About this file
This document contains details and drawings for a 2024 roofing project for the Hillsdale Community Schools in Hillsdale, Michigan. The project involves roof repairs and replacements at the Hillsdale High School and Davis Middle School. Key work includes making necessary roof repairs, cleaning and preparing roofing surfaces, applying base and top coats, installing recovery boards, SBS modified base and cap sheets, and coating the entire roofing surface. The project scope, square footage, and details for each building are provided.
The document includes thermal imaging results, indicating 1,000 (+/-) SF of wet insulation on the roofs. Detailed drawings and specifications are provided for various roof components and penetrations. Contractors must verify existing roof decks and apply the appropriate details. The project is expected to be bid and awarded in early 2024, but no specific dates are provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HCS - 2024 Roofing - Addendum #1.pdf | ||
| HCS - Project Manual - 2024 Roofing - 1.12.24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H I
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
COVER
SHEET
A1
HILLSDALE COMMUNITY SCHOOLSSUMMARY OF WORK LOCATION MAP
NOTES
SITE MAP
DRAWING INDEX
BUILDING OVERVIEW
HILLSDALE HIGH SCHOOL:
1.) MAKE ANY AND ALL NECESSARY ROOF REPAIRS.
2.) ALLOW REPAIRS TO CURE PROPERLY
3.) CLEAN AND PREP ROOFING SURFACE
4.) APPLY LIQUITEC BASE COAT AT A RATE OF 3 GAL./ SQ. AND EMBED POLYESTER SCRIM
5.) APPLY LIQUITEC TOP COAT AT A RATE OF 2 GAL./ SQ.
DAVIS MIDDLE SCHOOL:
1.) WET VAC THE EXISTING GRAVEL FROM THE ROOFING SURFACE.
2.) MAKE ANY AND ALL NECESSARY REPAIRS.
3.) ADHERE ½” DENS DECK PRIMED RECOVERY BOARD OVER EXISTING ROOFING SUBSTRATE IN HIGH RISE FOAM
ADHESIVE
4.) INSTALL CANTS / SADDLES AT THE PENETRATION TRANSISTIONS.
5.) INSTALL SBS MODIFIED BASE SHEET AND SBS MINERAL MODIFIED CAP SHEET IN THE FIELD OF THE ROOF IN HOT
ASPHALT
6.) INSTALL SBS MODIFIED BASE SHEET AND SBS MINERAL MODIFIED CAP SHEET ON ALL VERTICAL FLASHINGS IN
HOT ASPHALT
7.) PROPERLY TERMINATE ALL FLASHINGS AND INSTALL PROPER EDGE METAL TREATMENTS
8.) ALL VERTICAL SEAMS ARE TO BE 3-COURSED IN SILVER-FLASH MASTIC AND GARMESH
9.) ENTIRE ROOFING SURFACE IS TO BE COATED WITH GARLA-BRITE AT A RATE OF 1 GAL./ SQ.
DAVIS MIDDLE SCHOOL
A1 – COVER PAGE
A2 – ROOF PLAN – DAVIS
A2.1 – ROOF PLAN – HIGH SCHOOL
A3 – DRAWING – DAVIS
A3.1 – DRAWING – HIGH SCHOOL
T1 – THERMALS – DAVIS
T2 – THERMALS – HIGH SCHOOL
D1 – DETAILS – DAVIS
D2 – DETAILS – DAVIS
D3 – DETAILS – HIGH SCHOOL
REPORT GENERATED BY:
THE GARLAND COMPANY
ALL COMMENTS, RECOMMENDATIONS, AND
ANALYSIS ARE THE OPINIONS OF THE
INDIVIDUALS COMPLETING THE INSPECTION.
THEY DO NOT CONSTITUTE THE OFFICIAL
POSITION OF THE GARLAND COMPANY. THIS
REPORT WAS NOT GENERATED BY AN ARCHITECT,
ENGINEER, OR CONSULTANT AND DOES NOT HAVE
INDEPENDENT TESTING DATA.
THIS REPORT DOES NOT MAKE ANY CLAIM ON
WHAT A MANUFACTURER CAN, OR WILL,
DETERMINE TO BE PROPER OR IMPROPER DETAILS
OR METHODS. NOR CAN IT MAKE A
DETERMINATION ON WHAT A CONTRACTOR OR
MANUFACTURER WILL, OR WILL NOT, WARRANTY.
HILLSDALE HIGH SCHOOL
DAVIS MIDDLE SCHOOL
30 N WEST ST
HILLSDALE, MI 49242
HILLSDALE HIGH SCHOOL
30 S NORWOOD AVE
HILLSDALE, MI 49242
DAVIS MIDDLE SCHOOL
HILLSDALE HIGH SCHOOL
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
ROOF
PLAN
A2
DAVIS MIDDLE SCHOOL
2024 ROOFING
NOT INCLUDED
SECTION SQUARE FOOTAGE:
SECTION #1: BUR 8,600 SF
SECTION #2: BUR 6,800 SF
SECTION #3: BUR 7,800 SF
SECTION #4: BUR 3,200 SF
SECTION #5: BALLASTED EPDM 120 SF
SECTION #6: BALLASTED EPDM 400 SF
SECTION #7: SINGLE-PLY 850 SF
SECTION #8: MOD BIT 25,200 SF
SECTION #9: SINGLE-PLY 250 SF
SECTION #10: SINGLE-PLY 250 SF
SECTION #11: BUR 500 SF
SECTION #12: MOD BIT 4,000 SF
TOTAL: 57,970 SF
SECTION SQUARE FOOTAGE:
SECTION #1: BUR 8,600 SF
SECTION #2: BUR 6,800 SF
SECTION #3: BUR 7,800 SF
SECTION #4: BUR 3,200 SF
SECTION #5: BALLASTED EPDM 120 SF
SECTION #6: BALLASTED EPDM 400 SF
SECTION #7: SINGLE-PLY 850 SF
SECTION #8: MOD BIT 25,200 SF
SECTION #9: SINGLE-PLY 250 SF
SECTION #10: SINGLE-PLY 250 SF
SECTION #11: BUR 500 SF
SECTION #12: MOD BIT 4,000 SF
TOTAL: 57,970 SF
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
ROOF
PLAN
A2.1
HILLSDALE HIGH SCHOOL
2024 ROOFING
NOT INCLUDED
SECTION SQUARE FOOTAGE:
SECTION #1: BUR 3,300 SF
SECTION #2: BUR 3,900 SF
SECTION #3: BUR 3,000 SF
SECTION #4: SINGLE-PLY 18,000 SF
SECTION #5: BUR 5,400 SF
SECTION #6: BUR 8,700 SF
SECTION #7: SINGLE-PLY 5,200 SF
SECTION #8: MOD BIT 9,400 SF
SECTION #9: SINGLE-PLY 7,900 SF
SECTION #10: SINGLE-PLY 4,600 SF
SECTION #11: SINGLE-PLY 4,400 SF
SECTION #12: MOD BIT 9,700 SF
SECTION #13: BUR 8,300 SF
SECTION #15: BUR 14,000 SF
SECTION #16: BUR 1,000 SF
SECTION #17: BUR 8,900 SF
SECTION #18: SINGLE-PLY 9,600 SF
TOTAL: 125,300 SF
SECTION SQUARE FOOTAGE:
SECTION #1: BUR 3,300 SF
SECTION #2: BUR 3,900 SF
SECTION #3: BUR 3,000 SF
SECTION #4: SINGLE-PLY 18,000 SF
SECTION #5: BUR 5,400 SF
SECTION #6: BUR 8,700 SF
SECTION #7: SINGLE-PLY 5,200 SF
SECTION #8: MOD BIT 9,400 SF
SECTION #9: SINGLE-PLY 7,900 SF
SECTION #10: SINGLE-PLY 4,600 SF
SECTION #11: SINGLE-PLY 4,400 SF
SECTION #12: MOD BIT 9,700 SF
SECTION #13: BUR 8,300 SF
SECTION #15: BUR 14,000 SF
SECTION #16: BUR 1,000 SF
SECTION #17: BUR 8,900 SF
SECTION #18: SINGLE-PLY 9,600 SF
TOTAL: 125,300 SF
8 9
10 11
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
ROOF
DRAWING
A3
ROOF DRAWINGS:
DAVIS MIDDLE SCHOOL
DRAIN
ROUND CURB PENETRATION
EXHAUST
LADDER
LEGEND
PIPE / PENETRATION
CURB
CHIMNEY
TAPERED INSULATION
HVAC UNITRTU
DRAIN
ROUND CURB PENETRATION
EXHAUST
LADDER
LEGEND
PIPE / PENETRATION
CURB
CHIMNEY
TAPERED INSULATION
HVAC UNITRTU
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D2
D2
D2
D2
D2
D2
D2
D2
D2
D2
D2
D2
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
ROOF
DRAWING
A3.1
ROOF DRAWINGS:
HILLSDALE HIGH SCHOOL
DRAIN
ROUND CURB PENETRATION
EXHAUST
LADDER
LEGEND
PIPE / PENETRATION
CURB
CHIMNEY
TAPERED INSULATION
HVAC UNITRTU
DRAIN
ROUND CURB PENETRATION
EXHAUST
LADDER
LEGEND
PIPE / PENETRATION
CURB
CHIMNEY
TAPERED INSULATION
HVAC UNITRTU
D3
D3
D3
D3
D3
D3
D2
D2
D3
D3
D3
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
THERMAL
IMAGING
T1
THERMAL SCAN RESULTS:
2024 ROOFING
THERMAL SCAN INFORMATION:
SECTION: WET INSULATION:
TOTAL: 0 SF
THERMAL SCAN INFORMATION:
SECTION: WET INSULATION:
TOTAL: 0 SF
PONDING WATER
WET INSULATION
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
THERMAL
IMAGING
T1
THERMAL SCAN RESULTS:
2024 ROOFING
THERMAL SCAN INFORMATION:
SECTION: WET INSULATION:
TOTAL: 1,000 (+/-) SF
THERMAL SCAN INFORMATION:
SECTION: WET INSULATION:
TOTAL: 1,000 (+/-) SF
PONDING WATER
WET INSULATION
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
MIDDLE
SCHOOL
DETAILS
D1
N.T.S.D1
1 TYPICAL MINERAL FINISH
N.T.S.D1
2 EQUIPMENT SUPPORT
N.T.S.D1
3 EXHAUST FAN
N.T.S.D1
4 EXPANSION JOINT
N.T.S.D1
5 HATCH
N.T.S.D1
6 HEAT STACK
N.T.S.D1
7 METAL EDGE DETAIL
1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.
1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.
Detail Requirements
2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.
1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.
Detail Requirements
2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.
N.T.S.D1
8 PASSIVE AIR VENT
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
MIDDLE
SCHOOL
DETAILS
D2
N.T.S.D2
1 PITCH POCKET
N.T.S.D2
2 PLUMBING STACK
N.T.S.D2
3 ROOF DRAIN
N.T.S.D2
4 SCUPPER
N.T.S.D2
5 SKYLIGHT
N.T.S.D2
6 SURFACE MOUNTED COUNTERFLASHING
N.T.S.D2
7 THROUGHWALL COUNTERFLASHING
1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.
1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.
Detail Requirements
2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.
1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.
Detail Requirements
2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.
N.T.S.D2
8 CURB
L L
S D
A L
E C
O M
M U
N I
T Y S
C H
O O
L S
S
N O
R W
O O
D S
T
H I
L L
S D
A L
E M
I
SHEET NO.
SHEET TITLE:
APPROVED FOR
BIDDING
HIGH
SCHOOL
DETAILS
D3
N.T.S.D1
1 TYPICAL FIELD DETAIL
N.T.S.D1
2 PERIMETER EDGE DETAIL
N.T.S.D1
3 CURB DETAIL
N.T.S.D1
4 PIPE PENETRATION DETAIL
1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.
1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.
Detail Requirements
2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.
1) Details shown are representative of finished details. Contractors shall take into account existing insulation, new insulation, and the new roof system. Wood blocking shall be added to achieve the minimum flashing heights shown.
Detail Requirements
2) Deck types vary between roof areas and buildings. Contractor must verify roof decks and apply details accordingly.
N.T.S.D1
5 SCUPPER
N.T.S.D1
5 SCUPPER BOX TO DOWN SPOUT
| 2024 HIllsdale Details and Drawings - 01.03.2024.vsdx |
| A1 |
| A2 |
| A2.1 |
| A3 |
| A3.1 |
| T1 |
| T2 |
| D1 |
| D2 |
| D3 |
File details come from the government source that posted it. Updated .