20241025_100% GOODMAN AVE PlanDoc.pdf
PDF 17 MB Posted
- Attached to
- Goodman Avenue Reconstruction Project
- Solicitation number
- 2025-0001
- Issued by
- Valencia County, New Mexico
About this file
This document is a comprehensive construction plan set for the Goodman Avenue Reconstruction Project by the City of Rio Communities in New Mexico, developed by HDR Engineering and professionally engineered by Antonio Nunez-Tovar (NM License 25774). The project involves reconstructing approximately 0.37 miles of Goodman Avenue, including roadway reconstruction, earthwork, pedestrian path construction, traffic control, permanent signing and striping, and miscellaneous infrastructure improvements. The project will involve removing and replacing the existing roadway with a minor alignment shift to accommodate a new asphalt pavement pedestrian path, constructing two safety lights per intersection at two intersections, and adding drainage features. Key quantities include 1,800 cubic yards of unclassified excavation, 8,600 square yards of subgrade preparation, 2,600 tons of base course, 1,300 tons of minor paving, and installation of various infrastructure elements like concrete sidewalks, valley gutters, and traffic signs.
The project is fully documented with 78 detailed sheets covering everything from existing utility locations to proposed road cross-sections, lighting plans, and construction phasing. The construction will be completed in two primary phases, with eastbound and westbound traffic being alternately detoured during construction. The project includes specific requirements for utility coordination, traffic management, and adherence to New Mexico Department of Transportation standards. Funding and specific financial details are not explicitly outlined in the document, but the comprehensive nature of the plan suggests a well-structured municipal infrastructure improvement project with careful consideration of engineering, safety, and community access requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2155 LOUISIANA BLVD NE,
SUITE 3000
ALBUQUERQUE, NM 87110
(505) 830-5400
DRAWING FILE: 1COVER.dwg LAYOUT: COVER
D
AT
E:
O ct
- 9 :3
1a m
U
SE
R
: A N
G O
N
ZA
LE
Z
R
CALL NM ONE-CALL
SYSTEM SEVEN (7) DAYS
PRIOR TO ANY EXCAVATION
PROJECT
LOCATION
VICINITY MAP
H O
R N
ER
ST
RIO COMMUNITIES BLVD
GOODMAN AVE
NOT TO SCALE
THE 2019 EDITION OF NEW MEXICO DEPARTMENT OF
TRANSPORTATION STANDARD DRAWINGS FOR HIGHWAY AND
BRIDGE CONSTRUCTION SHALL GOVERN CONSTRUCTION OF THIS
PROJECT.
LENGTH OF PROJECT 0.37 MILES
INTENT OF PROJECT
THE SCOPE OF THIS PROJECT INCLUDES ROADWAY RECONSTRUCTION, EARTHWORK
(EXCAVATION), PEDESTRIAN PATH CONSTRUCTION, TRAFFIC CONTROL, PERMANENT
SIGNING AND STRIPING, AND MISCELLANEOUS CONSTRUCTION.
PROF ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ -TOVARNE
W MEX ICO
25774
OCT 25, 2024
INDEX OF SHEETS
SHEET NO. DESCRIPTION
SERIES 1
1 - 1 COVER SHEET AND VICINITY MAP
1 - 2 INDEX OF SHEETS
1 - 3 SUMMARY OF QUANTITIES
1 - 4 GENERAL NOTES
SUBTOTAL = 4
SERIES 2
2 - 1 EXISTING TYPICAL SECTIONS
2 - 2 EXISTING PAVEMENT CORE DATA
2 - 3 PROPOSED TYPICAL SECTIONS
2 - 4 TO 2 - 6 SURFACING SCHEDULE
2 - 7 TO 2 - 8 MISCELLANEOUS QUANTITIES
2 - 9 PERMANENT SIGNING AND STRIPING - STRIPING QUANTITIES
2 - 10 TO 2 - 11 PERMANENT SIGNING AND STRIPING - SIGNING QUANTITIES
2 - 12 REMOVAL QUANTITIES
2 - 13 MISCELLANEOUS DETAILS
2 - 14 PERMANENT SIGNING AND STRIPING - SIGN FACE DETAILS
SUBTOTAL = 14
SERIES 3
3 - 1 OVERALL PROJECT SURVEY CONTROL PLAN, NOTES AND LEGEND
3 - 2 TO 3 - 5 HORIZONTAL LAYOUT PLAN
3 - 6 TO 3 - 7 ROADWAY PLAN AND PROFILE
3 - 8 TO 3 - 11 ROADWAY PLAN AND PROFILE - PEDESTRIAN PATH
SUBTOTAL = 11
SERIES 4
4 - 1 TO 4 - 11 TURNOUT PLAN AND PROFILE
4 - 12 DRIVEPAD DETAILS
4 - 13 TO 4 - 17 CURB RAMP DETAILS
4 - 18 TO 4 - 22 GRADING PLANS
SUBTOTAL = 22
SERIES 5
NO SHEETS
SUBTOTAL = 0
SERIES 6
6 - 1 CONSTRUCTION SIGNING SUGGESTED SEQUENCE OF CONSTRUCTION
6 - 2 NMDOT STANDARD DRAWING - TRAFFIC CONTROL GENERAL NOTES
6 - 3 CONSTRUCTION SIGNING PHASING MAP
6 - 4 CONSTRUCTION SIGNING SIGN FACE DETAILS
6 - 5 CONSTRUCTION SIGNING SUMMARY OF QUANTITIES
6 - 6 TO 6 - 7 CONSTRUCTION SIGNING - PHASE 1
6 - 8 CONSTRUCTION SIGNING - DETOUR PLAN
6 - 9 TO 6 - 10 CONSTRUCTION SIGNING - PHASE 2
SUBTOTAL = 10
SERIES 7
NO SHEETS
SUBTOTAL = 0
SERIES 8
8 - 1 LIGHTING GENERAL NOTES
8 - 2 LIGHTING SCHEDULE
8 - 3 TO 8 - 6 LIGHTING DETAILS
8 - 7 LIGHTING PLAN
SUBTOTAL = 7
SERIES 9
NO SHEETS
SUBTOTAL = 0
SERIES 10
NO SHEETS
SUBTOTAL = 0
SERIES 11
11 - 1 EXISTING UTILITIES
11 - 2 PROPOSED UTILITIES
11 - 3 TO 11 - 4 NM WATER STANDARD DRAWINGS
SUBTOTAL = 4
SERIES 12
NO SHEETS
SUBTOTAL = 0
SERIES 13
NO SHEETS
SUBTOTAL = 0
SERIES 14
14 - 1 TO 14 - 6 GOODMAN AVENUE CROSS SECTIONS
SUBTOTAL = 6
PROJECT SHEET TOTAL = 78
INDEX OF SHEETS
SHEET NO. DESCRIPTION
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 1IS01.dwg LAYOUT: IS01-01
D
AT
E:
O ct
- 1 1:
am
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 1-2PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
IN
D
EX
O
F
SH
EE
TS
SUMMARY OF QUANTITIES
NMDOT
ITEM NO. SHORT DESCRIPTION BID UNIT
ROADWAY CONSTRUCTION
ENGINEERING DRAINAGE LIGHTING CONSTRUCTION
SIGNING
PERMANENT
SIGNING & STRIPING
UTILITY
(NON-PARTICIPATING
PROJECT TOTAL
ESTIMATE FINAL ESTIMATE FINAL ESTIMATE FINAL ESTIMATE FINAL ESTIMATE FINAL ESTIMATE FINAL ESTIMATE FINAL ESTIMATE FINAL
201000 CLEARING AND GRUBBING LS LS LS
203000 UNCLASSIFIED EXCAVATION C.Y. 1,800 1,800
207000 SUBGRADE PREPARATION S.Y. 8,600 8,600
303000 BASE COURSE TON 2,600 2,600
407000 ASPHALT MATERIAL FOR TACK COAT TON 3 3
408100 PRIME COAT MATERIAL TON 17 17
416104 MINOR PAVING TYPE I, HMA SP-IV TON 1,300 1,300
416204 MINOR PAVING TYPE II, HMA SP-IV TON 250 250
502030 DRILLED SHAFT FOUNDATION 30" DIAMETER L.F. 25 25
540060 REINFORCING BARS GRADE 60 LB 600 600
601000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS LS LS
601110 REMOVAL OF SURFACING S.Y. 6,650 6,650
602000 RIPRAP CLASS A C.Y. 80 80
603281 SWPPP PLAN PREPARATION AND MAINTENANCE LS LS LS
608004 CONCRETE SIDEWALK 4" S.Y. 110 110
608106 DRIVE PAD 6" S.Y. 50 50
609200 HEADER CURB L.F. 500 500
609624 CONCRETE VALLEY GUTTER 6" X 24" L.F. 500 500
618000 TRAFFIC CONTROL MANAGEMENT LS LS LS
618011 PUBLIC AWARENESS LS LS LS
621000 MOBILIZATION LS LS LS
663850 WATER VALVE ADJUSTMENT EACH 2 2
663865 ADJUST WATER METER TO GRADE EACH 1 1
667110 MAIL BOX INSTALLATION-SINGLE EACH 5 5
701000 PANEL SIGNS S.F. 210 210
701100 STEEL POST AND BASE POST FOR ALUMINUM PANEL SIGNS L.F. 260 260
702610 PORTABLE CHANGEABLE MESSAGE SIGN EACH 2 2
702810 TRAFFIC CONTROL DEVICES FOR CONSTRUCTION LS LS LS
704000 RETROREFLECTORIZED PAINTED MARKINGS 4" L.F. 3,600 3,600
704004 RETROREFLECTORIZED PAINTED MARKINGS 12" L.F. 240 240
706350 POWER SERVICE INSTALLATION LS LS LS
706420 LIGHTING CONTROL CABINET-TWO CIRCUIT EACH 2 2
707530 TYPE V STANDARD, 30' EACH 4 4
709020 RIGID ELECTRICAL CONDUIT 2" (DIA.) L.F. 910 910
710000 ELECTRICAL PULL BOX (STANDARD) EACH 8 8
711101 SINGLE CONDUCTOR 1 L.F. 520 520
711106 SINGLE CONDUCTOR 6 L.F. 3,320 3,320
716701 LED ROADWAY LUMINAIRE EACH 4 4
801000 CONSTRUCTION STAKING BY THE CONTRACTOR LS LS LS
802000 POST CONSTRUCTION PLANS LS LS LS
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 1SQ01.dwg LAYOUT: SQ01-01
D
AT
E:
O ct
- 9 :3
1a
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 1-3PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
SU
M
M
AR
Y O
F Q
U
AN
TI
TI
ES
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 1GN01.dwg LAYOUT: GN01-01
D
AT
E:
O ct
- 9 :3
2a
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 1-4PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
G
EN
ER
AL
N O
TE
S
1. SPECIFICATIONS: ALL WORK DETAILED ON THESE PLANS TO BE PERFORMED UNDER
CONTRACT, EXCEPT AS OTHERWISE STATED OR PROVIDED FOR HEREON, SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE NEW MEXICO DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY AND BRIDGE CONSTRUCTION,
2019 EDITION.
2. GENERAL: THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS,
RULES AND REGULATIONS WHICH APPLY TO THE CONSTRUCTION OF THESE
IMPROVEMENTS.
3. BUSINESS ACCESS: THE CONTRACTOR SHALL PROVIDE INGRESS AND EGRESS TO LOCAL
BUSINESSES AND RESIDENCES FOR THE DURATION OF THE PROJECT. THE CONTRACTOR
SHALL ADVISE OF AND SCHEDULE ACCESS CLOSURES AT LEAST 24 HOURS IN ADVANCE,
WITH PROPERTY OWNERS AND THE CITY MANAGER. THIS WORK WILL BE CONSIDERED
INCIDENTAL TO ITEM NO. 618000 TRAFFIC CONTROL MANAGEMENT.
4. CONSTRUCTION SCHEDULE: TEN (10) WORKING DAYS PRIOR TO BEGINNING
CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE CITY OF RIO COMMUNITIES
(CITY) A DETAILED CONSTRUCTION SCHEDULE.
5. THE CONTRACTOR SHALL NOT BEGIN WORK BEFORE 7:00 A.M. NOR CONTINUE WORK
AFTER 5:30 P.M. WITHOUT THE APPROVAL OF THE CITY MANAGER.
6. NM ONE-CALL: TWO (2) WORKING DAYS PRIOR TO ANY EXCAVATION, THE CONTRACTOR
SHALL CONTACT THE NEW MEXICO ONE CALL SYSTEM (505-260-1990) FOR LOCATION OF
EXISTING UTILITIES.
7. PERMITS: THE CONTRACTOR SHALL OBTAIN ALL THE NECESSARY PERMITS FOR THE
PROJECT PRIOR TO COMMENCING CONSTRUCTION.
8. OVERNIGHT PARKING: OVERNIGHT PARKING OF CONSTRUCTION EQUIPMENT SHALL NOT
OBSTRUCT DRIVEWAYS OR DESIGNATED TRAFFIC LANES. THE CONTRACTOR SHALL NOT
STORE ANY EQUIPMENT OR MATERIAL WITHIN THE PUBLIC RIGHT-OF-WAY.
9. SURVEY MONUMENTS: THE CONTRACTOR SHALL NOTIFY THE CITY NOT LESS THAN SEVEN
(7) DAYS PRIOR TO STARTING WORK IN ORDER THAT THE CITY MAY TAKE NECESSARY
MEASURES TO ENSURE THE PRESERVATION OF SURVEY MONUMENTS. CONTRACTOR
SHALL NOT DISTURB PERMANENT SURVEY MONUMENTS WITHOUT THE CONSENT OF THE
CITY AND SHALL NOTIFY THE CITY AND BEAR THE EXPENSE OF REPLACING ANY THAT
MAY BE DISTURBED WITHOUT PERMISSION. REPLACEMENT SHALL BE DONE ONLY BY THE
CITY. WHEN A CHANGE IS MADE IN THE FINISHED ELEVATION OF THE PAVEMENT OF ANY
ROADWAY IN WHICH A PERMANENT SURVEY MONUMENT IS LOCATED, CONTRACTOR SHALL,
AT HIS OWN EXPENSE, ADJUST THE MONUMENT COVER TO THE NEW GRADE UNLESS
OTHERWISE SPECIFIED.
10. CONSTRUCTION LIMITS: CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE PUBLIC
RIGHT-OF-WAY AND/OR PROJECT LIMITS. ANY DAMAGE TO ADJACENT PROPERTIES
RESULTING FROM THE CONSTRUCTION PROCESS IS THE RESPONSIBILITY OF THE
CONTRACTOR. ANY COSTS INCURRED FOR REPAIRS SHALL BE AT THE COST OF THE
CONTRACTOR.
11. BUILDING DAMAGE: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT
BUILDING STRUCTURES ADJACENT TO THE PROJECT NOT BE DAMAGED DUE TO ANY
CONSTRUCTION ACTIVITIES. DAMAGE CAUSED TO ANY BUILDING STRUCTURE WILL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR, INCLUDING ALL COSTS INCURRED IN
RESTORING/REPAIRING SAID DAMAGE.
12. AS-BUILTS: THE CONTRACTOR SHALL MAINTAIN AN UP TO DATE SET OF AS-BUILT PLANS
FOR THE PROJECT. THESE PLANS SHALL BE KEPT CURRENT, WITHIN TWO WEEKS, AT ALL
TIMES AND SHALL BE SUBJECT TO THE REVIEW BY THE PROJECT MANAGER THROUGHOUT
THE PROJECT AND WILL BE REVIEWED BY THE PROJECT MANAGER FOR ACCURACY AND
COMPLETENESS AT LEAST ONCE EVERY 30 DAYS. THE FINAL AS-BUILT PLANS SHALL BE
SUBMITTED AND ACCEPTED BY THE PROJECT ENGINEER PRIOR TO FINAL PAYMENT.
AS-BUILT PLANS SHALL BE INCIDENTAL TO ITEM NO 802000 POST CONSTRUCTION PLAN.
13. GRAFFITI: THE CONTRACTOR SHALL MAINTAIN A GRAFFITI-FREE WORK SITE AND SHALL
PROMPTLY REMOVE ANY AND ALL GRAFFITI FROM ALL EQUIPMENT, FACILITIES,
APPURTENANCES, AND ANY AND ALL BARRICADING AND SIGNAGE ASSOCIATED WITH THE
PROJECT WHETHER PERMANENT OR TEMPORARY. THIS WORK SHALL BE CONSIDERED
INCIDENTAL TO ITEM NO. 618000 TRAFFIC CONTROL MANAGEMENT AND NO SEPARATE
MEASUREMENT OR PAYMENT WILL BE MADE THEREFOR.
14. CONSTRUCTION SIGNAGE: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND
MAINTAINING ALL CONSTRUCTION SIGNAGE UNTIL THE PROJECT HAS BEEN ACCEPTED BY
THE CITY OF RIO COMMUNITIES.
15. NON-VIBRATORY ROLLER: THE CONTRACTOR SHALL BE RESTRICTED TO THE USE OF A 35
TON MAXIMUM NON-VIBRATORY ROLLER TO OBTAIN THE REQUIRED COMPACTION IN
PAVEMENT STRUCTURE, ROADWAY BACKFILL, EMBANKMENT, AND SUBGRADES IN URBAN
AREAS WHERE THE USE OF HEAVIER EQUIPMENT COULD DAMAGE UNDERGROUND
UTILITIES OR OTHER PERMANENT STRUCTURES.
16. EXISTING TIE-IN: ALL NEW STREET PAVING, CURB AND GUTTER, SIDEWALKS OR DRIVEPADS
SHALL MATCH THE ELEVATIONS OF ABUTTING EXISTING AREAS AS SHOWN IN THE PLANS
OR AS DIRECTED BY THE PROJECT ENGINEER.
17. DAMAGE REPAIR: THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ANY DAMAGE TO
EXISTING PAVEMENTS, PAVEMENT MARKINGS, CURB & GUTTER, DRIVE PADS, CURB RAMPS,
SIGNAGE, AND SIDEWALK DURING CONSTRUCTION, APART FROM THOSE SECTIONS
INDICATED FOR REMOVAL ON THE PLANS AND SHALL REPAIR OR REPLACE PER NMDOT
STANDARDS, AT THEIR OWN EXPENSE.
18. DAMAGED PAVEMENT MARKINGS: ALL PAVEMENT MARKINGS ALTERED OR DESTROYED
SHALL BE REPLACED WITH RETROREFLECTORIZED PAINTED MARKINGS BY CONTRACTOR
TO THE SAME LOCATION AS EXISTING, OR AS INDICATED BY THIS PLAN SET.
19. OSHA REQUIREMENTS: ALL EXCAVATION, TRENCHING, AND SHORING ACTIVITIES MUST BE
CARRIED-OUT IN ACCORDANCE WITH OSHA 29 CFR 1926.652.
20. MATCHING EXISTING GRADES: WHERE A PROFILE GRADE IS NOT PROVIDED IN THE PLANS, STREET CENTERLINE GRADES SHALL BE RESTORED BY THE CONTRACTOR TO THE
EXISTING CENTERLINE GRADES. CROSS SECTION THE EXISTING ROAD PRIOR TO
CONSTRUCTION AS NEEDED TO MATCH EXISTING (50' MIN). MINOR ADJUSTMENTS TO THE
STREET GRADES MAY BE NECESSARY AND WILL BE DIRECTED BY THE PROJECT
ENGINEER. MINOR ADJUSTMENTS TO THE STREET GRADES WILL BE CONSIDERED
INCIDENTAL TO ITEM NO. 416204 MINOR PAVING TYPE II, HMA SP-IV. SMOOTH TRANSITIONS
SHALL BE MADE BETWEEN EXISTING PAVEMENT WHICH REMAINS IN PLACE AND PAVEMENT
WHICH IS BEING REPLACED. TRAFFIC CONTROL DEVICES INCLUDING PAVEMENT MARKINGS
MUST BE RESTORED TO THE SAME OR BETTER CONDITION AS BEFORE CONSTRUCTION.
THIS WORK WILL BE CONSIDERED INCIDENTAL TO ITEM NO. 618000 TRAFFIC CONTROL
MANAGEMENT.
21. HUMAN REMAINS: IF HUMAN REMAINS ARE ENCOUNTERED, THE CONTRACTOR SHALL
CEASE ALL WORK, AND CONTACT THE OFFICE OF MEDICAL EXAMINER FOR FURTHER
INSTRUCTIONS.
22. DROP-OFF POLICY: IF A PAVEMENT DROP-OFF IS CREATED DURING CONSTRUCTION, THE
CONTRACTOR SHALL INITIATE PROTECTIVE ACTION TO MAINTAIN A SMOOTH TRANSITION.
THIS WORK SHALL BE CONSIDERED INCIDENTAL TO ITEM NO. 618000 TRAFFIC CONTROL
MANAGEMENT AND NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE THEREFOR.
23. PUBLIC INFORMATION: COORDINATION WITH THE CITY CLERKS OFFICE, WHO WILL ADVISE
THE PUBLIC OF CONSTRUCTION FOR THE DURATION OF THE PROJECT. ANY IMPACT TO
THE ACCESS OF BUSINESSES SHALL BE CORRDINATED SEVEN (7) DAYS IN ADVANCE WITH
THE CITY AND BUSINESSES.
24. UTILITY REPAIR: THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE EXISTING
UTILITY LINES WITHIN THE CONSTRUCTION AREA. ANY DAMAGE TO EXISTING FACILITIES
CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE
CONTRACTOR'S EXPENSE AND APPROVED BY THE CITY.
25. ALL ELECTRICAL, TELEPHONE, CABLE TV, GAS AND OTHER UTILITY LINES, CABLES AND
APPURTENANCES ENCOUNTERED DURING CONSTRUCTION THAT REQUIRE RELOCATION,
SHALL BE COORDINATED WITH THAT UTILITY. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR COORDINATION OF ALL NECESSARY UTILITY ADJUSTMENTS. NO ADDITIONAL
COMPENSATION WILL BE ALLOWED FOR DELAYS OR INCONVENIENCES CAUSED BY UTILITY
COMPANY WORK CREWS. THE CONTRACTOR MAY BE REQUIRED TO RESCHEDULE THEIR
ACTIVITIES TO ALLOW UTILITY CREWS TO PERFORM THEIR REQUIRED WORK.
26. DISPOSAL SITE FOR ALL EXCESS EXCAVATION MATERIAL, AND UNSUITABLE MATERIAL
SHALL BE OBTAINED BY THE CONTRACTOR IN COMPLIANCE WITH APPLICABLE
ENVIRONMENTAL REGULATIONS AND APPROVED BY THE CITY. ALL COSTS INCURRED IN
OBTAINING A DISPOSAL SITE AND HAUL THERETO SHALL BE CONSIDERED INCIDENTAL TO
ITEM NO. 203000 UNCLASSIFIED EXCAVATION AND NO SEPARATE MEASUREMENT OR
PAYMENT WILL BE MADE.
27. ALL PERMANENT PAVEMENT MARKING AND TRAFFIC SIGNING SHALL BE FURNISHED BY THE
CONTRACTOR PER PLAN.
28. THE CONTRACTOR SHALL COORDINATE WITH THE CITY PRIOR TO BEGINNING ANY
CONSTRUCTION WORK ON OR ADJACENT TO EXISTING STREETS.
29. ALL BARRICADES AND CONSTRUCTION SIGNING SHALL CONFORM TO APPLICABLE SECTIONS
OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD), U.S. DEPARTMENT
OF TRANSPORTATION, LATEST EDITION.
30. THE CONTRACTOR SHALL MAINTAIN ALL CONSTRUCTION BARRICADES AND SIGNING AT ALL
TIMES. THE CONTRACTOR SHALL VERIFY THE PROPER LOCATION OF ALL BARRICADING AT
THE END AND BEGINNING OF EACH DAY.
31. ALL SAWCUT PAVEMENT SHALL HAVE A UNIFORM EDGE AND BE SPRAYED WITH TACK
COAT.
32. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXCAVATE AND VERIFY THE
HORIZONTAL AND VERTICAL LOCATIONS OF ALL POTENTIAL OBSTRUCTIONS. SHOULD A
CONFLICT EXIST, THE CONTRACTOR SHALL NOTIFY THE CITY INSPECTOR IMMEDIATELY SO
THE CONFLICT CAN BE RESOLVED WITH A MINIMUM AMOUNT OF DELAY.
33. IF THE CONTRACTOR IS NOT ALLOWED TO WORK AT NIGHT DUE TO THE CITY'S NOISE
ORDINANCE, THE CONTRACTOR SHALL OPEN ALL TRAFFFIC LANES TO TRAFFIC WITH
PROPER USE OF TRENCH PLATES DURING NON-WORKING HOURS, UNLESS PERMITTED BY
CONSTRUCTION PROJECT MANAGER.
34. THE CONTRACTOR SHALL RECORD DATA ON ALL UTILITY LINES AND ACCESSORIES AS
REQUIRED BY THE CITY FOR THE PREPARATION OF "AS-BUILT" DRAWINGS. CONTRACTOR
SHALL NOT COVER UTILITY LINES AND ACCESSORIES UNTIL ALL DATA HAS BEEN
RECORDED.
35. SALVAGEABLE MATERIALS: SALVAGEABLE MATERIALS FROM THIS PROJECT ARE TO BE
HAULED AND STOCKPILED AT THE CITY PUBLIC WORKS YARD. HAUL OF SUCH MATERIAL
SHALL BE PERFORMED DURING NORMAL WORKING HOURS AS DIRECTED BY THE PROJECT
MANAGER. PAYMENT FOR THIS WORK SHALL BE INCLUDED IN THE CONTRACT PRICE FOR
EACH SALVAGE ITEM.
36. ADJACENT LANDSCAPING TO BE PROTECTED BY THE CONTRACTOR AND NO SEPARATE
PAYMENT WILL BE MADE. CONTRACTOR SHALL TAKE VIDEO AND PHOTOS OF ALL EXISTING
LANDSCAPING. DAMAGE TO EXISTING LANDSCAPING SHALL BE REPLACED IN KIND BY
CONTRACTOR WITH NO SEPARATE PAYMENT.
37. IF EXISTING FIBER OPTIC OR ANY OTHER EXISTING CITY TRAFFIC INFRASTRUCTURE IS
DAMAGED AS PART OF THIS PROJECT WORK, THE CONTRACTOR SHALL REPAIR IT OR
REPLACE IT PER CITY TRAFFIC REQUIREMENTS. DAMAGED FIBER OPTIC CABLE SHALL BE
REPLACED FROM EXISTING FULL SPLICE TO EXISTING FULL SPLICE; NO INTERMEDIATE
SPLICE WILL BE ALLOWED. THIS WORK SHALL BE DONE AT THE EXPENSE OF THE
CONTRACTOR AND NO ADDITIONAL PAYMENT WILL BE MADE.
GENERAL NOTES
EXISTING TYPICAL SECTION 1
STA. 11+70.55 TO STA. 27+40.00
TRANSITION
STA. 10+62.32 TO STA. 11+70.55 (DAMON ST INTERSECTION)
STA. 27+40.00 TO STA. 27+85.11 (EXISTING TYPICAL 1 TO TYPICAL 2)
EXISTING
R/W
EXISTING
R/W
29' 21'
VARIES
12'
DRIVING
LANE
WESTBOUND
GOODMAN
AVE
EXISTING PAVEMENT SECTION
EXISTING EXISTING VARIES
EASTBOUND
12'
DRIVING
LANE
17' 7'
VARIES
EXISTING TYPICAL SECTION 2
STA. 27+85.11 TO STA. 29+65.50
TRANSITION
STA. 29+65.50 TO STA. 30+47.30 (HORNER ST INTERSECTION)
EXISTING
R/W
EXISTING
R/W
26' 24'
VARIES
12'
DRIVING
LANE
WESTBOUND
GOODMAN
AVE
EXISTING PAVEMENT SECTION
EXISTING EXISTING VARIES
EASTBOUND
12'
DRIVING
LANE
VARIES
50'
5'
50'
EXISTING PAVEMENT SECTION
REFER TO SHEET 2-2 FOR CORE DATA
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 2TS01.dwg LAYOUT: TS01-01
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 2-1PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
EX
IS
TI
N
G T
YP
IC
AL
S
EC
TI
O
S
O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 2TS01.dwg LAYOUT: TS01-02
D
AT
E:
O ct
- 9 :5
3a
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
SHEET NO. 2-2PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
EX
IS
TI
N
G P
AV
EM
EN
T
C O
R E
D
AT
A
GOODMAN AVE
2.0%*
EXISTING
R/W
EXISTING
R/W
11'
DRIVING LANE
11'
DRIVING LANE
21'29'
2.0%*
VARIES
5' - 8'
PEDESTRIAN
PATH
VARIES
2:1 TO 12:1
9'
DITCH
10'
DITCH
4:1
4'5' 5' 5'
3:1
FLOW LINE
MATCH EXISTING
MATCH EXISTING
PAVEMENT SECTION 1
GOODMAN AVE, DAMON ST,REID ST, RIGGS ST,
PAVEMENT SECTION 2
TURNOUTS
PRIME
COAT
TACK
COAT
SUBGRADE
PREPARATION
PRIME
COAT
2" HMA SP-IV
6" BASE
COURSE
SUBGRADE
PREPARATION
4" HMA SP-IV
2-2" LIFTS
6" BASE
COURSE
PROPOSED TYPICAL SECTION 1
STA. 11+71.81 TO STA. 19+00.07
STA. 19+84.07 TO STA. 20+17.26
STA. 21+01.32 TO STA. 24+32.30
STA. 25+16.31 TO STA. 27+40.00
TRANSITION
STA. 10+62.32 TO STA. 11+71.81 (DAMON ST INTERSECTION)
STA. 19+00.07 TO STA. 19+84.07 (REID ST INTERSECTION)
STA. 20+17.26 TO STA. 21+01.32 (RIGGS ST INTERSECTION)
STA. 24+32.30 TO STA. 25+16.31 (DOERING ST INTERSECTION)
STA. 27+40.00 TO STA. 27+85.11 ( TYPICAL SECTION 2)
2.0%
3:1 OR FLATTER
PAVEMENT SECTION 3
PEDESTRIAN PATH
PRIME
COAT
2.5" HMA SP-IV
4" BASE
COURSE
2.0%
FLOW LINE
VARIES
6.5' - 8'
PEDESTRIAN
PATH
STA. 11+43.63 TO STA. 12+55.20
STA. 14+76.25 TO STA. 15+32.73
STA. 15+56.43 TO STA. 16+50.07
STA. 20+07.84 TO STA. 20+56.06
STA. 25+54.26 TO STA. 27+34.80
GOODMAN AVE
2.0%*
EXISTING
R/W
EXISTING
R/W
11'
DRIVING LANE
11'
DRIVING LANE
24'26'
2.0%*
7'
PEDESTRIAN
PATH
7'
DITCH
4:1
4'3'
2.0%
3:1 OR FLATTER
FLOW LINE
PROPOSED TYPICAL SECTION 2
STA. 27+85.11 TO STA. 29+65.50
TRANSITION
STA. 29+65.57 TO STA. 30+47.30 (HORNER ST INTERSECTION)
PEDESTRIAN
PATH
PEDESTRIAN
PATH
DOERING ST
50'
50'
VARIES
8.2' - 9.6'
EXISTING CINDER
BLOCK WALL
VARIES
HEADER CURB
CUT
3:1 OR FLATTER
FILL
4:1
MATCH EXISTING
CUT
2:1 OR FLATTER
FILL
2:1 OR FLATTER
MATCH EXISTING
CUT
3:1 OR FLATTER
FILL
4:1
PAVEMENT SECTION 1
PAVEMENT SECTION 1PAVEMENT
SECTION 3
PAVEMENT
SECTION 3
PAVEMENT
SECTION 3
PROFILE GRADE LINE
AND POINT OF ROTATIONPROFILE GRADE LINE
AND POINT OF ROTATION
PROFILE GRADE LINE
AND POINT OF ROTATIONPROFILE GRADE LINE
AND POINT OF ROTATION
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 2TS02.dwg LAYOUT: TS02-01
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 2-3PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
PR
O
PO
SE
D T
YP
IC
AL
S
EC
TI
O N
S
* SEE SERIES 3 FOR SUPERELEVATION
ROTATION INFORMATION
SURFACING SCHEDULE
207000 303000 416104 416204 * * 407000 408100
SUBGRADE
PREPARATION BASE COURSE MINOR PAVING TYPE I, HMA SP-IV MINOR PAVING TYPE II, HMA SP-IV
PG 76-22
ASPHALT
MATERIAL
HYDRATED
LIME
ASPHALT MATERIAL FOR
TACK COAT PRIME COAT MATERIAL
STATION TO STATION DESCRIPTION
LENGTH
(L.F.)
AVG.
WIDTH
(L.F.)
AREA
(S.Y.)
AVG.
WIDTH
(L.F.)
AVG.
DEPTH
(IN.)
AREA
(S.Y.) TON
AVG.
WIDTH
(L.F.)
DEPTH
(IN.)
AREA
(S.Y.) TON
AVG.
WIDTH
(L.F.)
DEPTH
(IN.)
AREA
(S.Y.) TON TON TON
AVG.
WIDTH
(L.F.)
AREA
(S.Y.) TON
AVG.
WIDTH
(L.F.)
AREA
(S.Y.) TON
ALIGNMENT: GOODMAN AVE
10+62.32 29+94.97 GOODMAN AVE 1932.65 22.00 4724.26 22.00 6.00 4724.26 1555.07 22.00 4.00 4724.26 1006.79 58.39 10.07 22.00 4724.26 1.57 22.00 4724.26 8.86 14+67.90 14+81.90 SPEED HUMP 14.00 22.00 CALC 17.11 1.87 0.11 0.02 22.00 17.11 0.03 21+42.90 21+56.90 SPEED HUMP 14.00 22.00 CALC 17.11 1.87 0.11 0.02 22.00 17.11 0.03 25+92.90 26+06.90 SPEED HUMP 14.00 22.00 CALC 17.11 1.87 0.11 0.02 22.00 17.11 0.03
29+65.13 29+94.86 HORNER ST NORTH-WEST CURB
RETURN 29.73 CALC 20.93 CALC 6.00 20.93 6.89 CALC 4.00 20.93 4.46 0.26 0.04 CALC 20.93 0.01 CALC 20.93 0.04
30+16.64 30+47.30 HORNER ST NORTH-EAST CURB
RETURN 30.66 CALC 25.63 CALC 6.00 25.63 8.44 CALC 4.00 25.63 5.46 0.32 0.05 CALC 25.63 0.01 CALC 25.63 0.05
29+64.57 29+94.83 HORNER ST SOUTH CURB RETURN 30.26 CALC 21.49 CALC 6.00 21.49 7.07 CALC 4.00 21.49 4.58 0.27 0.05 CALC 21.49 0.01 CALC 21.49 0.04
ALIGNMENT: GOODMAN AVE
11+49.97 12+94.97 SURFACING TAPER - NORTH DAMON ST
TO TURNOUT 1 145.00 2.66 42.86 1.86 6.00 30.00 9.87 0.53 4.00 8.57 1.83 0.11 0.02 0.53 8.57 0.00 1.06 17.14 0.03
11+71.81 14+03.32 SURFACING TAPER - SOUTH DAMON ST
TO TURNOUT 2 231.51 2.66 68.42 1.86 6.00 47.90 15.77 0.53 4.00 13.68 2.92 0.17 0.03 0.53 13.68 0.00 1.06 27.37 0.05
13+28.34 15+15.38 SURFACING TAPER - TURNOUT 1 TO
TURNOUT 4 187.04 2.66 55.28 1.86 6.00 38.70 12.74 0.53 4.00 11.06 2.36 0.14 0.02 0.53 11.06 0.00 1.06 22.11 0.04
14+34.97 15+05.00 SURFACING TAPER - TURNOUT 2 TO
TURNOUT 3 70.03 2.66 20.70 1.86 6.00 14.49 4.77 0.53 4.00 4.14 0.88 0.05 0.01 0.53 4.14 0.00 1.06 8.28 0.02
15+35.37 16+03.73 SURFACING TAPER - TURNOUT 3 TO
TURNOUT 5 68.36 2.66 20.20 1.86 6.00 14.14 4.66 0.53 4.00 4.04 0.86 0.05 0.01 0.53 4.04 0.00 1.06 8.08 0.02
15+65.51 18+55.83 SURFACING TAPER - TURNOUT 4 TO
TURNOUT 7 290.32 2.66 85.81 1.86 6.00 60.06 19.77 0.53 4.00 17.16 3.66 0.21 0.04 0.53 17.16 0.01 1.06 34.32 0.06
16+34.16 17+67.04 SURFACING TAPER - TURNOUT 5 TO
TURNOUT 6 132.88 2.66 39.27 1.86 6.00 27.49 9.05 0.53 4.00 7.85 1.67 0.10 0.02 0.53 7.85 0.00 1.06 15.71 0.03
17+95.54 20+17.26 SURFACING TAPER - TURNOUT 6 TO
RIGGS ST 221.72 2.66 65.53 1.86 6.00 45.87 15.10 0.53 4.00 13.11 2.79 0.16 0.03 0.53 13.11 0.00 1.06 26.21 0.05
18+86.83 19+00.07 SURFACING TAPER - TURNOUT 7 TO
REID ST 13.24 2.66 3.91 1.86 6.00 2.74 0.90 0.53 4.00 0.78 0.17 0.01 0.00 0.53 0.78 0.00 1.06 1.57 0.00
19+84.07 21+86.09 SURFACING TAPER - REID ST TO
TURNOUT 8 202.02 2.66 59.71 1.86 6.00 41.80 13.76 0.53 4.00 11.94 2.54 0.15 0.03 0.53 11.94 0.00 1.06 23.88 0.04
21+01.32 22+57.45 SURFACING TAPER - RIGGS ST TO
TURNOUT 9 156.13 2.66 46.15 1.86 6.00 32.30 10.63 0.53 4.00 9.23 1.97 0.11 0.02 0.53 9.23 0.00 1.06 18.46 0.03
22+16.54 22+70.71 SURFACING TAPER - TURNOUT 8 TO
TURNOUT 10 54.17 2.66 16.01 1.86 6.00 11.21 3.69 0.53 4.00 3.20 0.68 0.04 0.01 0.53 3.20 0.00 1.06 6.40 0.01
22+86.83 23+39.35 SURFACING TAPER - TURNOUT 9 TO
DRIVEPAD 1 52.52 2.66 15.52 1.86 6.00 10.87 3.58 0.53 4.00 3.10 0.66 0.04 0.01 0.53 3.10 0.00 1.06 6.21 0.01
23+03.54 23+50.40 SURFACING TAPER - TURNOUT 10 TO
TURNOUT 11 46.86 2.66 13.85 1.86 6.00 9.69 3.19 0.53 4.00 2.77 0.59 0.03 0.01 0.53 2.77 0.00 1.06 5.54 0.01
23+69.59 25+41.27 SURFACING TAPER - DRIVEPAD 1 TO
TURNOUT 12 171.68 2.66 50.74 1.86 6.00 35.52 11.69 0.53 4.00 10.15 2.16 0.13 0.02 0.53 10.15 0.00 1.06 20.30 0.04
23+83.81 24+32.30 SURFACING TAPER - TURNOUT 11 TO
DOERING ST 48.49 2.66 14.33 1.86 6.00 10.03 3.30 0.53 4.00 2.87 0.61 0.04 0.01 0.53 2.87 0.00 1.06 5.73 0.01
25+16.31 29+65.13 SURFACING TAPER - DOERING ST TO
HORNER ST 448.82 2.66 132.65 1.86 6.00 92.86 30.57 0.53 4.00 26.53 5.65 0.33 0.06 0.53 26.53 0.01 1.06 53.06 0.10
25+74.34 26+21.12 SURFACING TAPER - TURNOUT 12 TO
TURNOUT 13 46.78 2.66 13.83 1.86 6.00 9.68 3.19 0.53 4.00 2.77 0.59 0.03 0.01 0.53 2.77 0.00 1.06 5.53 0.01
26+54.69 26+84.13 SURFACING TAPER - TURNOUT 11 TO
DRIVEPAD 2 29.44 2.66 8.70 1.86 6.00 6.09 2.00 0.53 4.00 1.74 0.37 0.02 0.00 0.53 1.74 0.00 1.06 3.48 0.01
27+10.16 28+11.86 SURFACING TAPER - DRIVEPAD 2 TO
TURNOUT 14 101.70 2.66 30.06 1.86 6.00 21.04 6.93 0.53 4.00 6.01 1.28 0.07 0.01 0.53 6.01 0.00 1.06 12.02 0.02
28+39.57 29+64.57 SURFACING TAPER - DRIVEPAD 2 TO
HORNER ST 125.00 2.66 36.94 1.86 6.00 25.86 8.51 0.53 4.00 7.39 1.57 0.09 0.02 0.53 7.39 0.00 1.06 14.78 0.03
ALIGNMENT: NORTH DAMON ST
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 2SS01.dwg LAYOUT: 2SS01-01
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
SHEET NO. 2-4
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
SU
R
FA
C
IN
G
S C
H
ED
LE
SUBGRADE
PREPARATION BASE COURSE MINOR PAVING TYPE I, HMA SP-IV MINOR PAVING TYPE II, HMA SP-IV
PG 76-22
ASPHALT
MATERIAL
HYDRATED
LIME
ASPHALT MATERIAL FOR
TACK COAT PRIME COAT MATERIAL
STATION TO STATION DESCRIPTION
LENGTH
(L.F.)
AVG.
WIDTH
(L.F.)
AREA
(S.Y.)
AVG.
WIDTH
(L.F.)
AVG.
DEPTH
(IN.)
AREA
(S.Y.) TON
AVG.
WIDTH
(L.F.)
DEPTH
(IN.)
AREA
(S.Y.) TON
AVG.
WIDTH
(L.F.)
DEPTH
(IN.)
AREA
(S.Y.) TON TON TON
AVG.
WIDTH
(L.F.)
AREA
(S.Y.) TON
AVG.
WIDTH
(L.F.)
AREA
(S.Y.) TON
ALIGNMENT: GOODMAN AVE
HORNER ST
ALIGNMENT: NORTH DAMON ST
100+11.00 100+66.00 DAMON ST NORTH 55.00 CALC 183.81 CALC 6.00 183.81 60.50 CALC 4.00 183.81 39.17 2.27 0.39 CALC 183.81 0.06 CALC 183.81 0.34
100+11.74 100+15.96 SURFACING TAPER - NORTH DAMON ST
LT 20.64 2.66 6.10 1.86 6.00 4.27 1.41 0.53 4.00 1.22 0.26 0.02 0.00 0.53 1.22 0.00 1.06 2.44 0.00
100+25.37 100+66.00 SURFACING TAPER - NORTH DAMON ST
LT 40.26 2.66 11.90 1.86 6.00 8.33 2.74 0.53 4.00 2.38 0.51 0.03 0.01 0.53 2.38 0.00 1.06 4.76 0.01
100+08.71 100+15.96 SURFACING TAPER - NORTH DAMON ST
RT 18.78 2.66 5.55 1.86 6.00 3.89 1.28 0.53 4.00 1.11 0.24 0.01 0.00 0.53 1.11 0.00 1.06 2.22 0.00
100+23.55 100+66.00 SURFACING TAPER - NORTH DAMON ST
RT 42.20 2.66 12.47 1.86 6.00 8.73 2.87 0.53 4.00 2.49 0.53 0.03 0.01 0.53 2.49 0.00 1.06 4.99 0.01
ALIGNMENT: SOUTH DAMON ST
110+07.00 110+79.00 DAMON ST SOUTH 72.00 CALC 303.63 CALC 6.00 303.63 99.94 CALC 4.00 303.63 64.71 3.75 0.65 CALC 303.63 0.10 CALC 303.63 0.57
110+07.00 110+77.71 SURFACING TAPER - SOUTH DAMON ST
LT 102.65 2.66 30.34 1.86 6.00 21.24 6.99 0.53 4.00 6.07 1.29 0.08 0.01 0.53 6.07 0.00 1.06 12.14 0.02
110+07.00 110+77.81 SURFACING TAPER - SOUTH DAMON ST
RT 79.27 2.66 23.43 1.86 6.00 16.40 5.40 0.53 4.00 4.69 1.00 0.06 0.01 0.53 4.69 0.00 1.06 9.37 0.02
ALIGNMENT: TURNOUT 1
120+11.00 120+29.32 TURNOUT 1 18.32 CALC 26.18 CALC 6.00 26.18 8.62 CALC 2.00 26.18 2.79 0.16 0.03 CALC 26.18 0.05
120+29.32 120+38.00 TURNOUT 1 - BASE COURSE 8.68 CALC 9.98 CALC 6.00 9.98 3.29
ALIGNMENT: TURNOUT 2
130+10.00 130+20.00 TURNOUT 2 10.00 CALC 14.52 CALC 6.00 14.52 4.78 CALC 2.00 14.52 1.55 0.09 0.02 CALC 14.52 0.03
ALIGNMENT: TURNOUT 3
140+10.00 140+20.00 TURNOUT 3 10.00 CALC 13.38 CALC 6.00 13.38 4.41 CALC 2.00 13.38 1.43 0.08 0.01 CALC 13.38 0.03
ALIGNMENT: TURNOUT 4
150+11.00 150+44.26 TURNOUT 4 33.26 CALC 76.06 CALC 6.00 76.06 25.03 CALC 2.00 76.06 8.10 0.47 0.08 CALC 76.06 0.14
ALIGNMENT: TURNOUT 5
160+10.00 160+20.00 TURNOUT 5 10.00 CALC 13.71 CALC 6.00 13.71 4.51 CALC 2.00 13.71 1.46 0.08 0.01 CALC 13.71 0.03
ALIGNMENT: TURNOUT 6
170+10.00 170+20.00 TURNOUT 6 10.00 CALC 12.26 CALC 6.00 12.26 4.04 CALC 2.00 12.26 1.31 0.08 0.01 CALC 12.26 0.02
ALIGNMENT: TURNOUT 7
175+11.00 175+33.00 TURNOUT 7 22.00 CALC 28.31 CALC 6.00 28.31 9.32 CALC 2.00 28.31 3.02 0.17 0.03 CALC 28.31 0.05
ALIGNMENT: RIED ST
180+11.00 180+65.00 RIED ST 54.00 CALC 174.89 CALC 6.00 174.89 57.57 CALC 4.00 174.89 37.27 2.16 0.37 CALC 174.89 0.06 CALC 174.89 0.33 180+11.00 180+20.00 SURFACING TAPER - REID ST LT 23.86 2.66 7.05 1.86 6.00 4.94 1.62 0.53 4.00 1.41 0.30 0.02 0.00 0.53 1.41 0.00 1.06 2.82 0.01 180+28.50 180+65.00 SURFACING TAPER - REID ST LT 36.89 2.66 10.90 1.86 6.00 7.63 2.51 0.53 4.00 2.18 0.46 0.03 0.00 0.53 2.18 0.00 1.06 4.36 0.01 180+11.00 180+20.00 SURFACING TAPER - REID ST RT 23.86 2.66 7.05 1.86 6.00 4.94 1.62 0.53 4.00 1.41 0.30 0.02 0.00 0.53 1.41 0.00 1.06 2.82 0.01 180+28.50 180+65.00 SURFACING TAPER - REID ST RT 36.89 2.66 10.90 1.86 6.00 7.63 2.51 0.53 4.00 2.18 0.46 0.03 0.00 0.53 2.18 0.00 1.06 4.36 0.01
ALIGNMENT: RIGGS ST
190+10.01 190+51.94 RIGGS ST 41.93 CALC 143.63 CALC 6.00 143.63 47.28 CALC 4.00 143.63 30.61 1.78 0.31 CALC 143.63 0.05 CALC 143.63 0.27 190+09.57 190+51.94 SURFACING TAPER - RIGGS ST LT 59.50 2.66 17.59 1.86 6.00 12.31 4.05 0.53 4.00 3.52 0.75 0.04 0.01 0.53 3.52 0.00 1.06 7.03 0.01 190+10.45 190+51.94 SURFACING TAPER - RIGGS ST RT 58.62 2.66 17.33 1.86 6.00 12.13 3.99 0.53 4.00 3.47 0.74 0.04 0.01 0.53 3.47 0.00 1.06 6.93 0.01
ALIGNMENT: TURNOUT 8
200+11.00 200+29.06 TURNOUT 8 18.06 CALC 22.00 CALC 6.00 22.00 7.24 CALC 2.00 22.00 2.34 0.14 0.02 CALC 22.00 0.04
200+29.06 200+34.00 TURNOUT 8 - BASE COURSE 4.94 CALC 5.15 CALC 6.00 5.15 1.70
ALIGNMENT: TURNOUT 9
210+10.00 210+20.00 TURNOUT 9 10.00 CALC 12.50 CALC 6.00 12.50 4.11 CALC 2.00 12.50 1.33 0.08 0.01 CALC 12.50 0.02
210+05.00 210+10.00 TURNOUT 9 - BASE COURSE 5.00 CALC 5.18 CALC 6.00 5.18 1.71
ALIGNMENT: TURNOUT 10
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 2SS01.dwg LAYOUT: 2SS01-02
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
SHEET NO. 2-5
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
SU
R
FA
C
IN
G
S C
H
ED
LE
SUBGRADE
PREPARATION BASE COURSE MINOR PAVING TYPE I, HMA SP-IV MINOR PAVING TYPE II, HMA SP-IV
PG 76-22
ASPHALT
MATERIAL
HYDRATED
LIME
ASPHALT MATERIAL FOR
TACK COAT PRIME COAT MATERIAL
STATION TO STATION DESCRIPTION
LENGTH
(L.F.)
AVG.
WIDTH
(L.F.)
AREA
(S.Y.)
AVG.
WIDTH
(L.F.)
AVG.
DEPTH
(IN.)
AREA
(S.Y.) TON
AVG.
WIDTH
(L.F.)
DEPTH
(IN.)
AREA
(S.Y.) TON
AVG.
WIDTH
(L.F.)
DEPTH
(IN.)
AREA
(S.Y.) TON TON TON
AVG.
WIDTH
(L.F.)
AREA
(S.Y.) TON
AVG.
WIDTH
(L.F.)
AREA
(S.Y.) TON
ALIGNMENT: GOODMAN AVE
TURNOUT 9 - BASE COURSE
ALIGNMENT: TURNOUT 10
220+11.00 220+29.11 TURNOUT 10 18.11 CALC 26.22 CALC 6.00 26.22 8.63 CALC 2.00 26.22 2.79 0.16 0.03 CALC 26.22 0.05
ALIGNMENT: TURNOUT 11
240+11.00 240+29.05 TURNOUT 11 18.05 CALC 27.08 CALC 6.00 27.08 8.92 CALC 2.00 27.08 2.89 0.17 0.03 CALC 27.08 0.05
240+29.05 240+31.54 TURNOUT 11 - BASE COURSE 2.49 CALC 3.32 CALC 6.00 3.32 1.09
ALIGNMENT: DOERING ST
250+11.00 250+80.00 DOERING ST 69.00 CALC 214.93 CALC 6.00 214.93 70.75 CALC 4.00 214.93 45.80 2.66 0.46 CALC 214.93 0.07 CALC 214.93 0.40 250+11.00 250+20.00 SURFACING TAPER - DOERING ST LT 23.85 2.66 7.05 1.86 6.00 4.93 1.62 0.53 4.00 1.41 0.30 0.02 0.00 0.53 1.41 0.00 1.06 2.82 0.01 250+27.00 250+80.00 SURFACING TAPER - DOERING ST LT 53.57 2.66 15.83 1.86 6.00 11.08 3.65 0.53 4.00 3.17 0.67 0.04 0.01 0.53 3.17 0.00 1.06 6.33 0.01 250+11.00 250+20.00 SURFACING TAPER - DOERING ST RT 23.86 2.66 7.05 1.86 6.00 4.94 1.62 0.53 4.00 1.41 0.30 0.02 0.00 0.53 1.41 0.00 1.06 2.82 0.01 250+28.50 250+80.00 SURFACING TAPER - DOERING ST RT 51.89 2.66 15.34 1.86 6.00 10.74 3.53 0.53 4.00 3.07 0.65 0.04 0.01 0.53 3.07 0.00 1.06 6.13 0.01
ALIGNMENT: TURNOUT 12
260+10.00 260+20.00 TURNOUT 12 10.00 CALC 15.77 CALC 6.00 15.77 5.19 CALC 2.00 15.77 1.68 0.10 0.02 CALC 15.77 0.03
ALIGNMENT: TURNOUT 13
270+10.00 270+20.00 TURNOUT 13 10.00 CALC 16.22 CALC 6.00 16.22 5.34 CALC 2.00 16.22 1.73 0.10 0.02 CALC 16.22 0.03
ALIGNMENT: TURNOUT 14
290+20.00 290+23.00 TURNOUT 14 3.00 CALC 8.17 CALC 6.00 8.17 2.69 CALC 2.00 8.17 0.87 0.05 0.01 CALC 8.17 0.02
SUBTOTAL: 7195.57 2265.21 1283.46 38.90 76.70 13.22 2.01 12.37
ALIGNMENT: PEDESTRIAN PATH
50+59.81 52+22.20 PEDESTRIAN PATH: DAMON ST TO
TURNOUT 1 162.39 CALC 142.96 CALC 4.00 142.96 31.37 CALC 2.50 142.96 19.04 1.10 0.19 CALC 142.96 0.27
52+33.68 54+46.51 PEDESTRIAN PATH: TURNOUT 1 TO
TURNOUT 4 212.83 CALC 185.22 CALC 4.00 185.22 40.65 CALC 2.50 185.22 24.67 1.43 0.25 CALC 185.22 0.35
54+70.21 57+79.61 PEDESTRIAN PATH: TURNOUT 4 TO
TURNOUT 7 309.40 CALC 273.03 CALC 4.00 273.03 59.92 CALC 2.50 273.03 36.37 2.11 0.36 CALC 273.03 0.51
57+90.61 58+23.27 PEDESTRIAN PATH: TURNOUT 7 TO REID
ST 32.66 CALC 29.03 CALC 4.00 29.03 6.37 CALC 2.50 29.03 3.87 0.22 0.04 CALC 29.03 0.05
58+88.43 61+11.24 PEDESTRIAN PATH: REID ST TO
TURNOUT 8 222.81 CALC 197.43 CALC 4.00 197.43 43.33 CALC 2.50 197.43 26.30 1.53 0.26 CALC 197.43 0.37
61+20.97 61+95.51 PEDESTRIAN PATH: TURNOUT 8 TO
TURNOUT 10 74.54 CALC 61.52 CALC 4.00 61.52 13.50 CALC 2.50 61.52 8.19 0.48 0.08 CALC 61.52 0.12
62+07.85 62+73.88 PEDESTRIAN PATH: TURNOUT 10 TO
TURNOUT 11 66.03 CALC 36.99 CALC 4.00 36.99 8.12 CALC 2.50 36.99 4.93 0.29 0.05 CALC 36.99 0.07
62+86.31 63+52.48 PEDESTRIAN PATH: TURNOUT 11 TO
DOERING ST 66.17 CALC 44.61 CALC 4.00 44.61 9.79 CALC 2.50 44.61 5.94 0.34 0.06 CALC 44.61 0.08
64+20.67 68+86.46 PEDESTRIAN PATH: DOERING ST TO
HORNER ST 465.79 CALC 390.62 CALC 4.00 390.62 85.72 CALC 2.50 390.62 52.03 3.02 0.52 CALC 390.62 0.73
SUBTOTAL: 1361.42 298.76 181.33 10.52 1.81 2.55
PROJECT TOTAL: 8556.99 2563.97 1283.46 220.24 87.21 15.04 2.01 14.92
PROJECT USE: 8600 2600 1300 250 90 20 3 17
NOTES:
1. AMOUNTS OF BITUMINOUS MATERIAL SHOWN ARE FOR ESTIMATING PURPOSES ONLY. CORRECT AMOUNTS WILL BE DETERMINED BY THE MATERIAL AND TESTING LABORATORY.
2. * HYDRATED LIME AND PG 76-22 QUANTITIES ARE SHOWN FOR INFORMATION OF THE CONTRACTOR ONLY.
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 2SS01.dwg LAYOUT: 2SS01-03
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
SHEET NO. 2-6
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
SU
R
FA
C
IN
G
S C
H
ED
U
LE
ESTIMATED SURFACING FACTORS
ITEM
UNIT WEIGHT HYDRATED LIME Gallons/
TONPG 76-22 SEC. 407 SEC. 408
% BY WT. OF
TOTAL MIX
GALLONS PER
S.Y.
GALLONS PER
S.Y.
LBS. PER
C.Y.
% BY WT. OF
TOTAL MIX
HOT MIX ASPHALT SP-IV 5.8% ** 3836 ** 1.00% **
ASPHALT MATERIAL FOR TACK COAT 0.08 * 240
PRIME COAT MATERIAL 0.45 * 240
BASE COURSE 3950 **
FOR CONTRACTORS INFORMATION ONLY.
* FOR ESTIMATING PURPOSES ONLY, APPLICATION RATE WILL BE DETERMINED IN THE FIELD BY THE PROJECT MANAGER.
** FOR ESTIMATING PURPOSES ONLY, ACTUAL WEIGHTS OR PERCENT SHALL BE DETERMINED BY APPROVED MIX DESIGN.
HEADER CURB ITEM NO. 609200
ID
NUMBER STATION OFFSET TO STATION OFFSET LENGTH L.F. DESCRIPTION
ALIGNMENT: PEDESTRIAN PATH
HC-01 50+59.81 8.50' LT - 51+68.98 8.50' LT 109.17
HC-02 53+90.03 8.50' LT - 54+33.93 7.00' LT 44.00
HC-03 54+79.67 7.00' LT - 55+63.85 8.50' LT 84.28
HC-04 59+21.62 8.50' LT - 59+69.84 8.50' LT 48.22
HC-05 64+68.04 8.50' LT - 66+48.61 8.63' LT 180.57
SUBTOTAL 466.24
ALIGNMENT: REID ST
HC-06 180+29.00 25.49' LT - 180+52.41 25.49' LT 23.41
SUBTOTAL 23.41
TOTAL 489.65
USE 500 L.F.
STATIONS TAKEN AT FLOWLINE
CONSTRUCTION ENGINEERING & LUMP SUM ITEMS
NMDOT ITEM
NO. DESCRIPTION UNIT
201000 CLEARING AND GRUBBING LS
601000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LS
603281 SWPPP PLAN PREPARATION AND MAINTENANCE LS
618000 TRAFFIC CONTROL MANAGEMENT LS
618011 PUBLIC AWARENESS LS
621000 MOBILIZATION LS
702810 TRAFFIC CONTROL DEVICES FOR CONSTRUCTION LS
801000 CONSTRUCTION STAKING BY THE CONTRACTOR LS
802000 POST CONSTRUCTION PLANS LS
EARTHWORK SUMMARY
STATION TO STATION
203000
UNCLASSIFIED EXCAVATION
(CU.YD.)
EMBANKMENT
(CU.YD.)
203100 BORROW
(CU. YD.)
EXCESS
EXCAVATION
(CU.YD.)
REMARKS
PHASE 1
ALIGNMENT: GOODMAN AVE
10+62.32 - 29+94.99 864.61 67.23 797.38
ALIGNMENT: SOUTH DAMON ST
110+10.00 - 110+52.41 59.97 0 59.97
ALIGNMENT: RIGGS ST
190+10.01 - 190+51.94 10.06 2.58 7.48
SUBTOTAL 934.64 SUBTOTAL 0.00 864.83
PHASE 2
ALIGNMENT: GOODMAN AVE
10+62.32 - 29+94.99 698 63.03 634.97
ALIGNMENT: NORTH DAMON ST
100+10.08 - 100+66.00 27.7 0 27.70
ALIGNMENT: REID ST
180+11.00 - 180+65.00 34.51 0 34.51
ALIGNMENT: DOERING ST
250+11.00 - 250+80.00 39.31 0 39.31
SUBTOTAL 799.52 SUBTOTAL 0.00 736.49
PROJECT TOTALS: 1,734.16 0.00
PROJECT USE 1,800 0
NOTES:
1. SEE TRAFFIC CONTROL PLANS (SERIES 6 SHEETS) FOR PROJECT CONSTRUCTION PHASING.
2. UNCLASSIFIED EXCAVATION QUANTITY DOES NOT INCLUDE REMOVAL OF SURFACING. REMOVAL OF SURFACING WILL BE PAID FOR UNDER
ITEM 601110 "REMOVAL OF SURFACING."
CONCRETE VALLEY GUTTER 6" X 24" ITEM NO. 609624
ID NUMBER STATION OFFSET TO STATION OFFSET LENGTH L.F. DESCRIPTION
ALIGNMENT: GOODMAN AVE
VG-01 10+80.91 15.22' LT - 11+36.34 14.27' LT 56.69 NORTH DAMONT ST
VG-02 10+85.37 17.86' RT - 11+57.31 16.81' RT 70.33 SOUTH DAMONT ST
VG-03 13+02.98 15.00' LT - 13+20.38 15.00' LT 17.40 TURNOUT #1
VG-04 14+11.98 16.00' RT - 14+26.31 16.00' RT 14.33 TURNOUT #2
VG-05 15+13.66 16.00' RT - 15+26.71 16.00' RT 13.05 TURNOUT #3
VG-06 15+23.37 15.00' LT - 15+57.51 15.00' LT 34.14 TURNOUT #4
VG-07 16+12.08 16.00' RT - 16+25.50 16.00' RT 13.42 TURNOUT #5
VG-08 17+75.40 16.00' RT - 17+87.19 16.00' RT 11.79 TURNOUT #6
VG-09 18+63.83 15.00' LT - 18+78.83 15.00' LT 15.00 TURNOUT #7
VG-10 19+15.04 15.00' LT - 19+69.11 15.00' LT 54.07 REID ST
VG-11 20+33.84 16.00' RT - 20+84.73 16.00' RT 50.89 RIGGS ST
VG-12 21+94.09 15.00' LT 22+08.54 15.00' LT 14.45 TURNOUT #8
VG-13 22+66.11 16.00' RT 22+78.17 16.00' RT 12.06 TURNOUT #9
VG-14 22+78.71 15.00' LT 22+95.55 15.00' LT 16.84 TURNOUT #10
VG-15 23+58.40 15.00' LT 23+75.81 15.00' LT 17.41 TURNOUT #11
VG-16 24+47.27 15.00' LT - 25+01.34 15.00' LT 54.07 DOERING ST
VG-17 25+49.93 16.00' RT 25+65.68 16.00' RT 15.75 TURNOUT #12
VG-18 26+29.78 16.00' RT 26+46.03 16.00' RT 16.25 TURNOUT #13
SUBTOTAL 497.94
TOTAL 497.94
USE 500
CONCRETE SIDEWALK 4" ITEM NO. 608004
STATION TO STATION LOCATION LENGTH
(L.F.)
WIDTH
(L.F.)
AREA
(S.Y.) REMARKS
ALIGNMENT: PEDESTRIAN PATH
49+84.16 - 50+04.98 LT. 20.81 8 15.11 R1-A DAMON ST
50+41.31 - 50+59.81 LT. 18.50 8 13.90 R1-B DAMON ST
58+23.27 - 58+40.89 LT. 17.61 8 13.45 R5-A REID ST
58+70.81 - 50+88.43 LT. 17.61 8 13.45 R5-B REID ST
63+52.48 - 63+72.34 LT. 19.86 6.5 12.75 R9-A DOERING ST
64+03.05 - 64+20.67 LT. 17.61 8 13.45 R9-B DOERING ST
68+86.46 - 69+04.20 LT. 17.74 8 11.67 R10-A HORNER ST
69+36.58 - 69+55.98 LT. 19.40 8 14.45 R10-B HORNER ST
PROJECT TOTAL 108.24
PROJECT USE 110
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 2MQ01.dwg LAYOUT: 2MQ01-01
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 2-7PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
M
IS
C
EL
LA
N
EO
U
S Q
U
AN
TI
DRIVE PAD 6" ITEM NO. 608106
ID NUMBER AREA
(S.Y.) REMARKS
ALIGNMENT: GOODMAN AVE
D-01 23.20 D-02 20.95
PROJECT
TOTAL 44.15
PROJECT
USE 50
MAIL BOX INSTALLATION-SINGLE ITEM NO. 667110
ID NUMBER EACH REMARKS
TURNOUT #1 1
DRIVEPAD #1 1
TURNOUT #12 1
DRIVEPAD #2 1
TURNOUT # 14 1
PROJECT TOTAL 5
PROJECT USE 5
NOTE:
1. COORDINATE LOCATION WITH PROPERTY OWNER, POSTAL SERVICE, AND THE CITY OF RIO COMMUNITIES.
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 2MQ01.dwg LAYOUT: 2MQ01-02
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 2-8PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
M
IS
C
EL
LA
N
EO
U
S Q
U
AN
TI
TI
ES
RIPRAP CLASS A ITEM NO. 602000
OUTFALL
REF NO. LOCATION VOLUME
C.Y. REMARKS
ALIGNMENT: GOODMAN AVE
TURNOUT 1 NORTH CHANNEL 5.50
TURNOUT 2 SOUTH CHANNEL 6.10
TURNOUT 3 SOUTH CHANNEL 6.10
TURNOUT 4 NORTH CHANNEL 5.00
TURNOUT 5 SOUTH CHANNEL 6.10
TURNOUT 6 SOUTH CHANNEL 6.10
TURNOUT 7 NORTH CHANNEL 5.60
20+57 NORTH CHANNEL 7.40
RIGGS ST SOUTH CHANNEL 6.30
TURNOUT 8 NORTH CHANNEL 5.50
TURNOUT 9 SOUTH CHANNEL 6.10
TURNOUT 12 SOUTH CHANNEL 6.10
TURNOUT 13 SOUTH CHANNEL 6.30
TOTAL 78.20
USE 80 C.Y.
FOR CONTRACTOR USE ONLY HEADER CURB PAID FOR
UNDER 608004 - CONCRETE SIDEWALK 4"
ID NUMBER LENGTH L.F. DESCRIPTION
R1-A 21.18
R1-B 18.77
R3-A 12.29
R3-B 9.43
R5-A 17.61
R5-B 17.85
R9-A 20.13
R9-B 17.85 R10-A 18.06 R10-B 19.69
PROJECT TOTAL 172.86
PROJECT USE 200 L.F.
PERMANENT STRIPING QUANTITIES
ITEM NUMBER STATION TO STATION DESCRIPTION UNITS SUBTOTAL PROJECT TOTAL REMARKS
ALIGNMENT: GOODMAN AVE
704000 10+62.32 - 11+03.11 RETROREFLECTORIZED PAINTED MARKINGS 4" (DOUBLE YELLOW) L.F 40.79 81.58 BOP TO DAMON ST 704000 11+31.24 - 14+68.00 RETROREFLECTORIZED PAINTED MARKINGS 4" (DOUBLE YELLOW) L.F 336.76 673.52 DAMON ST TO SPEED HUMP 704000 14+82.00 - 19+30.05 RETROREFLECTORIZED PAINTED MARKINGS 4" (DOUBLE YELLOW) L.F 448.05 896.10 SPEED HUMP TO REID ST 704000 19+54.05 - 20+47.26 RETROREFLECTORIZED PAINTED MARKINGS 4" (DOUBLE YELLOW) L.F 93.21 186.42 REID ST TO RIGGS ST 704000 20+71.36 - 21+43.00 RETROREFLECTORIZED PAINTED MARKINGS 4" (DOUBLE YELLOW) L.F 71.64 143.28 RIGGS ST TO SPEED HUMP 704000 21+57.00 - 24+62.28 RETROREFLECTORIZED PAINTED MARKINGS 4" (DOUBLE YELLOW) L.F 305.28 610.56 SPEED HUMP TO DOERING ST 704000 24+86.30 - 25+93.00 RETROREFLECTORIZED PAINTED MARKINGS 4" (DOUBLE YELLOW) L.F 106.70 213.40 DOERING ST TO SPEED HUMP 704000 26+07.00 - 29+84.92 RETROREFLECTORIZED PAINTED MARKINGS 4" (DOUBLE YELLOW) L.F 377.92 755.84 SPEED HUMP TO HORNER ST
GOODMAN AVE- 4" STRIPING 3,561
ALIGNMENT: GOODMAN AVE
704004 10+93.69 - 11+09.03 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 15.34 15.34 NORTH DAMON ST STOP BAR 704004 11+22.12 - 11+48.65 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 24.00 24.00 SOUTH DAMON ST STOP BAR 704004 14+68.00 - 14+82.00 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 27.78 27.78 SPEED HUMP ARROWS 704004 19+28.69 - 19+42.20 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 13.51 13.51 REID ST STOP BAR 704004 20+59.73 - 20+79.35 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 19.62 19.62 RIGGS ST STOP BAR 704004 21+43.00 - 21+57.00 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 27.78 27.78 SPEED HUMP ARROWS 704004 24+60.84 - 24+75.19 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 14.34 14.34 DOERING ST STOP BAR 704004 25+93.00 - 26+07.00 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 27.78 27.78 SPEED HUMP ARROWS 704004 29+84.92 - 29+84.92 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 19.32 19.32 GOODMAN AVE/HORNER ST STOP BAR 704004 29+93.08 - 30+07.67 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 14.60 14.60 GOODMAN AVE/HORNER ST STOP BAR 704004 30+10.39 - 30+27.81 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 17.44 17.44 GOODMAN AVE/HORNER ST STOP BAR 704004 30+36.13 - 30+36.13 RETROREFLECTORIZED PAINTED MARKINGS 12" (SOLID WHITE) L.F. 11.76 11.76 GOODMAN AVE/HORNER ST STOP BAR
GOODMAN AVE- 12" STRIPING 233
ITEM NUMBER DESCRIPTION TOTAL USE
704000 RETROREFLECTORIZED PAINTED MARKINGS 4" 3,561 3,600
704004 RETROREFLECTORIZED PAINTED MARKINGS 12" 233 240
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 7PS_SQ01.dwg LAYOUT: 2MQ01-04
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 2-9PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
PE
R
M
AN
EN
T
SI
G
N
IN
G A
N D
S
TR
IP
IN
G
ST
R
IP
IN
G
Q U
AN
TI
PERMANENT SIGNING SUMMARY OF QUANTITIES
SIGN CODE STATION OFFSET PANEL LEGEND NO. OF
SIGNS
PANEL SIZE
(IN.)
PANEL
SIGN SHEETING POST LENGTHS MOUNTING REQUIREMENTS BASE POSTS
2.50"X2.50" POSTS
REMARKSITEM NO. LETTERING BACKGROUND
LEFT CTR. RIGHT TOTAL
L.F.
U-CHANNEL SQUARE TUBE POST
NO.
TOTAL
LENGTH
L.F.
ITEM NO.
701100
701000 REFLECTIVITY
TYPE
REFLECTIVITY
TYPE
4 1.75"X 1.75" 2.0"X 2.0" 2.25"X 2.25" 2.50"X2.50"
W X H S.F. LB/FT 12 GA 12 GA 12 GA 10 GA L.F. L.F.
ALIGNMENT: GOODMAN AVE
R1-1-30 10+87.90 29' LT STOP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
D3-1-38 10+87.90 29' LT GOODMAN AVE 1 38 X 9 2.38 XI XI ***MOUNTED ON R1-1-30
D3-1-35 10+87.90 29' LT DAMON ST 1 35 X 9 2.19 XI XI ***MOUNTED ON R1-1-30
R1-1-30 11+56.98 26' RT STOP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
D3-1-38 11+56.98 26' RT GOODMAN AVE 1 38 X 9 2.38 XI XI ***MOUNTED ON R1-1-30
D3-1-35 11+56.98 26' RT DAMON ST 1 35 X 9 2.19 XI XI ***MOUNTED ON R1-1-30
R2-1-30-25 12+86.51 19' RT 25 MPH SIGN 1 24 X 30 5.00 XI XI - 10 - 10 X 1 3.67 13.667 W17-1-30 14+68.00 19' RT SPEED HUMP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667 W17-1-30 14+82.00 17' LT SPEED HUMP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
R2-1-30-25 17+66.61 17' LT 25 MPH SIGN 1 24 X 30 5.00 XI XI - 10 - 10 X 1 3.67 13.667
R1-1-30 19+22.62 33' LT STOP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
D3-1-38 19+22.62 33' LT GOODMAN AVE 1 38 X 9 2.38 XI XI ***MOUNTED ON R1-1-30
D3-1-30 19+22.62 33' LT REID ST 1 30 X 9 1.88 XI XI ***MOUNTED ON R1-1-30
R1-1-30 20+82.72 26' RT STOP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
D3-1-38 20+82.72 26' RT GOODMAN AVE 1 38 X 9 2.38 XI XI ***MOUNTED ON R1-1-30
D3-1-31 20+82.72 26' RT RIGGS ST 1 31 X 9 1.94 XI XI ***MOUNTED ON R1-1-30
W17-1-30 21+50.00 19' RT SPEED HUMP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667 W17-1-30 21+43.00 17' LT SPEED HUMP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
R2-1-30-25 24+57.00 19' RT 25 MPH SIGN 1 24 X 30 5.00 XI XI - 10 - 10 X 1 3.67 13.667
R1-1-30 24+54.03 32' LT STOP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
D3-1-38 24+54.03 32' LT GOODMAN AVE 1 38 X 9 2.38 XI XI ***MOUNTED ON R1-1-30
D3-1-33 24+54.03 32' LT DOERING ST 1 33 X 9 2.06 XI XI ***MOUNTED ON R1-1-30
W17-1-30 25+93.00 19' RT SPEED HUMP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667 W17-1-30 26+07.00 17' LT SPEED HUMP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
R2-1-30-25 27+54.02 17' LT 25 MPH SIGN 1 24 X 30 5.00 XI XI - 10 - 10 X 1 3.67 13.667
R1-1-30 29+84.90 23' RT STOP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
D3-1-38 29+84.90 23' RT GOODMAN AVE 1 38 X 9 2.38 XI XI ***MOUNTED ON R1-1-30
D3-1-35 29+84.90 23' RT HORNER ST 1 35 X 9 2.19 XI XI ***MOUNTED ON R1-1-30
R1-4-18 29+84.90 23' RT ALL WAY (PLAQUE) 1 18 X 6 0.75 XI XI ***MOUNTED ON R1-1-30
R1-1-30 29+86.99 30' RT STOP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
D3-1-38 29+85.54 30' RT GOODMAN AVE 1 38 X 9 2.38 XI XI ***MOUNTED ON R1-1-30
D3-1-35 29+85.54 30' RT HORNER ST 1 35 X 9 2.19 XI XI ***MOUNTED ON R1-1-30
R1-4-18 29+85.54 30' RT ALL WAY (PLAQUE) 1 18 X 6 0.75 XI XI ***MOUNTED ON R1-1-30
R1-1-30 30+35.84 25' RT STOP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
D3-1-38 30+35.84 25' RT GOODMAN AVE 1 38 X 9 2.38 XI XI ***MOUNTED ON R1-1-30
D3-1-35 30+35.84 25' RT HORNER ST 1 35 X 9 2.19 XI XI ***MOUNTED ON R1-1-30
R1-4-18 30+35.84 25' RT ALL WAY (PLAQUE) 1 18 X 6 0.75 XI XI ***MOUNTED ON R1-1-30
R1-1-30 30+36.16 25' RT STOP 1 30 X 30 6.25 XI XI - 10 - 10 X 1 3.67 13.667
D3-1-38 30+36.16 25' RT GOODMAN AVE 1 38 X 9 2.38 XI XI ***MOUNTED ON R1-1-30
D3-1-35 30+36.16 25' RT HORNER ST 1 35 X 9 2.19 XI XI ***MOUNTED ON R1-1-30
R1-4-18 30+36.16 25' RT ALL WAY (PLAQUE) 1 18 X 6 0.75 XI XI ***MOUNTED ON R1-1-30
ALIGNMENT: PEDESTRIAN PATH
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 7PS_SQ01.dwg LAYOUT: 2MQ01-05
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 2-10PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
PE
R
M
AN
EN
T
SI
G
N
IN
G A
N D
S
TR
IP
IN
G
SI
G N
IN
G
Q U
AN
TI
PERMANENT SIGNING SUMMARY OF QUANTITIES
SIGN CODE STATION OFFSET PANEL LEGEND NO. OF
SIGNS
PANEL SIZE
(IN.)
PANEL
SIGN SHEETING POST LENGTHS MOUNTING REQUIREMENTS BASE POSTS
2.50"X2.50" POSTS
REMARKSITEM NO. LETTERING BACKGROUND
LEFT CTR. RIGHT TOTAL
L.F.
U-CHANNEL SQUARE TUBE POST
NO.
TOTAL
LENGTH
L.F.
ITEM NO.
701100
701000 REFLECTIVITY
TYPE
REFLECTIVITY
TYPE
4 1.75"X 1.75" 2.0"X 2.0" 2.25"X 2.25" 2.50"X2.50"
W X H S.F. LB/FT 12 GA 12 GA 12 GA 10 GA L.F. L.F.
ALIGNMENT: GOODMAN AVE
***MOUNTED ON R1-1-30
ALIGNMENT: PEDESTRIAN PATH
R5-3-24 58+22.99 9' LT NO MOTOR VEHICLES 1 24 X 24 4.00 XI XI ***MOUNTED ON R1-1-30 R5-3-24 63+51.50 8' RT NO MOTOR VEHICLES 1 24 X 24 4.00 XI XI ***MOUNTED ON R1-1-30 R5-3-24 68+93.24 8' RT NO MOTOR VEHICLES 1 24 X 24 4.00 XI XI ***MOUNTED ON R1-1-30
TOTAL 169.13 160.00 69.67 259.67
USE 170 160 70 260
***NO ADDITIONAL POST(S) OR SUPPORT(S) NEEDED. TO BE MOUNTED ON POST(S) OR SUPPORT(S) WITH OTHER SIGN(S).
N O
D
ES
C
R
IP
TI
O
N D
AT
E
BY
DRAWING FILE: 7PS_SQ01.dwg LAYOUT: 2MQ01-06
D
AT
E:
O ct
- 1 1:
R
: A N
G O
N
ZA
LE
Z
C
IT
Y O
F R
IO
C
O M
M U
N
IT
IE
S
OCT 25, 2024
PRO F ES S I O NA L ENG INEER
AN
TO
NIO NUNEZ-TOVARNE
W MEX ICO
25774
SHEET NO. 2-11PROJECT DEVELOPED BY: HDR
PROJECT CONTROL NUMBER: C3223177
G O
O D
M
AN
A
VE
N U
E R
EC
O
N
ST
R U
C
TI
O N
PE
R
M
AN
EN
T
SI
G
N
IN
G A
N D
S
TR
IP
IN
G
SI
G N
IN
G
Q U
AN
TI
REMOVAL OF SURFACING ITEM NO. 601110
STATION TO STATION AREA
( S.Y.) REMARKS
ALIGNMENT: GOODMAN AVE
10+62.22 - 29+94.77 5,077.37 GOODMAN AVE
30+16.64 - 30+47.30 25.63 HORNER ST NORTH-WEST CURB RETURN
ALIGNMENT: NORTH DAMONT ST
100+11.93 - 100+66.00 182.27 NORTH DAMON ST
ALIGNMENT: SOUTH DAMONT ST
110+07.00 - 110+77.54 353.07 SOUTH DAMON ST
ALIGNMENT: TURNOUT 1
120+16.73 - 120+38.00 26.67 TURNOUT 1
ALIGNMENT: TURNOUT 2
130+10.00 - 130+23.88 20.61 TURNOUT 2
ALIGNMENT: TURNOUT 3
140+10.00 - 140+23.93 16.48 TURNOUT 3
ALIGNMENT: TURNOUT 4
150+16.29 - 150+44.26 74.58 TURNOUT 4
ALIGNMENT: TURNOUT 5
160+10.00 - 160+23.15 16.17 TURNOUT 5
ALIGNMENT: TURNOUT 6
170+10.00 - 170+22.07 12.22 TURNOUT 6
ALIGNMENT: REID ST
180+13.36 - 180+65.00 166.37 REID ST
ALIGNMENT: RIGGS ST
190+10.01 - 190+52.54 178.70 RIGGS ST
ALIGNMENT: TURNOUT 8
200+13.41 - 200+34.00 21.82 TURNOUT 8
ALIGNMENT: TURNOUT 9
210+05.00 - 210+21.80 17.42 TURNOUT 9
ALIGNMENT: TURNOUT 10
220+14.05 - 220+29.11 24.11 TURNOUT 10
ALIGNMENT: TURNOUT 11
240+14.25 - 240+31.54 27.69 TURNOUT 11
ALIGNMENT: DOERING ST
250+14.82 - 250+80.00 224.70 DOERING ST
ALIGNMENT: TURNOUT 12
260+10.00 - 260+22.37 145.58 TURNOUT 12
ALIGNMENT: TURNOUT 13
270+10.00 - 270+22.33 19.51 TURNOUT 13
ALIGNMENT: TURNOUT 14
290+20.04 - 290+23.13 8.66 TURNOUT 14
TOTAL 6,639.64
USE 6,650.00
NOTES:
1. SEE PAVEMENT CORES SHT. 2-2.
2. INCLUDES ALL MATERIALS UP TO 4" DEEP FROM EXISTING GROUND SURFACE.
SUMMARY OF REMOVALS
DESCRIPTION EACH L.F. S.Y.
SIGNS 12
FENCE 210
18" STORM DRAIN 100
24" STORM DRAIN 133
24" END SECTION 2
CONCRETE DRIVEPAD 79
CONCRETE WALL 20
MAILBOX 5
REMOVE TREE 6
FOR CONTRACTOR USE ONLY
REMOVALS OF STRUCTURES AND OBSTRUCTIONS ITEM NO. 601000
STATION OFFSET TO STATION OFFSET EACH LENGTH L.F. AREA S.Y. REMARKS
ALIGNMENT: GOODMAN AVE
10+90.09 32' LT - 1 EXISTING SIGNING
11+51.39 38' RT - 1 EXISTING SIGNING
19+20.22 26' LT - 1 EXISTING SIGNING
21+13.83 16' RT - 1 EXISTING SIGNING
21+64.80 25' LT - 1 EXISTING SIGNING
24+45.68 23' LT - 1 EXISTING SIGNING
26+20.39 51' RT - 1 EXISTING SIGNING
29+69.15 41' RT - 1 EXISTING SIGNING
29+69.81 60' LT - 1 EXISTING SIGNING
29+87.51 69' RT - 1 EXISTING SIGNING
30+34.63 30' RT - 1 EXISTING SIGNING
30+43.73 15' LT - 1 EXISTING SIGNING
SUBTOTAL 12
15+56.55 11' RT - 15+56.24 21' RT 18 EXISTING WIRE FENCE
25+54.25 27' LT - 27+34.79 27' LT 191 EXISTING WOODEN FENCE
SUBTOTAL 210
14+08.18 15' RT - 14+28.47 15' RT 20 18" STORM DRAIN
24+39.78 21' LT -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .