C) and FAR 16.505(b)(2)(i)(A).

The Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. 41 U.S.C. § 6101(b)(1) and FAR

16.505(b)(2)(i)(B).

A logical follow-on order in the interest of economy and efficiency. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(i)(2)(C).

To satisfy a minimum guarantee. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(D).

Authorized or required by statute. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(E).

The Library’s minimum needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. 41

U.S.C. § 6101(b)(2)(B) and FAR 16.505(a)(4)(i).

The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

5. Rationale for Contracting Without Competition

We are authorized to limit competition on the basis of the citation in section 4 because: The Library has an expected surge in vacancy announcements at the end of Fiscal Year (FY) 2024 and early FY 2025 and the associated position descriptions will require ongoing updates and quality control beyond the amount originally contemplated in task order LCHRS23F0008. Although the Library anticipates fluctuations in the monthly requirements beyond that time, this J&A only covers a 1-year duration of services as the

Library plans to solicit, negotiate, and award an IDIQ for a broad range of Human Capital and Human Resources support services in

FY25. It is anticipated that future needs for classification support and quality control would be fulfilled under the anticipated IDIQ in

FY25 and beyond.

Use of the incumbent contractor, AEIO, LLC, for additional work that must begin in FY24 mitigates the risk of splitting the requirement amongst multiple contractors whereby the specific division of work would create additional administrative burden when assigning, tracking, and accepting completed work. If an alternate contractor were used, the government would also face a brief period of duplicative contracts from September 2024 through November 2024, which is not in the government’s best interest.

6. Actions to Overcome Barriers to Competition Before Subsequent Contract Is Required

To increase competition, we will: As noted in the preceding sections, the Library anticipates issuance of a competitively awarded IDIQ that will be used to fulfill future requirements in the area of position description, classification support, and additional fields within

Human Capital and Human Resources. This is anticipated to minimize any barriers to competition as the IDIQ will be issued as a full and open competitive solicitation on sam.gov.

7. Program Office Certification

I certify that the description of the Government’s minimum needs, schedule requirements, and technical information that provide the basis for this justification are accurate and complete.

PART 3 – CONTRACTING OFFICER DETERMINATIONS & CERTIFICATION

8. Efforts to Solicit from As Many Potential Sources As Practicable Unless a justification is based on FAR 6.302-2, Unusual and compelling urgency, contracting officers shall post justifications for other than full and open competition, including brand name justifications, to the Contract Opportunities website on sam.gov (or eBuy for Brand Name Justifications under FAR Part 8) prior to requesting a proposal or otherwise entering into negotiations.

Advance notice will be published in sam.gov for 15 days before a contract is awarded. FAR 5.203(a).

Advance or concurrent notice will be published in sam.gov for a reasonable time for commercial items FAR 5.203(a) and 12.204(b).

Advance notice will not be published because the action meets the following FAR exception:

Notice would compromise national security. FAR 5.202(a)(1).

Unusual and compelling urgency; notice period would seriously injure Government. FAR 5.202(a)(2).

Expressly authorized or required to be made through another Government agency. FAR 5.202(a)(4).

Order will be placed against an IDIQ contract awarded under FAR 16.5. FAR 5.202(a)(6).

Order will be placed against GSA schedule or other competitively-awarded contract. FAR 5.202(a)(11).

Other:

Advance notice will not be published per 41 U.S.C. § 6101; see attached deviation from the FAR per LCR 7-210 § 3.A.

We made the following efforts to interest potential sources in this award: No other offerors were contacted in advance of approving this J&A. Due to concerns regarding duplicative contracts, it is not in the government’s interest to manage an increased volume of work through another contractor resource.

9. Listing of Sources That Expressed Interest in Writing

The following sources expressed interest in this award: Not applicable.

10. Additional Information

The following additional information is relevant to this justification and approval: Not applicable.

11. Contracting Officer Determination that Price Is Fair and Reasonable The contracting officer will ensure that the price for this contracting action is fair and reasonable based on one or more of the following methods, prior to award of any contract action that is authorized by this J&A.

Historical prices paid by the Government Published competitive price lists

Library’s Independent Government Estimate Prices obtained through market research

Other: Prices obtained through competitive proposals

12. Contracting Officer Determination of Responsibility Checked System for Award Management (or will check in the case of competitive proposals for a brand name product)

13. Contracting Officer Determination of Best Value I have determined that this action represents the best value to the Government because: use of on alternate contractor to fulfill an increased volume of work would be duplicative and not in the government’s best interests.

14. Contracting Officer Certification I certify that, to the best of my knowledge and belief, this justification is accurate and complete. For those actions up to $750,000, I approve contracting without competition for this requirement.