This document contains design drawings and specifications for the DNR Maple River Dike Upgrades project, a state-level construction contract opportunity in Michigan. The project involves the installation of soil erosion and sedimentation control (SESC) measures, riprap, and embankment fill for the dike upgrades. The project area spans approximately 16.7 acres across three distinct units. The Sequence of Construction notes outline the required steps for the contractor to follow during the construction process. The related state and local contract opportunity, named 751/21113. BDW; Maple River Flooding Dike Repairs, is located in Clinton County and Marlette City, Michigan. The bid attachments must be uploaded to SIGMA VSS, and questions should be directed to the project engineer, James Ensign. The bid submission deadline is 2:00 p.m., and approved emailed submissions may be accepted on a case-by-case basis.
The design drawings provide detailed information about the project's quantities, including the construction of a borrow site pond with specific side slopes and depths. Contractors will be required to become co-permittees for the NPDES permit and comply with all associated requirements, including the maintenance of best management practices (BMPs). The successful contractor will be responsible for maintaining all permanent SESC measures for one year after construction is complete.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGNED
8949.58
REVISIONS
DESCRIPTION REV.
DRAWN
CHECKED
APPROVED
DRAWING NO.PROJECT NO.
and
These Drawings are the property of the State of Michigan and are not to be reused or reproduced without written permission from the State of Michigan.
DRAWING TITLE
Design
IDENTIFICATION NO.
BID DOCUMENTS
CONSTRUCTION
FINAL RECORD
DATE
Construction
Division
530 W ALLEGAN
LANSING, MI
ISSUED FOR
NO. DATE CK'D
www.bergmannpc.com office:
fax:
7050 West Saginaw Hwy.
Suite 200 Lansing, MI 48917
517.272.9835 517.272.9836
PROJECT: DNR MAPLE RIVER
DIKE UPGRADES
STATE FILE NO.: XXX
STATE INDEX NO.: X
6/
/2
9:
A
M A
R C
H
D x
STATE OF MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET STATE FACILITIES
ADMINISTRATION
DESIGN AND
CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
J. ENSIGN, PE
A. NODARSE, PE
A. NODARSE, PE
J. ENSIGN, PE
SESC NOTES AND
DETAILS
C300
SESC KEYING SYSTEM
REFERS TO THE APPROPRIATE D.T.M.B. S.E.S.C.
KEYING SYSTEM DETAIL
SOIL BOUNDARY
STRAW WATTLE
LIMITS OF EARTH DISTURBANCE:
UNIT B: 7.2 ACRES
UNIT C: 5.4 ACRES
UNIT D: 4.1 ACRES
TOTAL: 16.7 ACRES
PERMANENT TURF REINFORCEMENT MAT
PERMANENT SEEDING AND MULCH
SOIL TYPES:
SESC LEGEND:
PROJECT
LOCATION
SITE LOCATION MAP
NOT TO SCALE
SESC NOTES:
1. CONTRACTOR IS TO CONTACT THE DTMB OFFICE AT LEAST THREE (3) DAYS
PRIOR TO THE START OF CONSTRUCTION.
2. CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL SOIL
EROSION CONTROL MEASURES DURING CONSTRUCTION. SESC MEASURES
SHOULD BE CHECKED DAILY AND AFTER STORM EVENTS FOR
EFFECTIVENESS. OWNER SHALL MAINTAIN ALL PERMANENT SESC MEASURES
AFTER CONSTRUCTION IS COMPLETE. ALL SESC MEASURES SHALL BE
CHECKED MONTHLY FOR ONE YEAR FOR EFFECTIVENESS. ANY MEASURES
THAT HAVE FAILED SHALL BE REPAIRED AND/OR REPLACED.
3. ALL TEMPORARY S.E.C. MEASURES SHALL BE MAINTAINED 30 DAYS AFTER
CONSTRUCTION IS COMPLETE OR UNTIL GRADED AREAS ARE STABILIZED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING TEMPORARY
SESC MEASURES.
4. ALL GRADED AREAS EXPOSED FOR MORE THAN 20 DAYS SHALL HAVE STRAW
MULCH APPLIED AT THE RATE OF 3 TONS / ACRE. AREAS NOT AT FINISHED
GRADE AND WHICH WILL BE DISTURBED AGAIN WITHIN ONE YEAR MUST BE
SEEDED AND MULCHED WITH QUICK GROWING TEMPORARY SEEDING
MIXTURE AND MULCH. AREAS WHICH ARE AT FINISHED GRADE AND WILL NOT
BE DISTURBED FOR A YEAR MUST BE SEEDED AND MULCHED WITH A
PERMANENT SEED MIXTURE.
5. ONLY LIMITED DISTURBANCE WILL BE PERMITTED TO PROVIDE ACCESS TO
THE SITE FOR GRADING AND TO CONSTRUCT SEDIMENT BASINS, SEDIMENT
TRAPS, DIVERSION TERRACES, INTERCEPTOR CHANNELS, AND/OR CHANNELS
OF CONVEYANCE AS APPROPRIATE.
6. EROSION AND SEDIMENTATION CONTROLS MUST BE CONSTRUCTED,
STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE WITH THE
TRIBUTARY AREAS OF THOSE CONTROLS.
7. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION MUST BE
MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL
EROSION AND SEDIMENTATION CONTROL ON A DAILY BASIS AND AFTER EACH
STORM EVENT. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK,
INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING,
REMULCHING, AND RENETTING, MUST BE PERFORMED IMMEDIATELY.
8. CONTACT INFORMATION FOR THE ON-SITE EXCAVATING CONTRACTORS,
HAULING CONTRACTORS, ETC., PERSON AND COMPANY, INCLUDING OFFICE,
MOBILE AND FAX PHONE NUMBERS, SHALL BE SUBMITTED TO THE OTTAWA
COUNTY DRAIN COMMISSIONER'S OFFICE PRIOR TO COMMENCEMENT OF
EARTH DISTURBANCE.
9. APPROVAL OF THE SOIL EROSION PERMIT DOES NOT AUTHORIZE ANY EARTH
DISTURBANCE ACTIVITY OFF-SITE WITHOUT WRITTEN PERMISSION FOR THAT
EARTH DISTURBANCE ACTIVITY FROM THE LANDOWNER.
SEQUENCE OF CONSTRUCTION NOTES:
NOTE: THIS TEXT IS NOT INTENDED TO DICTATE A METHODS AND MEANS TO THE
CONTRACTOR. IT IS THE SUGGESTED PROCESS FOR CONSTRUCTION ACTIVITIES IN
ORDER TO MINIMIZE THE AMOUNT OF SOIL EROSION TO THE SITE AND TO COMPLY
WITH THE REQUIREMENTS OF THE SOIL EROSION AND SEDIMENTATION CONTROL
PERMIT. AS PART OF THE PERMIT CONDITIONS, THE CONTRACTOR WILL BE HELD TO
THIS SCHEDULE AND TO THE SOIL EROSION PLAN. IF THE CONTRACTOR SEES FIT,
HE OR SHE MAY AMEND THIS SCHEDULE AND/OR PLAN, BUT A REVISED WRITTEN
SEQUENCING SCHEDULE AND/OR SOIL EROSION PLAN MUST BE SUBMITTED TO THE
DTMB FOR APPROVAL PRIOR TO DEVIATING TO THIS SCHEDULE AND/OR PLAN.
STEP 1: INSTALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL ITEMS AS
SHOWN ON PLANS.
STEP 2: ROUGH GRADING: STRIPPING AND STOCKPILING TOPSOIL. AREAS THAT WILL NOT
BE FURTHER DISTURBED DURING THE COURSE OF CONSTRUCTION SHALL BE
IMMEDIATELY SEEDED WITH MULCH. EXCESS MATERIAL SHALL EITHER BE
STOCKPILED IN THE AREAS SHOWN ON THE DRAWINGS, LEVELED ON SITE, OR
DISPOSED OF OFF-SITE IN A LEGAL MANNER. STOCKPILES SHALL BE TEMPORARILY
STABILIZED WITH SILT FENCE AND/OR TEMPORARY SEEDING.
STEP 3: INSTALL RIPRAP.
STEP 4: FILL EMBANKMENT UTILIZING IMPORTED MATERIAL TO PROPOSED CONTOURS AND
TYPICAL CROSS SECTION DETAIL.
STEP 5: PLACE TOPSOIL AND GRADE.
STEP 6: SEED DISTURBED AREAS.
STEP 7: FINAL GRADING: ALL REMAINING AREAS SHALL BE SEEDED AND MULCHED WITHIN 5
DAYS OF FINAL GRADING.
STEP 8: TEMPORARY SOIL EROSION CONTROL MEASURES ARE TO BE REMOVED WHEN
PERMANENT MEASURES ARE IN PLACE AND THE AREA STABILIZED.
UPON FINAL COMPLETION AND ACCEPTANCE BY THE OWNER, CONTINUED MAINTENANCE OF ALL
PERMANENT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE THE
RESPONSIBILITY OF THE OWNER. CONTRACTOR TO BECOME A CO-PERMITTEE FOR THE NPDES
PERMIT. CONTRACTOR SHALL COMPLY WITH ALL COMPONENTS OF THE PERMIT, INCLUDING
MAINTENANCE OF BMP'S.
DRAIN 75 BOTH SIDES OF DRAIN
BOYCE DRAIN BOTH SIDES OF DRAIN
HOUGHTON MUCK
SARANAC SILTY CLAY LOAMY SAND, 2 TO 6
PERCENT SLOPES
ZIEGENFUSS SILT LOAM, 0 TO 1 PERCENT
SLOPES
BM# NORTHING EASTING ELEVATION DESCRIPTION
1573 598206.02 13067070.34 650.78
SET NAIL IN NLY SIDE
TRIPLE 24" WILLOW TREE
1574 597673.34 13068538.09 650.13
SET 60D NAIL IN NLY
SIDE 14" MAPLE TREE
2884 600110.37 13076159.11 653.84
FOUND RR SPIKE IN CUT
OFF UTILITY POLE
REVISIONS
DESCRIPTION REV.
DRAWN
CHECKED
APPROVED
DRAWING NO.PROJECT NO.
and
These Drawings are the property of the State of Michigan and are not to be reused or reproduced without written permission from the State of Michigan.
DRAWING TITLE
Design
IDENTIFICATION NO.
BID DOCUMENTS
CONSTRUCTION
FINAL RECORD
DATE
Construction
Division
530 W ALLEGAN
LANSING, MI
ISSUED FOR
NO. DATE CK'D
www.bergmannpc.com office:
fax:
7050 West Saginaw Hwy.
Suite 200 Lansing, MI 48917
517.272.9835 517.272.9836
Know what's below.
before you dig.Call
R
PROJECT: DNR MAPLE RIVER
DIKE UPGRADES
STATE FILE NO.: XXX
STATE INDEX NO.: X
6/
/2
9:
A
M A
R C x
STATE OF MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET STATE FACILITIES
ADMINISTRATION
DESIGN AND
CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
J. ENSIGN, PE
A. NODARSE, PE
A. NODARSE, PE
J. ENSIGN, PE
QUANTITIES
C400
REVISIONS
DESCRIPTION REV.
DRAWN
CHECKED
APPROVED
DRAWING NO.PROJECT NO.
and
These Drawings are the property of the State of Michigan and are not to be reused or reproduced without written permission from the State of Michigan.
DRAWING TITLE
Design
IDENTIFICATION NO.
BID DOCUMENTS
CONSTRUCTION
FINAL RECORD
DATE
Construction
Division
530 W ALLEGAN
LANSING, MI
ISSUED FOR
NO. DATE CK'D
www.bergmannpc.com office:
fax:
7050 West Saginaw Hwy.
Suite 200 Lansing, MI 48917
517.272.9835 517.272.9836
Know what's below.
before you dig.Call
R
PROJECT: DNR MAPLE RIVER
DIKE UPGRADES
STATE FILE NO.: XXX
STATE INDEX NO.: X
6/
/2
9:
A
M A
R C x
STATE OF MICHIGAN
DEPARTMENT OF
TECHNOLOGY,
MANAGEMENT AND
BUDGET STATE FACILITIES
ADMINISTRATION
DESIGN AND
CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
J. ENSIGN, PE
A. NODARSE, PE
A. NODARSE, PE
J. ENSIGN, PE
QUANTITIES
C400500
BORROW SITE
AA
B
B
1:10 1:10
100'
70'
1.5'
SECTION A:A
SECTION B:B
NOTES:
1. BORROW SITE POND SHALL BE CONSTRUCTED WITH 1:10 SIDE SLOPES TO A DEPTH OF 1.5' WITH SEVERAL 2.0' DEEP POOLS.
2. COORDINATE FINAL SHAPE IN THE FIELD WITH ENGINEER AND OWNER.