20242064_A2_Addendum_2.pdf

PDF 240 KB Posted

Attached to
ITB 20242064 Digester and SHT Coating
Solicitation number
S-KE0010-00010555
Issued by
Lane County, Oregon

About this file

This document is an Addendum to an Invitation to Bid (ITB) issued by the City of Eugene's Public Works Wastewater Division for the Digester and Sludge Holding Tank (SHT) Coatings project, ITB 20242064. The addendum provides responses to questions raised during the pre-bid meeting, including information on the current coating, drawing details, drain protection, wall coating termination, keyway locations, expected resurfacing depth, and the project completion timeline. The work includes recoating the interior digester roof and making coating repairs to the interior sludge holding tank lid. The project is located in Eugene, Oregon, within Lane County. The City is willing to negotiate the project completion date, but there are operational advantages to meeting the original 70-day timeline.

The addendum also clarifies that the contractor will be responsible for debris disposal, and the City can dewater the sludge holding tank in the event of unexpected water. All other terms, conditions, and specifications of the solicitation remain unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Public Works Wastewater Division

Date: June 11, 2024

To: All Potential Bidders

From: Dori Palmer, Purchasing Analyst

Subject: City of Eugene Invitation to Bid 20242064, Digester and SHT Coatings

ADDENDUM NO. 2

The solicitation referenced above is clarified/amended as follows:

Responses to questions arising from the pre-bid meeting are below:

Digester:

Q. What is the current coating?

A. It was determined coating is Polibrid 705, an elastomeric polyurethane

Q. Are there additional drawings indicating the height?

A. A drawing indicating the height of 27’6” is added as part of this addendum.

Q. Will City plug the drain?

A. Contractor will protect drains from debris

Q. How far down the wall to coat?

A. Termination point on the wall was decided to be approximately 5’ down the wall from the ceiling (at least 1’ below product line)

Q. Locations of keyways?

A. Keyways (as defined in the specification) should be installed at the bottom edge (below waterline) of the lining system and around all penetrations including pipes, holes (as in the ceiling), etc. Keyways around the penetrations should be within 6 inches of the penetration.

Q. Expected resurfacing depth for bid reference?

A. Resurfacer to be assumed at a nominal thickness of 3/8”

Q. How hard fast is the 70-day completion?

A. There are operational advantages to hold to the 70-day completion. However the City is aware of scheduling and material requirements and is willing to negotiate the completion and acceptance of the project no later than September 30th.

Sludge Holding Tank:

Q. Will we keep dry due to rain etc.?

A. City can dewater in the event of unexpected water. Debris will still be up to the Contractor to dispose of.

All other terms, conditions and specifications of this solicitation remain unchanged.

20242064_A2_Addendum_2
049-81-S-3