20242064_A2_Addendum_2.pdf
PDF 240 KB Posted
- Attached to
- ITB 20242064 Digester and SHT Coating
- Solicitation number
- S-KE0010-00010555
- Issued by
- Lane County, Oregon
About this file
This document is an Addendum to an Invitation to Bid (ITB) issued by the City of Eugene's Public Works Wastewater Division for the Digester and Sludge Holding Tank (SHT) Coatings project, ITB 20242064. The addendum provides responses to questions raised during the pre-bid meeting, including information on the current coating, drawing details, drain protection, wall coating termination, keyway locations, expected resurfacing depth, and the project completion timeline. The work includes recoating the interior digester roof and making coating repairs to the interior sludge holding tank lid. The project is located in Eugene, Oregon, within Lane County. The City is willing to negotiate the project completion date, but there are operational advantages to meeting the original 70-day timeline.
The addendum also clarifies that the contractor will be responsible for debris disposal, and the City can dewater the sludge holding tank in the event of unexpected water. All other terms, conditions, and specifications of the solicitation remain unchanged.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Public Works Wastewater Division
Date: June 11, 2024
To: All Potential Bidders
From: Dori Palmer, Purchasing Analyst
Subject: City of Eugene Invitation to Bid 20242064, Digester and SHT Coatings
ADDENDUM NO. 2
The solicitation referenced above is clarified/amended as follows:
Responses to questions arising from the pre-bid meeting are below:
Digester:
Q. What is the current coating?
A. It was determined coating is Polibrid 705, an elastomeric polyurethane
Q. Are there additional drawings indicating the height?
A. A drawing indicating the height of 27’6” is added as part of this addendum.
Q. Will City plug the drain?
A. Contractor will protect drains from debris
Q. How far down the wall to coat?
A. Termination point on the wall was decided to be approximately 5’ down the wall from the ceiling (at least 1’ below product line)
Q. Locations of keyways?
A. Keyways (as defined in the specification) should be installed at the bottom edge (below waterline) of the lining system and around all penetrations including pipes, holes (as in the ceiling), etc. Keyways around the penetrations should be within 6 inches of the penetration.
Q. Expected resurfacing depth for bid reference?
A. Resurfacer to be assumed at a nominal thickness of 3/8”
Q. How hard fast is the 70-day completion?
A. There are operational advantages to hold to the 70-day completion. However the City is aware of scheduling and material requirements and is willing to negotiate the completion and acceptance of the project no later than September 30th.
Sludge Holding Tank:
Q. Will we keep dry due to rain etc.?
A. City can dewater in the event of unexpected water. Debris will still be up to the Contractor to dispose of.
All other terms, conditions and specifications of this solicitation remain unchanged.